Amendment A001.pdf
PDF 1 MB Posted
- Solicitation number
- 69056721R000007
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A002 REVISED.pdf | ||
| Amendment A002.pdf | ||
| QA_02-17-2022.pdf | ||
| SEQU_C6_Final_Report.pdf | ||
| KICA_C6_Final_Report.pdf | ||
| 1_nps_pp_seki_2018(3)_2020(1)_ph1_2_final_plans_sheets2-79_signed_07-08-2021.pdf | ||
| CA NPS PP RFP .pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
N/A
PAGE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)
A001 2/2/2022 N/A See Block 14
6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A
Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.
X
69056721R000007
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
N/A
10B. DATED (SEE ITEM 13)
CODE: N/A FACILITY CODE: N/A N/A
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers (__ ) is extended, ( x ) is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
N/A
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN
ITEM 10A.
N/A
B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
N/A
C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
N/A
D OTHER (Specify type of modification and authority) N/A
E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
CA NPS PP SEKI 2018(3) and CA NPS PP SEKI 2020(1),Pavement Preservation SEKI Phase I and Pavement Preservation SEKI Phase II
See page 2
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
N/A
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITION NOT USABLE
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Amendment No. A001, dated 2/2/2022 Project No: CA PP SEKI 2018(3) & CA NPS PP SEKI 2020(1) Solicitation No. 69056721R000007 Project Name: Pavement Preservation SEKI Phase I &II
REVISIONS ARE AS FOLLOWS:
BID SCHEDULE
Page A-7 through A-13. Revises Bid Schedule A, Base, Quantities for Asphalt Concrete Patch, Type 1 and Type 2.
CONTRACT CLAUSES
CONTRACT CLAUSES
Page C-31. Revises FAR Clauses 52.217-7, Option for Increased Quantity –Separately Priced Line Item (Mar 1989), option exercise date from May 1, 2022 to July 15, 2022.
PLANS
Plan sheet #B.1-B.2 Revises Asphalt Concrete Patch Type 1 and Type 2 quantities.
Plan sheet #D.1 Revises Surfacing Tabulation Sheet - Base route number 0010 Asphaltic Pavement Patch Type 1 and Type 2 Quantities.
Plan Sheet #D.9 Revises Surface Tabulation Sheet – Base totals for Asphalt
Concrete Patch Type 1 and Type 2
ENCLOSURES
Pages:
A-7 through A-13 C-31
Plan Sheets:
B.1 - B.2 D.1 D.9
Notice to Bidders: Please submit revised pages A-7 through A-13 with your bid.
A - 7
Bidder/Offeror please note: Before preparing the bid, carefully read the Solicitation Provisions. Insert a unit bid price, in figures, for each pay item for which a quantity appears in the bid schedule. Multiply the unit price by the quantity for each pay item and show the amount bid. Should any mathematical check made by the Government show a mistake in the amount bid, the corrected unit price extension shall govern. When the word "LPSM" (Lump Sum) appears as a unit bid price, insert an amount for each lump sum pay item. When a sum based on a fixed rate appears for any pay item in the amount bid column, include the Government inserted amount bid for the item in the total bid amount. Total all of the amounts bid for each pay item and show the total bid amount.
