SOW_6913G619Q300010.pdf
PDF 282 KB Posted
- Solicitation number
- 6913G618Q300010
About this file
Statement of Work
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_0003_6913G619Q300010.pdf | ||
| 6913G619Q300010_Amendment_0002.pdf | ||
| Amendment_0001_6913G619Q300010.pdf | ||
| Amendment_0001_Pricing_Sheets.xlsx | XLSX spreadsheet | |
| 52.212-3_Offeror_Representation_and_Certification.pdf | ||
| Instructions,_Conditions_and_Notice_to_Offeror_6913G619Q300010.pdf | ||
| Pricing_Sheets_6913G619Q300010.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
6913G619Q300010
1 | P a g e
Department of Transportation Volpe National Transportation Systems Center Laboratory Material and Component Level Tests to Obtain General and Mechanical Properties of
Fiber-Reinforced Plastic Specimens from Cargo Tank Motor Vehicle Manufacturers Statement of Work
Background
The Volpe National Transportation Systems Center (Volpe) is currently conducting a study to establish experimental testing procedures and develop a finite element analysis (FEA) framework that can be used to evaluate the performance and determine the specifications of cargo tank motor vehicles (CTMV) made with fiber-reinforced plastic (FRP) materials. Because the Hazardous Materials Regulations (HMR) do not address the specific performance requirements for FRP CTMVs, the U.S. Department of Transportation’s Pipeline and Hazardous Materials Safety Administration (PHMSA) has been issuing special permits with renewable terms for commercial companies to manufacture, sell and use FRP cargo tanks for highway HM transportation. With increasing omnipresence and acceptance of the FRP CTMVs as an industrial standard for transporting corrosive HM, there have been calls to include FRP CTMV performance requirements in the HMR, so as to not only maximize the FRP CTMVs’ safety potential but also relieve both the PHMSA and the industrial stakeholders of the burden of the special permit application, authorization and renewal processes. The ultimate goal of the Volpe study is to provide performance data and technical parameters for PHMSA’s consideration in possible rulemaking on FRP CTMVs. The first phase of this study will include obtaining FRP specimens from commercial FRP cargo tank packaging manufacturers, conducting material and component level testing on the FRP specimens, and developing FE model parameters using the material and component level test data. A second phase of the study will include developing full scale FE models of FRP CTMVs and conducting numerical simulations to evaluate their performance.
Volpe has engaged in talks with FRP CTMV manufacturers to obtain FRP, core and/or sandwich specimens that are consistent in material constituents and composite properties with those employed in the manufacture of the FRP cargo tanks. Specified hereunder, this Statement of Work solicits laboratory testing services to obtain general and mechanical properties pertaining to these specimens.
Scope of Work
Upon reviewing the American Society for Testing and Materials’ (ASTM) FRP test standards, American Society of Mechanical Engineers’ (ASME) Boiler and Pressure Vessel Code (BPVC) and HMR Part 178, Subpart J, among other documents, Volpe has defined the requirements for the material and component level tests to be conducted on FRP materials, core materials and/or sandwich structures used in manufacturing the FRP CTMVs. FRP cargo tank structures are typically two elliptical heads connected by a cylindrical shell. There are two common constructions of the tank walls: a single FRP wall structure, or two FRP face materials sandwiching a core material. For a single wall structure, only the FRP wall material will be obtained and tested. For a sandwich wall structure, three material/structure types will be obtained and tested: FRP material, core material and sandwich structure. The core materials are expected to be commercially purchased and supplied by the manufacturers. The FRP and sandwich specimens are expected to be flat panels manufactured using potentially one of a variety of methods, such as a hand layup, vacuum infusion, autoclave, filament winding, or similar method depending on the specific process employed at the FRP cargo tank manufacturing plant. For the purpose of comparing flat versus curved
2 | P a g e specimen behaviours, curved specimens manufactured and/or cut out from actual vessels may be provided for a small set of selected tests to be conducted on these specimens.
