6913G625Q300043 Instructions to Offers - Evaluation Criteria.pdf

PDF 141 KB Posted

Attached to
Soil Boring Advancement Support - Carlisle, PA
Solicitation number
6913G625Q300043
Issued by

About this file

This is a Request for Quote (RFQ) for a Phase II Environmental Site Assessment at the Frog, Switch & Manufacturing Company site in Carlisle, PA, issued by the U.S. Department of Transportation's Volpe National Transportation Systems Center. The solicitation seeks a PA certified/licensed driller to conduct river/water drilling and sediment sampling, with a focus on technical capabilities, experience, and past performance.

Key requirements include submitting a two-page proposal demonstrating river/water drilling experience, providing proof of certification, a resume of personnel conducting the work, and at least two relevant references from similar projects completed within the last two years. Quotes are due by 3:00 PM EST on July 29, 2025, and will be evaluated in order of priority: 1) experience, past performance, and technical proposal, 2) schedule, and 3) price. The government anticipates awarding a firm fixed-price purchase order with a performance period from award date to March 28, 2027, with the work to be completed as soon as possible after contract award.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFQ No. 6913G625Q300043

U.S. Department of Transportation

Volpe National Transportation Systems Center Phase II Environmental Site Assessment at the Frog, Switch & Manufacturing Company (the

Site) located at 600 East High Street, Carlisle, PA : Drilling and Related Activities Instructions to Offerors and Evaluation Criteria

1. INSTRUCTIONS TO OFFERORS - SUBMISSION OF QUOTES:

Vendors are required to meet all solicitation requirements in addition to those identified as evaluation factors.

Failure to meet a requirement may result in a vendor submission being ineligible for award.

Questions shall be submitted by 10:00 PM EST on July 25, 2025.

Quotes shall be submitted by 3:00 PM EST on July 29, 2025.

Questions and quotes shall be submitted to Karen Marino at karen.marino@dot.gov

In addition to price, the schedule and technical factors below will be used to determine best value. Technical Factors and schedule are more important than price:

2. PRICE

The Government anticipates that a purchase order will be issued as a result of this Request for Quote. The vendor shall propose sufficient detail to meet the requirements of the Statement of Work (SOW). The Government will evaluate the past performance record of the proposed vendor for this requirement. The vendor shall submit relevant work experience in the following areas including past performance and relevance to the current SOW.

3. Evaluation of Offers - Evaluation and Basis of Award:

This resulting order will be awarded to the vendor that can provide the services that represent the best value to the Government. Best Value includes possessing the required certifications to complete the requirement. The Government will make award to the responsible vendor whose submission conforms with the solicitation terms and conditions and represents the “Best Value” to the Government. Therefore, award may be made to other than the lowest priced offer.

Comparative Evaluation: The Government may perform a comparative evaluation (comparing offers to each other) to select the contractor that is best suited and provides the best value, considering the evaluation factors in this solicitation

The Contractor’s written proposal of no more than two (2) pages in length (excluding resumes/licenses/experience) shall include evidence of the following qualifications:

RIVER/WATER DRILLING and SEDIMENT SAMPLING EXPERIENCE, PAST PERFORMANCE and TECHNICAL PROPOSAL (Technical Factor): The Contractor is required to be a PA certified/licensed driller with previous drilling and test pit sampling experience. The Contractor shall provide proof of the certification/license and a resume of the individual(s) that will be conducting the work. They should provide a brief write up of how they plan to perform the tasks in the SOW, how many people they plan to have on-site for each task and what equipment they plan to use to perform the work.

The Contractor shall provide at a minimum two relevant references/past performance reports for similar projects conducted within the last two years. If the Contractor has performed work in the past for the Federal Government, that performance will be considered when determining the capability to perform the work.

SCHEDULE: The Contractor shall provide a schedule for their work and submit it with their proposal. The government would like this work to be completed as soon as possible after contract award.

The award to the Contractor shall be evaluated in terms of and in order of priority:

1. Experience, past performance and technical proposal

2. Schedule

3. Price

File details come from the government source that posted it. Updated .