QA_10-06-2023.pdf
PDF 100 KB Posted
- Solicitation number
- 69056723B000023
About this file
This document contains technical questions and answers related to federal contract solicitation number 69056723B000023 for the ID FLAP SHOSHO MULTI(1) project involving road work on Coeur D'Alene River Road and Prichard Creek Road. The questions and answers provide clarification on specifications such as the required length of guard rail posts to use based on site conditions, the acceptable types of posts, potential substitute materials for epoxy paint, rumble strip installation methods, potential utility conflicts, and sign placement dimensions. Contractors should prepare bids in accordance with the solicitation documents and refer to plan sheets and specifications for technical requirements. Minor field adjustments may be necessary for sign locations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Tabulation of Bids.pdf | ||
| BidSum_ID FLAP SHOSHO MULTI(1).pdf | ||
| QA_10-11-2023.pdf | ||
| Amendment A001.pdf | ||
| id_flap_shosho_multi1_plans Final.pdf | ||
| IFB 69056723B000023.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project No: ID FLAP SHOSHO MULTI(1), Project: Coeur D Alene River Road and Prichard Creek Road
# General Technical Question Answer Date
1 X What length guard rail posts are being spec’d for this project? Both 6’ and 8’ are shown.
Both 6’ and 8’ posts are being spec’s for this project. Please refer to plan sheets D.6 & D.7 that show typical cross section details for when to use 6 foot post, typical guardrail cross section 6 foot, 8” or 12” block, Typical guardrail cross section 6 foot post centered on hinge, 8” or 12” block, and when to use 8 foot post depicted in typical cross section detail for 8 foot post on slope. Asses existing conditions in the field and submit bids according to the solicitation documents.
11/5/23
2 X It appears either wood or steel posts can be used. Is that correct?
No. See Guardrail Quantities table on Sheet D.1 for guardrail limits with the respective posts.
11/5/23
3 x Local/regional striping companies do not do epoxy paint in this area. Are you willing to allow substitute material? Hot Plastic paint and/or inlay could be an equal substitute for epoxy paint.
Submit bids according to the solicitation documents 11/6/23
4 X Ruble Strip Install – Local rumble strip installers use a grind machine and sweep up behind the grinding machine. Is this method acceptable rather than the vacuum equipped method in the specifications.
Submit bids according to the solicitation documents 11/6/23
5 X Gas Pipeline Vicinity – Are there any potential conflicts with sign location installs and the transmission line in the area?
There are no utility conflicts or proposed utility relocations on the project at the time of contract advertisement. Minor adjustment of sign locations may be required in the field.
Refer to Section 107.02 for utility locating.
11/6/23
6 X Will signs need to be at least 10 feet off the roadway edge?
Refer to the dimensions on the detail plan sheets under the Permanent Traffic Control Section.
11/6/23