This document contains a component quantities report for a highway construction project and the corresponding federal contract solicitation. The report details estimated material volumes and costs for various construction components along a 7.6 mile highway section from stations 684+13 to 685+20. Materials include cut and fill volumes, pavement layers, shoulders, and other grading elements. Total estimated costs are provided. The related solicitation from the Federal Highway Administration seeks construction services for a 7.6 mile section of Warren Wagon Road between miles 7.6 to 9.6 in Idaho Valley, as identified in the component quantities report. No other salient details are provided in the solicitation description.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Corridor Model Component Quantities Report Report Created: Saturday, December 07, 2019
Time: 10:58:23 PM
Corridor Name: WWR2_MatchExisting Alignment
Name:
Input Grid Factor: 1.000000 Note: All units in this report are in feet, square feet and cubic feet unless specified otherwise.
68413.950 Cut Volume: 29.765 1.00 0.000 Fill Volume: 1.00 0.000
Mesh\Modeling\Components\Grading\XS_TC_Cut: 5.635 1.00 0.000 Mesh\Modeling\Components\Grading\XS_TC_Foreslope: 1.799 1.00 0.000
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1: 4.132 1.00 0.000
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 2: 1.00 0.000
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 3: 6.609 1.00 0.000
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 4: 16.625 1.00 0.000
Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Foreslope: 2.773 1.00 0.000
Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Layer 3: 1.00 0.000
68420.000 Cut Volume: 29.747 180.023 0.04 6.668 Fill Volume: 1.00 0.000
Mesh\Modeling\Components\Grading\XS_TC_Cut: 6.303 36.112 1.00 36.112 Mesh\Modeling\Components\Grading\XS_TC_Foreslope: 1.437 9.789 1.00 9.789
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1: 4.145 25.037 0.04 0.927
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 2: 0.04 0.000
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 3: 6.636 40.066 0.04 1.484
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 4: 16.458 100.075 0.04 3.706
Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Foreslope: 2.508 15.976 1.00 15.976
Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Layer 3: 0.064 0.194 0.04 0.007
Component End Area
Totals
Component Surface Area
Totals
Station Material Area Volume Length Area Unit
Cost Material
Cost
Page 1 of 7Volumes Report
12/7/2019file:///C:/Users/danl/AppData/Local/Temp/RPTunbj5pym.html
68424.461 Cut Volume: 30.020 133.300 0.04 4.937 Fill Volume: 1.00 0.000
Mesh\Modeling\Components\Grading\XS_TC_Cut: 7.079 29.847 1.00 29.847 Mesh\Modeling\Components\Grading\XS_TC_Foreslope: 1.441 6.418 1.00 6.418
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1: 4.149 18.498 0.04 0.685
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 2: 0.04 0.000
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 3: 6.734 29.819 0.04 1.104
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 4: 16.665 73.874 0.04 2.736
Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Foreslope: 2.502 11.175 1.00 11.175
Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Layer 3: 0.139 0.453 0.04 0.017
68430.000 Cut Volume: 30.214 166.828 0.04 6.179 Fill Volume: 1.00 0.000
Mesh\Modeling\Components\Grading\XS_TC_Cut: 6.583 37.841 1.00 37.841 Mesh\Modeling\Components\Grading\XS_TC_Foreslope: 1.436 7.968 1.00 7.968
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1: 4.149 22.983 0.04 0.851
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 2: 0.04 0.000
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 3: 6.904 37.774 0.04 1.399
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 4: 17.034 93.334 0.04 3.457
Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Foreslope: 2.496 13.843 1.00 13.843
Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Layer 3: 0.251 1.079 0.04 0.040
68440.000 Cut Volume: 30.476 303.449 0.04 11.239 Fill Volume: 1.00 0.000
Mesh\Modeling\Components\Grading\XS_TC_Cut: 5.531 60.573 1.00 60.573 Mesh\Modeling\Components\Grading\XS_TC_Foreslope: 1.428 14.320 1.00 14.320
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1: 4.170 41.598 0.04 1.541
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 2: 0.04 0.000
Mesh\Modeling\Components\Pavt\XS_TC_Pavement 7.232 70.680 0.04 2.618
