OR_BLM_ERFO_2017(1)-32(2)_Plans.pdf
PDF 8 MB Posted
- Attached to
- OR BLM ERFO 2017(1)-32(2), Medford District Road Repair Phase 2, Josephine and Jackson Counties, OR.
- Solicitation number
- 69056719B000013
About this file
Plans
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CP GPS
JH
BH
TP
36 31
6 1
36 31
6 1
SEC.
SEC.
EL. 1234.56
N
E
RIP
G G
W W
DI
T
WESTERN FEDERAL LANDS HIGHWAY DIVISION
DETAIL APPROVED FOR USE 11/2001
REVISED: 9/2005 1/2007 10/2009 10/2014
W101-1
AND ABBREVIATIONS
PLAN SYMBOLS
P
M
D e c e m b e r
U
S C c p w w o r k d o r e b a b .d g n
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
DETAIL
U.S. CUSTOMARY DETAIL
STATE PROJECT
NUMBER
SHEET
A.2BLM ERFO 2017(1)-32(2)OR
DI
T
NO SCALE
- no symbol -wall face
N
W west drwg(s).
dist.
diaph.
diag.
dia.
DHV
D exp. jt.
exc.
EW
ER
EQ or eq.
EP
emb.
elev.
El. 94.16 ft e
E expansion joint excavation edge of water edge of road equation edge of pavement embankment elevation elevation with number superelevation rate east drawing(s) distance diaphragm diagonal diameter design hourly volume diameter galv.
ga.
galvanized gage (gauge)
HW
hex.
hdwl.
high water hexagon headwall ftg.
ft3 ft2 flg.
fin.
footing cubic foot (feet) square foot flange finish jt.
ID
joint inside diameter
LW
lt. or LT
Ls
LPSM
long.
LNFT
lat.
lam.
L low water left length of spiral lump sum longitudinal linear foot (feet) latitude lamination length of curve
NC
N normal crown north
OG
OD
o. to o.
o. c.
original ground outside diameter out to out on center pvmt.
PT
PST
PSC
PS
POT
POS
POC
pl.
PI
PCS
PCC
PC
pavement point of tangent point of spiral to tangent point of spiral to curve point of tangent to spiral point on tangent point on spiral point on curve plate point of intersection point of curve to spiral point of compound curve point of curve rte.
rt. or RT reqd.
reinf.
rdwy.
R/W
R.
R route right required reinforcement roadway right-of-way range radius typ.
Ts
TS
thd.
TBM
T.
T typical tangent distance (spiraled curve) point of tangent to spiral thread temporary bench mark township tangent distance
VPI
vph
V vertical point of intersection vehicles per hour design speed yd3 yd2 cubic yard(s) square yard sym.
STS
struc.
stiff.
stgr.
std.
STA, Sta.
ST
SS
SRS
SQYD
SQFT
spa.
SLRY
shldr.
sec.
SC
SADT
S symmetrical point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot spacing, spaces or spaced slurry unit shoulder section point of spiral to curve seasonal average daily traffic south
CUYD
culv.
CUFT
cubic yard(s) culvert cubic foot (feet) mon.
min.
MGAL
max.
matl.
monument minimum thousand gallon maximum material
NOTE:
on the appropriate plan sheet.
Other symbols used in the plans will be shown in a legend 1.
Property Line w/Found Property Corner
Section Corner (Found, Projected)16
Section Line16
Section Corner (Found, Projected)4
Section Line4
Parcel Number
National Park Boundary
National Forest Boundary
National Wildlife Refuge Boundary
Trail
Lake, Pond or Reservoir; Marshland
Spring or Seep
Material Source; Bore Hole; Test Pit
Section Line
Indian Reservation Boundary
Existing Roadway (Road, Paved, Gravel)
Section Corner (Found, Projected)
Large Creek or River
Spot Elevation; Coordinate Grid Tick
Above Ground Tank; Underground Tank
Treeline; Individual Trees
Boulder; Well; Satellite Dish; Grave
Cooking Grate; Garbage Can; Picnic Table
Flagpole; Fire Hydrant
Gas & Water Meter; Gas & Water Valve
Silt Fence
National Boundary
State Boundary
County Boundary
City Boundary
Township or Range Line
BLM Lands Boundary
Railroad
Intermittent Drainage or Small Creek
Control Point (Terrestrial and GPS); Jump Hub θs Ø
∆c spiral central angle diameter curve central angle total central angle approach ahead average daily traffic abutment appr.
AH
ADT
abut.
bearing bridge balance point bench mark back brg.
br.
BP
BM
BK
ctrs.
CS
cont.
constr. jt.
conn.
conc.
col.
CMP
clr.
cc or c. to c.
centers point of curve to spiral continuous construction joint connection concrete column corrugated metal pipe clear centerline center to center mile post main line
M.P.
M.L.
STEAM = steam, T = telephone, TV = CATV, W = water
P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, UP = transformer or junction box, WF = water fountain
EM = electric meter, T = telephone pedestal, TV = CATV pedestal, Light, Support w/Anchor)
Poles (Power, Telephone, Joint Use, EXISTING PROPOSED
Transition
Toe of Fill
Top of Cut
CL
North Arrow
Fence
Gate with Fence
Cattleguard
Guardrail
Retaining Wall
Pipe Culvert (arrow shows flow)
Pipe Culvert with End Section
Pipe Culvert with Headwall
Underdrain
Concrete Barrier
Slope Stake Limits
Pipe Culvert with Drop Inlet
Box Culvert
Delineators
Underground Utilities
Overhead/Above Ground Utilities
Signs (single, double post; portable)
Miscellaneous Utility Features
Building
Right-of-Way Line with Monument
Permanent Easement
Construction Easement
Riprap
Fiber Roll or Wattle
J O
S E
P H
IN
E
J A
C K
S
T
S
U M
P Q
U A
T
IO
N
L
F
R
E S
T
JACKSON CO
DOUGLAS CO
T 35 S
T 34 S
T 34 S
T 33 S
T 35 S
T 34 S
T 39 S
T 38 S
MERLIN
PASS
GRANTS
RIVER
ROGUE
GOLD HILL
WIMER
VICINITY MAP(S)
N
N
N
N
A.3
STATE PROJECT
NUMBER
SHEET
U
S In t2 D p w w o r k \d
\o r e b a c .d g n
OR BLM ERFO 2017(1)-32(2)
:1
M a y
W it u c k i
/2
C h e c k e d b y
D e s ig n e d b y
[1]
[1]
[1]
2 MI
2 MI
1 MI
1 MI
Rogue
Rive r
Fork
Ga lic e
C re e k
Ro gu e
Rive r
Long: 123° 32' 21.73" W
Lat: 42° 33' 22.03" N
STRATTON CREEK MP 0.90
Long: 123° 29' 43.85" W
Lat: 42° 37' 52.52" N
HOG CREEK MP 0.63
Long: 123° 30' 11.23" W
Lat: 42° 37' 18.28" N
HOG CREEK MP 2.85
Long: 123° 16' 25.30" W
Lat: 42° 29' 50.66" N
GRANITE HILL MP 1.65
Long: 123° 4' 10.21" W
Lat: 42° 32' 22.63" N
SARDINE RIDGE MP 0.54
Long: 123° 3' 54.30" W
Lat: 42° 32' 15.30" N
SARDINE RIDGE MP 0.94
E v a n s
C r e e k
R
W
Long: 122° 46' 33.67" W
Lat: 42° 42' 28.37" N
BUCK ROCK ROAD MP 6.10
Butte
Ragsdale
Campground
Treehorn
Spring
Beaver
Rock
Blue
Rock
Pilot
R 8 W
Long: 123° 35' 33.70" W
Lat: 42° 11' 51.60" N
KERBY-REEVES CREEK MP 3.14
Kirby
Junction
Cave
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
Long: 123° 29' 46.7" W
Lat: 42° 37' 58.6" N
ANGORA SPUR MP 0.28
Long: 123° 36' 46.1" W
Lat: 42° 40' 14.7" N
WHISKEY CREEK
Disposal Site
Long: 123° 35' 8.9" W
Lat: 42° 39' 1.6" N
Galice Creek Boat Ramp
Water Source
FOOTNOTE:
Location not shown on map, coordinates provided.
