19 Miles E of Mammoth, WY.

View the file

Other files

File Type Posted
Canyon_to_Tower,_Phase_3_Plans.pdf PDF
Prelim_Letter_Canyon_to_Tower_Phase_3.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WY NPS YELL 10(22), Canyon to Tower, Phase 3, Park County, WY

All project work is located in Yellowstone National Park, Park County, Wyoming.

This work consists of 9.852 kilometers of grading, base, paving, drainage, and retaining walls.

Project length: 9.852 Kilometers

Tentative Fixed Completion Date: Fall 2021 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)

Estimated Price Range: Over $20 Million

Location: 19 Miles East of Mammoth, WY.

DESCRIPTION OF WORK in US CUSTOMARY UNITS

FP-14

On e S ch ed ul e

Sc h

Na m e

A_

Ad di tio na l S ch

Sc h Na m e

_B

DIVISION 150 – Project Requirements 152 Construction Survey & Staking (yes/no) Yes Yes 153 Contractor Quality Control and Assurance

(yes/no) Yes Yes 154 Contractor Sampling & Testing (yes/no) Yes Yes 155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes Yes 157 Soil Erosion & Sediment Control (erosion control devices) Fiber Roll 5,832 m 5,900 m 158 Watering for Dust Control LS LS

DIVISION 200 – Earthwork 201 Clearing & Grubbing 13.2 ha 13.3 ha 203 Removal of Structures & Obstructions (concrete) 590 m2 590 m2 204 Roadway Excavation 69,000 m3 69,000 m3

DATA FOR SYNOPSIS IN FedBizOpps FP-14 PROJECTS (all) (rev 7/14) Page 4 Project No/Name: WY NPS YELL 10(22), Canyon to Tower, Phase 3 ch ed ul e

Sc h

Na m e tio na

Na m e

_B

204 Subexcavation 5,000 m3 5,000 m3 204 Select Borrow 5,100 t 5,100 t 205 Blasting Consultant (Consultant/Engineering Services) (yes/no) No No 207 Earthwork Geosynthetics 6,000 m2 6,000 m2 211 Roadway Obliteration 470 m2 470 m2

DIVISION 250 – Slope Reinforcement and Retaining Walls 251 Riprap 230 m3 230 m3 251 Riprap Ditch 2,350 m 2,350 m 252 Rockery, Special Rock Embankment, and Rock Buttress (Special Rock Embankment) 440 m3 440 m3 252 Rockery, Special Rock Embankment, and Rock Buttress (Rockery) 280 m2 280 m2 255 Mechanically Stabilized Earth Walls (retaining walls) 40 m2 40 m2 261 Reinforced Soil Slopes 130 m2 130 m2

DIVISION 300 – Aggregate and Base Courses 302 Minor Crushed Aggregate 60 m3 60 m3 303 Road Reconditioning 0 12,000 m2 308 Recycled aggregate base 98,000 m2 98,000 m2 DIVISION 400 – Asphalt Pavements & Surface Treatments 401 Asphalt Concrete Pavement By Gyratory Mix Design Method 20,360 t 20,360 t 403 Asphalt Concrete 3,425 t 4,100 t 406 Fog Seal 79,500 m2 79,500 m2 408 Cold Recycled Asphalt Base Course 79,500 m2 79,500 m2 412 Asphalt Tack Coat (asphalt surface treatment) 80 t 80 t

DATA FOR SYNOPSIS IN FedBizOpps FP-14 PROJECTS (all) (rev 7/14) Page 5 Project No/Name: WY NPS YELL 10(22), Canyon to Tower, Phase 3 ch ed ul e

Sc h

Na m e tio na

Na m e

_B

DIVISION 600 – Incidental Construction 602 Culverts & Drains (culverts) 1,576 m 1,576 m 604 Manholes, Inlets, & Catch Basins (inlets) 14 ea 14 ea 608 Paved Waterways (culverts & drains) 66 m2 66 m2 609 Curb & Gutter (Curb Stone) 110 m 110 m 609 Curb & Gutter (concrete) 780 m 780 m 615 Sidewalks, Pads & Paved Medians (concrete – minor structures) 4,487 m2 4,445 m2 617 Guardrail 108 m 108 m 620 Stone Masonry (veneer) 102 m2 102 m2 620 Stone Masonry (head wall) 166 ea 166 ea 621 Monuments & Markers (construction survey & staking) (yes/no) No No 622 Rental Equipment (yes/no) Yes Yes 623 General Labor (yes/no) Yes Yes 624 Topsoil (landscaping & related items) 110,480 m2 110,480 m2 625 Turf Establishment (mulching) 110,480 m2 110,480 m2 633 Permanent Traffic Control (traffic control devices) Sign System 18 m2 20 m2 634 Permanent Pavement Markings (traffic pavement markings) 75,900 m 75,900 m 635 Temporary Traffic Control – Flagger 9,000 Fxhr 9,000 Fxhr 635 Temporary Traffic Control – Portable changeable message sign 5 ea 5 ea 646 Roadside Development (Fixture, vault toilet) 3 ea 3 ea 646 Roadside Development (Fixture, pedestrian railing) 70 m 70 m