Bid Schedule
Project No:CA NPS PP SEKI 2018(3) & CA NPS PP SEKI 2020(1)
Project Name:Pavement Preservation SEKI Phase I & II Revised by Amendment A001
A - 8
Amendment Item No. Pay Item No. Description Quantity Unit Unit Price Amount
A0020 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
A0040 15301-0000 CONTRACTOR QUALITY CONTROL
ALL LPSM $___LPSM_____ $____________
A0060 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
A0080 15501-0000 CONSTRUCTION SCHEDULE
ALL LPSM $___LPSM_____ $____________
A0100 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1
710.0 TON $____________ $____________
A0120 40601-0000 FOG SEAL
18.0 TON $____________ $____________
A0140 40712-0000 BLOTTER
80 TON $____________ $____________
A0160 40901-2000 MICRO SURFACING, TYPE 2
730,000 SQYD $____________ $____________
A0180 40901-3000 MICRO SURFACING, TYPE 3
417,000 SQYD $____________ $____________
A0200 41201-0000 TACK COAT
3.5 TON $____________ $____________
A0220 41401-3000 CRACKS, CLEANING AND FILLING
1,115 LNFT $____________ $____________
A0240 41402-2000 CRACKS, CLEANING AND SEALING
69.00 MILE $____________ $____________
A001 A0260 41801-1000 ASPHALT CONCRETE PAVEMENT PATCH, TYPE 1
405 SQYD $____________ $____________
A001 A0280 41801-2000 ASPHALT CONCRETE PAVEMENT PATCH, TYPE 2
14,400 SQYD $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
A - 9
A0300 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY
80 HOUR $____________ $____________
A0320 62201-0450 BACKHOE LOADER, 4 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET,
18-INCH WIDTH
80 HOUR $____________ $____________
A0340 62201-2360 VACUUM SWEEPER
160 HOUR $____________ $____________
A0360 62301-0000 GENERAL LABOR
160 HOUR $____________ $____________
A0380 63315-0000 RUMBLE STRIP
22 SQYD $____________ $____________
A0400 63326-0000 MUMBLE STRIP
6.30 MILE $____________ $____________
A0420 63401-0000 PAVEMENT MARKINGS (TYPE B)
2,500,000 LNFT $____________ $____________
A0440 63405-0050 PAVEMENT MARKINGS, SYMBOLS (TYPE B)
350 EACH $____________ $____________
A0460 63406-0000 RAISED PAVEMENT MARKER
440 EACH $____________ $____________
A0480 63502-0700 TEMPORARY TRAFFIC CONTROL, CONE
220 EACH $____________ $____________
A0500 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN
6 EACH $____________ $____________
A0520 63503-0700 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS
250,000 LNFT $____________ $____________
A0540 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
300 SQFT $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
A - 10
A0560 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER
14,000 HOUR $____________ $____________
A0580 63506-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR
330 HOUR $____________ $____________
A0600 63507-0700 TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR
192 DAY $____________ $____________
Submitted by:____________________________________ Schedule Total:____________
Bid Schedule Schedule:A Schedule Type:Base
A - 11
Amendment Item No. Pay Item No. Description Quantity Unit Unit Price Amount
X0020 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
X0040 15301-0000 CONTRACTOR QUALITY CONTROL
ALL LPSM $___LPSM_____ $____________
X0060 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
X0080 15501-0000 CONSTRUCTION SCHEDULE
ALL LPSM $___LPSM_____ $____________
X0100 40712-0000 BLOTTER
40 TON $____________ $____________
X0120 40901-2000 MICRO SURFACING, TYPE 2
90,000 SQYD $____________ $____________
X0140 41401-3000 CRACKS, CLEANING AND FILLING
52 LNFT $____________ $____________
X0160 41402-2000 CRACKS, CLEANING AND SEALING
7.50 MILE $____________ $____________
X0180 41801-2000 ASPHALT CONCRETE PAVEMENT PATCH, TYPE 2
2,000 SQYD $____________ $____________
X0200 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY
20 HOUR $____________ $____________
X0220 62201-0450 BACKHOE LOADER, 4 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET,
18-INCH WIDTH
20 HOUR $____________ $____________
X0240 62201-2360 VACUUM SWEEPER
40 HOUR $____________ $____________
X0260 62301-0000 GENERAL LABOR
40 HOUR $____________ $____________
Bid Schedule Schedule:X Schedule Type:Options
A - 12
X0280 63401-0000 PAVEMENT MARKINGS (TYPE B)
116,000 LNFT $____________ $____________
X0300 63405-0050 PAVEMENT MARKINGS, SYMBOLS (TYPE B)
85 EACH $____________ $____________
X0320 63502-0700 TEMPORARY TRAFFIC CONTROL, CONE
220 EACH $____________ $____________
X0340 63503-0700 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS
10,000 LNFT $____________ $____________
X0360 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
100 SQFT $____________ $____________
X0380 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER
1,200 HOUR $____________ $____________
X0400 63507-0700 TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR
25 DAY $____________ $____________
Submitted by:____________________________________ Schedule Total:____________
Bid Schedule Schedule:X Schedule Type:Options
A - 13
Bid Schedule Summary
Schedule Bid Total
Schedule A - Base(A - 8 through A-10)
Schedule X - Option(A - 11 through A-12)
Total - Schedules A + Schedule X
Submitted By: ________________________________
Bid Schedule
James Mills Digitally signed by James Mills DN: CN=James Mills, dnQualifier=A01410D00000179E72B1FE500001FB8, O=Colorado, C=US Date: 2022.02.01 09:13:48-07'00'
Revised by Amendment A001
James Mills Digitally signed by James Mills DN: CN=James Mills, dnQualifier=A01410D00000179E72B1FE500001FB8, O=Colorado, C=US Date: 2022.02.01 09:13:23-07'00'
Contract Clauses CA NPS PP SEKI 2018(3) and CA NPS PP SEKI 2020(1), Pavement Preservation SEKI Phase I and Pavement Preservation SEKI Phase II
C - 31
52.217-7 Option for Increased Quantity--Separately Priced Line Item (Mar 1989)
The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor not later than May 1, 2022 July 15, 2022. Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.
