6620-001P Pierce Stocking Covered Bridge - Inspection Report 2021.pdf

PDF 2 MB Posted

Attached to
MI NP MULTI PMS(1), Pavement Preservation Michigan
Solicitation number
69056724R000002
Issued by

About this file

This document contains a bridge inspection report and related federal contract opportunity. The bridge inspection report provides details of an inspection of the Pierce Stocking Covered Bridge located in Sleeping Bear Dunes National Lakeshore. The report finds the bridge to be in generally good condition but recommends minor maintenance work costing an estimated $17,000. This includes replacing decayed approach guardrail posts, improving drainage, and periodic debris removal.

The related federal contract opportunity is a solicitation for pavement preservation work in Michigan national parks under the Western Region Pavement Preservation Indefinite Delivery/Indefinite Quantity multiple award contract. Only the prime contractors that have been awarded spots on this MATOC will be eligible to bid when the project is formally advertised. The work involves road resurfacing and related pavement repairs.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BRIDGE INSPECTION REPORT

PIERCE STOCKING COVERED BRIDGE

PIERCE STOCKING DRIVE OVER GREENAN ROAD

SLEEPING BEAR DUNES NATIONAL LAKESHORE

LOOKING EAST

STRUCTURE NO. 6620-001P

INSPECTION TYPE: ROUTINE

INSPECTION DATE: 9/21/2021

NORTH SIDE

Report prepared by:

Federal Highway Administration Federal Lands Bridge Office Bridge Inspection and Management Program 21400 Ridgetop Circle Sterling, Virginia 20166 https://bridge.flhd.fhwa.dot.gov

RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 6620-001P

PIERCE STOCKING COVERED BRIDGE INSPECTION DATE : 09/21/2021

PRIORITY OF IMPROVEMENT226

A (Critical) - Structure is closed, in immediate damage of collapse, or presents a critical safety danger.

B (Major) - Structure is seriously deficient or presents a safety hazard, but can remain open at reduced loads or with frequent inspections.

C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.

D (Minor) - Structure is generally in good condition. Preventive maintenance may be required.

E (Special) - Structure is under construction or reconstruction.

D

Item No.

Maintenance Recommendations

(GENERALLY NOT FLHP ELIGIBLE)

QTY. UNIT UNIT

COST

PRELIM.

COST

ESTIMATE

222.3

REPLACE DECAYED APPROACH GUARDRAIL POSTS AS

NECESSARY. 1 LS 6000 6000

58.7

IMPROVE DRAINAGE IN ASPHALT WEARING SURFACE

ALONG CURBLINE TO ADEQUATELY DIRECT ROADWAY

RUNOFF.

1 LS 10000 10000

58.7

PERIODICALLY REMOVE SOIL AND GRAVEL

ACCUMULATION FROM BICYCLE LANE. PERIODICALLY

REMOVE LEAF DEBRIS FROM ALONG CURBS, FROM

CURB DRAINS, AND FROM DROP INLETS.

1 LS 1000 1000

PRELIM. MAINTENANCE TOTAL : 17000

Item No.

REHABILITATION/RECONSTRUCTION

(TYPICALLY NEEDED WITHIN 5 YEARS)

QTY. UNIT

UNIT

COST

PRELIM. COST ESTIMATES

REHAB RECONSTR

PRELIM. REHABILITATION/RECONSTRUCTION TOTAL :

COST ESTIMATE SUMMARY

PRELIM. MAINTENANCE TOTAL :

PRELIM. REHABILITATION TOTAL :

PRELIM. RECONSTRUCTION TOTAL : .. 0

TOTAL ITEMIZED COSTS:

PRELIMINARY ESTIMATE TOTAL * :

(*Includes typical contract costs for mobilization, traffic control and design/construction engineering: but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for planning purposes only; they should not be used as a complete or final engineers estimate.)

Remarks : Cost estimates are based on historical data, including costs for similar projects when available.