While the complete test matrix encompasses tests in four categories to obtain general, mechanical, thermal and fire properties, this Statement of Work solicits engineering testing services to obtain general and mechanical properties of the above specimens. The general properties include constituent content, density, thickness, etc. The mechanical properties include anisotropic elasticity, anisotropic strengths, impact strength and toughness, fatigue performance, etc. The material parameters obtained in these tests are crucial for the FEA and performance evaluation of full scale FRP CTMVs, to be conducted in Phase II of the Volpe study.
The test matrix is defined solely in terms of ASTM test standards. Table 1 summarizes the expected type and number of materials/structures to be obtained from the manufacturers and tested. Table 2 shows the ASTM standard tests referenced in this Statement of Work, along with a list of main properties to be obtained in each test, required sampling/repeat test numbers and test parameters expected to be provided by Volpe.
Table 1. Materials to be Tested.
Material Type
No. of Materials to be Tested
No.
Required
Maximum No. of
Optional
Total Maximum
No.
FRP Specimens (flat) 2 3 5 Coupons to be cut from curved FRP specimens 0 8 8 Core Materials 1 2 3 Sandwich Structures 1 2 3
The FRPs are expected to include both glass and carbon FRPs. The core materials are expected to include balsa wood, polypropylene (PP) honeycomb and polyethylene terephthalate (PET) foam. In addition to the FRP materials from flat specimens (with flatness being required by most of the referenced ASTM test standards), core materials and sandwich structures, a small number of curved FRP specimens are expected to be provided by the manufacturers. The curved FRP specimens are expected to have a curvature in the hoop direction. The contractor shall conduct only the ASTM D3171 content test, the ASTM D3039/D3039M tensile test in the axial direction only (modified to accommodate the curvature in the hoop direction, see Test Reference No. 3B in Table 2) and ASTM D790 (modified to accommodate the curvature in the hoop direction, see Test Reference No. 6B in Table 2) on the curved specimens. Some of the curved specimens are expected to be supplied as sandwich structures, in which case, prior to cutting out the test coupons from these specimens, the contractor shall separate the FRPs from the cores in the sandwich structures and clean up the FRP specimens for further test preparation.
Table 1 specifies the “Required” numbers of materials for each material type to be obtained and tested in this Statement of Work. Depending on the availability of the materials to be supplied by the manufacturers, additional optional tests may be ordered by Volpe not to exceed the numbers specified under “Maximum Optional” numbers of materials. The total numbers of materials to be tested are not expected to exceed the “Maximum Total” numbers of materials in Table 1.
3 | P a g e
Table 2. ASTM Test Standards and Main Properties to be Obtained.
Test Ref.
No.
Test Standard Properties Material to be Tested
Sampling Requirements
(per test standard requirements)
Test Parameters Expected to be Provided by Volpe
1A ASTM D3171 Constituent Content of Composite Materials Fiber, Resin, Void Content FRP Specimens (flat) Min. 3
Identification of required procedure from alternatives included in the test standard
1B ASTM D3171 Constituent Content of Composite Materials Fiber, Resin, Void Content Coupons to be cut from curved FRP specimens
Min. 3 Identification of required procedure from alternatives included in the test standard
2 ASTM D2583 Indentation Hardness of Rigid Plastics by Means of a Barcol Impressor Indentation Hardness FRP Specimens
(flat) Min. 10 indentations None expected
3A ASTM D3039/
D3039M
Tensile Properties of Polymer Matrix Composite Materials
Tensile Strength, Tensile Modulus, Poisson’s Ratio, Stress-Strain Response
FRP Specimens (flat) 5 None expected
3B ASTM D3039/
D3039M
Tensile Properties of Polymer Matrix Composite Materials
Tensile Strength, Tensile Modulus, Poisson’s Ratio, Stress-Strain Response
Coupons to be cut from curved FRP specimens
5 None expected
4 ASTM D5379/
D5379M
Shear Properties of Composite Materials by the V-Notched Beam Method
Shear Strength, Shear Modulus, Stress-Strain Response
FRP Specimens (flat) 5 None expected
5 ASTM D7291/
D7291M
Through-Thickness “Flatwise” Tensile Strength and Elastic Modulus of a Fiber- Reinforced Polymer Matrix Composite Material
Flatwise Tensile Strength, Flatwise Modulus
FRP Specimens (flat) 5 None expected
