QA 09-16-2022.pdf

PDF 98 KB Posted

Attached to
AK ANCHORAGE T 2016(1) Connecting Anchorage Trail Improvements
Solicitation number
69056722B000022
Issued by

About this file

This document contains answers to technical questions regarding a federal contract solicitation for trail improvements in Anchorage, Alaska. The solicitation is for connecting trails and requires steel pipe piles to be installed in accordance with Section 551, as well as bridges to be constructed using non-weathering steel under Section 717 and AWS D1.5 welding standards. The work must be fully complete and ready for use by August 29, 2023 according to the contract, though other documents specify a later completion date of November 14, 2023. Clarification on discrepancies in completion dates will be provided in Amendment A001.

View the file

Other files

File Type Posted
Awarded Bid Tabulation_AK ANCHORAGE T 2016(1).pdf PDF
Bid Tabulation_AK ANCHORAGE T 2016(1).pdf PDF
BidSum_AK ANCHORAGE T 2016(1).pdf PDF
QA 10-03-2022.pdf PDF
Amendment A002.pdf PDF
Amendment A001.pdf PDF
QA 8-22-2022.pdf PDF
ak-a2020161_SWPPP.pdf PDF
ak-a2020161_ControlPointCoordinates.xls XLS spreadsheet
ak-a2020161_HydraulicDesignReport.pdf PDF
ak-a2020161_GeotechnicalReport.pdf PDF
ak-a2020161_SlopeStakingReport.pdf PDF
ak-a2020161_Earthwork.pdf PDF
ak-a2020161_XS.pdf PDF
ak-a2020161_plans.pdf PDF
Additional Physical Data.zip ZIP file
IFB_AK ANCHORAGE T 2016(1)_FO.pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project No: AK ANCHORAGE T 2016(1)

Project: Connecting Anchorage Trail Improvements

# General Technical Question Answer Date

1 X

52.211‐10 says the work is to be complete ready for use not later than 8/29/2023.

108.01 says all work is to be completed by

November 14, 2023.

Please clarify.

will be addressed under Amendment A001 8/22/22

2 X

We see there are bridge specifications in the solicitation, but we don’t see any specifications for the pilings. For example Sheet H‐1 states under the Bridges General Notes that the specification for structural steel is under Section

717 which is all non weathering steel (i.e. A588).

There is no specific call out for the pilings and what grade of pipe they should be. In most applications the piling typically falls under its own spec and does not fall under the bridge spec. The welding detail is also for bridge spec

(AWS D1.5), and we do not see welding details called out for piling. Are we to assume that the piling materials are to fall under section 717, and welding detail to fall under AWSD1.5? Any clarification on this would be greatly appreciated.

In accordance with the Bid Schedule and Sheet H.1, Steel Pipe Pile, In‐Place is a 551 Pay Item; so see FP‐

14 Section 551 which specifies the required work for

Driven Piles, and references materials under

Subsection 551.02.

9/16/22

Check General or Technical