Component End Area
Totals
Component Surface Area
Totals
Station Material Area Volume Length Area Unit
Cost Material
Cost
Page 2 of 7Volumes Report
Layer 3:
Mesh\Modeling\Components\Pavt\XS_TC_Pavement
Layer 4: 17.750 173.920 0.04 6.441
Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Foreslope: 2.487 24.916 1.00 24.916
Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Layer 3: 0.445 3.478 0.04 0.129
68448.058 Cut Volume: 30.457 245.506 0.04 9.093 Fill Volume: 1.00 0.000
Mesh\Modeling\Components\Grading\XS_TC_Cut: 4.070 38.685 1.00 38.685 Mesh\Modeling\Components\Grading\XS_TC_Foreslope: 1.420 11.475 1.00 11.475
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1: 4.237 33.877 0.04 1.255
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 2: 0.04 0.000
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 3: 7.514 59.411 0.04 2.200
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 4: 18.377 145.561 0.04 5.391
Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Foreslope: 2.479 20.008 1.00 20.008
Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Layer 3: 0.565 4.067 0.04 0.151
68450.000 Cut Volume: 30.374 59.059 0.04 2.187 Fill Volume: 1.00 0.000
Mesh\Modeling\Components\Grading\XS_TC_Cut: 3.559 7.407 1.00 7.407 Mesh\Modeling\Components\Grading\XS_TC_Foreslope: 1.419 2.757 1.00 2.757
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1: 4.255 8.245 0.04 0.305
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 2: 0.04 0.000
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 3: 7.583 14.657 0.04 0.543
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 4: 18.532 35.834 0.04 1.327
Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Foreslope: 2.478 4.812 1.00 4.812
Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Layer 3: 0.593 1.124 0.04 0.042
68460.000 Cut Volume: 29.961 301.678 0.04 11.173
Component End Area
Totals
Component Surface Area
Totals
Station Material Area Volume Length Area Unit
Cost Material
Cost
Page 3 of 7Volumes Report
Fill Volume: 1.00 0.000 Mesh\Modeling\Components\Grading\XS_TC_Cut: 2.292 29.254 1.00 29.254
Mesh\Modeling\Components\Grading\XS_TC_Foreslope: 1.412 14.155 1.00 14.155 Mesh\Modeling\Components\Pavt\XS_TC_Pavement
Layer 1: 4.314 42.844 0.04 1.587
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 2: 0.04 0.000
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 3: 7.822 77.022 0.04 2.853
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 4: 19.063 187.973 0.04 6.962
Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Foreslope: 2.471 24.741 1.00 24.741
Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Layer 3: 0.692 6.426 0.04 0.238
68470.000 Cut Volume: 29.639 298.002 0.04 11.037 Fill Volume: 1.00 0.000
Mesh\Modeling\Components\Grading\XS_TC_Cut: 2.378 23.350 1.00 23.350 Mesh\Modeling\Components\Grading\XS_TC_Foreslope: 1.404 14.082 1.00 14.082
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1: 4.313 43.136 0.04 1.598
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 2: 0.04 0.000
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 3: 7.786 78.036 0.04 2.890
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 4: 18.980 190.214 0.04 7.045
Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Foreslope: 2.463 24.667 1.00 24.667
Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Layer 3: 0.671 6.815 0.04 0.252
68480.000 Cut Volume: 29.366 295.027 0.04 10.927 Fill Volume: 1.00 0.000
Mesh\Modeling\Components\Grading\XS_TC_Cut: 2.503 24.406 1.00 24.406 Mesh\Modeling\Components\Grading\XS_TC_Foreslope: 1.397 14.005 1.00 14.005
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1: 4.312 43.127 0.04 1.597
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 2: 0.04 0.000
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 3: 7.682 77.340 0.04 2.864
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 4: 18.749 188.644 0.04 6.987
Component End Area
Totals
Component Surface Area
Totals
Station Material Area Volume Length Area Unit
Cost Material
Cost
Page 4 of 7Volumes Report
Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Foreslope: 2.455 24.590 1.00 24.590
Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Layer 3: 0.606 6.382 0.04 0.236
68490.000 Cut Volume: 29.870 296.179 0.04 10.970 Fill Volume: 1.00 0.000
Mesh\Modeling\Components\Grading\XS_TC_Cut: 3.839 31.708 1.00 31.708 Mesh\Modeling\Components\Grading\XS_TC_Foreslope: 1.394 13.953 1.00 13.953