6A ASTM D790
Flexural Properties of Unreinforced and Reinforced Plastics and Electrical Insulating Materials
Flexural Strength, Flexural Modulus, Flexural Stress-Strain Response
FRP Specimens (flat) 5 Desired span to depth ratio
6B ASTM D790
Flexural Properties of Unreinforced and Reinforced Plastics and Electrical Insulating Materials
Flexural Strength, Flexural Modulus, Flexural Stress-Strain Response
Coupons to be cut from curved FRP specimens
5 Desired span to depth ratio
7 ASTM D6264 /
D6264M
Measuring the Damage Resistance of a Fiber- Reinforced Polymer-Matrix Composite to a Concentrated Quasi-Static Indentation Force
Static Indentation Damage Resistance (Force-Indenter Displacement Response, Dent Depth, Damage Characteristics)
FRP Specimens (flat) 5
Criteria to end test (in contact force, displacement or damage state) as needed
4 | P a g e
8 ASTM D7136/
D7136M
Measuring the Damage Resistance of a Fiber- Reinforced Polymer Matrix Composite to a Drop-Weight Impact Event
Drop-Weight Impact Damage Resistance (Indenter Contact Force and Velocity versus Time, Dent Depth, Damage Characteristics)
FRP Specimens (flat) 5 None expected
9 ASTM D3479/
D3479M
Tension-Tension Fatigue of Polymer Matrix Composite Materials
Tension-Tension Stress-Cycles (S-N) Data
FRP Specimens (flat) 12
Load ratio, load frequency (3-5 Hz), expected number of cycles (up to 200K)
10 ASTM C394/
C394M Shear Fatigue of Sandwich Core Materials Core Shear Stress Cycles (S-N)
Data Core Materials Min. 3 x 3 load levels
Load ratio, load frequency (3-5 Hz), expected number of cycles (up to 100K)
11 ASTM C393/
C393M
Core Shear Properties of Sandwich Constructions by Beam Flexure
Core Shear Strength, Core Shear Modulus
Sandwich Structures 5 3- or 4-point loading configuration
12 ASTM D7766/
D7766M
Damage Resistance Testing of Sandwich Constructions
Static Indentation Damage Resistance, Drop-Weight Impact Damage Resistance
Sandwich Structures
5 x 2 test conditions
Identification of required procedure from alternatives included in the test standard
13 ASTM D6641/
D6641M
Compressive Properties of Polymer Matrix Composite Materials Using a Combined Loading Compression (CLC) Test Fixture
Compressive Strength, Compressive Modulus, Poisson’s Ratio, Stress-Strain Response
FRP Specimens (flat) 5 None expected
14 ASTM C271/
C271M Density of Sandwich Core Materials Core Density Core Materials 5 None expected
15 ASTM C366/
C366M Measurement of Thickness of Sandwich Cores Core Thickness Core Materials 5 None expected
16A ASTM C297/
C297M
Flatwise Tensile Strength of Sandwich Constructions Core Flatwise Tensile Strength Core Materials 5 None expected
16B ASTM C297/
C297M
Flatwise Tensile Strength of Sandwich Constructions
Sandwich Flatwise Tensile Strength
Sandwich Structures 5 None expected
17 ASTM C365/
C365M
Flatwise Compressive Properties of Sandwich Cores
Core Flatwise Compressive Strength, Core Flatwise Compressive Modulus
Core Materials 5 None expected
18 ASTM C273/
C273M Shear Properties of Sandwich Core Materials Core Shear Strength, Core Shear Modulus Core Materials 5 None expected
19 ASTM C364/
C364M
Edgewise Compressive Strength of Sandwich Constructions
Sandwich Compressive Strength (Edgewise)
Sandwich Structures 5 None expected
5 | P a g e
Typical in-plane dimensions of the specimen panels are expected to be 18x18 inch2 and 24x24 inch2 but can vary by manufacturer. The specimen panels will have various thicknesses conforming to manufacturer specifications. Typical nominal thicknesses are expected to include 0.25, 0.3125, 0.375 and
0.5 inches for the FRPs, 0.5 and 0.75 inches for the cores and up to 1.25 inches for the sandwich structures. However, deviations from the nominal thicknesses are expected. Owing to variations in the manufacturing process, some FRP specimens are expected to be more than 0.6 inches thick and some sandwich structures are expected to be up to 1.5 inches thick. In cases that the specimen thickness exceeds the recommended range specified in a specific test standard, the contractor shall consult with Volpe and if feasible, propose modifications to the tests to accommodate the thicker specimens. One FRP specimen panel from each manufacturer is expected to have a nominal thickness of 0.75 inches, as required by the ASTM D5379/D5379M shear test standard (Test Reference No. 4) for the tests to be conducted in the two thickness related directions. All specimen panels are expected to meet the flatness requirements of specific ASTM test standards, with the exception of Test Reference Nos. 1B, 3B and 6B as discussed above.
