PROJECT DESCRIPTION_WA ERFO FS MTBKR605 2020-1(2).pdf

PDF 187 KB Posted

Attached to
WA ERFO FS MTBKR605 2020-1(2), Forest Road 7810 MP 0.1 Repair
Solicitation number
69056727B000003
Issued by

About this file

This is a presolicitation notice for a Forest Service construction project. The work involves bank stabilization and stream diversion on Forest Road 7810 near the Carbon River, 22 miles south of Enumclaw, Washington, in the Mt. Baker-Snoqualmie National Forest adjacent to Mt. Rainier National Park. The project encompasses 0.05 miles of construction with a tentative solicitation date of Spring 2027 and a tentative fixed completion date of Fall 2027, with the exact completion date to be specified in the SF1442 Continuation, Block 11 upon solicitation issuance. The estimated price range is $700,000 to $2,000,000.

The project requirements include construction survey and staking, contractor quality control and assurance, contractor sampling and testing, construction schedules, and soil erosion and sediment control measures, including 300 linear feet of fiber roll. Incidental construction work includes 10 hours of bird survey biological services, 0.16 acres of alder or willow pole cuttings for plantings, temporary stream diversion, temporary traffic control services (500 hours of flagger time, 50 days of traffic control supervisor services, and signs/devices), and environmental mitigation work. Environmental mitigation pay items include 720 log barriers, 32 root wads, 54 untreated timber piles for bank stabilization, 1,560 units of streambed material, and 350 units of coarse woody debris for bank stabilization. The format follows the FP-24 base schedule with measurements in US customary units.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WA ERFO FS MTBKR605 2020-1(2), Forest Road 7810 MP 0.1 Repair

Mt. Baker-Snoqualmie National Forest, Pierce County, Washington

This requirement is for a construction project located near the Forest Service Road

7810 bridge along the Carbon River, 22 miles south of Enumclaw, WA.

Construction will be in the Mt. Baker-Snoqualmie National Forest near the boundary of Mt. Rainier National Park. The work includes bank stabilization and stream diversion.

Project length: 0.05 miles

Tentative Fixed Completion Date: Fall 2027

(Once solicitation is issued, see SF1442 Continuation, Block 11 for exact date.)

Tentative Solicitation Date: Spring 2027

Estimated Price Range: $700,000 to $2,000,000

Location: 22 miles south of Enumclaw, WA

DESCRIPTION OF WORK in US CUSTOMARY UNITS

FP-24

B as e S ch ed u le

DIVISION 150 – Project Requirements

152 Construction Survey & Staking (yes/no) Yes

153 Contractor Quality Control and Assurance (yes/no) Yes

A154 Contractor Sampling & Testing (yes/no) Yes

155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes

157 Soil Erosion & Sediment Control (erosion control devices) Fiber Roll 300 LNFT

DIVISION 600 – Incidental Construction

623 Special Labor, Hired Technical Services, Biological Services (Bird Survey) 10 HOUR

B as e S ch ed u le

626 Plants, Trees, Shrubs, Vines & Groundcovers Cuttings, Alder or Willow Pole

0.16 ACRE

628 Temporary Stream Diversion YES

(LPSM)

635 Temporary Traffic Control – Flagger 500 HOUR

635 Temporary Traffic Control – Traffic Control Supervisor 50 DAY

635 Temporary Traffic Control Signs and devices

YES

(LPSM)

647 Environmental Mitigation (use pay item description) Log Barrier Root Wad Bank Stabilization (Untreated Timber Pile) Streambed Material Bank Stabilization (Coarse Woody Debris)