Long: 123° 38' 6.65" W
Lat: 42° 40' 49.80" N
WHISKEY CREEK MP 3.30
Long: 122° 50' 2.04" W
Lat: 42° 45' 7.31" N
UPPER TRAIL CREEK MP 1.70
Long: 123° 39' 33.7" W
Lat: 42° 41' 25.8" N
WHISKEY CREEK
Water Source
Long: 123° 30' 9.8" W
Lat: 42° 38' 4.1" N
HOG CREEK
Disposal Site
Long: 123° 29' 36.20" W
Lat: 42° 38' 8.74" N
ANGORA SPUR
Disposal Site
Long: 123°5' 24.9" W
Lat: 42°37' 12.2" N
SARDINE RIDGE
Water Source
Long: 123° 35' 26.5" W
Lat: 42° 11' 49.0" N
KERBY-REEVES CREEK
Disposal Site
Long: 122° 50' 31.3" W
Lat: 42° 45' 25.9" N
UPPER TRAIL CREEK
Water Source
Long: 122° 49' 31.1" W
Lat: 42° 44' 49.9" N
UPPER TRAIL CREEK
Water Source
Sheet and Description
D.1 D.2 D.3 D.4 D.5 D.6 D.7 D.8 D.9 D.10 D.11
Kerby-Reeves Creek BLM Road 39-8W-3 M.P.
3.14
Upper Trail Creek BLM Road 32- 1W-33.01 M.P. 1.70
Buck Rock Road BLM Road 33- 1W-8.00 M.P. 6.10
Whiskey Creek Road BLM Road 33-8-26.0 M.P. 3.30
Sardine Ridge BLM Road 35- 3W-8.00 M.P. 0.54
Sardine Ridge BLM Road 35- 3W-8.00 M.P. 0.94
Granite Hill BLM Road 35-5W-
21.0 M.P.
1.65
Stratton Creek BLM Road 35- 7W-4.1
M.P. 0.90
Angora Spur BLM Road 34- 7W-11.1 M.P. 0.28
Hog Creek BLM Road
35-7W-11.0 M.P. 0.63
Hog Creek BLM Road 35-
7W-11.00 M.P. 2.85
ALLOWANCE Bid Schedule
A0020 15101-0000 MOBILIZATION LPSM All ALL
A0040 15201-0000 CONSTRUCTION SURVEY AND
STAKING LPSM All ALL
A0060 15301-0010 CONTRACTOR QUALITY CONTROL
AND ASSURANCE LPSM All ALL
A0080 15401-0000 CONTRACTOR TESTING LPSM All ALL
A0100 15501-0000 CONSTRUCTION SCHEDULE LPSM All ALL
A0120 15705-1400 SOIL EROSION CONTROL, FIBER
ROLL LNFT 245 660 260 650 170 155 1,150 250 160 240 160 4,100
A0140 20303-1600 REMOVAL OF PAVEMENT, ASPHALT SQYD 2,689 61 2,750
A0160 20401-0000 ROADWAY EXCAVATION (DEBRIS
REMOVAL) CUYD 450 10 460
A0180 20402-0000 SUBEXCAVATION CUYD 187 264 250 39 740
A0200 20410-0000 SELECT BORROW CUYD 145 205 84 26 460
A0220 20701-0400 SEPARATION-STABILIZATION
GEOTEXTILE, CLASS 1, TYPE D SQYD 324 460 584 132 1,500
A0240 20703-2000 GEOGRID, STABILIZATION SQYD 1,320 1,870 310 3,500
A0260 25101-0300 PLACED RIPRAP, METHOD A,
CLASS 3 CUYD 5 5
A0280 25501-0000 MECHANICALLY STABILIZED
EARTH WALL (GRS) SQFT 775 450 325 1,100 700 750 400 4,500
A0300 30201-1000 ROADWAY AGGREGATE, METHOD 1 CUYD 123 257 99 409 51 19 707 79 593 43 75 145 2,600
A0320 30302-1000 DITCH RECONDITIONING LNFT 650 850 75 1,575
A0340 30302-2000 SHOULDER RECONDITIONING LNFT 650 30 680
A0360 40301-0200 ASPHALT CONCRETE PAVEMENT, 1.94 TON/CUYD
TYPE 2 TON 606 19 625
A0380 60201-0800 24-INCH PIPE CULVERT LNFT 30 5 3 38
A0400 60501-0000 STANDARD UNDERDRAIN SYSTEM LNFT 650 250 300 50 1,250
A0420 60704-0000 CLEANING CULVERT IN PLACE EACH 1 1 2
A0440 62201-0250 DUMP TRUCK, 10 CUBIC YARD
MINIMUM CAPACITY HOUR 80 80
A0460 62201-0700 BACKHOE LOADER, 1 CUBIC YARD
MINIMUM CAPACITY FRONTEND
BUCKET, 10 CUBIC FOOT
MINIMUM CAPACITY BACKHOE
BUCKET, 90 HP MINIMUM
FLYWHEEL HOUR 80 80
MileStone: 100% Date Completed: In Progress Report Date: 05/16/19
A M E N D
Line Item No.
Pay Item Number
SUMMARY OF QUANTITIES
-M ay
-2
:0
A M
Remarks and/or Determination of
Estimated Quantity Pay Item Description Unit
Estimated Quantities c:
\p w -w or k\ d0 su m m ar y_ fin al
.x ls m ]S he et
STATE PROJECT
B.1BLM ERFO 2017(1)-32(2)OR
SHEET
NUMBER
Sheet and Description
D.1 D.2 D.3 D.4 D.5 D.6 D.7 D.8 D.9 D.10 D.11
Kerby-Reeves Creek BLM Road 39-8W-3 M.P.
3.14
Upper Trail Creek BLM Road 32- 1W-33.01 M.P. 1.70
Buck Rock Road BLM Road 33- 1W-8.00 M.P. 6.10
Whiskey Creek Road BLM Road 33-8-26.0 M.P. 3.30
Sardine Ridge BLM Road 35- 3W-8.00 M.P. 0.54
Sardine Ridge BLM Road 35- 3W-8.00 M.P. 0.94
Granite Hill BLM Road 35-5W-
21.0 M.P.
1.65
Stratton Creek BLM Road 35- 7W-4.1
M.P. 0.90
Angora Spur BLM Road 34- 7W-11.1 M.P. 0.28
Hog Creek BLM Road
35-7W-11.0 M.P. 0.63
Hog Creek BLM Road 35-
7W-11.00 M.P. 2.85
ALLOWANCE Bid Schedule
A0480 62301-0000 GENERAL LABOR HOUR 44 44
A0500 62502-0000 TURF ESTABLISHMENT SQYD 108 361 139 361 72 58 611 111 61 106 112 2,100
A0520 62901-1100 ROLLED EROSION CONTROL
PRODUCT, TYPE 4 SQYD 206 292 52 550
A0540 63501-0000 TEMPORARY TRAFFIC CONTROL LPSM All ALL
-M ay -2
:0
A M
MileStone: 100% Date Completed: In Progress Report Date: 05/16/19 c:
\p w -w or k\ d0 su m m ar y_ fin al
.x ls m ]S he et
2)
SUMMARY OF QUANTITIES
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of
Estimated Quantity
STATE PROJECT
B.2BLM ERFO 2017(1)-32(2)OR
SHEET
Travel way
Underdrain
Shldr.
2'
Underdrain
TYPICAL SECTIONTYPICAL SECTION
C.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft p w w o r k d o r e b c a .d g n
OR BLM ERFO 2017(1)-32(2)
M a y
T
H a s h e m
W it u c
C h e c k e d b y
D e s ig n e d b y
[2]
[1]
[1]
[2]
[2]
[1]
[3]
[3]
[3]
LC
1:3
1:3
NO SCALE
l im it s
C o n s tr u c ti o n it s
C o n s tr u c ti
2%
Va ria ble ty p
3'
Shldr.
2'3' method 1, 8" compacted depth
Roadway aggregate, 18' min.
Profile grade
Existing ground
UPPER TRAIL CREEK
~650 LNFT
BLM ROAD 32-1W-33.01 M.P. 1.7
1:3
Existing ground it s
C o n s tr u c ti it s
C o n s tr u c ti ria ble ty p
Profile grade
LC
GRANITE HILL
8" roadway aggregate, method 1, 8" compacted depth
2' 2' 14' min.
~1,100 LNFT
BLM ROAD 35-5W-21.0 M.P. 1.65
4" asphalt concrete pavement, type 2, 4" compacted depth placed in two equal lifts
Reconditioning/ Ditch
FOOTNOTE:
See Sheet H.6.
rate of 25:1 between widths.
Adjust to match existing road width as approved by CO. Taper at a superelevation. Do not exceed 6% superelevation.