The scope of work includes: receive, examine and document the specimen panels shipped from the manufacturers or Volpe; cut out the test coupons from the specimen panels and prepare/treat/condition them according to ASTM standard test specifications and any specific instructions provided in this Statement of Work; conduct the tests in the required repeat numbers; provide QA/QC and accuracy verification of the test data; conduct simple statistical analyses and report test data according to the test standard and/or specific Volpe instructions (as defined in this Statement of Work), including providing pre- and post-test photographic documentations of the specimens; ship unused and lightly used specimen panels back to Volpe, and ship back or archive post-test coupons/specimens; and conduct regular project progress meetings and report test data to Volpe as soon as they are obtained and QA/QC verified.
Requirements
The contractor shall have expertise in the following areas:
• Professionally accredited testing capabilities of the ASTM standard tests listed in Table 1;
• In-house facility and equipment to conduct the testing work;
• Prior experiences with conducting the ASTM standard tests listed in Table 1;
• Ability and experience with advanced edge-cutting techniques in test coupon preparation;
• Ability to statistically analyze the test data and provide reports that meet ASTM standard and
Volpe requirements.
The contractor shall provide adequate labor to enable timely completion of the project.
The contractor shall seek Volpe approval to substitute an equivalent test for any test in Table 1 with reasonable justifications such as reduced cost, more accurate result, more comprehensive test data, etc.
Period of Performance
Period of performance is from date of award through June 30, 2019.
Place of Performance
The work shall be done at the contractor’s location.
6 | P a g e
Work Requirements
Definition of Test and Report Procedures. For each test to be conducted on a required material or an optional material (if the option is elected to be exercised), the contractor shall conduct four stages of the test and report procedures defined as follows.
Test coupon preparation. The contractor shall cut out the test coupons from the specimen panels and prepare/treat/condition the coupons according to the ASTM standard test specifications and any specific instructions provided in this Statement of Work. Prior to cutting the test coupons from the specimen panels, the contractor shall develop a cut-out plan to maximize the usage of each specimen panel. The edges of the test coupons shall be cut smooth to avoid introducing stress concentrations. Edge smoothness equivalent to or better than that obtained by the water jet cutting method is required for the FRP test coupons.
There have been concerns that damaged edges can particularly lead to lower hoop properties measured in the ASTM D3039 test. To eliminate or minimize this effect, when preparing coupons for testing according to the ASTM D3039 test standard in an FRP material’s hoop direction, the contractor shall follow the procedures described in the attachment (to this Statement of Work) titled “Instructions on Cutting Coupons from Flat FRP Specimen Panels for ASTM D3039 Tensile Test in the Transverse or Hoop Direction” (or similar ones eliminating/minimizing the edge damage, as verified with and approved by Volpe).
Performance of tests. The contractor shall conduct the tests specified in the test matrix following the ASTM test standard specifications and any modifications identified within this Statement of Work and/or subsequently agreed to by Volpe. The tests shall be conducted for the specified material/structure type in the required repeat number of tests in each specified material orientation, as defined in the test matrices hereafter. If needed, the contractor may prepare extra coupons and conduct trial tests on the extra coupons to establish procedure, parameter range, etc., prior to conducting actual required tests. For the fatigue tests, the contractor shall consult with Volpe to verify number of load levels, number of repeat tests, frequency and number of loading cycles, criteria to terminate the tests, etc. Substitution for any test in the test matrices shall be subjected to Volpe approval. The contractor shall plan to accommodate Volpe requests and arrange for Volpe and/or PHMSA engineers to visit the testing facility and observe the test procedures.