STRUCTURE LOAD RATING STRUCTURE NO. 6620-001P

PIERCE STOCKING COVERED BRIDGE INSPECTION DATE: 09/20/2021

TRUCK TYPE

INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)

TONS METRIC TONS TONS METRIC TONS

H 10 9 16 15

HS 15 14 25 23

TYPE 3 13 12 22 20

TYPE 3S2 19 17 32 29

TYPE 3-3 26 24 43 39

DESIGN LOADING: 1 - H 10

X CAPACITY MEETS OR EXCEEDS DESIGN LOAD

CAPACITY IS LESS THAN DESIGN LOAD

ORIGINAL LOAD RATING CALCULATION APPLICABLE

ORIGINAL LOAD RATING CALCULATION REVISED

DATE OF LOAD RATING CALCULATION: 02/20/2019

LOAD RATING CONTROLLED BY:

REMARKS: SEE BRIDGE FILE FOR LOAD RATING CALCULATIONS.

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 6620-001P

PIERCE STOCKING COVERED BR DGE INSPECTION DATE: 09/20/2021

STRUCTURE IDENTIFICATION

(201) PARK: SLEEPING BEAR DUNES NATIONAL LAKESHORE

(202) STRUCTURE NAME:..............PIERCE STOCKING COVERED

BRIDGE

(203) STRUCTURE KIND:............... 1 - BRIDGE

(204) STRUCTURE NUMBER:.........6620-001 P

5 - MIDWEST(205) NPS REGION:

(206) ROUTE CODE NUMBER:

(207) ROAD SECTION NO:

(208) NPS ROAD CLASS:............... 1 - PRINCIPAL PARK ROAD

(209) WITHIN NPS BNDRY?:.......... Yes

(210) OPERATING UNIT:.................PARK

(211) PROJECT NO(S):................... PRIVATE JOB

(212) DRAWING NUMBERS:...........NONE

(21) MAINTAINED BY:......................66 - NATIONAL PARK SERVICE

(22) OWNER:................................... 66 - NATIONAL PARK SERVICE

(1) STATE:

(2) STATE HWY. AGENCY DIST:

(3) COUNTY CODE:

(4) CITY / PLACE CODE:

(5) INVENTORY ROUTE:

(6) FEATURES INTERSECTED:

(7) FACILITY CARRIED:

(8) STATE STRUCTURE NO:

(9) LOCATION:

(10) INV. RTE. - MIN. VERT. CLR:

(11) MILE POINT:

(27) YEAR BUILT:

(106) YEAR RECONSTRUCTED:

(20) TOLL:

(37) HISTORIC DESIGNATION:

265 - MICHIGAN

26089 LEELANAU

00000

1 6 1 00012 0

GREENAN ROAD

PIERCE STOCKING DRIVE

6620001P0000000

2 5 MILES FROM PARK ENTRANCE

13.50 FT ( 4.11 M)

2 51 (KM PT: 0.77 )

3 - ON FREE ROAD

5 - NOT ELIGIBLE

STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE

(43A) MAIN STR. MATERIAL:..........1 - CONCRETE (44A) APPR. STR. MATERIAL:............ 0 - Other

(43B) MAIN STR. TYPE:.................. 04 - TEE BEAM (44B) APPR. STR. TYPE:.................... 00 - OTHER

(45) NO. OF MAIN SPANS:..............001 (46) NO OF APPROACH SPANS:

(48) MAX. SPAN LENGTH:..............32 FT ( 9.8 M)

(49) STRUCTURE LENGTH:........... 33.0 FT ( 10.1 M) (108) WEAR SURFACE/PROTECT SYSTEM:

(216A) ABUTMENT #1 FDN:........... 0 - UNKNOWN A) TYPE WEARING SURFACE:.. 6 - BITUMINOUS

(216B) ABUTMENT #2 FDN:........... 0 - UNKNOWN B) TYPE MEMBRANE:................. 0 - NONE

(217A) PREDOM. PIER FDN:.......... 6 - N/A C) TYPE PROTECTION:.............. 0 - NONE

(217B) SECOND. PIER FDN:.......... 6 - N/A (218) IS SALT USED?.......................... NO

(107) DECK TYPE:.......................... 1 - CONCRETE CAST-IN-PLACE

LOAD RATING AND POSTING

(31) DESIGN LOAD:.........................1 - H 10 (41) LOAD RESTRICTION:.................. P - POSTED FOR LOAD

(66) INVENTORY RATING:..............15.3 TONS ( 13.9 METRIC TONS) (70) BRIDGE POSTING:...................... 5 - EQUAL TO OR ABOVE LEGAL