Superelevate roadway on curves to match the existing roadway
Underdrain
TYPICAL SECTIONTYPICAL SECTION
C.2
STATE PROJECT
NUMBER
SHEET
U
S
S u r_ ft p w w o r k \d
\o r e b c b .d g n
OR BLM ERFO 2017(1)-32(2)
:3
M a y
H a s h e
W it u c
/2
/2
C h e c k e d b y
D e s ig n e d b y
[2]
[1]
[1]
[2]
[2]
[1]
[3]
[3]
[4]
[4]
1:3
1:3 it s
C o n s tr u c ti ria ble method 1, 8" compacted depth
Roadway aggregate, Profile grade
14' min. 2'2'
LC
~130 LNFT
BLM ROAD 35-3W-8.00 M.P. 0.54
SARDINE RIDGE
~200 LNFT
BLM ROAD 35-7W-4.1 M.P. 0.90
STRATTON CREEK
HOG CREEK
~110 LNFT
BLM ROAD 35-7W-11.00 M.P. 0.63
HOG CREEK
~190 LNFT
BLM ROAD 35-7W-11.00 M.P. 2.85
it s
C o n s tr u c ti it s
C o n s tr u c ti ria ble ty p method 1, 8" compacted depth
Roadway aggregate, Profile grade
14' min. 2'2'
LC
Existing ground
BUCK ROCK ROAD
~250 LNFT
BLM ROAD 33-1W-8.00 M.P. 6.10
FOOTNOTE:
Construction limits approved by CO.
See Sheet H.6.
rate of 25:1 between widths.
Adjust to match existing road width as approved by CO. Taper at a it s
C o n s tr u c ti
MSE
Wall vert
Travel way
Travel way
TYPICAL SECTIONTYPICAL SECTION
C.3
STATE PROJECT
NUMBER
SHEET
U
S
S u r_ ft p w w o r k \d
\o r e b c d .d g n
OR BLM ERFO 2017(1)-32(2)
:5
M a y
H a s h e
W it u c
/2
/2
C h e c k e d b y
D e s ig n e d b y
[2]
[1]
[1]
[2]
[2]
[1]
[3]
[3]
[3] [3]
LC
1:3
1:3
NO SCALE
Existing ground
FOOTNOTE:
Construction limits approved by CO rate of 25:1 between widths.
Adjust to match existing road width as approved by CO. Taper at a it s
C o n s tr u c ti ria ble
Profile grade
14' min.1' method 1, 4" compacted depth
Roadway aggregate, 1'
SARDINE RIDGE
~105 LNFT
BLM ROAD 35-3W-8.00 M.P. 0.94
LC
1:3
1:3
Existing ground
2%
Va ria ble
Profile grade
14' min. 3'3' method 1, 12" compacted depth
Roadway aggregate, KERBY-REEVES CREEK
~195 LNFT
BLM ROAD 39-8W-3 M.P. 3.14
it s
C o n s tr u c ti it s
C o n s tr u c ti
Cul it s
C o n s tr u c ti
Ditch
Reconditioning
Travel way
TYPICAL SECTIONTYPICAL SECTION
C.4
STATE PROJECT
NUMBER
SHEET
U
S
S u r_ ft p w w o r k
\d
\o r e b c f
.d g n
OR BLM ERFO 2017(1)-32(2)
:1
M a y
H a s h e
W it u c
/2
/2
C h e c k e d b y
D e s ig n e d b y
[2]
[1]
[1]
[2]
[3]
[3]
[2]
[1]
LC
1:3
1:3 it s
C o n s tr u c ti it s
C o n s tr u c ti ria ble ty p
Profile grade
14' min. 3'3' method 1, 12" compacted depth
Roadway aggregate, WHISKEY CREEK
~650 LNFT
BLM ROAD 33-8-26.0 M.P. 3.3
FOOTNOTE:
Shoulder Reconditioning.
rate of 25:1 between widths.
Adjust to match existing road width as approved by CO. Taper at a superelevation. Do not exceed 6% superelevation.
Superelevate roadway on curves to match the existing roadway
1:3 it s
C o n s tr u c ti it s
C o n s tr u c ti ria ble method 1, 8" compacted depth
Roadway aggregate, Profile grade
14' min. 2'2'
ANGORA SPUR
~1,500 LNFT
BLM ROAD 34-7W-11.1 M.P. 0.28
LC
k "O
QJ
u
QJ
.r::
u
Cl "iii
QJ
N
M N
Install Mechanically Stabilized Earth Wall (GRS).
See Sheet G.1 for details
Install soil erosion control, fiber roll
STATE PROJECT
SHEET
NUMBER
OR BLM ERFO 2017(1)-32(2) 0.1
Placed riprap, method A, class 3
Install 24" pipe culvert
NO SCALE
NOTE:
1. Site not surveyed. Horizontal alignment is a representation.
Adjust to fit field conditions.
KERBY-REEVES CREEK
M.P. 3.14 i "O u
OJ
.I::
u k "O
OJ
C:
0, "iii
OJ
Cl
N
LEGEND:
� Deep patch (see Sheet E.2)
Install soil erosion control/, fiber roll
NO SCALE
STATE PROJECT
OR BLM ERFO 2017(1)-32(2)
NOTE:
1. Site not surveyed. Horizontal alignment is a representation. Adjust to fit field conditions.
2. Location of Deep Patch limits to be identified by CO.
3. Field fit underdrain outlets as directed by the CO.
UPPER TRAIL CREEK
M.P. 1.70
SHEET
D.2 k "O QJ -"' u QJ.r::
u
.D
"O QJ C: Cl "iii QJ
N
M N
N
LEGEND:
� Deep patch (see Sheet E.2)
Install soil erosion control, fiber roll
Existing pipe
\ \ 0
\ If:;.
-\-- ---� I
\ \\�u \ 1 0 I o
I
I _ I:,)
L-�+.-777 \ �
I
l. i C n, 1 i I a l �-
§ fir
__rrv--:;i r� f I
I
I
I I� I
NO SCALE
STATE PROJECT
OR BLM ERFO 2017(1)-32(2)
NOTE:
1. Site not surveyed. Horizontal alignment is a representation.
Adjust to fit field conditions.
2. See Note 3 on Sheet D.2.
BUCK ROCK ROAD
M.P. 6.10
SHEET
0.3 k "O
QJ
u
QJ
.r::
u
.D
C:
Cl "iii
QJ
N
�I l/l l l/l z .. $
Install soil erosion I �·ber roll • contra, 11
·onin9 Fi ditl so 1..N R.econ 6 Ider ShOLl
6S0LNFT
itch Reconditioning
NO SCALE
STATE
OR
PROJECT
Fo 2017(1)-32(2) BLM ER
NOTE.
d Horizontal al!gn
. ment is a representation. 1. She . ri· Id con I ID •
.,. not surveye .
d·t· ns Adjust to flt ,e
SHEET
NUMBER
D.4
WHISKEY CREEK
M.P. 3.30 k "O
QJ
u
QJ
.r::
u
.D
"O
QJ
C:
Cl "iii
QJ
M
N
M N
Install soil erosion control, fiber roll
Install Mechanically Stabilized Earth Wall (GRS) See Sheet G.1 for details
STATE PROJECT
OR BLM ERFO 2017(1)-32(2)
NO SCALE
NOTE:
1. Site not surveyed. Horizontal alignment is a representation.
Adjust to fit field conditions.
SARDINE RIDGE
M.P. 0.54
SHEET
0.5 k "O
QJ
u
QJ
.r:: u
.D
"O
QJ
C:
Cl "iii
QJ
N
M N
STATE PROJECT
OR BLM ERFO 2017(1)-32(2)
Install soil erosion control, fiber roll
Install Mechanically Stabilized Earth Wall (GRS) See Sheet G.1 for details
NO SCALE
NOTE:
1. Site not surveyed. Horizontal alignment is a representation.
Adjust to fit field conditions.
SARDINE RIDGE
M.P. 0.94
SHEET
0.6
Existing pipe
175' Standard underdrain system
----, U D f----f-- - --/ UD /---. - -----, UD 1--- -
LEGEND:
t. n (see Subexcava JO Sheet E.l)
. control, fiber roll Install soil erosion
. control, fiber roll Install soil erosion
350'
Existing pipe
Reconditioning Ditch
STATE
OR
PROJECT
0 2017(1)-32(2) BLM ERF
NO SCALE
. representation.
O'E.
r nment is a N , J • d Horizontal a ig 1. Sit� no� s½rri�� �onditions. Adjust o
2. See Note 3 on Sheet D.2.
GRANITE HILL
M.P. 1.65 k "O
QJ
u
QJ
.r::
u vi
.D
"O
QJ
C:
Cl
'iii
QJ
N
M N
Install soil erosion control, fiber roll
NO SCALE
STATE PROJECT
OR BLM ERFO 2017(1)-32(2)
NOTE:
1. Site not surveyed. Horizontal alignment is a representation.
Adjust to fit field conditions.