Unless otherwise agreed to by Volpe, the contractor shall observe the following priority order of tests to be conducted:
• Tensile/shear tests before bending tests;
• Tensile tests before tension-tension fatigue tests;
• Fatigue tests concurrent with non-fatigue tests;
• Static before indentation/impact tests;
• FRP tests before sandwich structure tests before core tests.
Application of QA/QC measures. The contractor shall have an established plan for quality assurance (QA) and quality control (QC) and have it executed for the test procedure, test outcome and verification of data accuracy in this project. The contractor shall provide Volpe with a copy of the QA/QC plan as part of the Contractor’s proposal.
7 | P a g e
Report of test data. The contractor shall perform statistical analyses of the test data, such as calculating the average and standard deviation of a given parameter obtained in a test, as required by the test standards. The contractor shall report the test data according to the test standard and specific Volpe instructions as outlined within this Statement of Work. Force-displacement and stress-strain data generated in any test shall be included in the test report and data delivery, in addition to other test data specified by the test standards. For instance, the force-displacement data obtained in ASTM D790 shall be reported in addition to the other data specified by the test standard. The contractor shall deliver the test reports and test data electronically, unless requested otherwise by Volpe. Raw and processed data from each repeat test shall be delivered to Volpe in the electronic Excel file format. Electronic comma/tab delimited text files that can be easily converted to Excel worksheets will also be acceptable. Images only of data sheets/data curves will not be acceptable. The contractor shall promptly deliver the test data to Volpe once the data are obtained and QA/QC verified, whereas the test reports shall be delivered by the deliverable due dates.
Photographs shall be taken of pre-test coupons including one mounted on the test fixture for each test. Photographs shall be taken of each post-test coupon clearly showing salient post-test features including deformation pattern, damage pattern, failure mode, etc. The contractor shall provide Volpe with electronic copies of the photos with clear and distinct identifications.
Tasks. The work is broken down into the following tasks.
Task 1. Receive, examine and document the specimen panels shipped from the manufacturers or Volpe. Specimen panels will be shipped from the manufacturers or Volpe to the contractor’s testing facility. Upon receiving the specimen panels, the contractor shall measure the main dimensions, inspect for any unusual conditions and conduct the ASTM D2583 hardness test (Test Reference No. 2 in Table 2) on all incoming specimens. The contractor shall assess the thickness variation pattern of each specimen and devise a coupon cut-out plan that will meet the tolerance requirements of the thickness dimension for each specimen. The contractor shall take notice of the three material directions of interest, i.e., axial, hoop and thickness, expected to be marked by the manufacturers on each specimen, for reference of the test orientations. The contractor shall record the inspection findings in a written document aided by photographs of the specimens that can be used in future reports/papers/presentations by Volpe. The contractor shall separate curved FRPs from the cores in a small number of curved sandwich structures and clean up the FRP specimens for further test preparation. Volpe is expected to provide the test parameters listed in Table 2 as needed to perform the tests, and the contractor shall verify the items on this list and if additional clarifications and requirements are needed from Volpe, and jointly determine/verify the test parameters during the initial meeting with Volpe (see Task 6).
Task 2. Conduct tests on FRP materials. Under Subtask 2.1 the contractor shall conduct the “Required No. Tests” listed in Table 3. Volpe may elect for the contractor to conduct additional optional tests (Subtasks 2.2 – 2.14) up to the number specified under “Maximum Optional Tests” in Table 3 for each test reference number. The contractor shall follow the procedures outlined in “Definition of Test and Report Procedures” above for each test. Each subtask number (2.2 - 2.14) corresponds with performing optional tests by each of the thirteen test standards listed in Table 3.
