This document is a project description for the MT FLAP DOT 236(2), Winifred North project. The project consists of 18.6 miles of work on a gravel road in Fergus County, Montana, including drainage, subexcavation, roadway reconditioning, aggregate surfacing, aggregate stabilization, guardrail, cattle guards, and signage. The project is estimated to cost between $5 and $10 million, with a tentative fixed completion date in Summer 2025. Key requirements include 58,500 tons of untreated aggregate course, 62,500 tons of stabilized aggregate surface course, 56 linear feet of 30-inch pipe culvert, 70 linear feet each of 24-inch and 54-inch arch pipe culverts, 12 MGS tangent guardrail terminal sections, 2 cattle guards, and various traffic control elements. This project will be solicited as Full and Open competition.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Project Description MT FLAP DOT 236(2).pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MT FLAP DOT 236(2), Winifred North
This work consists of: Drainage, subexcavation, roadway reconditioning, aggregate surfacing, aggregate stabilization, guardrail, cattle guards, and signage.
Project Location: 4 miles NW of Winfred, Fergus County Montana
Project Length: 18.6 Miles
Estimated Price Range: Between $5 and $10 Million
Tentative Fixed Completion Date: Summer 2025
(Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)
DIVISION 250 – Slope Reinforcement and Retaining Walls
251 Riprap Class 2 – 30 CUYD
DIVISION 300 – Aggregate and Base Courses
301 Untreated Aggregate Course 58500 TON
302 Minor Crushed Aggregate 2700 TON
303 Road Reconditioning 98208 LNFT
311 Stabilized Aggregate Surface Course Aggregate
62500 TON
Calcium Chloride
1115 TON
DIVISION 600 – Incidental Construction
602 Culverts & Drains (indicate one or both) 30-inch Pipe Culvert 56 LNFT 24-inch EQ DIA Arch Pipe Culvert
70 LNFT
54-inch EQ DIA Arch Pipe Culvert
70 LNFT
End Section 30-inch
2 EACH
End Section 24-inch EQ DIA Arch
Pipe
4 EACH
End Section 54-inch EQ DIA Arch Pipe
4 EACH
607 Cleaning, Relaying, & Repairing Existing Drainage Structures Cleaning 4 EACH Repairing 4 EACH
617 Guardrail Terminal Section MGS Tangent
12 EACH
Wood Post
100 EACH
Remove and Reset Guardrail
5325 LNFT
619 Fence, Gates & Cattle Guards 24-ft Cattle Guard
2 EACH
622 Rental Equipment (yes/no) Yes
623 General Labor (yes/no) Yes
624 Topsoil (landscaping & related items) 4-inch depth
700 SQYD
625 Turf Establishment (indicate seeding or mulching separately) 700 SQYD
633 Permanent Traffic Control – Sign System 496 SQFT
635 Temporary Traffic Control Barricade Type 3
6 EACH
Cone Type 36-inch
20 EACH
Drum
20 EACH
Construction Sign
267 SQFT
Flagger
1700 HOUR