QA_10_15_2025.pdf

PDF 416 KB Posted

Attached to
MT FLAP DOT 236(2), Winifred North Federal contract opportunity
Solicitation number
69056725B000010
Issued by
Department of Transportation Federal Highway Administration

About this file

This document is a Questions and Answers (Q&A) file for the MT FLAP DOT 236 (20) project, specifically for the Winifred North contract. The document contains nine technical questions submitted by potential bidders, with responses from the government consistently directing bidders to review solicitation documents and specific sections of the contract specifications. Key questions addressed include rail section removal and reset specifications, material sourcing, excavation requirements, project personnel roles, period of performance, water sourcing, project phasing, tax exemption status, and anticipated on-site work start date. The government's responses are uniformly non-committal, repeatedly instructing bidders to refer to the solicitation documents and various referenced sections such as SCR Section 204, SCR Section 105, and the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects. All questions were responded to on either 10/8/25 or 10/9/25, indicating this is part of the pre-bid clarification process.

View the file

Other files for this federal contract opportunity

Other files attached to MT FLAP DOT 236(2), Winifred North, newest first.
File Type Posted
BidTabs_MT FLAP DOT 236(2) Winifred North.pdf PDF
BidSum_MT FLAP DOT 236(2)_Winifred North.pdf PDF
QA_10_17_2025.pdf PDF
QA_10_14_2025.pdf PDF
mta-dot236-2_WinifredNorth_Grizzly_Bear_Sightings_Log.docx DOCX document
mta-dot236-2_WinifredNorth_plans.pdf PDF
IFB_69056725B000010_MT FLAP DOT 236(2).pdf PDF
mta-dot236-2_WinifredNorth_Final Geotechnical Report-Signed.pdf PDF
mta-dot236-2_WinifredNorth_Hydraulics_Memo_Final.pdf PDF
mta-dot236-2_WinifredNorth_control-points.xlsx XLSX spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MT FLAP DOT 236 (20),

Winifred North

# General Technical Question Answer Date

1 X

Line Item WE2320 Remove and Reset, Rail Section, 240 Each

What is the length of the rail sections to be removed and reset.

Please submit bids according to the solicitation documents. Reference is made to sheets C.6 and D.2 for the estimated length included in the guardrail remove and reset item.

10/8/25

2 X Are there any existing pits nearby we can use for the stone?

The Government does not intend to provide additional information on this. See the Notice to Bidders, Section IV - Specifications and Permits and SCR Section 105 - Control of Materials. Please submit bids according to the solicitation documents.

10/9/25

3 X Please further define the requirements for the pricing line as called out for "unclassified borrow".

Comply with the requirements of SCR Section 204 - Excavation and Embankment and SCR Section 704 – Soil. please submit bids according to the solicitation documents.

10/9/25

4 X Do the Superintendent, SSHO and QC Manager need to be 3 separate individuals?

The Government does not intend to provide additional information on this. Comply with the requirements of SCR Division 100 – General Requirements and the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14, U.S. Customary Units. Please submit bids according to the solicitation documents.

10/9/25

Check General or Technical

5 X

Can the period of performance be extended after award once the material/equipment lead times are confirmed due to current market conditions for the equipment for this project?

The Government does not intend to provide additional information on this. See Block 11 of the Notice to Bidders (Continuation SF 1442) for the required period of performance. Please submit bids according to the solicitation documents.

10/9/25

6 X Is there a bulk water fill i.e. a hydrant or water source we can pump from for grading operations in close proximity?

The Government does not intend to provide additional information on this. See Notice to Bidders, Section IV - Specifications and Permits. Please submit bids according to the solicitation documents.

10/9/25

7 X Does this project require phasing?

The Government does not intend to provide additional information on this. Please submit bids according to the solicitation documents.

10/9/25

8 X Is this project tax exempt?

The Government does not intend to provide additional information on this. Please submit bids according to the solicitation documents.

10/9/25

9 X When do you anticipate on site work starting?

The Government does not intend to provide additional information on this. See Block 11 of the Notice to Bidders (Continuation SF 1442) for the expected notice to proceed.

Please submit bids according to the solicitation documents.

10/9/25