Preliminary_Plans.pdf

PDF 2 MB Posted

Attached to
WA FS ERFO 071-2010, West Fork White River Road Emergency Repairs
Solicitation number
69056718B000033
Issued by

About this file

Preliminary Plan Sheets

View the file

Other files

File Type Posted
Bid_Summary_WA_FS_ERFO_071-2010.pdf PDF
Q&A_03-27-2019.pdf PDF
W_Fk_White_Riv_Bridge_As-built.pdf PDF
Plan_Request_form.pdf PDF
plans_we0712010.pdf PDF
WA_FS_ERFO_071-2010,_West_Fork_White_River_Rd..pdf PDF
IFB_West_Fork_White_River.pdf PDF
PROJECT_DESCRIPTION_West_Fork.pdf PDF
Preliminary-Letter.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Greenwater

Alder

Longmire

Ashford

Tacoma

Way

Federal

Kent

Renton

Enumclaw

W h ite

R ive r

W e s t

F o rk

W h it e

R iv e r

Sumner

Preston

Upper

Gree n

R iv e r

SCALE IN MILES

To Ya kim a W

A

T o S e a tt le W

A

White R iv er

Mt. Rainier

Carbon

R iv e r

Puyallup

R iv e r

D a lla s R id g e r e t a wr a el C r e vi R

P A C

IF

IC

C R

E S

T T

R A

IL

PROJECT LOCATION

167 164

410 410

Maple Valley

Vicinity Map)

(See Sheet A.3 for

WHITE RIVER BRIDGE

PROJECT MANAGER

R

E N

O R

A I

N

N

ST F

R

I

D

D E P A

T

NTOFT A SP

T T

O

U

TE

ATESO

AM

E R

IC

A

M

INDEX TO SHEETSBRITISH COLUMBIA

I D

A H

O

OREGON

UNITED STATES

CANADA

P A

C I F I C

O C

A E

N tS rait ofJuan deFuca

OC

LU

MBIA R

IV

ER

A

SN

KE

R

VERI

M

COLU B

I A

V R I

E R

Lakes

Banks

Lakes

Moses

Reservoir

Potholes

OLYMPIC

NATIONAL

PARK

MOUNT

RAINIER

N.P.

MOUNT

ST. HELENS

NAT'L VOLC.

MON.

NORTH

CASCADES

NATIONAL

PARK

BELLINGHAM

Forks

Aberdeen

Chehalis

Longview

OLYMPIA

TACOMA

SEATTLE

EVERETT

Wenatchee

Lake

Moses

SPOKANE

Pullman

Pasco

RICHLAND

Kennewick Walla Walla

ANGELES

PORT

Townsend

Port Vernon

Mt.

VANCOUVER

WASHINGTON KEY MAP

YAKIMA

u n d o S t e g u

P

N

B. CHON

C. PLAN SHEETS

B. SUMMARIES

A. GENERAL INFORMATION

C.1

B.1

A.3

A.2

A.1

SITE PLAN

SUMMARY OF QUANTITIES

VICINTY MAP

PLAN SYMBOLS AND ABBREVIATIONS

TITLE SHEET

A.1

STATE PROJECT

NUMBER

SHEET

U

S S u r ft

D c m y fi le s p w p r o d u c ti o n d w e a a .d g n

WA FS ERFO 071-2010

P

M

S e p te m b e r

L J I

M E

N E

Z

C h e c k e d b y

D e s ig n e d b y

FEDERAL HIGHWAY ADMINISTRATION

U. S. DEPARTMENT OF TRANSPORTATION

APPROVED:

DATE

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

SPECIFICATION:

VANCOUVER, WASHINGTON

WESTERN FEDERAL LANDS HIGHWAY DIVISION

PLANS PREPARED BY

Western Federal Lands Highway Division

Chief of Engineering, on Federal Highway Projects, FP-14

Construction of Roads and Bridges

Standard Specifications for

PLANS FOR PROPOSED PROJECT

WASHINGTON

PIERCE COUNTY

MOUNT BAKER-SNOQUALMIE NATIONAL FOREST

TYPE OF CONSTRUCTION:

DESIGN DESIGNATION:

e (max)

V

ADT (YR+20)

ADT (YEAR)

NA

NA

NA

NA

Project Location

0 5 15 205 10

MT. RAINIER

NATIONAL PARK

FOREST

NATIONAL

SNOQUALMIE

asphalt removal, and roadway obliteration

Bridge salvage, bridge demolition, WA FS ERFO 071-2010

EMERGENCY REPAIRS

WEST FORK WHITE RIVER ROAD

PRELIMINARY

E

36 3631 31

1 1 6 6

15 15

22 22

SEC.

