This is a project description document detailing the scope of work for the MT FLAP PARK 2021(1) Old Yellowstone Trail South Improvements and Preservation project in Park County, MT, located 55 miles south of Livingston. The project includes two bid schedules (A and B) and involves drainage work, roadway reconditioning, aggregate surfacing, and signage across 8.08 miles of roadway. The estimated price range is $2-5 million, with a tentative solicitation date of Spring 2025 and completion date of Fall 2025.

The detailed scope includes earthwork (clearing, grubbing, cattle guard removal, culvert removal), aggregate surface course (24,000-35,600 tons), road reconditioning (5.51-8.08 miles), and incidental construction including pipe culvert installation (18-inch, 24-inch, and 36-inch), guardrail installation (800 LNFT), signage (23-156 SQFT), and temporary traffic control measures including flaggers (1300-1600 hours) and a traffic control supervisor (70-80 days). The project requires contractor quality control, sampling and testing, construction surveying, and soil erosion control measures including fiber rolls and check dams.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MT FLAP PARK 2021(1), Old Yellowstone Trail South

Improvements and Preservation

Park County, MT

The work consists of drainage, roadway reconditioning, aggregate surfacing, and signage.

Project length: 8.08 miles

Tentative Solicitation Date: Spring 2025

Tentative Fixed Completion Date: Fall 2025

(Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)

Estimated Price Range: $2 million to $5 million

Location: 55 miles S of Livingston, MT

DESCRIPTION OF WORK in US CUSTOMARY UNITS

FP-14

S ch ed u le A ed u

B

DIVISION 150 – Project Requirements

152 Construction Survey & Staking (yes/no) Yes Yes

153 Contractor Quality Control and Assurance (yes/no)

Yes Yes

154 Contractor Sampling & Testing (yes/no) Yes Yes

155 Schedules for Construction Contracts (construction schedules) (yes/no)

Yes Yes

157 Soil Erosion & Sediment Control (erosion control devices)

Fiber Rolls, Check Dams

Fiber Rolls, Check Dams

158 Watering for Dust Control LPSM LPSM

DIVISION 200 – Earthwork

201 Clearing & Grubbing 0.7 acre 0.9 Acre

203 Removal of Cattle Guard 1 each 1 each

203 Removal of pipe culvert 2 each 2 each

204 Ditch, excavation 100 lnft 100 LNFT ed u

A ed u

B

DIVISION 300 – Aggregate and Base Courses

301 Aggregate Surface Course 24000 Ton 35600 Ton

303 Road Reconditioning 5.51 Miles 8.08 Mile

DIVISION 600 – Incidental Construction

602 18-inch pipe culvert 300 LNFT 400 LNFT

602 24-inch pipe culvert 340 LNFT 400 LNFT

602 36-inch pipe culvert 40 LNFT 40 LNFT

602 End Section for 24-inch pipe culvert 1 Each 1 Each

607 Cleaning Culvert in place 0 2 Each

617 Guardrail 0 800 LNFT

617 Guardrail Terminal Section 0 2 Each

622 Rental Equipment (yes/no) Yes Yes

623 General Labor (yes/no) Yes Yes

625 Turf Establishment

0.7 Acre

0.9 Acre

633 Sign System 23 SQFT 156 SQFT

633 Object Marker, Type 3 4 4

635 Temporary Traffic Control – Flagger 1300 HRS 1600 HRS

635 Temporary Traffic Control – Construction Sign

7 Each 7 Each

635 Temporary Traffic Control – (Traffic Control Supervisor)

70 DAY

80 DAY