52.219-8 Utilization of Small Business Concerns (Oct 2018)
(a) Definitions. As used in this contract-- “HUBZone small business concern” means a small business concern, certified by the Small Business
Administration, that appears on the List of Qualified HUBZone Small Business Concerns maintained by the Small Business Administration.
“Service-disabled veteran-owned small business concern”—
(1) Means a small business concern—
(i) Not less than 51 percent of which is owned by one or more service-disabled veterans or, in the case of any publicly owned business, not less than 51 percent of the stock of which is owned by one or more service-disabled veterans; and
(ii) The management and daily business operations of which are controlled by one or more service-disabled veterans or, in the case of a service-disabled veteran with permanent and severe disability, the spouse or permanent caregiver of such veteran.
(2) Service-disabled veteran means a veteran, as defined in 38 U.S.C. 101(2), with a disability that is service-connected, as defined in 38 U.S.C. 101(16).
“Small business concern” means a small business as defined pursuant to Section 3 of the Small Business Act and relevant regulations promulgated pursuant thereto.
“Small disadvantaged business concern”, consistent with 13 CFR 124.1002, means a small business concern under the size standard applicable to the acquisition, that—
(1) Is at least 51 percent unconditionally and directly owned (as defined at 13 CFR 124.105) by—
(i) One or more socially disadvantaged (as defined at 13 CFR 124.103) and economically disadvantaged (as defined at 13 CFR 124.104) individuals who are citizens of the United States; and
(ii) Each individual claiming economic disadvantage has a net worth not exceeding $750,000 after taking into account the applicable exclusions set forth at 13 CFR 124.104(c)(2); and
(2) The management and daily business operations of which are controlled (as defined at 13.CFR
124.106) by individuals, who meet the criteria in paragraphs (1)(i) and (ii) of this definition.
“Veteran-owned small business concern” means a small business concern—
(1) Not less than 51 percent of which is owned by one or more veterans (as defined at 38 U.S.C.
101(2)) or, in the case of any publicly owned business, not less than 51 percent of the stock of which is owned by one or more veterans; and
(2) The management and daily business operations of which are controlled by one or more veterans.
“Women-owned small business concern” means a small business concern—
(1) That is at least 51 percent owned by one or more women, or, in the case of any publicly owned business, at least 51 percent of the stock of which is owned by one or more women; and
(2) Whose management and daily business operations are controlled by one or more women.
(b) It is the policy of the United States that small business concerns, veteran-owned small business concerns, service-disabled veteran-owned small business concerns, HUBZone small business concerns, 40301-0100 40601-
40901-2000 40901-3000 41201-0000 41401-3000
41402-
41801-1000 41801-2000
FT FT
TON TON SQYD SQYD TON LNFT MILE SQYD SQYD
0010 Generals Highway Historic 73857 44.70 45.88 6,230 23.3 16,129 173
0010 (1) Pullout 73857 178
0011 Cedar Grove Road 73850 0.00 7.58 40,022 23.9 106,281 7.58 676
