6923G520R0100A00004.pdf

PDF 144 KB Posted

Attached to
Facilities Master Plan
Solicitation number
6923G520R0100
Issued by

View the file

Other files

File Type Posted
6923G520R0100A00006.pdf PDF
6923G520R0100A00005.pdf PDF
6923G520R0100A00003.pdf PDF
6923G520R0100A00002.pdf PDF
SCA_Wage Determination.txt TXT text file
6923G520R0100A00001.pdf PDF
SLS_326_296siteplan(1) (2).pdf PDF
SLS_340_77base1(1) (1).pdf PDF
Facilities Master Plan_RFP (FINAL) (002).pdf PDF
SLS340_86(1).pdf PDF
SLS_326_297SITEPLAN(1) (1).pdf PDF
52.212-3 Offeror Representations and Certifications-Commercial Items.docx DOCX document
ADBLDG_siteplan (1).pdf PDF
SLS_152_2Snellsnugharbor(1) (1).pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE PAGE OF PAGES

1 2

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

6923G520R0100

9B. DATED (SEE ITEM 11)

05/04/2021

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)2. AMENDMENT/MODIFICATION NUMBER

6923G520R0100A00004 07/12/2021

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

GLS Contracting Office 180 Andrews Street Massena, NY, 13662, US

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

This amendment serves to provide the answers to questions asked by interested contractors.

(Continued on Page 2)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

6923G520R0100A00004

Questions and Answers Question: Are there any asbestos surveys of existing facilities?

Answer: There has been asbestos sampling completed in multiple facilities and locations throughout in areas with suspected asbestos containing material (ACM). An inventory has been keep of the status of these locations and condition of ACM if it has been left in place. This information can be given to the awarded offeror.

Question: Are the major utilities feeding facilities and the highway tunnel under the Eisenhower Lock to be included in the Facilities Master Plan?

Answer: These should be excluded from the Facilities Master Plan. Paragraph II.2.a) shall be reworded as follows:

Eisenhower and Snell Locks: Upstream and downstream control houses, Hands-Free Mooring (HFM) Buildings, Center Buildings, the Eisenhower Lock Vessel Traffic Control (VTC) building Compressor/Electrical Building, miscellaneous small outbuildings, associated roadways and parking areas. Specifically to be excluded from consideration in the Facilities Master Plan are the concrete lock structures, the steel hydraulic structures and associated operating machinery (lock gates, valves, etc.), the Visitors’ Center Building, the marine floating plant, highway tunnel under the lock, and utilities feeding facilities.