SEC.

G W G W

EL. 94.61 ft N

DI

T

A.2

STATE PROJECT

NUMBER

SHEET

WA ID FS ERFO 071-2010

C h e c k e d b y

D e s ig n e d b y

N

DI

wall face

T

ABBREVIATIONS

PLAN SYMBOLS AND

U

S S u r ft m y fi le s p w p r o d u c ti o n d w e a b .d g n

A u g u s t θs Ø

∆c appr.

AH

ADT

abut.

brg.

br.

BP

BM

BK

CUYD

culv.

CUFT

ctrs.

CS

cont.

constr. jt.

conn.

conc.

col.

CMP

clr.

cc or c. to c.

drwg(s).

dist.

diaph.

diag.

dia.

DHV

D exp. jt.

exc.

EW

ER

EQ or eq.

EP

emb.

elev.

El. 94.61 ft e

E ftg.

ft3 ft2 flg.

fin.

galv.

ga.

HW

hex.

hdwl.

jt.

ID

LW

lt. or LT

Ls

LPSM

long.

LNFT

lat.

lam.

L mon.

min.

MGAL

max.

matl.

M.P.

M.L.

NC

N

OG

OD

o. to o.

o. c.

pvmt.

PT

PST

PSC

PS

POT

POS

POC

pl.

PI

PCS

PCC

PC

rte.

rt. or RT reqd.

reinf.

rdwy.

R/W

R.

R sym.

STS

struc.

stiff.

stgr.

std.

STA, Sta.

ST

SS

SRS

SQYD

SQFT

spa.

SLRY

shldr.

sec.

SC

SADT

S typ.

Ts

TS

thd.

TBM

T.

T

VPI

vph

V

W yd3 yd2 spiral central angle diameter curve central angle total central angle approach ahead average daily traffic abutment bearing bridge balance point bench mark back cubic yard(s) culvert cubic foot (feet) centers point of curve to spiral continuous construction joint connection concrete column corrugated metal pipe clear centerline center to center drawing(s) distance diaphragm diagonal diameter design hourly volume diameter expansion joint excavation edge of water edge of road equation edge of pavement embankment elevation elevation with number superelevation rate east footing cubic foot (feet) square foot flange finish galvanized gage (gauge) high water hexagon headwall joint inside diameter low water left length of spiral lump sum longitudinal linear foot (feet) latitude lamination length of curve monument minimum thousand gallon maximum material mile post main line normal crown north original ground outside diameter out to out on center pavement point of tangent point of spiral to tangent point of spiral to curve point of tangent to spiral point on tangent point on spiral point on curve plate point of intersection point of curve to spiral point of compound curve point of curve route right required reinforcement roadway right-of-way range radius symmetrical point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot spacing, spaces or spaced slurry unit shoulder section point of spiral to curve seasonal average daily traffic south typical tangent distance (spiraled curve) point of tangent to spiral thread temporary bench mark township tangent distance vertical point of intersection vehicles per hour design speed west cubic yard(s) square yard

LC

North Arrow

Survey Monument

Common Ownership

Parcel Number

Property Line w/Found Property Corner

Section Corner (Found, Projected)16

Section Line16

Section Corner (Found, Projected)4

Section Line4

Section Corner (Found, Projected)

Section Line

Township or Range Line

Indian Reservation Boundary

BLM Lands Boundary

National Wildlife Refuge Boundary

National Forest Boundary

National Park Boundary

City Boundary

County Boundary

State Boundary

National Boundary

Treeline

Individual Trees

Intermittent Drainage or Small Creek

Large Creek or River

Spring or Seep

Lake, Pond or Reservoir; Marshland

Trail

Railroad

Existing Roadway (Road, Paved, Gravel)

Gas & Water Meter; Gas & Water Valve

Spot Elevation; Coordinate Grid Tick

Material Source

Clearing Limits

Miscellaneous Utility Features

Light, Support w/Anchor)