List of subtasks:
8 | P a g e
2.1 Required tests on FRP materials;
2.2 Optional ASTM D3171 test on FRP materials (Test Ref. No. 1A);
2.3 Optional ASTM D3171 test on FRP materials (curved, Test Ref. No. 1B);
2.4 Optional ASTM D2583 test on FRP materials (Test Ref. No. 2);
2.5 Optional ASTM D3039/D3039M test on FRP materials (Test Ref. No. 3A);
2.6 Optional ASTM D3039/D3039M test on FRP materials (curved, Test Ref. No. 3B);
2.7 Optional ASTM D5379/D5379M test on FRP materials (Test Ref. No. 4);
2.8 Optional ASTM D7291/D7291M test on FRP materials (Test Ref. No. 5);
2.9 Optional ASTM D790 test on FRP materials (Test Ref. No. 6A);
2.10 Optional ASTM D790 test on FRP materials (curved, Test Ref. No. 6B);
2.11 Optional ASTM D6264/D6264M test on FRP materials (Test Ref. No. 7);
2.12 Optional ASTM D7136/D7136M test on FRP materials (Test Ref. No. 8);
2.13 Optional ASTM D3479/D3479M test on FRP materials (Test Ref. No. 9);
2.14 Optional ASTM D6641/D6641M test on FRP materials (Test Ref. No. 13).
Table 3. Test Matrix for FRP Materials
Test Ref.
No.
Test Standard Directionality to be Tested
No. Required Directionality Tests (units) per Material
Type
No. of Required
FRP
Materials to be Tested
Maximum No. of
Optional
FRP
Materials To be
Tested
No. of Tests (units) to be Performed
Required No. Tests
(units )
Maximum No.
Optional Tests
(units)
Maximum Total No.
Tests (units)
1A ASTM D3171 N/A 1 2 3 2 3 5
1B * ASTM D3171 N/A 1 0 8 0 8 8
2 ASTM D2583 Thickness 1 2 3 2 3 5
3A ASTM D3039/
D3039M Axial, Hoop 2 2 3 4 6 10
3B
* ASTM
D3039/ D3039M
Axial 1 0 8 0 8 8
4 ASTM D5379/
D5379M
Axial, Hoop, Thickness 3 2 3 6 9 15
5 ASTM D7291/
D7291M Thickness 1 2 3 2 3 5
6A ASTM D790 Axial, Hoop 2 2 3 4 6 10
6B * ASTM D790
Axial, Hoop (on concave, convex sides)
3 0 8 0 24 24
7 ASTM D6264 /
D6264M Thickness 1 2 3 2 3 5
8 ASTM D7136/
D7136M Thickness 1 2 3 2 3 5
9 ASTM D3479/
D3479M Axial, hoop 2 2 3 4 6 10
13 ASTM D6641/
D6641M Axial, Hoop 2 2 3 4 6 10
* For coupons from curved FRP specimens. See descriptions of curved FRP specimens in “Scope of Work” under Table 1.
9 | P a g e
Task 3. Conduct tests on core materials. Under Subtask 3.1 the contractor shall conduct the “Required No. Tests” listed in Table 4. Volpe may elect for the contractor to conduct additional optional tests (Subtask 3.2 -3.7) up to the number specified under “Maximum Optional Tests” in Table 4 for each test reference number. The contractor shall follow the procedures outlined in “Definition of Test and Report Procedures” above for each test. Each subtask number (3.2 - 3.7) corresponds with performing optional tests by each of the six test standards listed in Table 4.
List of subtasks:
3.1 Required tests on core materials;
3.2 Optional ASTM C394/C394M test on core materials (Test Ref. No. 10);
3.3 Optional ASTM C271/C271M test on core materials (Test Ref. No. 14);
3.4 Optional ASTM C366/C366M test on core materials (Test Ref. No. 15);
3.5 Optional ASTM C297/C297M test on core materials (Test Ref. No. 16A);
3.6 Optional ASTM C365/C365M test on core materials (Test Ref. No. 17);
3.7 Optional ASTM C273/C273M test on core materials (Test Ref. No. 18).
Table 4. Test Matrix for Core Materials
Test Ref. No. Test Standard Directionality to be Tested
No. Required Directionality Tests (units) per Material
Type
No. of Required
Core Materials to be Tested
Maximum No. of
Optional Core
Materials To be
Tested
No. of Tests (units) to be Performed
Required No. Tests
(units )
Maximum No.
Optional Tests
(units)
Maximum Total No.
