QA_69056724R000004 6.28 response.pdf
PDF 116 KB Posted
- Attached to
- Western Federal Lands AE CI/CPE IDIQ
- Solicitation number
- 69056724R000004
About this file
This document is a Question and Answer (Q&A) response related to a Request for Qualifications (RFQ) for Architect and Engineering (A/E) Construction Management/Inspection Support Services for the Federal Highway Administration (FHWA) in several Western states.
The RFQ seeks to award up to five (5) Indefinite Delivery, Indefinite Quantity (IDIQ) contracts, with three (3) contracts reserved for small business concerns. Key requirements include submitting 3-5 resumes for Consultant Project Engineer and Consultant Inspector positions, 1 resume each for the Consultant Management Firm Project Executive and Training/Hiring Personnel. Evaluation factors include professional qualifications, relevant experience, and management approach. The RFQ provides clarification on the resume requirements, page limits, and use of 11x17 pages. It also notes that the Section G matrix is scored as part of the evaluation factors.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| QA_69056724R000004 response_07.31.24.pdf | ||
| Amendment 2024_CI_CPE_ IDIQ_RFQ_A002.docx | DOCX document | |
| QA_69056724R000004 response_07.19.pdf | ||
| QA_69056724R000004 response_07.08.24.pdf | ||
| Amendment 2024_CI_CPE_ IDIQ_RFQ_A001.docx | DOCX document | |
| QA_69056724R000004 response.pdf | ||
| 2024_CI_CPE_ IDIQ_RFQ.pdf | ||
| Construction Manual.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DATE QUESTION ANSWER
6/19/2024
Under Evaluation Factor 1 ‐ Professional Qualifications, the directions state: "Submit a minimum of three (3) and maximum of five (5) resumes for key personnel A and B listed above and one (1) resume for key personnel
C and D (if applicable)." I interpret this to mean we must submit 3‐5 resumes for the CPE position, 3‐5 resumes for the CI position, 1 resume for the CMEx, and 1 resume for the Training/Hiring Personnel (if applicable).
Please confirm this is correct (as opposed to 3‐5 resumes total between the CPE and CI positions).
Correct, please submit three to five resumes for the
Consultant Project Engineer (CPE) position, three to five resumes for the Consultant Inspector (CI) position, one resume for the Consultant Management Firm Project
Executive (CMEx) position, and one resume for the
Training/Hiring Personnel position (if applicable).
6/19/2024
This question also regards Evaluation Factor 1 ‐
Professional Qualifications. In the Draft SOW, "Project
Office Clerk" and "Project Office Assistant" are listed as positions that may need to be filled under this contract.
These two positions do not fall under C.6 Additional
Services like Contract Dispute Specialist, Scheduling
Specialist, etc., which all include language to the effect of: "Because this position falls under Additional Services, the CMF is not required to have someone who meets these qualifications at the time of the execution of the
IDIQ.". Should we include Section E resumes for these individuals?
Please refer to the Request for Qualifications Evaluation
Factors and Standard Form 330 for information on what resumes to submit for this Request for Qualifications.
The draft SOW is only for additional context for the work that will be performed in the future.
6/20/2024
I am having trouble finding a good source of information for what the US Census Bureau considers rural; I am getting a lot of information about counties/census tracts that are "mostly urban," "mostly rural," etc. A project might be located within a large census area (like
Missoula County) that has an urban area within it, but the project itself it far outside the urban area (though still within that county).
The specific project location will be used to determine whether the project meets the criteria related to rural locations.
6/20/2024
For Minimum Requirement A (Section E's), can you please confirm if there are a minimum of three (3) and a maximum of five (5) resumes for key personnel A, and an additional minimum of three (3) and a maximum of five (5) resumes for key personnel B?
Correct, please submit three to five resumes for the
Consultant Project Engineer (CPE) position, three to five resumes for the Consultant Inspector (CI) position, one resume for the Consultant Management Firm Project
Executive (CMEx) position, and one resume for the
Training/Hiring Personnel position (if applicable).
6/20/2024
On multi‐season projects that are still in progress, can we separate seasons if season one meets the minimum requirements in sections i and ii of the RFQ?
This would not be considered a completed project.
Q&A 69056724R000004
Request For Qualifications 2024 Architect/Engineer Construction Management/Inspection
Support Services for the States of AK, WA, OR, ID, MT, and WY
DATE QUESTION ANSWER
Q&A 69056724R000004
Request For Qualifications 2024 Architect/Engineer Construction Management/Inspection
Support Services for the States of AK, WA, OR, ID, MT, and WY
6/20/2024
For Section F requirements, instead of 100% completed by the submission of the minimum qualifications of this
RFQ, can it be amended to read ‐ "all relevant experience identified shall have met the minimum requirements i and ii below between May 1st, 2018 and submission of the minimum qualifications of this RFQ."
This would allow current projects to be included in
Section F that are still underway but still currently meet the current qualifications.
See amendment.
6/25/2024
Are we allowed to include a graphical cover, divider pages and a table of contents?
Graphical cover, divider pages and table of contents are permitted.
Supporting tables and/or charts would need to be included in the applicable section and count towards page counts.
6/25/2024
Is a one‐page transmittal letter allowed? Transmittal letters are permitted and count towards page counts.
6/25/2024
Evaluation Factor 1: Please confirm the total amount of key personnel we are allowed to propose for EACH of key personnel Classifications (A‐D). We interpret it as a maximum of five (5) EACH for Construction Project
Engineer and the Construction Inspector, and one EACH for the Management Executive and the
Recruiter/Trainer (a max total of 12 key personnel). Is this correct?
Correct, please submit three to five resumes for the
Consultant Project Engineer (CPE) position, three to five resumes for the Consultant Inspector (CI) position, one resume for the Consultant Management Firm Project
Executive (CMEx) position, and one resume for the
Training/Hiring Personnel position (if applicable).
6/25/2024
Evaluation Factors 3 and 4. Please confirm how many pages EACH are allowed for these sections.
Narrative submitted for Evaluation Factor 3 shall not exceed three (3) pages. Narrative for Evaluation Factor 4 shall not exceed one (1) page.
6/26/2024
May we use 11" x 17" pages for our organization chart and in Section H of the SF330?
11" x 17" chart is permitted and would be included in the applicable section and count towards the page counts.
6/26/2024
Is the Section G matrix scored? Please refer to the Request for Qualifications, Source
Selection Evaluation Criteria, for details on Evaluation
Factors.
6/26/2024
The RFQ does not stipulate page sizes for any individual section of the SF330. Are we permitted to use 11x17 pages for Section D (organizational chart)? Would 11x17 pages in other sections be permitted and, if so, counted as 1 or 2 pages?
11" x 17" chart is permitted and would be included in the applicable section and count towards the page counts (page for page).
File details come from the government source that posted it. Updated .