This document describes a federal contract opportunity for a wildlife overpass construction project. The project involves building a precast concrete arch structure, connecting MSE walls, installing 8-foot tall fencing with wire mesh and gates, grading, asphalt paving, turf establishment, installing solar powered video cameras, and temporary traffic control measures. The location is at milepost 19.3 on State Highway 21, 20 miles east of Boise, Idaho. The estimated price range is between $3 million to $5 million, with a tentative completion date of November 2022. The solicitation will be offered as a small business set-aside through the Department of Transportation Federal Highway Administration. The pre-solicitation provides the project description and preliminary plans for the wildlife overpass.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ID DOT 21(1) PRELIM PLANS.pdf | ||
| ID DOT 21(1) Prelim Letter.pdf | ||
| PROJECT DESCRIPTION_ID DOT 21(1) SH-21.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ID DOT 21(1) SH-21 Wildlife Overpass at Cervidae Peak, MP 19.3
This project includes, a precast concrete arch structure, MSE walls connecting to the concrete arch structure, 8-foot tall steel post fence with wire mesh, and gates intermittently positioned along the fence alignment. This project also includes grading related to fence installation and concrete arch installation, asphalt Paving, turf establishment, solar powered video camera installation, and all necessary staging, erosion control and traffic control to complete the work.
Tentative Fixed Completion Date: November, 2022
(Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)
Estimated Price Range: $3 million to $5 million
Location: 20 Miles East of Boise Idaho.
DESCRIPTION OF WORK in US CUSTOMARY UNITS
FP-14
O ne
S ch ed ul e Sc h N am e
DIVISION 150 – Project Requirements 152 Construction Survey & Staking (yes/no) Yes 153 Contractor Quality Control and Assurance
(yes/no) Yes 154 Contractor Testing (yes/no) Yes 155 Schedules for Construction Contracts (construction schedules) (yes/no) Select 157 Soil Erosion & Sediment Control - Silt Fence
13,000 LN
FT
157 Soil Erosion & Sediment Control - Stabilized Construction Exit 2 158 Watering for Dust Control LPSM
DIVISION 200 – Earthwork 201 Clearing & Grubbing 1 acre 204 Excavation & Embankment 1000 CY 203 Pavement Removal 1400 SQ YD 204 Unclassified Borrow 17,000 CY DIVISION 250 – Slope Reinforcement and Retaining Walls 251 Riprap 500 CY
O ne
S ch ed ul e Sc h N am e
255 Mechanically Stabilized Earth Walls (retaining walls) 4500 SQFT DIVISION 300 – Aggregate and Base Courses 301 Aggregate Courses (crushed aggregate) 230 CY DIVISION 400 – Asphalt Pavements & Surface Treatments 401 Asphalt Concrete Pavement By Gyratory Mix Design Method 1100 TON 413 Asphalt Pavement Milling 1300 SQYD
DIVISION 550 – Bridge Construction 552 Structural Concrete (concrete – major structures) 1250 CY DIVISION 600 – Incidental Construction 617 Guardrail 570 LNFT 618 Concrete Barriers & Precast Guardwalls 300 LNFT 619 Fence 13,100
LNFT
619 Gate (3 feet) 10 EA 619 Gate (10 feet) 10 EA 624 Topsoil (landscaping & related items) 2500 CY 625 Turf Establishment (indicate seeding or mulching separately) 2 acres 635 Temporary Traffic Control - Signs 35 SQ FT 635 Temporary Traffic Control – Pavement Markings 5820 LN FT 635 Temporary Traffic Control – Portable Changeable Message Signs 2 EA 635 Temporary Traffic Control – Traffic Signal System 2 EA 635 Temporary Traffic Control – Flagger 112 HR 646 Roadside Development – Camera Fixture 4 EA 646 Roadside Development – Cameras 10 EA 646 Roadside Development – Jumpouts 11 EA