AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

N/A

PAGE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)

A001 07/10/2019 N/A See Block 10

6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A

Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.

X

69056719B000013

9B. DATED (SEE ITEM 11)

06/17/2019

10A. MODIFICATION OF CONTRACT/ORDER NO.

N/A

10B. DATED (SEE ITEM 13)

CODE: N/A FACILITY CODE: N/A N/A

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers (__ ) is extended, ( x ) is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

N/A

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN

ITEM 10A.

N/A

B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

N/A

C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

N/A

D OTHER (Specify type of modification and authority) N/A

E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

OR BLM ERFO 2017(1)-32(2), Medford District Road Repair Phase 2

See page 2

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

N/A

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITION NOT USABLE

30-105 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

Amendment No. A001, dated 07/10/2019 OR BLM ERFO 2017(1)-32(2) Solicitation No. 69056719B000013 Medford District Road Repair Phase 2

REVISIONS ARE AS FOLLOWS:

SF 1442, SOLICITATION, OFFER, AND AWARD (Pen & Ink change)

SPECIAL CONTRACT REQUIREMENTS

Page E-15 through E-16, Subsection 108.02, Subcontracting. Deletes Subsection.

PLANS

Plan Sheet A.3 Revises callout for Buck Rock Road M.P. 6.10.

ENCLOSURES

Pages:

E-15 through E-16

Plan Sheets:

A.3

E-15 DIVISION 100

Special Contract Requirements Project: OR BLM ERFO 2017(1)-32(2), Medford District Road Repair Phase 2

Section 108. — PROSECUTION AND PROGRESS

09/17/18– FP-14

108.01 Commencement, Prosecution, and Completion of Work. Add the following:

Furnish at least a 48-hour advanced notice before changing the current work schedule. Work schedule changes that include additional shifts require a 14-day advanced notice.

Perform work under this contract according to the following:

(a) Limit work as provided for in Sections 105, 107, and 157.

(b) Limit work as provided for in Subsection 156.07.

(c) Following the winter shutdown period, do not perform any ground disturbing activities before May 1, 2020.

108.01A Labor. (Added Subsection).

Follow the requirements of FAR Clause 52.222-6 Construction Wage Rate Requirements.

Adjacent or virtually adjacent work sites, as used in FAR Clause 52.222-6, are defined to be work sites within ½ mile of the project. Application of Construction Wage Rate Requirements (Davis- Bacon Act) for work sites beyond ½ mile of the project will be determined by the CO.

108.02 Subcontracting. Amend as follows:

Delete the text of the first paragraph and substitute the following:

Follow the requirements of FAR clauses 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns, 52.222-11 Subcontracts (Labor Standards), and 52.236-1, Performance of Work by the Contractor.

Delete the last paragraph and substitute the following:

Evaluate the percentage of the cost of contract performance incurred for personnel in FAR Clause 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns, according to the following formula:

P = H / T where:

P = Percent of the cost of contract performance incurred for personnel working for HUBZone firms.

Revised by Amendment A001

E-16 DIVISION 100

Special Contract Requirements Project: OR BLM ERFO 2017(1)-32(2), Medford District Road Repair Phase 2

T = Total wages/benefits paid during the life of the contract. Certified payrolls will be used to determine Davis-Bacon wages and benefits paid. Submit certified statements at least monthly declaring the wages and benefits paid to non-Davis Bacon personnel under this contract.

H = Total wages/benefits paid to employees working for HUBZone firms (prime and subcontractors).

In FAR Clause 52.236-1, Performance of Work by the Contractor, the percentage of work performed on-site by the Contractor will be computed as 100 percent less the combined initial dollar amount of all subcontracts involving on-site labor as a percent of the original dollar amount of the contract.

108.03 Determination and Extension of Contract Time. Add the following to paragraph (c):

No adjustment in contract time or amount will be made for stop orders issued under Subsection 108.05(a) or (b), except an adjustment in contract time, as provided by FAR Clause 52.249-10 Default (Fixed-Price Construction), may be made when the Contractor is able to demonstrate that the weather was unusually severe based on the most recent 10 years of historical data.

108.04 Failure to Complete Work on Time. Delete this Subsection and substitute the following:

Follow the requirements of FAR Clause 52.211-12 Liquidated Damages — Construction.

Liquidated damages in the amount specified in Table 108-1 will be assessed for each calendar day beyond the time specified in the contract until substantial completion of the work.