STRATTON CREEK
M.P. 0.90
SHEET
0.8
.0 "O
QJ
QJ
.0 "O
QJ
C:
Cl "iii
QJ
N
M N
N
I
I I I I
J /,, ____
\\� I/
\ \ti>// I I� \ \
I/� \ \
I I� \ \
;1,f" \ \ I I \ \ I I \ \
I I \ \
I I \ \
I I \ \
I I \ \
I I \ \
I I \ \
I I
I I
I I
I I I I
I I I I
/I
I I
NOTE:
STATE PROJECT
OR BLM ERFO 2017(1)-32(2)
I I I I
I I I I
1. Site not surveyed. Horizontal alignment is a representation.
\--; '-- 'y f .,,,,,- Roadway excavation (debris removal) '-- , _.,.., / / "-/ Cleaning culvert in place
NO SCALE
Adjust to fit field conditions.
ANGORA SPUR
M.P. 0.28
SHEET
0.9 k "O
QJ
u
QJ
.r::
u
.D
"O
QJ
C:
Cl "iii
QJ
N
M N
Install Mechanically Stabilized Earth Wall (GRS) See Sheet G.1 for details
Existing 24" pipe culvert.
Extend pipe culvert 5'
STATE
OR
PROJECT
BLM ERFO 2017(1)-32(2)
Install soil erosion control, fiber roll
NO SCALE
NOTE:
1. Site not surveyed. Horizontal alignment is a representation.
Adjust to fit field conditions.
HOG CREEK
M.P. 0.63
SHEET
D.10 k "O
QJ
u
QJ
.r::
u
.D
"O
QJ
C:
Cl "iii
QJ
N n n
N
M N
Install Mechanically Stabilized Earth Wall (GRS) See Sheet G.1
Install soil erosion control, fiber roll
NO SCALE
STATE PROJECT
OR BLM ERFO 2017(1)-32(2)
NOTE:
1. Site not surveyed. Horizontal alignment is a representation.
Adjust to fit field conditions.
HOG CREEK
M.P. 2.85
SHEET
D.11
SUBEXCAVATION SECTION
SUBEXCAVATION AND BACKFILL SECTION
SUBEXCAVATION BACKFILL
NO SCALE
Bottom of subexcavation
Subexcavation
Existing pavement structure
Existing subgrade
Existing ground
2% (min.)
AND BACKFILL
SUBEXCAVATION
Bottom of subexcavation geotextile, class 1, type D
Separation-stabilization
E.1
STATE PROJECT
NUMBER
SHEET
U
S S u r_ ft p w w o r k \d
\o r e b e x .d g n
OR BLM ERFO 2017(1)-32(2)
:4
J u n e
W it u c
/2
C h e c k e d b y
D e s ig n e d b y
LC
LC
LC
Select borrow
See Sheet C.1
Pavement section, according to subsection 203.04
Remove the existing pavement structure
(Information Only Quantity).
pavement structure is 598 cubic yards
Estimated quantities for removing the existing1.
2.
NOTE:
DEEP PATCH
E.2
STATE PROJECT
NUMBER
SHEET
U
S S u r_ ft p w w o r k \d
\o r e b e y .d g n
OR BLM ERFO 2017(1)-32(2)
:2
M a y
W it u c
/2
C h e c k e d b y
D e s ig n e d b y
NO SCALE
LC
d e p th
S u b e x c a v a ti o n
Existing ground geotextile, class 1, type D (woven)
Separation-stabilization
NOTE:
V :0 .5
H control product, type 4 Rolled erosion
Select borrow total thickness
12" (min) top lift Match existing slope angle
Existing ground
3' (min.) lap
DEEP PATCH
Roadway Aggregate, Method 1 according to subsection 203.04
Remove the existing pavement structure layer so the two layers are not in direct contact.
between the 3-foot geogrid lap and the overlying geogrid below the next layer. Provide a thin layer of select borrow
Wrap each geogrid layer a minimum 3-feet horizontally back1.
2% Slope at 6" vertical spacing
Place geogrid, stabilization on top geogrid layer
No facing wrap u
CJ)
2.
C:
Cl
~I N
.c
9- L/l
"' " Lil Lil M c:
B
"C e
QJ
u
C.
N L
QJ
.c E
QJ
u
Existing ground
Fiber roll
3' (min.)
ELEVATION
', D , .. ': ,.::;
I ' ~-••
3' min. or i',' •:"
as specified in plans
Runoff from
',,.; disturbed areas ·:-- r::i'\
PLAN
~o e
Existing ground (typ.)
I ~ --- Flow direction Q ;
Ii::
INSTALLATION BEYOND TOE OF SLOPE
Excavate trench 2" larger than fiber roll
Step 1: Excavate trench and install fiber rolls
Backfilled and compacted soil to match ground level
Step 2: Backfill soil against fiber rolls
STATE PROJECT
OR BLM ERFO 2017(1)-32(2)
NOTE:
1. Drive stakes at each end and at 4-foot spacing until fiber roll is secure to slope. Live stakes may be used for permanent installations. Do not crush fiber roll while staking.
2. Overlap fiber rolls 12-inch minimum. Drive stakes at 6-inches from fiber roll end angles towards the adjacent fiber roll and space stakes at 4-foot max.
PROPERLY STAKED AND ENTRENCHED FIBER ROLL
FIBER ROLL SPACING
Slope Spacing
(FT)
1 :4 or flatter 40 1:3 30 1:2 20 1:1 10
Stagger joints (typ.)
STAKES REQUIRED Slope Fiber roll length
(FT)
Stakes required for each roll
4 1" x 1" Wood stake
FIBER ROLL STAKING DETAIL
Place excavated material on uphill side of fiber roll
1" x 1" or 1" 0 wood stakes. See Note 2.
FIBER ROLL LAPPING DETAIL
Install fiber rolls along contours
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
U.S. CUSTOMARY DETAIL
FIBER ROLL
SHEET
NUMBER
F.1
ALTERNATE FIBER ROLL .JOINT DETAIL
SLOPE PROTECTION INSTALLATION INSTALLATION ALONG SLOPES DETAIL APPROVED FOR USE 10/2014
~ NO SCALE REVISED:
~ DRAFT: 7 /2016
DETAIL
W157-21 L... __________________________________________________________________ ........ __ .....;. ________ ..i.,.. ___ __, .0
"O u
<LI
.c u
.0
"O
<LI
C:
Cl "iii
<LI
Use a double row of
Slope stake
Blanket edge
6" (min.)
edge overlap
Use a double row of staples at tow of slope
NO SCALE
STATE PROJECT
OR BLM ERFO 2017(1)-32(2)
NOTE:
1. Install staples according to the manufacturer's recommendations and Section 629.
2. Overlap in the direction of the prevailing wind.
3. Securely fasten the Rolled Erosion Control Product to the soil by installing staples at a rate of 1.5 per square yard.
SHEET
NUMBER
F.2
ROLLED EROSION CONTROL
PRODUCT ON SLOPES
[1]
EARTH WALL (GRS)
MECHANICALLY STABLILIZED
[1] Reinforcement length is equal to the wall height; 8-foot; or length that extends 4 feet beyond the failure surface, whichever is greatest.
G.1
STATE PROJECT
NUMBER
SHEET
I n t_ ft p w w o r k d o r e b w a .d g n
OR BLM ERFO 2017(1)-32(2)
M a y
C h e c k e d b y
D e s ig n e d b y
There is no topsoil that can be conserved within wall construction areas.
Two interior cells
Select granular backfill
Structure excavation limits
Existing ground m in full depth (vegetated face)
Topsoil, exterior cell
W a ll h e ig h t, H
Limits of stabilized volume included in pay area volume included in pay area
Limits of stabilized
1'-0"
Reinforcement length
L = H, 8'-0" (min.)
line at top of wall
Final ground
(min.)
3'-0"
Select granular backfill
FOOTNOTE:
2'-0" (min.)
1:2 (m ax.
Shoulder
See Sheet G.2
Wall drainage sysem
Turf establishment on exposed topsoil p a y l im it s
According to section 209
Structure excavation slope
3 cells wide, 6" deep
Cellular confinement system facing, Embankment vertical spacing geogrid type I on 12" (max.)
