Q&A_05-03-19.pdf
PDF 56 KB Posted
- Solicitation number
- 69056719B000011
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BidSumA+B.pdf | ||
| A001.pdf | ||
| Plans_-_OR_DOUGLAS_17(1)_-_Revised_041719.pdf | ||
| IFB.pdf | ||
| ESCP_OR_DOUGLAS_17(1)_Little_River_Road_Rock_Slope.pdf | ||
| PROJECT_DESCRIPTION.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OR DOUGLAS 17(1)
Little River Road Rock Slope Stabilization MP 24.6
# General Technical Question Answer Date
1 X
Will WFL allow for Power Outages in the Rock/slope mitigation area to conduct critical slope work? And if Power Outages are allowed, what is the max duration of the Power Outage per day?
The government does not have an agreement to provide power outages in the contract. The Contractor is required to obtain additional permits or agreements that are required by the Contractor’s method of operation and comply with Section 107.
5/3/19