Preliminary Letter
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Canyon_to_Tower,_Phase_3_Plans.pdf | ||
| PROJECT_DESCRIPTION.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Western Federal Lands Highway Division 610 E. Fifth Street
Vancouver, WA 98661 Phone 360-619-7700
Fax 360-619-7846
NOTICE TO PROSPECTIVE OFFERORS
RE: WY NPS YELL 10(22)
Canyon to Tower, Phase 3 Solicitation No. 69056719R000018
The attached preliminary plans are being furnished to aid prospective Offerors in identifying the location and type of work for this project. The project will be advertised during a period when viewing of the project may not be possible due to snow. Therefore, prospective Offerors are encouraged to view the project during fall as conditions permit. After mid-September, access will be weather dependent; contact the Yellowstone National Parks 24-hour road information for current road conditions at 307-344-2117 or http://www.nps.gov/yell/conditions.htm. No Federal Highway Administration personnel will be available for show-me tours.
Two Bid Schedules - The work will be solicited under two alternate schedules, with different amounts of work in each schedule. One schedule will be awarded. See the Description of Work document for additional details.
• Schedule A consists of 9 .845 kilometers of Grand Loop Road reconstruction between Chittenden Road to Tower Fall, reconstruction of pull outs, and reconstruction and expansion of the Tower Fall parking lot. Work consists of roadway excavation, grading, base, paving, drainage, and retaining walls.
• Schedule B consists of all work in Schedule A plus paving the Chittenden Road parking lot.
Project Location and Type of Work - All project work is located in Yellowstone National Park, Park County Wyoming.
Technical Questions – All technical questions must be submitted by email wfl.plans-spec@dot.gov or FAX 360-619-7932
General Questions - Contact our office at wfl.contracts@dot.gov or at 360-619-7520.
Special Notice - Fall Weed Inspection May be Necessary
The upcoming contract will require aggregate, and masonry to be secured from commercial sources. These commercial sources must pass a Yellowstone National Park weed inspection.
Commercial certifications may be acceptable if materials have been certified through the North American Invasive Species Management Association standard.
08/28/2019 http://www.nps.gov/yell/conditions.htm mailto:plans-spec@dot.gov mailto:plans-spec@dot.gov mailto:wfl.contracts@dot.gov
Preliminary Plans letter
Solicitation documents - Documents will be available during the winter of 2019/2020. Please monitor the FedBizOpps (FBO) site for actual date of solicitation release (www.fbo.gov). To receive automatic notification through FBO, select the “Watch this opportunity” feature and follow the steps as indicated.
Thank you for your interest in this project.