Reinforcement geotextile or
NOTE:
1.
excavation limits
Structure
Embankment see Plan, section C
Pavement section,
10.4 x 16 25101 -0300
30302 -1000
60201 -0800
60501 -0000
60704 -0000
Station
ES
TI
M A
TE
D M
A X
IM
U M
C O
V
ER
S
TR
U C
TU
R A L
EX
C A V A
TI
O N
PL
A C
ED
R
IP
R A P, M
ET
H O
D A
C
LA
S S
D
IT
C H
R
EC
O N
D
IT
IO
N
IN
G
-I
N C
H P
IP
E
C U
LV
ER
T
S
TA
N D
A R D
U N
D
ER
D R
IN
YS
TE
M
C
LE
A N
IN
G
C U
LV
ER
T
IN
P
LA
C E
S K
EW
A N
G
LE
A llo w ab le P ip e
M at er ia l (S ee k ey b el ow
B
EV
EL
S
1V :n
H
B
EV
EL
S
1V :n
H
REMARKS
See below for numbered notes
FEET CUYD CUYD LNFT LNFT LNFT EACH Lt Rt Kerby-Reeves Creek M.P. 3.14 5 28 4 30 GS
Upper Trail Creek M.P. 1.70 75 650
Buck Rock Road M.P. 6.10 29 250
Whiskey Creek M.P. 3.30 650 1
Granite Hill M.P. 1.65 35 850 300
Angora Spur M.P. 0.28 1
Hog Creek M.P. 0.63 5 GS
PROJECT TOTAL 167 4 1500 35 1200 2
Allowable Pipe Material
NOTE: AluminumA
AS
C
GS
Fe (blank) x/__
Aluminized steel Concrete Galvanized steel Ductile iron or cast iron soil pipe Any appropriate matl.
Any appropriate matl. except __
1. Steel pipe culvert minimum wall thickness is the thickness required by the Std. 602-1 fill height table.
PAY ITEM NUMBER
TABULATION OF DRAINAGE QUANTITIES
c:
\p w
-w or k\ d0 or -e b1
D ra in ag e_
Q ty s.
xl sx ]S he et
-M ay -2
9:
W it uc ki
/2
D es ig ne d by
C he ck ed b y:
STATE PROJECT
H.1
SHEET
NUMBER
BLM ERFO 2017(1)-32(2)OR
Note: The quantities shown hereon are approximate and are subject to field adjustments.
Ul 2.
C Cl
"C
.c
.c N N M
.c Q)
I
9-st N st f 9-u c..
N st
N L Q) .c E Q) u Q)
STATE PROJECT SHEET
NUMBER
METAL ROUND PIPE CULVERT OR BLM ERFO 2017(1)-32(2) H.2
FILL HEIGHT AND METAL THICKNESS TABLE FOR HELICAL LOCKSEAM AND WELDED SEAM PIPE CULVERT
STEEL ALUMINUM NOTE:
PIPE 2½" x ½" CORRUGATIONS 3" x 1" CORRUGATIONS 5" x 1" CORRUGATIONS PIPE 2½" x ½" CORRUGATIONS 3" x 1" CORRUGATIONS
1. When directed, camber pipe culverts upward
SIZE MINIMUM METAL THICKNESS (INCH/GAGE) SIZE MINIMUM
METAL THICKNESS (INCH/GAGE) from a chord through the inlet and outlet
DIAMETER COVER 0.064/16 0.079/14 0.109/12 0.138/10 0.168/8 0.064/16 0.079/14 0.109/12 0.138/10 0.168/8 0.064/16 0.079/14 0.109/12 0.138/10 0.168/8 DIAMETER COVER 0. 060/16 0. 075/14 0.105/12 0.135/10 0.164/8 0. 060/16 0. 075/14 0.105/12 0.135/10 0.164/8 inverts an ordinate amount equal to 1 % of the INCHES INCHES MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET) INCHES INCHES MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET) pipe length. Develop camber on a parabolic
12 12 100 100 100 100 100 12 12 100 100 100 100 100 curve. If the midpoint elevation on the 15 12 100 100 100 100 100 15 12 100 100 100 100 100 parabolic curve as designed exceeds the 18 12 100 100 100 100 100 18 12 100 100 100 100 100 elevation of the inlet invert, reduce the amount 21 12 100 100 100 100 100 21 12 88 100 100 100 100 of camber or increase the pipe culvert gradient.
24 12 100 100 100 100 100 24 12 77 97 100 100 100 30 12 85 100 100 100 100 30 12 62 77 100 100 100 71 89 100 100 100 2. Fill heights exceeding 100 feet require
36 12 71 89 100 100 100 81 100 100 100 100 36 12 52 64 90 100 100 59 74 100 100 100 special analysis by the CO.
42 12 61 76 100 100 100 70 87 100 100 100 42 12 44 55 77 99 100 51 64 89 100 100 The fill heights in the table are for helical 48 12 53 66 93 100 100 61 76 100 100 100 54 68 95 100 100 48 12 67 87 100 44 56 78 100 100 3.
54 12 59 83 100 100 54 68 95 100 100 48 60 85 100 100 54 18 54 71 88 39 50 69 93 100 lockseam and welded seam pipe only.
60 12 74 97 100 49 61 86 100 100 43 54 76 98 100 60 18 57 72 35 45 62 83 98 Fill heights for culvert pipe with annular
66 12 87 100 44 55 78 100 100 39 49 69 89 100 66 18 58 32 40 56 76 89 corrugations are more restrictive than those of helical lockseam and welded seam pipe.
72 12 80 97 40 51 71 92 100 36 45 63 82 100 72 18 45 30 37 55 70 82 Obtain approval before furnishing annular 78 12 87 37 47 66 85 100 33 42 58 75 92 78 24 34 48 64 75 corrugation pipe.
84 12 75 35 43 61 78 96 31 39 54 70 86 84 24 44 59 70 90 12 32 40 57 73 90 29 36 51 65 80 90 24 41 62 65 4. Measure minimum cover from the top of the 96 12 38 53 69 84 34 48 61 75 96 24 38 51 61 pipe culvert to the subgrade for flexible
102 18 36 50 65 79 32 45 57 71 102 24 46 55 pavements, and to the top of the pavement for 108 18 47 61 75 42 54 67 108 24 42 50 rigid pavements. Measure maximum fill height 114 18 45 58 71 40 52 63 114 24 45 from the top of the pipe to the top of the
120 18 43 55 67 38 49 60 120 24 40 pavement for both flexible and rigid pavement.
126 18 52 64 47 57 132 18 50 61 44 54 138 18 48 58 42 52 144 18 56 50
METAL PIPE ARCH CULVERT
FILL HEIGHT AND METAL THICKNESS TABLE FOR HELICAL LOCKSEAM AND WELDED SEAM PIPE CULVERT
STEEL ALUMINUM
PIPE ARCH 2½" x ½" CORRUGATIONS 3" x 1" CORRUGATIONS 5" x 1" CORRUGATIONS PIPE ARCH 2½" x ½" CORRUGATIONS 3" x 1" CORRUGATIONS
SIZE EQUI- MINIMUM METAL THICKNESS (INCH/GAGE) SIZE
EQUI- MINIMUM METAL THICKNESS (INCH/GAGE)
VALENT CORNER MINIMUM VALENT CORNER MINIMUM
SPANx RISE DIAMETER RADIUS COVER 0. 064/16 0. 079/14 0.109/12 0.138/10 0.168/8 0. 079/14 0.109/12 0.138/10 0.168/8 0. 079/14 0.109/12 0.138/10 0.168/8 SPAN x RISE DIAMETER RADIUS COVER 0.060/16 0.075/14 0.105/12 0.135/10 0.060/16 0.075/14 0.105/12 0.135/10
INCHES INCHES INCHES INCHES MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET) INCHES INCHES INCHES INCHES MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)
17 X 13 15 3 12 13 17x 13 15 3 12 13 21 X 15 18 3 12 12 21 X 15 18 3 12 12 24 X 18 21 3 12 13 24x 18 21 3 12 13 28x20 24 3 12 13 28x20 24 3 12 13 35x24 30 3 12 12 35x24 30 3 12 12 42 X 29 36 3.5 12 12 42x29 36 3.5 15 12 49x 33 42 4 12 12 49x33 42 4 15 12 57x38 48 5 12 12 57x38 48 5 15 12 60x46 54 8 15 21 21 60x46 54 8 15 21 64x43 54 6 12 12 64x43 54 6 18 12 66x 51 60 9 15 21 21 66x 51 60 9 18 21 71 x47 60 7 12 12 73x55 66 12 18 20 73x55 66 12 18 20 20 81 X 59 72 14 21 17 77x52 66 8 12 12 87x63 78 14 21 17 81 X 59 72 14 18 17 17 95x67 84 16 24 17 83 x57 72 9 12 12 103 X 71 90 16 24 17 87 X 63 78 14 18 17 17 95x 67 84 16 18 17 17 103 X 71 90 16 18 17 17
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
112 X 75 96 18 21 16 16 FEDERAL LANDS HIGHWAY
117 X 79 102 18 21 16 16 U.S. CUSTOMARY STANDARD
128 X 83 108 18 24 16 16 137 x87 114 18 24 16 16
142 X 91 120 18 24 16 16 METAL PIPE CULVERT
STANDARD APPROVED FOR USE 12/1993 I STANDARD
NO SCALE REVISED: 4/1994 6/2005 I 602-1
2.