LOADS

(64) OPERATING RATING:..............25.6 TONS ( 23.2 METRIC TONS)

INSPECTION DATES

(90) INSPECTION DATE: 09/21/2021 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):

(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL:.......... N

(220) SPECIAL STUDY TYPE: 0 - NONE INSP. EVERY MONTHS - LAST INSP:

(221) SPECIAL STUDY DATE: (B) UNDERWATER:..................... N

INSP. EVERY MONTHS - LAST INSP:

(C) SPECIAL INSPECTION:........ N

INSP. EVERY MONTHS - LAST INSP:

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 6620-001P

PIERCE STOCKING COVERED BR DGE INSPECTION DATE: 09/20/2021

GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA

(16) LATITUDE:................................ 44° 51'40.40" (51) CURB TO CURB WIDTH:............ 22.0 FT ( 6.7 M)

(17) LONGITUDE:............................ 86°02 '38 30" (52) DECK WIDTH:.......................... 23.0 FT ( 7 M)

(19) DETOUR LENGTH:.................. 199 MI ( 199 KM) (32) APPR. ROADWAY WIDTH:...... 18.0 FT ( 5.5 M)

(28A) LANES ON STRUCT:.............02 (213) APPR. PAVEMENT WIDTH:... 18.0 FT ( 5.5 M)

(28B) LANES UNDER STRUCT:......01 LEFT SHOULDER:............... 0 0 FT ( 0 M)

(42A) SERVICE ON:.........................1 - HIGHWAY RIGHT SHOULDER:.......... 0 0 FT ( 0 M)

(42B) SERVICE UNDER:................. 1 - HIGHWAY, WITH OR W/OUT (33) BRIDGE MEDIAN:.................... 0 - NO MEDIAN

PEDESTRIAN

(29) AVG DAILY TRAFFIC:..............400 (34) SKEW ANGLE:......................... 0 °

(30) YEAR OF ADT:......................... 2019 (35) STRUCTURE FLARED:............ 0 - NO FLARE

(114) FUTURE ADT:.........................480 (47) TOTAL HORIZ. CLEARANCE:.. 22 FT ( 6.7 M)

(115) YEAR OF FUTURE ADT:........2039 (50) SIDEWALKS

(101) PARALLEL STRUCTURE:......N - NO PARALLEL STRUCTURE LEFT:.................................... 0 0 FT ( 0 M)

(38) NAVIGATION CONTROL:.........0 - NO NAVIGATION CONTROL ON RIGHT:.................................. 0 0 FT ( 0 M)

WATERWAY (BRIDGE PERMIT NOT

REQUIRED)

(39) VERTICAL CLEARANCE:.........0 FT ( 0 M) (214) BRIDGE RAIL TYPE

(40) HORIZ. CLEARANCE:..............0 FT ( 0 M) RAIL CONFIGURATION:...... 1 - FULL HEIGHT (NO PARAPET)

(111) ABUT OR PIER PROT:...........1 - NAVIGATION PROTECTION NOT MATERIAL:........................... 8 - T MBER/OTHER

REQUIRED

LATERAL UNDERCLEARANCE: DESIGN TYPE:..................... 1 - CONTINUOUS RAIL

(55) RIGHT:..............................8.00 FT ( 2.44 M) (215) BRIDGE RAIL HEIGHT:.......... 2 25 FT ( 0.69 M)

(56) LEFT:................................ 0 FT ( 0 M) (53) MIN. VRT. CLR. OVER DECK: 13.58 FT ( 4.14 M)

(54) MIN. VRT. UNDRCLRANCE:... 12.33 FT ( 3.76 M)

CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST

(58) DECK:....................................... 7 (67) STRUCTURAL EVALUATION:

(59) SUPERSTRUCTURE:...............7 (68) DECK GEOMETRY:

(60) SUBSTRUCTURE:.......... 7 (69) UNDERCLEARANCES:

(61) CHANNEL:................................N (71) WATERWAY ADEQUACY:........... N

(62) CULVERT:.................................N (72) APPROACH ALIGNMENT:

