NV NPS PP LAKE 2019(1)
Pavement Preservation Lake Mead Phase 2
# General Technical Question Answer Date
1 X RE: Subsection 152.05(m), Can a GPS be used to conduct the road width survey?
See Subsections 152.01 and 152.02(b). 10/7/19
2 X
RE: Section 108.01(f), Are the limited work hours for the entire project including parking lot areas (ie; Section 634 ‐ applying first application of Permanent Pavement Markings prior to opening the parking lot to traffic) or is the intent of this subsection for mainline operations only?
Subsection 108.01(f) is a limitation for the entire project.
10/7/19
3 X
RE: Section 108.01(g), Can the Contractor submit a blanket request to work all Saturdays and Sundays for the duration of the project at the pre‐con or will the Contractor be required to make incremental requests to work each weekend in two‐week increments?
You may submit blanket requests, but blanket requests do not relieve the contractor of the requirements to provide a 14‐day advance notice for work schedule changes that include additional shifts; as well as, the requirements of Subsection 108.01(g) and Section 155.
10/7/19