0011 (1) Approach, (12) Pullouts 73850 6,789 0.53
0015 Grant Grove Road 73052 0.00 4.70 24,816 26.5 73,069 1,410
0015 (7) Pullouts 73052 1,851
0205 North Side Road 73056 0.00 1.56 8,237 18.0 16,474 0.50 32
0205 (1) Pullout 73056 133
0206AZ Sheep Creek Campground Road A 73059 0.00 0.49 2,587 11.8 3,392 0.49 95
0206AZ (111) Slips 73059 4,440 0.34
0206BZ Sheep Creek Campground Road B 73059 0.00 0.47 2,482 13.8 3,806 0.47 70
0206CZ Sheep Creek Campground Road C 73059 0.00 0.07 370 14.7 604 0.07 15
0206DZ Sheep Creek Campground Road D 73059 0.00 0.08 422 12.1 567 0.08 30
0206EZ Sheep Creek Campground Road E 73059 0.00 0.11 581 11.6 749 0.11 25
0206FZ Sheep Creek Campground Road F 73059 0.00 0.14 739 13.8 1,133 0.14 108
0206GZ Sheep Creek Campground Road G 73059 0.00 0.09 475 10.2 538 0.09 18
0207AZ Sentinel Campground Road A 73060 0.00 0.60 3,168 11.8 4,154 0.60 356
0207AZ (83) Slips 73060 3,320 0.26
0207BZ Sentinel Campground Road B 73060 0.00 0.22 1,162 11.6 1,498 0.22 44
0207CZ Sentinel Campground Road C 73060 0.00 0.12 634 9.5 669 11
0207DZ Sentinel Campground Road D 73060 0.00 0.12 634 8.8 620 51
0207EZ Sentinel Campground Road E 73060 0.00 0.10 528 8.4 493 0.10 5
0209AZ Moraine Campground Road A 73063 0.00 0.61 3,221 13.2 4,724 0.61 56
0209AZ (68) Slips 73063 2,720 0.21
0209BZ Moraine Campground Road B 73063 0.00 0.10 528 11.7 686 0.10
0209CZ Moraine Campground Road C 73063 0.00 0.16 845 12.1 1,136 0.16 14
0209DZ Moraine Campground Road D 73063 0.00 0.37 1,954 12.6 2,736 0.37 40
0209EZ Moraine Campground Road E 73063 0.00 0.12 634 10.8 761 0.12 5
0209FZ Moraine Campground Road F 73063 0.00 0.13 686 11.7 892 0.13
0212 Grant Tree Road 73065 0.00 0.77 4,066 26.6 12,017 0.77 77
0212 (1) Pullout 73065 667 0.05
0216AZ Azalea Campground Road A 73066 0.00 0.27 1,426 16.9 2,678 0.27 153
0216AZ (15) Slips 73066 1,000 0.08
145.2 = Hot Asphalt Concrete (lbs/cuft) 0.43 = Emulsified Asphalt (Gal./sqyd)
0.15 = Fog Seal (Gal./sqyd) 240.0 = Emulsified Asphalt (Gal./ton)
233.0 = Fog Seal (Gal./ton) 0.10 = Tack Coat (Gal./sqyd)
233.0 = Tack Coat (Gal./ton)
J:\_Transportation\W3X71254_WFL_PP_SEKI\700FHWA\T0053\Roadway\CADD_Sheets\Combined Phase 1&2 Project\_Tabs\[SEKI_PH1_2_Proj_Sum_Shts.xlsm]KICARoad 1
NPS PP SEKI 2018(3)
NPS PP SEKI 2020(1)
ASPHALT
CONCRETE
PAVEMENT,
TYPE 1
FOG
SEAL
TACK COAT
0 0
Note: Protect curbs, curb and gutter, valves, concrete bridges, manhole covers, snow pole holders, etc.
MICRO
SURFACING,
TYPE 3
Slips cover all campground roads
Slips cover all campground roads
PROJECT
SHEET
NO.
CA D.1
SURFACING TABULATION SHEET - BASE
STATE
MILES SQFT
CRACKS,
CLEANING
AND FILLING
CRACK,
CLEANING
AND
SEALING
ASPHALT
CONCRETE
PAVEMENT
PATCH, TYPE
ASPHALT
CONCRETE
PAVEMENT
PATCH, TYPE
MICRO
SURFACING,
TYPE 2
BID ITEM NUMBER
Remarks
R O
U T E N
U M
B E R
ROUTE NAME FMSS No.
MILE TO MILE
L E N
G T H
W
ID
T H
Slips cover all campground roads
Treat only MP 44.70 to MP 45.88. Do not treat concrete bridge decks
Treat asphalt covered bridge deck
Crack sealing MP 1.10 to MP 1.60; treat asphalt covered bridge deck
Material Application Rates and Weights Used for Estimating Purposes
These values are for estimating purposes only and application rates and weight may change based on actual test strip and field results.
