Q&A_05-03-19.pdf

PDF 56 KB Posted

Attached to
OR DOUGLAS 17(1)/Little River Road Rock Slope Stabilization MP 24. 6
Solicitation number
69056719B000011
Issued by

View the file

Other files

File Type Posted
BidSumA+B.pdf PDF
A001.pdf PDF
Plans_-_OR_DOUGLAS_17(1)_-_Revised_041719.pdf PDF
IFB.pdf PDF
ESCP_OR_DOUGLAS_17(1)_Little_River_Road_Rock_Slope.pdf PDF
PROJECT_DESCRIPTION.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OR DOUGLAS 17(1)

Little River Road Rock Slope Stabilization MP 24.6

# General Technical Question Answer Date

1 X

Will WFL allow for Power Outages in the Rock/slope mitigation area to conduct critical slope work? And if Power Outages are allowed, what is the max duration of the Power Outage per day?

The government does not have an agreement to provide power outages in the contract. The Contractor is required to obtain additional permits or agreements that are required by the Contractor’s method of operation and comply with Section 107.

5/3/19

Check General or Technical