C:
"' "C u ~I N M
.c Q)
9-st N st f 9-u c..
N st
N L Q) .c E Q) u Q)
COUPLING BANDS FOR METAL PIPE CULVERT £11
ROUND PIPE PIPE ARCH MINIMUM BAND WIDTH (INCHES)
CORRUGATION ANNULAR HELICALLY SEMI-
SIZE £21 DIAMETER SPAN x RISE CORRUGATED CORRUGATED CORRUGATED
INCHES INCHES INCHES BANDS £31 BANDS f4J
1½ X ¼ underdrain f 61 - 10.5 7 12 to 36 17 X 13 to 42 X 29 7 12
2½ X ½ 42 to 72 49 X 33 to 83 X 57 10.5 12 78 to 84 - 10.5 12
3 X 1 36 to 72 60 X 46 to 81 X 59 12 14
78 to 144 87 X 64 to 142 X 91 12 14
5x1 36 to 72 60 X 46 to 81 X 59 20 22
78 to 144 87 X 64 to 142 X 91 20 22 flJ Fabricate annular, helical and semi-corrugated type coupling bands from the same metal as the connecting pipe. Provide coupling bands not more than 3 nominal sheet thicknesses thinner than the thickness of the pipe to be connected, and no thinner than 0. 052 inch for steel or 0.048 inch for aluminum. Fasten coupling bands with the following diameter of bolt:
BANDS f5J
10.5
10.5 10.5 10.5
Band
SLEEVE JOINT
Smoother sleeve with center stop.
Stab type joint
Band
STATE PROJECT SHEET
NUMBER
OR BLM ERFO 2017(1)-32(2)
NOTE:
1. Watertight pipe joints are not required unless specified in the Special Contract Requirements.
2. Other types of coupling bands or fastening devices that comply with the joint performance criteria of AASHTO Standard specifications for Highway Bridges, Division II Section 26 may be used.
H.3
¾" for 18" round culvert (21" x 15" pipe arch) or less ½" for 21" round culvert (24" x 18" pipe arch) or more SMOOTH SLEEVE BAND FLAT BAND f21 For helically corrugated pipe with rerolled ends, the nominal corrugations size refers to the dimension of the end corrugation in the pipe.
£31 Use annular corrugated bands with pipes having annular corrugations or with helical pipe having rerolled end to form annular corrugations. A 10.5 inch band is acceptable on pipe ends rerolled with 2½" x ½" corrugations. A 12 inch band is acceptable on pipe ends rerolled with 3" x 1" pipe corrugations.
£41 Use helical corrugated bands with pipes having helically corrugated ends.
£51 The minimum band widths shown for 3" x 1" and 5" x 1" corrugated sizes apply to 2½" x ½" corrugations on rerolled pipe ends.
f 61 Smooth sleeve-type couplers and flat bands may be used for pipe diameters of 12" or less.
Use a matching metal having a nominal thickness of not less than 0.040 inch for steel, or 0. 036 inch for aluminum, or a plastic with an equivalent strength to metal.
Band Bolts
SIDE VIEW
Band Angle Rivet, spot weld, or Bolts fillet weld at crest
Oval Lug of corrugation at heel and toe of angle ~
Bar & Strap
Integral Flange
~~ ~ ~Wedge
Wedge and Strap
STANDARD BAND CONNECTIONS
Angle Band
END VIEW
Second angle connection optional to 42" diameter, required above 42" diameter
ANNULAR BAND
Band Bolts
SIDE VIEW
Band
Continuous corrugation around band meshes with second annular corrugation in pipe end
SIDE VIEW
Rivet, spot weld, or fillet weld at crest of corrugation at heel and toe of angle Bolt, bar and strap connector
Bolts
Angle Band
END VIEW
Second angle connection optional to 42" diameter, required above 42" diameter
HELICAL BAND
NO SCALE
Band
END VIEW
SEMI-CORRUGATED BAND
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
METAL PIPE CULVERT
COUPLING BAND
STANDARD APPROVED FOR USE 12/1993 STANDARD
REVISED: 4/1994 6/2005 602-2
2.
C Cl
"C ,:j
~I N M
.c Q)
9-st N st f 9-u c..
"' N st
N L Q) .c E Q) u Q)
ABOVE NATURAL GROUND
Finished subgrade ~
-- -- ---- l_ --- --- Roadway embankment
I Bedding Natural ground
ON NATURAL GROUND
Finished subgrade ~
BEDDING DEPTH
½'1/foot of cover, 12" (min.), 24" (max.)
Remove unyielding material and replace with selected fine compressible material. Lightly compact in layers not over 6" in uncompacted depth.
ON UNYIELDING MATERIAL
Finished subgrade ~ ___ _
PIPE SIZE (HJ
12" to 54"
> 54"
* Reduce to 18" for trench excavations
DEPTH
4"
6"
See bedding depth table
18" (min.)
in trench excavation
~ I Roadway embankment __:_L_ 2H or 12' (max.) PIPE BEDDING
Natural ground
Remove unstable material to firm bearing soil and replace with approved granular foundation fill material properly compacted
Metal end section
STATE PROJECT SHEET
NUMBER
OR BLM ERFO 2017(1)-32(2) H.4
NOTE:
1. When directed, camber pipe culverts upward from a chord through the inlet and outlet inverts an ordinate amount equal to 1 % of the pipe length. Develop camber on a parabolic curve. If the midpoint elevation on the parabolic curve as designed exceeds the elevation of the inlet invert, reduce the amount of camber or increase the pipe culvert gradient.
2. H equals the diameter of all round pipe culverts or the rise dimension of all pipe arch culverts.
3. See Section 704 for bedding and backfill requirements.
MINIMUM SPACING
DIAMETER SPACING or SPAN
UP to 48" 24"
Half diameter or 48" and UP span or 36", whichever is less
Minimum spacing (see table)
1'-0" minimum
ON UNSTABLE MATERIAL
LEGEND:
ABOVE AND BELOW
NATURAL GROUND
Bedding material (uncompacted)
Embankment material placed in layers not exceeding 6" compacted depth.
Compacted backfill material placed in layers not exceeding 6" compacted depth. Or lean concrete backfill in accordance with Section 614.
Impermeable backfill material.
Original natural ground surface \
Roadway excavation
L Finished subgrade or embankment height
__ __ before trench excavation
Bedding Culvert end treatment
BELOW NATURAL GROUND OR
TRENCH EXCAVATION IN EMBANKMENT
ELEVATION
MULTIPLE PIPE INSTALLATION
A
~ Width
Embankment slope
High water elevation
L._ Piping plug
A
SECTION A-A
Construct piping plug of impermeable backfill material at the pipe culvert inlet where granular material is used for backfill. Width may be adjusted to tie into impervious material.
PIPING PLUG
NO SCALE
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
METAL AND PLASTIC
PIPE CULVERT BEDDING
STANDARD APPROVED FOR USE 12/1993 STANDARD
REVISED: 4/1994 6/2005
DRAFT: 10/2014 602-3
2.
C Cl
"C
~I N M
.c Q)
9-st N st f 9-u c..
"' N st
N L Q) .c E Q) u Q)
A l Dia.
or Span
C l Dia.
A j
PLAN VIEW
CULVERT WITH STANDARD
END SECTION
Original ground
Geotextile
SECTION A-A
B l Dia.
or Span
L
B j
PLAN VIEW
CULVERT WITHOUT STANDARD
END SECTION
Original ground
Geotextile
SECTION 8-8
PROTECTIVE APRON AT CULVERT OUTLET WITHOUT DITCH
~E L
~E
PLAN VIEW
CULVERT WITH STANDARD
END SECTION
SECTION C-C
D l Dia.
