WA NPS OLYM 2019(1)
South Beach Culvert Replacement
# General Technical Question Answer Date
1 X Currently the camp ground is full of campers directly in the work area. I assume they will be closing the camp ground during construction?
The South Beach Campground Road will be closed according to Subsection 156.04.
7/29/19
2 X Can we stage materials and equipment on the project site. Looks like plenty of room.
Stage equipment and stockpile materials at the locations specified under Subsection 105.04.
7/29/19
3 X Are you aware if the park service has a dump site close by where excess spoils can be placed?
A waste site has not been identified. 7/29/19
4 X
The Standard 1442 form in the current bid document appears to be marked DRAFT. Will you be sending out a revised version with the "DRAFT" lettering removed or should we submit the paperwork as‐is?
Yes, an amendment posted today, 8/5/19, has revised Standard 1442 form, and extends the bid period.
8/5/19
5 X Would you please clarify if this solicitation needs Bid Bond or not? On the form 1442 , 13b say an offer guarantee is not required.
A Bid Bond is not required. See Section 102 of the Special Contract Requirements.
8/6/19
6 X Also, we want to suggest to complete the project in September as it will rain in Oct and that would delay the job.
The fixed completion date of October 28, 2019 does not restrict an earlier completion, so this date will not change as it allows a longer time if needed.
8/6/19