Liquidated damages will not be assessed for the following:

(a) The day of the final inspection.

(b) Days required to perform work added to the contract after substantial completion including items identified during the final inspection that were not required before that time.

(c) Delays by the Government after all work is complete and before a formal acceptance is executed.

(d) Periods of time when all work is complete but acceptance is delayed pending the plant establishment period or similar warranty period.

(e) During winter shutdown periods ordered by the CO.

Revised by Amendment A001

2 MI

2 MI

1 MI

1 MI

Rogue

Rive r

Fork

Ga lic e

C re e k

Ro gu e

Rive r

MERLIN

Long: 123° 32' 21.73" W

Lat: 42° 33' 22.03" N

STRATTON CREEK MP 0.90

Long: 123° 29' 43.85" W

Lat: 42° 37' 52.52" N

HOG CREEK MP 0.63

Long: 123° 30' 11.23" W

Lat: 42° 37' 18.28" N

HOG CREEK MP 2.85

J O

S E

P H

IN

E

C

O

J A

C K

S O

N

C

O

Long: 123° 16' 25.30" W

Lat: 42° 29' 50.66" N

GRANITE HILL MP 1.65

Long: 123° 4' 10.21" W

Lat: 42° 32' 22.63" N

SARDINE RIDGE MP 0.54

Long: 123° 3' 54.30" W

Lat: 42° 32' 15.30" N

SARDINE RIDGE MP 0.94

GRANTS

PASS ROGUE

RIVER GOLD HILL

WIMER

E v a n s

C r e e k

R W

T

S

Long: 122° 46' 33.67" W

Lat: 42° 42' 28.37" N

BUCK ROCK ROAD MP 6.10

U M

P Q

U A

N A

T

IO

N A

L

F

O R

E S

T

JACKSON CO

DOUGLAS CO

Butte

Ragsdale

Campground

Treehorn

Spring

Beaver

Rock

Blue

Rock

Pilot

R 8 W

Long: 123° 35' 33.70" W

Lat: 42° 11' 51.60" N

KERBY-REEVES CREEK MP 3.14

Kirby

Cave

Junction

T 35 S

T 34 S

T 34 S

T 33 S

T 35 S

T 34 S

T 39 S

T 38 S

R W

R W

R W

R W

R W

R W

R W

R W

R W

R W

R W

Long: 123° 29' 46.7" W

Lat: 42° 37' 58.6" N

ANGORA SPUR MP 0.28

Long: 123° 36' 46.1" W

Lat: 42° 40' 14.7" N

WHISKEY CREEK

Disposal Site

Long: 123° 35' 8.9" W

Lat: 42° 39' 1.6" N

Galice Creek Boat Ramp

Water Source

FOOTNOTE:

Location not shown on map, coordinates provided.

VICINITY MAP(S)

Long: 123° 38' 6.65" W

Lat: 42° 40' 49.80" N

WHISKEY CREEK MP 3.30

Long: 122° 50' 2.04" W

Lat: 42° 45' 7.31" N

UPPER TRAIL CREEK MP 1.70

N

N

N

N

Long: 123° 39' 33.7" W

Lat: 42° 41' 25.8" N

WHISKEY CREEK

Water Source

Long: 123° 30' 9.8" W

Lat: 42° 38' 4.1" N

HOG CREEK

Disposal Site

Long: 123° 29' 36.20" W

Lat: 42° 38' 8.74" N

ANGORA SPUR

Disposal Site

Long: 123°5' 24.9" W

Lat: 42°37' 12.2" N

SARDINE RIDGE

Water Source

Long: 123° 35' 26.5" W

Lat: 42° 11' 49.0" N

KERBY-REEVES CREEK

Disposal Site

Long: 122° 50' 31.3" W

Lat: 42° 45' 25.9" N

UPPER TRAIL CREEK

Water Source

Long: 122° 49' 31.1" W

Lat: 42° 44' 49.9" N

UPPER TRAIL CREEK

Water Source

A.3

STATE PROJECT

NUMBER

SHEET

U

S I n t2

D c p w w o r k d o r e b a c .d g n

OR BLM ERFO 2017(1)-32(2)

P

M

J u ly

S

W it u c k i

C h e c k e d b y

D e s ig n e d b y

1 Revised by Amendment A001

[1]

[1]

[1] [1]

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
A001