glac01046_Plans_Pre-Ad Package.pdf

PDF 13 MB Posted

Attached to
MT PRA GLAC 10(46) GTSR -Big Bend Vault Toilet Construction
Solicitation number
69056720B000026
Issued by

About this file

This document outlines a federal contract opportunity for construction services. The Department of Transportation Federal Highway Administration is soliciting bids for the MT PRA GLAC 10(46) GTSR -Big Bend Vault Toilet Construction project. Bids are due by June 30, 2020 according to the attached solicitation and pre-solicitation documents. Interested parties should review the plans and specifications in the attached glac01046_Plans_Pre-Ad Package.pdf file for details on project scope and requirements. The contract is set to be awarded by July 31, 2020 for construction to be completed by October 31, 2020.

View the file

Other files

File Type Posted
Pre-Ad Letter_Big Bend.docx DOCX document
FBO presol.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Preliminary Not for Construction

N

CL

PL

CL CL

C L

CL CL

CL

PL

PL

CL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

CL

GPK FILE DATED :

STATE PLANE COORDINATES GEO COORDINATES

POINT

NUMBER NORTH EAST ELEVATION LATITUDE LONGITUDE ELLIPSOID

HEIGHT

COMBINED

FACTOR DESCRIPTION NOTE:

526 1659377.520 948003.064 5684.688 1.

527 1659952.073 949351.910 5774.623

528 1658829.117 949460.456 5848.829

529 1658260.088 949329.406 5884.583

23130 1639296.980 976795.320 4735.969

23132 1639458.911 978087.152 4730.023

PROJECT : GTSR - BIG BEND VAULT TOILET CONSTRUCTION

DATE OF FIELD WORK :

DATE OF FINAL ADJUSTMENT :

PROJECT UNITS : INTERNATIONAL FEET

COORDINATE SYSTEM : SPCS NAD83; MONTANA (2500)

EPOCH DATE :

VERTICAL DATUM : NAVD88

To precisely check distances between points as measured on the ground, inverse the state plane coordinates and divide the computed distance by a mean combined factor of the two points.

F:

\h ig hw ay s\

FH

W

A\

_g la c0

_G

TS

R _R oa d\

D es ig n\

M ap pi ng a nd

5-

A ug

-2

2:

P

M B

Th om ps on

8/

J.

K ey

8/

D es ig ne d by

C he ck ed b y:

STATE PROJECT

C.26

SHEET

NUMBER

PRA GLAC 10(46)MT

NPS Drwg. No. 117 170507

SURVEY CONTROL

Sheets
C.2 - SITE PLAN ENLARGED
C.3 - SITE PLAN
C.4 - STANDARDS
C.5 - GENERAL STRUCTURAL NOTES
C.6 - FOUNDATION PLAN
C.7 - FOUNDATION SLAB REINF. PLANS
C.8 - MAIN LEVEL FRAMING PLAN
C.9 - ROOF FRAMING PLAN
C.10 - WEST ELEVATION VIEW
C.11 - NORTH/SOUTH ELEVATION VIEWS
C.12 - BUILDING SECTION
C.13 - PRECAST WALL PANEL ELEVATIONS
C.14 - STANDARD CONCRETE DETAILS
C.15 - STANDARD CONCRETE DETAILS
C.16 - FOUNDATION DETAILS
C.17 - FOUNDATION DETAILS
C.18 - PRECAST FRAMING DETAILS
C.19 - PRECAST FRAMING DETAILS
C.20 - PRECAST FRAMING DETAILS
C.21 - VAULT DETAILS
C.22 - ROCKERY RETAINING WALL DETAIL
C.23 - ELECTRICAL PLANS
C.24 - SITE DETAILS
C.25 - SITE DETAILS

File details come from the government source that posted it. Updated .