3,464260,775 16,129 0 14.45 0
TABULATION OF
SURFACING QUANTITIES
SHEET TOTAL
NPS PMIS No. 257275
39,960
1,600
61,100
16,660
3/23/21 9:53 AM
1,200
29,880
24,480
Treat the road and loop starting at the gate
6,000
KINGS CANYON NATIONAL PARK
9,000
Revised by Amendment A0011
1,173
4,464
40301-0100 40601-
40901-2000 40901-3000 41201-0000 41401-3000
41402-
41801-1000 41801-2000
FT FT
TON TON SQYD SQYD TON LNFT MILE SQYD SQYD
0952BZ Dorst Campground Parking B 133
0952CZ Dorst Campground Parking C 207
0952DZ Dorst Campground Dump Parking 437
0952EZ Dorst Campground Parking E 303 0.02
0952FZ Dorst Campground Parking F 918
0952GZ Dorst Campground Amphitheater Parking 2,429
0952HZ Dorst Campground Group Parking H 1,415 33
0952JZ Dorst Campground Group Parking I 1,193
Ash Mountain Recreation Hall Parking 1,852
0953Z Lodgepole Visitor Center Rear Parking 73943 574 0.04
Alta 0.00 0.57 3,010 8.0 1.7
Beetle Rock 0.00 0.35 1,848 8.0 1.1
Big Trees 0.00 0.59 3,115 8.0 1.8
Congress 0.00 1.49 7,867 8.0 4.5
Generals Hwy Parking Access 0.00 0.04 211 8.0 0.1
Giant Forest - Local 0.00 0.20 1,056 8.0 0.6
Museum Access Paths 0.00 0.48 2,534 8.0 1.5
Public Toilet Access 0.00 0.01 53 8.0 0.0
Round Meadow 0.00 0.12 634 8.0 0.4
Sherman Tree 0.00 1.36 7,181 8.0 4.1
Sunset Rock 0.00 0.09 475 8.0 0.3
2.00 200
145.2 = Hot Asphalt Concrete (lbs/cuft) 0.43 = Emulsified Asphalt (Gal./sqyd)
0.15 = Fog Seal (Gal./sqyd) 240.0 = Emulsified Asphalt (Gal./ton)
233.0 = Fog Seal (Gal./ton) 0.10 = Tack Coat (Gal./sqyd)
233.0 = Tack Coat (Gal./ton)
J:\_Transportation\W3X71254_WFL_PP_SEKI\700FHWA\T0053\Roadway\CADD_Sheets\Combined Phase 1&2 Project\_Tabs\[SEKI_PH1_2_Proj_Sum_Shts.xlsm]SEQURoad 5
PROJECT
SHEET
NO.
CA D.9
SURFACING TABULATION SHEET - BASE
STATE
1,201
BID ITEM NUMBER
Remarks
R O
U T E N
U M
B E R
ROUTE NAME FMSS No.
MILE TO MILE
L E N
G T H
W
ID
T
H ASPHALT
CONCRETE
PAVEMENT,
TYPE 1
MILES SQFT
FOG
SEAL
MICRO
SURFACING,
TYPE 2
MICRO
SURFACING,
TYPE 3
TACK COAT
CRACKS,
CLEANING
AND FILLING
CRACK,
CLEANING
AND
SEALING
ASPHALT
CONCRETE
PAVEMENT
PATCH, TYPE
ASPHALT
CONCRETE
PAVEMENT
PATCH, TYPE
21,860
12,737
10,737
3,936
2,727
8,265
16,670
5,167
0 200TRAILS SUBTOTAL 0 16.1 0 0
960 65.67 183 11,975BASE TOTAL 674.6 17.2 693,538 392,300 2.9
0.0SHEET TOTAL 0 16.1 9,461 0
For all trails in the vicinity of the museum and
General Sherman Tree as directed by CO
Material Application Rates and Weights Used for Estimating Purposes
TABULATION OF
SURFACING QUANTITIES
These values are for estimating purposes only and application rates and weight may change based on actual test strip and field results.
Note: Protect curbs, inlets, manhole covers, stone walls, concrete stone swales, valves, asphalt curb and gutter, trees, stone cubs, wheel stops, grates, concrete bridges, concrete vaults, cattle guards, paved ditches, stone ditches, granite curbs, sidewalks, rock island and inlaid stones. SEQUOIA NATIONAL PARK
1,867
NPS PP SEKI 2018(3)
NPS PP SEKI 2020(1)
4/12/21 11:03 AM NPS PMIS No. 257275
0 2.06 0 233
0.0 0 2.00
Trails
1 Revised by Amendment A001
12,975
| AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT |
| A001 |