Heavy-Duty Railway Flatcars (Design/Engineering and Manufacture)
Solicitation number
6913G623Q300061
Issued by

About this file

This document is an amendment to solicitation number 6913G623Q300061 from the Department of Transportation for the purchase of heavy-duty railway flatcars. The amendment provides answers to technical questions from offerors. For flatcars requiring more than six axles, trucks may be designed for 55,000 pounds per axle. Manufacturing of the flatcars must take place in the United States to the maximum extent possible in order to avoid a waiver to the Buy American Act, which would delay the procurement. The award is for the purchase of the flatcar(s) and the Government requires ownership of the drawings.

View the file

Other files

File Type Posted
6913G623Q300061 Amendment 02.pdf PDF
6913G623Q300061 Amendment 01.pdf PDF
SF 1449 - 6913G623Q300061.pdf PDF
Army HD Flatcar SOW July 26_2023.docx DOCX document
Solicitation 6913G623Q300061.pdf PDF
Drawing - AIM Bulkhead Nut Plates.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

6913G623Q300061 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

6913G6

Cambridge MA 02142-1001 55 Broadway

VOLPE NAT'L TRANSPORTATION SYS CNTR

V335224410/25/2023

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.

Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers x is extended,

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

09/20/2023

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment is to:

1. Provide answers to offeror’s technical questions. See Continuation Sheet.

All other terms and conditions remain unchanged.

The response due date remains unchanged and is still 5:00PM ET, October 27, 2023.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Patricia Barnett

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable x

6913G623Q300061 Amendment 03 Continuation Sheet

Please see below questions submitted, with Government responses in bold.

1. Just to add some context for your technician team around the possibility of the DOT accepting alternate design loads, in the Flatcar bid it is read:

• Section 1 GENERAL: "The gross load on rail shall not exceed 65,750 pounds per axle."

• Section 2 160-TON, HEAVY-DUTY CHAIN-TIEDOWN FLATCAR: 2.1

DIMENSIONS: Paragraph 10: "Gross Rail Load: Not to exceed 65,750 pounds per axle when carrying two 80-ton heavy tracked vehicles (i.e., M1 Abrams tanks).

• Section 3 GENERAL SPECIFICATION: 3.1 Trucks: Paragraph 1: "The trucks and truck components shall be suitable for a gross rail load (GRL) of 65,750 pounds per axle"

• Section 3 GENERAL SPECIFICATION: 3.1 Trucks: Paragraph 6: "Center bowl diameter to be sized for the greater of 394,500 pounds gross rail load or total loaded railcar weight (at maximum load) as determined by design."

The 3 axle trucks have this axle load of 65750 per axle. The suitable trucks for "more than 6" axles are not designed for 65750 per axle, but less at 55000 per axle. The alternative next size up is designed for 71500 per axle, however this bowl design is for 286,000 pound GRL. The only truck that meets the above specification is the 3 axle truck that is presently represented.

The combination of maximum axle load and the center bowl design specified in Section 3 do not allow for usage of alternate truck designs.

For more than six axles per car, trucks may be designed for 55,000 lbs. per axle.

2. Specifically, where do the Railway Flatcars need to be made ? Where does manufacturing need to take place?

The Government prefers US-made components and manufacturing but understands if it’s more cost effective to manufacture outside the US. However, since it requires a waiver to the Buy American Act, it is the Government’s strong preference to not get a waiver, due to the delay to the procurement timeline.

3. Is this award for a purchase or lease?

The award is for the purchase of the flatcar(s). Additionally, the Government requires ownership of the drawings.