or Span
~E L jf !2 fi s:
:!:2 E:
Clo
:t::
.Q
PLAN VIEW
CULVERT WITHOUT STANDARD
END SECTION
Original ground Match existing ditch slope
----.-Lm:v-Trm ~ li
Geotextile
SECTION 0-0
D j
OUTLET WITHOUT DITCH
PROTECTIVE APRON DIMENSIONS AND QUANTITIES
FOR INFORMATION ONLY
CULVERT APRON APRON ESTIMATED ESTIMATED
SIZE RIPAP LENGTH DEPTH RIPRAP GEOTEXTILE
D CLASS L H QUANTITY QUANTITY
(INCHES) (FEET) (INCHES) (CUYD) (SQYD)
12 2 4 18 1.0 5 18 2 6 18 2.2 9
WITH 24 2 8 18 3.9 13
END 30 3 12.5 24 10.8 27
SECTION 36 3 15 24 15.6 37
42 4 21 30 34.0 63 48 4 24 30 44.4 78 12 2 6 18 1.7 7
18 2 8 18 3.2 12
WITHOUT 24 2 10 18 5.2 17
END 30 3 14.5 24 13.2 32
SECTION 36 3 17 24 18.5 42
42 4 23 30 38.7 70 48 4 26 30 49.8 86
OUTLET WITH DITCH
PROTECTIVE APRON DIMENSIONS AND QUANTITIES
WITH
END
SECTION
WITHOUT
END
SECTION
Original ground
CULVERT
SIZE
D
(INCHES)
Geotextile
FOR INFORMATION ONLY
RIPAP
CLASS
4D
APRON APRON
LENGTH DEPTH
L H
(FEET) (INCHES)
4 18 6 18 8 18
12.5 24
15 24 21 30 24 30 6 18 8 18
10 18
14.5 24 17 24
23 30 26 30
Sloped 1 V: 2H or flatter
IL__f
-----~ .s;
Cl .S
Flowline
SECTION E-E
ESTIMATED
RIPRAP
QUANTITY
(CUYD)
0.9 2.0 3.6 9.3
13.3 27.2 35.6
1.3 2.7 4.4
10.7 15.1
29.8 38.5
ESTIMATED
GEOTEXTILE
QUANTITY
(SQYD)
PROTECTIVE APRON AT CULVERT OUTLET WITH DITCH
NO SCALE
STATE PROJECT SHEET
NUMBER
OR BLM ERFO 2017(1)-32(2) H.5
NOTE:
1. Use for aprons serving culverts with slopes less than 10%.
2. Furnish separation and stabilization geotextile.
3. Do not measure riprap placement excavation for payment.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
U.S. CUSTOMARY DETAIL
PLACED RIPRAP AT
CULVERT OUTLETS
DETAIL APPROVED FOR USE --/---- DETAIL
REVISED: 8/2016 W251-1
L
LP
NO SCALE
H.6
STATE PROJECT
NUMBER
SHEET
U
S C u s to m a r y p w w o r k d o r e b h h .d g n
OR BLM ERFO 2017(1)-32(2)
M a y
C h e c k e d b y
D e s ig n e d b y
2"
VIEW B
Traveled LaneDitch Shoulder lap
12"
7.5"
See View "B"
15"
2"
Wire mesh
Hose clamp
Outlet pipe
RODENT GUARD DETAIL
NOTE:
PVC drainage pipe
6" Ø perforated
1'
2.5' (min.)
STANDARD UNDERDRAIN SYSTEM
DETAIL
STANDARD UNDERDRAIN
Embankment
Geotextile filter, class 1, type D underdrains encapuslated with
Granular backfill material for m in
.5 m in by the CO.
slope outlet pipe at least 2% to drain at locations designated
Install standard underdrain system outlets at low points, and
Adjust standard underdrain systems as directed by the CO.
1.
CJ)
2.
C:
~I N M
.c Q)
9- L/l N
" 0 f 9-u c..
N L Q) .c E Q) u Q)
SIGN SPACING TABLE
ROAD TYPE
Urban and Rural 30 MPH and less Urban and Rural 35 MPH to 50 MPH Rural greater than 50 MPH Expressway/ Freeway
G20-2
ROAD WORK
NEXT xx MILES
G20-1 See Note 11
DISTANCE BETWEEN
SIGNS IN FEET
A B 100 100 350 350 500 500
1000 1500
W20-1 over W16-8P
C
G20-2
G20-2
G20-2
G20-1 See Note 11
ROAD WORK
NEXT xx MILES
W20-1 over W16-8P See Note 9
STATE PROJECT
OR BLM ERFO 2017(1)-32(2)
NOTE:
1. Erect all project advance warning signs before starting construction work.
2. Not all details shown on the temporary traffic control sheets may be applicable to this project. The Contractor may add or delete information and details in this traffic control plan as necessary to accommodate actual operations.
3. Where advance warning signs, placed as shown, interfere with permanent signs, locate the warning signs as determined by the CO for best results. Vary messages as required.
4. Additional or different message signs may be required to fit the actual construction conditions.
5. Install advisory speed plates under the W20 series warning signs as needed to indicate a maximum recommended speed through the construction area.
6. Ensure all sign supports exposed to impact by traffic meet the requirements of NCHRP-350 or MASH for crashworthiness.
7. Maintain two-way traffic during all non-work hours except as approved by the CO.
8. Do not store traffic control devices along the roadway when not in use. Cover post-mounted signs when not applicable.
9. If W20-1 is placed on a roadway other than that on which the actual construction work occurs, include a supplementary plaque indicating the name of the road on which the construction does occur (applies to major roads only).
10. The message on the W20-1 signs may be "ROAD WORK AHEAD" or may specify the distance to the work area in feet or in miles. Install an additional W20-1 sign when approach speeds exceed 50 MPH. When used place the two W20-1 signs "B" feet apart according to the Sign Spacing Table.
11. For work zones that are 2 miles or more in length, install G20-1 signs at each end of the project. Show the distance on the G20-1 sign to the nearest whole mile.
12. If signing on a roadway under a jurisdiction other than the client agency, verify that an encroachment permit has been obtained.
13. State standards may be used as an alternative if approved by the CO.
14. Refer to the Section 635 of the Special Contract Requirements for allowable retroreflective sheeting types.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
FEDERAL LANDS HIGHWAY
SHEET
NUMBER
1.1
U.S. CUSTOMARY STANDARD
TEMPORARY TRAFFIC CONTROL
ADVANCE SIGNING
NO SCALE
STANDARD APPRDVED FOR USE 6/2005
REVISED:
DRAFT: 6/2014
STANDARD
635-1
V, 2.
C
"' "Cl
.ci ~I N M
.c Q)
9- L/l N
" 0 f 9-u c..
N L Q) .c E Q) u Q)
LENGTH AND SPACING TABLE
APPROACH BUFFER SPACE CHANNELIZING DEVICE
SPEED* LENGTH TAPER BUFFER WORK
AREA SPACE SPACE
MPH FEET
SPACING IN FEET
20 115 20 40 40 25 155 20 50 50 30 200 20 60 60 35 250 20 70 70 40 305 20 80 80 45 360 20 90 90 50 425 20 100 100 55 495 20 110 110 60 570 20 120 120 65 645 20 130 130 70 730 20 140 140
* Approach speed based on the regulatory posted speed, not the advisory speed.
Traffic flow -E.-:::~--
Traffic flow -----c:.::-,,➔ p • p Flagger location _:x
C B A
See Note 4
ADVANCE WARNING AREA (See Sign Spacing Table) r;;i
W13-1P (optional)
W16-2P (optional)
SIGN SPACING TABLE
ROAD TYPE
Urban and Rural 30 MPH and less Urban and Rural 35 MPH to 50 MPH Rural greater than 50 MPH Expressway/ Freeway
TAPER AREA BUFFER SPACE
50' - 100' (optional)
(See Length and Spacing Table)
DISTANCE BETWEEN
SIGNS IN FEET
A B 100 100 350 350 500 500
1000 1500
Device spacing (See Length and Spacing Table)
C
VARIABLE
WORKSPACE
STATE PROJECT SHEET
NUMBER
OR BLM ERFO 2017(1)-32(2) 1.2
NOTE:
1. Signs are shown for one direction of travel only. Place devices similar to those depicted for the opposite direction of travel.
2. Final location and spacing of signs and devices may be changed to fit field conditions as approved by the CO.
3. For pilot car operation, mount the PILOT CAR FOLLOW ME (G20-4) sign at a conspicuous location on the rear of vehicle. Prominently display the name of the contractor on the pilot car.
4. If closure is completely within the project limits, eliminate the "ROAD WORK AHEAD" (W20-1) and "END ROAD WORK" (G20-2) signs.
5. For night time flagging operation, provide floodlighting at flagger stations.
6. For project specific minimum width, refer to the Special Contract Requirements, Section 156.
7. Do not allow equipment, materials, or vehicles to be parked or stored in the buffer space.
Channelizing devices
BUFFER SPACE TAPER AREA
(optional) 50' - 100' (optional)
TERMINATION AREA
BUFFER SPACE
(optional)
Flagger location ~
A
END
ROAD WORK
G20-2 See Note 4
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
TEMPORARY TRAFFIC CONTROL
SINGLE LANE CLOSURE LAYOUT
(WITH FLAGGERS)
NO SCALE
STANDARD APPRDVED FOR USE 6/2005
REVISED:
DRAFT: 8/2013
635-6 en 2.
C:
Cl
"C u ~I N M
.c Q)
9- L/l N
" 0 f 9-u c..