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1: 4.312 43.122 0.04 1.597
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 2: 0.04 0.000
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 3: 7.581 76.317 0.04 2.827
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 4: 18.526 186.373 0.04 6.903
Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Foreslope: 2.453 24.539 1.00 24.539
Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Layer 3: 0.540 5.729 0.04 0.212
68500.000 Cut Volume: 31.245 305.576 0.04 11.318 Fill Volume: 1.00 0.000
Mesh\Modeling\Components\Grading\XS_TC_Cut: 5.684 47.614 1.00 47.614 Mesh\Modeling\Components\Grading\XS_TC_Foreslope: 1.393 13.933 1.00 13.933
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1: 4.312 43.119 0.04 1.597
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 2: 0.04 0.000
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 3: 7.563 75.721 0.04 2.804
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 4: 18.485 185.055 0.04 6.854
Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Foreslope: 2.451 24.519 1.00 24.519
Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Layer 3: 0.529 5.346 0.04 0.198
68509.230 Cut Volume: 32.969 296.335 0.04 10.975 Fill Volume: 1.00 0.000
Mesh\Modeling\Components\Grading\XS_TC_Cut: 7.116 59.071 1.00 59.071 Mesh\Modeling\Components\Grading\XS_TC_Foreslope: 1.396 12.870 1.00 12.870
Component End Area
Totals
Component Surface Area
Totals
Station Material Area Volume Length Area Unit
Cost Material
Cost
Page 5 of 7Volumes Report
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1: 4.312 39.798 0.04 1.474
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 2: 0.04 0.000
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 3: 7.565 69.810 0.04 2.586
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 4: 18.491 170.637 0.04 6.320
Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Foreslope: 2.455 22.640 1.00 22.640
Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Layer 3: 0.529 4.882 0.04 0.181
68510.000 Cut Volume: 33.024 25.423 0.04 0.942 Fill Volume: 1.00 0.000
Mesh\Modeling\Components\Grading\XS_TC_Cut: 7.160 5.500 1.00 5.500 Mesh\Modeling\Components\Grading\XS_TC_Foreslope: 1.397 1.076 1.00 1.076
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1: 4.312 3.322 0.04 0.123
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 2: 0.04 0.000
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 3: 7.565 5.828 0.04 0.216
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 4: 18.492 14.247 0.04 0.528
Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Foreslope: 2.455 1.892 1.00 1.892
Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Layer 3: 0.529 0.408 0.04 0.015
68520.000 Cut Volume: 33.180 331.022 0.04 12.260 Fill Volume: 1.00 0.000
Mesh\Modeling\Components\Grading\XS_TC_Cut: 7.743 74.514 1.00 74.514 Mesh\Modeling\Components\Grading\XS_TC_Foreslope: 1.391 13.938 1.00 13.938
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1: 4.312 43.120 0.04 1.597
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 2: 0.04 0.000
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 3: 7.562 75.636 0.04 2.801
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 4: 18.483 184.872 0.04 6.847
Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Foreslope: 2.449 24.524 1.00 24.524
Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder
Component End Area
Totals
Component Surface Area
Totals
Station Material Area Volume Length Area Unit
Cost Material
Cost
Page 6 of 7Volumes Report
Layer 3: 0.529 5.290 0.04 0.196
Totals:
Cut Volume: 3237.409 0.04 119.904 Fill Volume: 1.00 0.000
Mesh\Modeling\Components\Grading\XS_TC_Cut: 505.882 1.00 505.882 Mesh\Modeling\Components\Grading\XS_TC_Foreslope: 150.738 1.00 150.738
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1: 451.825 0.04 16.734
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 2: 0.04 0.000
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 3: 788.117 0.04 29.189
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 4: 1930.612 0.04 71.504
Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Foreslope: 262.842 1.00 262.842
Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Layer 3: 51.672 0.04 1.914
Total Estimated Cost: 1158.71
Component End Area
Totals
Component Surface Area
Totals
Station Material Area Volume Length Area Unit
Cost Material
Cost
Page 7 of 7Volumes Report