Tests (units)
10 ASTM C394/
C394M
Two in-plane shear directions
2 1 2 2 4 6
14 ASTM C271/
C271M N/A 1 0 3 0 3 3
15 ASTM C366/
C366M Thickness 1 0 3 0 3 3
16A ASTM C297/
C297M Thickness 1 0 3 0 3 3
17 ASTM C365/
C365M Thickness 1 0 3 0 3 3
18 ASTM C273/
C273M
Two in-plane shear directions
2 0 3 0 6 6
Task 4. Conduct tests on sandwich structures. Under Subtask 4.1 the contractor shall conduct the “Required No. Tests” listed in Table 5. Volpe may elect for the contractor to conduct additional optional tests (Subtask 4.2 – 4.5) up to the number specified under “Maximum Optional Tests” in Table 5 for each test reference number. The contractor shall follow the procedures outlined in “Definition of Test and Report Procedures” above for each test. Each subtask number (4.2 – 4.5) corresponds with performing optional tests by each of the four test standards listed in Table 5.
List of subtasks:
10 | P a g e
4.1 Required tests on sandwich structures;
4.2 Optional ASTM C393/C393M test on sandwich structures (Test Ref. No. 11);
4.3 Optional ASTM D7766/D7766M test on sandwich structures (Test Ref. No. 12);
4.4 Optional ASTM C297/C297M test on sandwich structures (Test Ref. No. 16B);
4.5 Optional ASTM C364/C364M test on sandwich structures (Test Ref. No. 19).
Table 5. Test Matrix for Sandwich Structures
Test Ref. No.
Test Standard
Directionality to be Tested
No. Required Directionality Tests (units) per Material
Type
No. of Required Sandwich Structures to be Tested
Maximum No. of
Optional Sandwich Structures
To be Tested
No. of Tests (units) to be Performed
Required No. Tests
(units )
Maximum Optional
Tests (units)
Maximum Total No.
Tests (units)
ASTM
C393/ C393M
Axial, Hoop 2 1 2 2 4 6
ASTM
D7766/ D7766M
Thickness 1 1 2 1 2 3
16B
ASTM
C297/ C297M
Thickness 1 0 3 0 3 3
ASTM
C364/ C364M
Axial, Hoop 2 0 3 0 6 6
Task 5. Following the completion of all tests the contractor shall consult with Volpe on the plan and method to return and/or archive the unused, lightly used and post-test coupons/specimens. At the end of the project, the contractor shall inspect the remaining specimen panels, collect unused specimens and lightly used ones that can still be of future use, and ship them back to Volpe upon Volpe’s request.
Task 6. Project Management. The contractor shall provide Volpe with a copy of the QA/QC plan at the initiation of the project. Once test specimens are received, inspected and documented for each manufacturer, the contractor shall contact Volpe via an initial teleconference or in-person meeting to report the specimen conditions, verify tests and order of tests to be performed, confirm test reporting requirements, determine/verify specific test parameters required by the test standards, deliverable due dates, etc. As the project progresses, this task shall include regular communications (including teleconferences) with Volpe and project management.
11 | P a g e
Schedule and Deliverables
List of schedule and deliverables:
CLIN /
Sub-CLIN
TASK /
Sub-Tasks DELIVERABLE* FORMAT DUE DATE
0100 1 Inspection and documentation of specimen panels received MS Word Within 1 week of receipt of specimens
0200 2.1 Test data (raw and processed), photographs, and report for required tests in Table 3
MS Excel, Word
Mutually agreed upon due date
0201 – 0213 (optional)
2.2 – 2.14 (optional)
Test data (raw and processed), photographs, and report for optional tests in Table 3
MS Excel, Word
Mutually agreed upon due date
0300 3.1 Test data (raw and processed), photographs, and report for required tests in Table 4
MS Excel, Word
Mutually agreed upon due date
0301 – 0306 (optional)
3.2 – 3.7 (optional)
Test data (raw and processed), photographs, and report for optional tests in Table 4
MS Excel, Word
Mutually agreed upon due date
0400 4.1 Test data (raw and processed), photographs, and report for required tests in Table 5
MS Excel, Word
Mutually agreed upon due date
0401 – 0404 (optional)
4.2 – 4.5 (optional)
Test data (raw and processed), photographs, and report for optional tests in Table 5
MS Excel, Word
Mutually agreed upon due date
0500 5 Return of unused, lightly used and post-test coupons/specimens
FedEx shipment
Mutually agreed upon due date
0600 6 Initial and progress report meetings Web or on-site Meetings
Upon receipt of specimens, biweekly and as requested
*Deliverables shall be electronically delivered to Technical Point of Contact.
