PROJECT_DESCRIPTION.pdf

PDF 174 KB Posted

Attached to
OR DOUGLAS 17(1)/Little River Road Rock Slope Stabilization MP 24. 6
Solicitation number
69056719B000011
Issued by

View the file

Other files

File Type Posted
BidSumA+B.pdf PDF
Q&A_05-03-19.pdf PDF
A001.pdf PDF
Plans_-_OR_DOUGLAS_17(1)_-_Revised_041719.pdf PDF
IFB.pdf PDF
ESCP_OR_DOUGLAS_17(1)_Little_River_Road_Rock_Slope.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OR DOUGLAS 17(1)/Little River Road Rock Slope Stabilization MP 24.6, Douglas County, Located Douglas County, Oregon

The work consists of Rock slope stabilization, pavement repair, guardrail, erosion control, temporary traffic control, permanent traffic control and other small items of work.

Project length: 0.180 Miles

Tentative Fixed Completion Date: Winter 2019/2020 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)

Estimated Price Range: $3 million to $5 million

Location: 22 Miles East of Roseburg, Oregon

DESCRIPTION OF WORK in US CUSTOMARY UNITS

FP-14

Sc he du le

A

DIVISION 150 – Project Requirements 152 Construction Survey & Staking (yes/no) Yes 153 Contractor Quality Control and Assurance

(yes/no) Yes 154 Contractor Sampling & Testing (yes/no) Yes 155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes 157 Soil Erosion & Sediment Control (erosion control devices) Silt Fence Fiber Roll

550 LNFT

1,100 LNFT

158 Watering for Dust Control ALL

DIVISION 200 – Earthwork 203 Removal of Structures & Obstructions (structures, demolition) Removal of Sign Removal of Guardrail Removal of Boulder

3 EACH

450 LNFT

2,500 CUYD

DIVISION 250 – Slope Reinforcement and Retaining Walls 260 Rock Bolts & Dowels Rock Bolt (40 kip design load) Rock Bolt (80 kip design load) Rock Dowel (40 kip design load)

3,320 LNFT

2,735 LNFT

1,735 LNFT

DIVISION 300 – Aggregate and Base Courses 303 Road Reconditioning 2,000 LNFT

Sc he du le

A

DIVISION 400 – Asphalt Pavements & Surface Treatments 403 Asphalt Concrete 400 TON 412 Asphalt Tack Coat (asphalt surface treatment) 245 GAL 413 Asphalt Pavement Milling 2,425 SQYD

DIVISION 600 – Incidental Construction 610 Horizontal Drains 3,000 LNFT 617 Guardrail 450 LNFT 621 Monuments & Markers (construction survey & staking) (yes/no) No 622 Rental Equipment (yes/no) No 623 General Labor (yes/no) Yes 634 Permanent Pavement Markings (traffic pavement markings) Type D, Solid (Yellow) Type D, Solid (White)

2,900 LNFT

2,900 LNFT

635 Temporary Traffic Control Traffic Control Supervisor Traffic Signal System Barricade, Type 3 Drum Warning Light Type B Concrete Barrier Pavement Markings (White Edge Line) Pavement Markings (White Stop Line) Pavement Marking Removal Construction Sign Flagger

ALL

ALL

4 EACH

20 EACH

4 EACH

1,250 LNFT

2,800 LNFT

60 LNFT

2,900 LNFT

167 SQFT

2,400 HOUR

651 Rockfall Protection Draped Rockfall Protection, Wire Mesh Draped Rockfall Protection, Wire Mesh (High Tensile Strength)

4,190 SQYD

2,395 SQYD

653 Rockfall Protection Midslope Rockfall Attenuator 3,300 SQYD 656 Temporary Roadway Rockfall Protection ALL

File details come from the government source that posted it.