(222) APPROACHES:...................... 6 (113) SCOUR CRITICAL:.................... N - NOT OVER WATERWAY

(223) RETAINING WALL:.................7 (225) PURPOSE OF IMPROVEMENT: 1 - MAINTENANCE

(36) TRAFFIC SAFETY FEAT: 1 1 1 1 (226) PRIORITY OF IMPROVEMENT: D - MINOR

(75A) TYPE OF WORK:................... (227) MAINTENANCE COST:.............$ 17000

(75B) WORK DONE BY:.................. (228) REHAB / RECNSTR COST:..... $ 0

(76) IMPROVEMENT LENGTH:....... FT ( 0 M) (229) CONSTRUCTION COST:.......... $ 0

ADDITIONAL INFORMATION

(230) STRUCTURE HISTORY:

1986-MAJOR RECONSTRUCTION OF TIMBER COVER. 1992-TIMBER RETAINING WALLS AT WINGWALL ENDS. 2008-APPROACH RAILS REPLACED, EXPOSED REBAR COATED, BOTTOM 2' OF SIDING REMOVED. 2021 - NEW TIMBER COVER

(231) ADDITIONAL CONSIDERATIONS:

(330) ADDITIONAL CONFIGURATION INFORMATION:

Inspector: Marcus Miller Structure Number: 6620001P0000000

Inspection Date: 09/21/2021 Facility Carried: PIERCE STOCKING DR

Bridge Inspection Report

Pictures

PHOTO 3

Description LOOKING WEST

PHOTO 4

Description SOUTH SIDE

Bridge Inspection Report

Pictures

PHOTO 5

Description GENERAL TOPSIDE VIEW LOOKING WEST

PHOTO 6

Description AREA OF PONDING ON SOUTH CURBLINE, EAST END

Bridge Inspection Report

Pictures

PHOTO 7

Description SOIL AND DEBRIS ACCUMULATION IN BICYCLE LANE ALONG SOUTH CURBLINE

PHOTO 8

Description MINOR VEHICLE SCRAPES TO SOUTH RAIL

Bridge Inspection Report

Pictures

PHOTO 9

Description PORCUPINE DAMAGE AT NORTH INTERIOR WALL, WEST SIDE

PHOTO 10

Description DROP INLET AT SOUTH CURB, WEST APPROACH; NOTE LEAF DEBRIS

Bridge Inspection Report

Pictures

PHOTO 11

Description TYPICAL DECAY OF EAST APPROACH GUARDRAIL POST, SOUTH SIDE, POST #7 SHOWN

PHOTO 12

Description WEST APPROACH RAIL POST #3 FROM BRIDGE; NOTE DECAY

Bridge Inspection Report

Pictures

PHOTO 13

Description WEST APPROACH RAIL POST #5 FROM BRIDGE; NOTE DECAY

PHOTO 14

Description MISALIGNMENT OF NORTH RAILING AT WEST APPROACH; NOTE DECAY AND MOSS ON

TOP OF RAIL POST

Bridge Inspection Report

Pictures

PHOTO 15

Description NEW SHINGLES ON ROOF, EAST SIDE SHOWN

PHOTO 16

Description GENERAL UNDERSIDE VIEW OF ROOF TRUSSES LOOKING WEST

Bridge Inspection Report

Pictures

PHOTO 17

Description GENERAL VIEW OF COVER INTERIOR, SOUTH INTERIOR SHOWN

PHOTO 18

Description POPOUTS WITH EXPOSED REBAR, SOUTH OVERHANG

Bridge Inspection Report

Pictures

PHOTO 19

Description GENERAL UNDERSIDE VIEW LOOKING EAST

PHOTO 20

Description GENERAL VIEW OF EAST ABUTMENT; NOTE TIMBER FRAMEWORK AT TOP OF

BREASTWALL AND EVIDENCE OF LEAKAGE

Bridge Inspection Report

Pictures

PHOTO 21

Description GENERAL VIEW OF WEST ABUTMENT

PHOTO 22

Description SPALL AT TOP OF BEARING SEAT KEY FOR BEAM #3 AT WEST ABUTMENT

Bridge Inspection Report

Pictures

PHOTO 23

Description SPALL WITH EXPOSED REBAR ON BEAM #4 AT EAST ABUTMENT

PHOTO 24

Description UNDERCLEARANCE SIGN AT WEST APPROACH, SOUTH SIDE; NOTE OBJECT MARKER

Bridge Inspection Report

Pictures

PHOTO 25

Description TYPE 3 OBJECT MARKER AT WEST APPROACH, NORTH SIDE