N L Q) .c E Q) u Q)
LENGTH AND SPACING TABLE
APPROACH BUFFER SPACE CHANNELIZING DEVICE
SPEED* LENGTH TAPER BUFFER WORK
AREA SPACE SPACE
MPH FEET
SPACING IN FEET
20 115 20 40 40 25 155 20 50 50 30 200 20 60 60 35 250 20 70 70 40 305 20 80 80 45 360 20 90 90 50 425 20 100 100
55 495 20 110 110 60 570 20 120 120 65 645 20 130 130 70 730 20 140 140
* Approach speed based on the regulatory posted speed, not the advisory speed.
Traffic flow .,.<~--
Traffic flow --~>-p C B
STOP LINE
See Note 6
A
ADVANCE WARNING AREA (See Sign Spacing Table)
~ Type B warning ~ light (optional)~
See Note 4 r;;i
W13-1P (optional)
W16-2P (optional) See Note 7
SIGN SPACING TABLE
ROAD TYPE
Urban and Rural 30 MPH and less Urban and Rural 35 MPH to 50 MPH Rural greater than 50 MPH Expressway/ Freeway
24"
½" Black border r\i PROCEED
• • r\i WHEN ~
CLEAR
'l, SPECIAL SIGN Black lettering on reflective white background
Channelizing devices p
15' TAPER AREA BUFFER SPACE
50' - 100' (optional)
(See Length and Spacing Table)
SR1-1
PROCEED
WHEN
CLEAR
Special sign
DISTANCE BETWEEN
SIGNS IN FEET
A B C
100 100 100
350 350 350 500 500 500
1000 1500 2640
Cl
• I"')
Cl
• I"')
Cl
• I"')
0 1-4 (optional)
Device spacing (See Length and Spacing Table)
10' min.
See Note 5
VARIABLE
WORK SPACE
STATE PROJECT
OR BLM ERFO 2017(1)-32(2)
NOTE:
1. Use this layout only if road users from both directions are able to see approaching vehicular traffic through and beyond the work site and have sufficient visibility of approaching vehicles.
2. Advance warning area signs are shown for one direction of travel only.
Place devices similar to those depicted for the opposite direction of travel.
3. Final location and spacing of signs and devices may be changed to fit field conditions as approved by the CO.
4. If closure is completely within the project limits, eliminate the "ROAD WORK AHEAD" (W20-1) and "END ROAD WORK" (G20-2) signs.
5. For project specific minimum width, refer to Special Contract Requirements, Section 156.
6. If the roadway surface is paved, install stop lines that comply with Section 38.16 of the MUTCD.
7. Use the "STOP AHEAD" (W3-1) sign when approach speeds exceed
50 MPH.
8. Do not allow equipment, materials, or vehicles to be parked or stored in the buffer space.
BUFFER SPACE
(optional)
165' - 230'
TAPER AREA
50' - 100' (optional)
TERMINATION AREA
SRl-1
PROCEED
WHEN
CLEAR
Special sign
STOP LINE
See Note 6
Reduce or eliminate drums in downstream taper if necessary to provide access to work space p A
END G20-2
SHEET
NUMBER
1.3
ROAD WORK See Note 4
NO SCALE
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
TEMPORARY TRAFFIC CONTROL
SINGLE LANE CLOSURE LAYOUT
{WITH STOP SIGN)
STANDARD APPROVED FOR USE 6/2005 STANDARD
REVISED:
DRAFT: 8/2013 635-8
V, 2.
C
"' "C!
"C
~I N M
.c Q)
9- L/l N
" 0 f 9-u c..
N L Q) .c E Q) u Q)
LENGTH AND SPACING TABLE
APPROACH BUFFER SPACE CHANNELIZING DEVICE CONCRETE WORK ZONE
SPEED* LENGTH TAPER BUFFER WORK BARRIER CLEAR ZONE
AREA SPACE SPACE FLARE WIDTH
MPH FEET SPACING IN FEET RATE FEET
20 115 20 40 40 1:8 10 25 155 20 50 50 1:8 10 30 200 20 60 60 1:8 10 35 250 20 70 70 1:9 10 40 305 20 80 80 1:10 15 45 360 20 90 90 1:12 20 50 425 20 100 100 1:14 20
55 495 20 110 110 1:16 20 60 570 20 120 120 1:16 30 65 645 20 130 130 1:16 30 70 730 20 140 140 1:16 30
* Approach speed based on the regulatory posted speed, not the advisory speed.
Traffic flow ""<s-------
Remove conflicting pavement markings r Channelizing devices 10' min.
See Note 3
STATE PROJECT
OR BLM ERFO 2017(1)-32(2)
NOTE:
1. Install signs and other devices for single lane closure according to
Standard 635-6, 7, 8, or 9. Final location and spacing of signs and devices may be changed to fit field conditions as approved by the CO.
2. Place barrier according to the AASHTO Roadside Design Guide. Terminate barrier ends outside the work zone clear zone or protect the barrier ends with a crash cushion. Include reflectors on barrier at 25' intervals.
3. For project specific minimum width, refer to Special Contract Requirements, Section 156.
4. Place channelizing devices at downstream taper during non-work hours or when access is not needed.
5. Do not allow equipment, materials, or vehicles to be parked or stored in the buffer space.
6. Reduce or eliminate drums and barrier in downstream taper if necessary to provide access to work space.
Temporary concrete barrier.
See Note 2
SHEET
NUMBER
1.4
Traffic flow > ® ®
Device spacing
See Note 2
TAPER AREA BUFFER SPACE
(50' - 100') (optional)
(See Length and Spacing Table) VARIABLE WORK SPACE
See Note 2
BUFFER SPACE TAPER AREA (50' - 100')
(optional) See Note 4
NO SCALE
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
TEMPORARY TRAFFIC CONTROL
SINGLE LANE CLOSURE LAYOUT
(WITH TEMPORARY BARRIER)
STANDARD APPRDVED FOR USE 6/2005 STANDARD
REVISED:
DRAFT: 6/2015 635-13
2.
C C, "C
'" ~I N M
.c Q)
9- L/l N
" 0 f 9-u c..
" N
N L Q) .c E Q) u Q)
"O "-0
OJ
IJ.J
<1/1 I '
6' - 12'
~ See Note 4 :::i
..c::
V)
"O
Cl.. .s "-
0 E: OJ
l() .gi
IJ.J
Break-away holes.
See post detail (typ.)
I ' ' t
Lt)
0 Lt)
<: .s 2
OJ E: 0
OJ
¼- <: l/)
OJ
OJ
l/)
_J
SINGLE POST SIGN
WOOD POST SELECTION TABLE
WIDTH AREA NUMBER POST SIZE D
"X" (SQFT) OF POSTS (INCH) (INCH)
Diamond :5 36" < 10 1 4x4 36 Other Shapes :5 48" 1 4x6 48
Diamond :5 48" 10 - 20 1 6x6 48
Diamond :5 48" 10- 20 2 4x4 36 Other Shapes :5 12' 20- 50 2 4x6 48
> 13' 50- 65 2 6x6 48 12' - 16' 50- 65 3 4x6 48
> 17' 65- 95 4 4x6 48 > 30' 65- 95 3 6x6 48
0.75X
I •
I • _J
HOLE SIZE
(INCH)
1.5
1.5
1.5 o.2x--t;: 0_6x ;t--o.2x r--·1•--·1·1 X
TWO POST SIGN
f. Post
, I' ' ' , I' ' '
: 1:
: 1:
Long side of post
Bottom of sign panel
Field drill holes through post parallel to sign face.
See table for hole size
POST DETAIL
STATE PROJECT SHEET
NUMBER
OR BLM ERFO 2017(1)-32(2) 1.5
NOTE:
1. Attach sign panels with a minimum of 2 - ¼" dia. bolts per post.
2. Hl and H2 = Overall post length.
Select post lengths to fit field conditions.
3. D = Post embedment depth for average soil conditions.
4. In areas where lateral distance is limited, a minimum lateral offset of 2' may be used. In areas with curbs, a minimum lateral distance of 1' behind the face of the curb may be used.
5. In pedestrian locations, or in areas with obstructed views, use 7' minimum mounting height for main sign and 6' minimum mounting height for secondary sign.
6. Use 7' minimum spacing between posts for sign posts 6" x 6" or larger.
7. State standards may be used as an alternative if approved by the CO.
On tangent alignment 93° 200'
SIGN INSTALLATION ANGLE
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
TEMPORARY TRAFFIC CONTROL
SIGN INSTALLATION
WOOD POSTS
NO SCALE
STANDARD APPRDVED FOR USE 6/2005
REVISED:
DRAFT: 9/2014
635-14
File details come from the government source that posted it.