This document is a solicitation for a pavement preservation project located in Indiana Dunes, covering 5.96 miles across Lake, Porter, and Laporte Counties. The project, identified by solicitation number 69056725R000016, involves crack sealing, patching, chip seal and micro surface treatments, and pavement marking with a tentative fixed completion date in Summer 2026 and an estimated price range of $5 million to $10 million.

The solicitation includes a detailed description of work across multiple divisions, with base requirements and three optional scopes (Option X, Option Y, Option Z). Key work elements include 550-850 cubic yards of waste management, full depth reclamation, asphalt concrete work, chip sealing, micro surfacing, pavement crack sealing, and pavement patching. Additional scope covers temporary traffic control, construction signs, cones, flagging, and permanent pavement markings. The project requires contractor quality control, sampling, testing, and construction schedule management, with varying quantities specified for each project option.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IN NP INDU PMS(1),

Pavement Preservation Indiana Dunes

69056725R000016

This work consists of crack sealing, patching, application of chip seal and micro surface treatments and pavement marking.

Project length: 5.96 Miles

Tentative Fixed Completion Date: Summer 2026

Estimated Price Range: $5 million to $10 million

Location: 4 miles North of Chesterton, Indiana. Lake, Porter, and Laporte Counties.

DESCRIPTION OF WORK in US CUSTOMARY UNITS

FP-24

B A

S E

O P

T

IO

N X

T

IO

Y

T

IO

Z

DIVISION 150 – Project Requirements

152 Construction Survey & Staking (yes/no) No No No No

153 Contractor Quality Control and Assurance (yes/no) Yes Yes Yes Yes

154 Contractor Sampling & Testing (yes/no) Yes Yes Yes Yes

155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes Yes Yes Yes

DIVISION 200 – Earthwork

204 Waste 550 CUYD 850 CUYD

DIVISION 300 – Aggregate and Base Courses

302 Roadway Aggregate 16 TON

304 Full Depth Reclamation 1,900 SQYD

B A

S E

T

IO

X

T

IO

Y

T

IO

Z

DIVISION 400 – Asphalt Pavements & Surface Treatments

403 Asphalt Concrete 410 TON

407 Chip Seal 40 TON

409 Micro Surfacing 179,000

SQYD

26,000

SQYD 11,600 SQYD

414 Asphalt Pavement Crack Sealing & Filling 11 MILE 0.65 MILE 1.05 MILE

418 Asphalt Concrete Pavement Patching 1970 SQYD 280 SQYD 70 SQYD

DIVISION 600 – Incidental Construction

609 Curb & Gutter (Wheel stop) 18 EACH

622 Rental Equipment (yes/no) Yes No No No

623 General Labor (yes/no) Yes No No No

634 Permanent Pavement Markings (traffic pavement markings)

164,000

LNFT

17,000

LNFT 650 LNFT 40 LNFT

635 Temporary Traffic Control – Flagger 2,000 HOUR 200 HOUR 90 HOUR 320 HOUR

635 Temporary Traffic Control – Pavement Markings

48,000

LNFT

635 Temporary Traffic Control – TCS 75 DAY 6 DAY 6 DAY 8 DAY

635 Temporary Traffic Control – Construction Sign 210 SQFT

635 Temporary Traffic Control – Cone 220 EACH