Technical Point of Contact:
Hailing Yu
(617) 494-2554 Email: Hailing.Yu@dot.gov mailto:Hailing.Yu@dot.gov
12 | P a g e
Attachment to Statement of Work
INSTRUCTIONS ON CUTTING COUPONS FROM FLAT FRP SPECIMEN PANELS
FOR ASTM D3039 TENSILE TEST IN THE TRANSVERSE OR HOOP DIRECTION
Specimen Geometry
1. Rectangular coupons. Refer to Figure 1 for nomenclature. Faces flat and parallel to < 0.08mm.
Edges flat and parallel to <0.08mm.
2. Finished specimen width of 25mm meets the requirements of ASTM D3039 (2017).
3. Specimen length determined as per the standards. Specimen length is a function of the gauge length and the grip length (which can vary according to the testing machine).
Figure 1: Specimen nomenclature. For transverse (hoop) testing, fibres are aligned width-wise.
4. Caul plates should be used to ensure high quality finish of specimen faces. The caul plates should be free from scratches and marks which could induce defects in the specimen’s faces.
5. Specimen cutting is best conducted with abrasive machining (milling, rotatory sawing, etc.) with diamond tooling. A representative cutting plan is shown in Figure 2.
a. An assessment of induced damage should be made. Particular attention should be focused on the exit face of the cutting path to ensure there is no (or highly localized) delamination damage. Cutting parameters may need to be adjusted until this can be achieved.
b. Specimen widths should be cut oversized to allow for edge finishing. An oversize of +5mm should suffice in most cases.
c. Water jet cutting may be substituted. The cutting kerf may vary between cutting methods and should be accounted for when developing the cutting plan for the panel.
Water jet piercing operations induce significant damage and should be avoided on the test panel.
6. Specimen edges must be finished as well as practically possible. Specimens may be stacked and clamped face-to-face in a block to minimize the number of finishing operations. The following treatments are required:
a. Surface grinding to +0.3-0.5mm on both opposite edges. Grinding parameters vary but material removal rates should be kept low enough to not induce damage.
b. Polishing with 800, 1200 grit wet and dry paper to required dimension.
c. Target surface roughness <32 microinches Ra, approximately 1 micron. (Ra definition: http://www.rubert.co.uk/faqs/roughness-parameters/)
7. Specimen polishing may not be practical for all applications, but methods to mitigate edge damage should be made.
8. Finishing is not required for ends and these faces are unloaded during testing.
http://www.rubert.co.uk/faqs/roughness-parameters/
13 | P a g e
Figure 2: Representative cutting plan.
Tabbing and Gripping
1. The standards are open about the lack of consistency in gripping and tabbing. According to
ASTM D3039:
“Design of mechanical test coupons, especially those using end tabs, remains to a large extent an art rather than a science, with no industry consensus on how to approach the engineering of the gripping interface. Each major composite testing laboratory has developed gripping methods for the specific material systems and environments commonly encountered within that laboratory.
Comparison of these methods shows them to differ widely, making it extremely difficult to recommend a universally useful approach or set of approaches.”
2. Use untabbed coupons for transverse (hoop) testing. Use Surfalloy (TM) grips with 2-3 layers of emery paper between the grip and the specimen. The emery paper extends beyond the grip region to ensure a smooth load transition (Figure 3).
14 | P a g e
Figure 3: Grip configuration showing use of emery paper.
Instrumentation
1. Use ASTM D3039 and ISO527-5 recommended 3 strain-gauge configuration as shown in Figure 4
(ISO527 version) to enable assessment of specimen bending during the test. Any specimen bending >3% results in a failed test, so flatness is crucial.
Figure 4: Specimen strain gauge locations (ISO527).