QandA_11-26-2026.pdf

PDF 187 KB Posted

Attached to
WA ERFO NPS OLYM 2022-1(3), OLYMPIC NPS ERFO REPAIRS 2022 Road 107 MP 0.3 TO 0.5 & MP 0.8
Solicitation number
69056727B000002
Issued by

About this file

This is a Questions and Answers document for federal contract Project No. WA ERFO NPS OLYM 2022-1(3), pertaining to Olympic National Park Service Emergency Repair and Facility Operations (ERFO) work.

The document contains one technical question from a potential bidder regarding the feasibility of manufacturing Schedule B line-item B0580, which calls for 140 grey dolos (concrete blocks) with a bark texture finish for an engineered log jam application on Road 107 (mile posts 0.3-0.5 and 0.8). The bidder requests permission to change the specification from "ENGINEERED LOG JAM WITH DOLOSSE-TEXTURED" to "ENGINEERED LOG JAM WITH DOLOSSE" (plain finish), citing manufacturing difficulties including reduced product quality, reduced weight, formwork damage, and inability to remove textured pieces from formwork. The government's response, dated 11/19/26, directs the bidder to submit bids per the existing solicitation documents, declining to modify the specification requirement.

View the file

Other files

File Type Posted
QandA_11-23-2026.pdf PDF
QandA_11-24-2026.pdf PDF
IFB_69056727B000002.pdf PDF
wa-ep-olym2022-1-3_plans_IFB.pdf PDF
Physical Data_WA ERFO NPS OLYM 2022-1(3).zip ZIP file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project No. WA ERFO NPS OLYM 2022-1(3)

Project WA ERFO NPS OLYM 2022-1(3)

# General Technical Question Answer Date

1 X

Our company recently received quote requests for project OLYMPIC NPS ERFO REPAIRS 2022

Road 107 MP 0.3 TO 0.5 & MP 0.8 for 8-ton dolos. The request was for Schedule A (140 plain concrete grey dolos) and Schedule B (140 grey dolos with bark finish). It is simple enough to address Schedule A request; however, it is difficult to fulfill Schedule B request. Adding a bark finish to the dolo formwork causes multiple issues including reduced product quality, reduced overall weight, damage to formwork and an and inability to remove the textured piece from the formwork. Is it possible to change line-item B0580 from “ENGINEERED

LOG JAM WITH DOLOSSE-TEXTURED” to

“ENGINEERED LOG JAM WITH DOLOSSE”? I

would be happy to answer any questions the design team may have regarding the formwork or manufacturing of the dolo product.

Please bid per the solicitation documents. 11/19/26

Check General or Technical

File details come from the government source that posted it. Updated .