About this file
This document contains questions and answers regarding a federal contract solicitation to construct a paved roadway in Idaho. The solicitation seeks bids to widen West Milner Road from 24 feet to 28 feet wide to accommodate additional vehicle traffic. Questions addressed application rates for turf establishment, requirements for materials origin, small business and DBE participation goals, acceptable substitutes for specified geogrid materials, mulch application quantities, and the required percentage of work to be self-performed by the prime contractor. Bidders must comply with relevant Federal Acquisition Regulation provisions and specifications in Idaho's FP14 manual governing road construction. The closing date for bids was not provided. The selected contractor will complete the road widening project for the Department of Transportation Federal Highway Administration.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| BidSum.pdf | ||
| Bid Opening Sign-in sheet.pdf | ||
| QA_02-09-2021_2.pdf | ||
| QA_02-09-2021.pdf | ||
| QA_02-08-2021.pdf | ||
| Amendment A001.pdf | ||
| QA_02-04-2021.pdf | ||
| QA_02-03-2021.pdf | ||
| QA_01-27-2021.pdf | ||
| QA_01-26-2021.pdf | ||
| QA_01-25-2021.pdf | ||
| QA_01-21-2021.pdf | ||
| West Milner_FinalGeotechnicalReport.pdf | ||
| id-a3109721_Plans.pdf | ||
| IFB 69056720B000010.pdf | ||
| West Milner_Cross Sections.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ID CASSIA 972(1)
West Milner Road, 700W to 1100W
# General Technical Question Answer Date
1 X
We are attempting to try and bid this project but this is the first time we have seen a seed spec with SLRY. We have asked several seed suppliers and it doesn’t appear there is a clear understanding of what SLRY is refereeing to.
We had one mention “slurry Unit” which implies mass as a proportion of volume. But that doesn’t tell us what the application rate is.
We have seen measurements such as .5 lbs/pls and .5 ac/pls but not once have we seen SLRY.
Could we please get clarification of what this is referring to and what application rate is expected
Application rates for Turf Establishment are shown under Section 625 of the Special Contract Requirements; and FP‐14 Subsection 109.02(n), which also provides additional information on Slurry Unit. See FP‐14 Subsection 109.02(n) for information on Slurry Unit.
1/21/2021 1/27/2021 (Revised)
2 X What is placing conserved Topsoil? See FP‐14 Section 624. 1/25/2021
3 X What is select topping? See Section 204. 1/25/2021
Check General or Technical
4 X On the turf establishment, what’s the unit SLRY?
How do you know how much?
See revised response to bidder question 1 in a forthcoming QA file stating: in the file QA_01‐21‐2021.pdf posted on Jan 21, 2021;
which states: “Application rates for Turf Establishment are shown under Section 625 of the Special Contract Requirements; and FP‐14 Subsection 109.02(n), which also provides additional information on Slurry Unit". See FP‐14 Subsection 109.02(n) for information on Slurry Unit.”
1/25/2021 1/27/2021 (Revised)
5 X Does materials have to be American made and what are the requirements for it?
See FAR 52.225. 1/26/2021
6 X Start date and Complete date See FAR 211.211‐10. 1/26/2021
7 X Are DBE’s required DBE’s are not required, but this project is a total small business set‐aside project.
1/26/2021
8 X
Would WFL accept an equivalent geogrid product based on Full‐scale laboratory and in‐ ground testing of pavement structures, in the United States, reinforced with the specific geogrid that quantifies the structural benefit of the product? The geogrid benefit must meet or exceed that of the design geogrid. A list of five comparable projects that are similar in terms of size and application, are located in the United States, and where the results of using the specific alternate geogrid material can be verified after a minimum of five years of service life
The Geogrid, stabilization shown on Plan Sheet C.3 is required to conform with Section 207 and Subsection 714.03 of FP‐
14. We do not evaluate proposed materials before award.
1/26/2021
9 X
What is the size of a “Unit” when it comes to the mulch?
Generally, the benchmark rate for mulch application is 2,000lbs per acre. Is this the quantity we should be going off of?
Payment for mulch is by the SLRY unit under Pay Item 62503‐0000 for Turf Establishment. See Subsection 625.08; and FP‐14 Subsection 109.02(n).
1/27/2021
10 X What area does the slurry unit coverage need to cover? If you spread it thinly it covers more, but if you expect it to be thicker it will cover less.
In accordance with the bid schedule and Subsection 109.02(n), 26 slurry units covers
6.5 acres.
1/27/2021
11 X What percentage of work does the General Contractor have to perform?
15%. See FAR 52.219‐14. 1/28/2021