This document contains technical questions and answers regarding Solicitation Number 69056722B000022 for the AK ANCHORAGE T 2016(1) Connecting Anchorage Trail Improvements project. The questions clarify that all work under the contract must be completed by November 14, 2023 according to specification 108.01, address the specifications for steel pipe piling and bridge components, and confirm that a subcontracting plan is not required to be submitted with bids but only by the low bidder prior to contract award. The related federal contract opportunity provides additional details on the full and open solicitation to improve trails in Anchorage, Alaska being issued by the Department of Transportation Federal Highway Administration.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project No: AK ANCHORAGE T 2016(1)
Project: Connecting Anchorage Trail Improvements
# General Technical Question Answer Date
1 X
52.211‐10 says the work is to be complete ready for use not later than 8/29/2023.
108.01 says all work is to be completed by
November 14, 2023.
Please clarify.
will be addressed under Amendment A001 8/22/2022
2 X
We see there are bridge specifications in the solicitation, but we don’t see any specifications for the pilings. For example Sheet H‐1 states under the Bridges General Notes that the specification for structural steel is under Section
717 which is all non weathering steel (i.e. A588).
There is no specific call out for the pilings and what grade of pipe they should be. In most applications the piling typically falls under its own spec and does not fall under the bridge spec. The welding detail is also for bridge spec
(AWS D1.5), and we do not see welding details called out for piling. Are we to assume that the piling materials are to fall under section 717, and welding detail to fall under AWSD1.5? Any clarification on this would be greatly appreciated.
In accordance with the Bid Schedule and Sheet H.1, Steel Pipe Pile, In‐Place is a 551 Pay Item; so see FP‐
14 Section 551 which specifies the required work for
Driven Piles, and references materials under
Subsection 551.02.
9/16/2022
3 X
The bidders checklist says a subcontracting plan must be included for large businesses with the bid documents, but page A‐6 says in bold letters
"Do not submit this form with your bid." Please clarify.
The Bid Submittal Checklist on the third page of the
Invitation for Bids does not indicate a subcontracting plan must be included. It only has a box to check if a bidder does include it. Follow the instructions on
Page A‐6 that states “Do not submit this form with your bid.”, as the low bidder will be required to submit this form after all bids are evaluated and before contract award.