Poles (Power, Telephone, Joint Use, Utility Colors and Designators

(Underground utilities are denoted by bars on either side of desiginator)

Underground Utilities

Overhead/Above Ground Utilities

Building

Underdrain

Box Culvert

Pipe Culvert with Drop Inlet

Pipe Culvert with Headwall

Pipe Culvert with End Section

Pipe Culvert (arrow shows flow)

Signs (single, double post; portable)

Retaining Wall

Cattleguard

Gate with Fence

Fence

Transition

Toe of Fill

Slope Stake Limits Top of Cut

Detour Centerline Not Applicable

Roadway Centerline

Construction Easement Not Applicable

Permanent Easement

Right-of-Way Line

PROPOSEDEXISTING

FM = force main, SA = sanitary sewer, SD = storm drain, SS = storm sewer, P = power, UP = transformer or junction box, EM = electric meter, WF = water fountain

T = telephone pedestal, TV = CATV pedestal, IRR = irrigation, W = water, STEAM = steam, G = gas, O = oil, FO = fiber optic, T = telephone, TV = CATV

13 18

19 20

17 16

21 22

23 24

30 29 28 27 26 25 30 29

33 34 35 36 31

K

IN

G C

O P

IE

R C E C

O

9 10 11 12 7 8

22 23

24 19

6 5

To Tacoma & I-5

Ri ve r

Fo rk

YWH SSAP K

OONIHC

WAL

CMUNE.

E.

S

N osedive C reek

Hazzard Creek

W es t

N a ti o n a l F o r e s t

B o u n d r yre vi R et i h WreviR etihW eti h W

C H

IN

O O

K P

A S S H

IG

H

W A

Y

.0

N

VICINITY MAP

N

SCALE IN MILES

1 0 1 2

A.3

STATE PROJECT

NUMBER

SHEET

U

S S u r ft m y fi le s p w p r o d u c ti o n d w e a c .d g n

WA FS ERFO 017-2010

S e p te m b e r

C h e c k e d b y

D e s ig n e d b y

H u c k le b e r r

R id g e

Pass

Haller

NATIONAL FOREST

SNOQUALMIE

NATIONAL FOREST

SNOQUALMIE

Greenwater

PROJECT LOCATION

WHITE RIVER BRIDGE

FOREST STATE PARK

FEDERATION

T o Y a k im a I-8

NOTE:

H u c k le b e rr

R id g e

T 18 N

T 19 N

T 18 N

T 19 N

R E

R E

R

E

R E

Forest Road 75 must be used as an alternate access route.

Project location cannot be accessed via Forest Road 74.1.

Project Disposal Site

Designated

145 145

135 135

ROAD

R O

A D

MULE/JIM CREEK

RO

AD 74

CHANNEL

OVERFLOW

CRIPPLE CREEK

185180

160 160

155 155

120 120

WEST FORK

WHITE RIVER

7400130

ROAD 75

N

150100500255075

Scale in feet

SITE PLAN

C.1

STATE PROJECT

NUMBER

SHEET

U

S S u r ft m y fi le s p w p r o d u c ti o n d w e c a .d g n

WA WA FS ERFO 071-2010

A

S e p te m b e r

C h e c k e d b y

D e s ig n e d b y river and floodplain remain free from debris contamination.

implement a Demolition Containment Plan that ensures the of materials at designated disposal site. Develop and

Remove bridge piers to 2-ft below existing grade. Dispose

Demolish existing 110-ft concrete superstructure bridge.

laws and regulations.

accordance with all federal, state, and local

Dispose of asphalt off of federal lands in and junction of Roads 74 and 75 (± 3311 SQYD).

Remove all existing asphalt between bridge disposal site.

Dispose of material at designated embankment (700 linear feet).

Excavate and remove existing road water quality.

facilitate work and protect diversion as needed to

Construct temporary river in place.

Shape to drain and compact materials the junction of Road 75 and Road 74.

along the cut slope of Road 74 beyond

Place waste materials in the ditch and

Designated Disposal Site:

OF PROJECT

BEGINNING

PROJECT

END OF

to access work items on site.

Construct temporary road as needed to existing grade at road washout.

Ramp ends of existing roadway down

we0712010_aa.pdf
we0712010_ab.pdf
we0712010_ac.pdf
we0712010_ca.pdf

File details come from the government source that posted it.