PRELIMINARY
INDEX TO SHEETS
PROJECT MANAGER
R
E N
O R
A I
N
N
ST F
R
I
D
D E P A
T
NTOFT A SP
T T
O
U
TE
ATESO
AM
E R
IC
A
M
BRITISH COLUMBIA
I D
A H
O
OREGON
UNITED STATES
CANADA
P A
C I F I C
O C
A E
N tS rait ofJuan deFuca
OC
LU
MBIA R
IV
ER
A
SN
KE
R
VERI
M
COLU B
I A
V R I
E R
Lakes
Banks
Lakes
Moses
Reservoir
Potholes
OLYMPIC
NATIONAL
PARK
MOUNT
RAINIER
N.P.
MOUNT
ST. HELENS
NAT'L VOLC.
MON.
NORTH
CASCADES
NATIONAL
PARK
BELLINGHAM
Forks
Aberdeen
Chehalis
Longview
OLYMPIA
TACOMA
SEATTLE
EVERETT
Wenatchee
Lake
Moses
SPOKANE
Pullman
Pasco
RICHLAND
Kennewick Walla Walla
ANGELES
PORT
Townsend
Port Vernon
Mt.
VANCOUVER
WASHINGTON KEY MAP
YAKIMA
u n d o S t e g u
P
SCALE IN MILES
0 2010 3010
202 2
M. MILLER
169164
PROJECT SITES
for Vicinity Maps
See Sheets A.3-5
J. TEMPORARY TRAFFIC CONTROL
H. EROSION CONTROL PLANS
G. 9000219-0.132
F. 9035-0.8
E. 57-23.03
D. 5640-0.04
C. 52-6.1
B. SUMMARIES
A. GENERAL INFORMATION
A.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft
D c m y fi le s p w p r o d u c ti o n d w a e f1 a a .d g n
WA FS ERFO 2016(1)-20(4)
A
M
J u n e
K
H a r r is o n
J
B u r k e
C h e c k e d b y
D e s ig n e d b y
J.5
J.1-4
H.3-5
H.2
H.1
G.1
F.1
E.2
E.1
D.1
C.3
C.2
C.1
B.1
A.6
A.3-5
A.2
A.1
DRAWINGS
TEMPORARY TRAFFIC CONTROL STANDARD
TEMPORARY TRAFFIC CONTROL PLANS
EROSION CONTROL STANDARD DRAWINGS
EROSION CONTROL PLAN FSR 9035-0.8
EROSION CONTROL PLAN FSR 52-6.1
FSR 9000219-0.132 PLAN AND SECTION
FSR 9035-0.8 PLAN AND SECTION
PLAN AND PROFILE
FSR 57-23.03 TYPICAL SECTION
FSR 5640-0.04 PLAN AND SECTIONS
PLACED
SPECIAL ROCK EMBANKMENT, MECHANICALLY
PLAN AND PROFILE
FSR 52-6.1 TYPICAL SECTION
SUMMARY OF QUANTITIES
SURVEY CONTROL
VICINITY MAPS
PLAN SYMBOLS AND ABBREVIATIONS
TITLE SHEET
FEDERAL HIGHWAY ADMINISTRATION
U. S. DEPARTMENT OF TRANSPORTATION
Project Location
APPROVED:
DATE
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
DESIGN DESIGNATION:
SPECIFICATION:
VANCOUVER, WASHINGTON
WESTERN FEDERAL LANDS HIGHWAY DIVISION
PLANS PREPARED BY
PLANS FOR PROPOSED PROJECT
Western Federal Lands Highway Division
Chief of Engineering, on Federal Highway Projects, FP-14
Construction of Roads and Bridges
Standard Specifications for
WA FS ERFO 2016(1)-20(4)
N e (max)
V
ADT (2038)
ADT (2018)
TYPE OF CONSTRUCTION:
N/A
20 MPH
<400
<400
SEATTLE
Renton
Bellevue
Everett
Merritt
Thelma
Darrington
Rockport
Silverton
Grassmere
Sedro-Woolley
Vernon
Mount
North
Cascades
Natinal
Park
Chalen
Lake
Marblemount Winthrop
Twisp
LENGTH 0.187 MILES
Miller River
MT. RAINIER
Lake
Chelan
NRA
District
Ranger
Darington
District
Ranger
Mt. Baker
District
Ranger
Skykomish
Forest
National
Mt. Baker drainage, and bank stabilization
Grading, aggregate, asphalt paving, KING COUNTY, WASHINGTON
MT. BAKER-SNOQUALMIE NATIONAL FOREST
SNOQUALMIE REPAIRS 2016
District
Ranger
Snoqualmie
Bend
North
Cle Elum
CP GPS
JH
BH
TP
36 31
6 1
36 31
6 1
SEC.
SEC.
EL. 1234.56
N
E
RIP
G G
W W
DI
T
WESTERN FEDERAL LANDS HIGHWAY DIVISION
DETAIL APPROVED FOR USE 11/2001
REVISED: 9/2005 1/2007 10/2009 10/2014
W101-1
AND ABBREVIATIONS
PLAN SYMBOLS
P
M a y
U
S C m y fi le s p w p r o d u c ti o n d w a e f1 a b .d g n
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
DETAIL
U.S. CUSTOMARY DETAIL
STATE PROJECT
NUMBER
SHEET
A.2 FS ERFO 2016(1)-20(4) WA
DI
T
NO SCALE
- no symbol -wall face
N
W west drwg(s).
dist.
diaph.
diag.
dia.
DHV
D exp. jt.
exc.
EW
ER
EQ or eq.
EP
emb.
elev.
El. 94.16 ft e
E expansion joint excavation edge of water edge of road equation edge of pavement embankment elevation elevation with number superelevation rate east drawing(s) distance diaphragm diagonal diameter design hourly volume diameter galv.
ga.
galvanized gage (gauge)
HW
hex.
hdwl.
high water hexagon headwall ftg.
ft3 ft2 flg.
fin.
footing cubic foot (feet) square foot flange finish jt.
ID
joint inside diameter
LW
lt. or LT
Ls
LPSM
long.
LNFT
lat.
lam.
L low water left length of spiral lump sum longitudinal linear foot (feet) latitude lamination length of curve
NC
N normal crown north
OG
OD
o. to o.
o. c.
original ground outside diameter out to out on center pvmt.
PT
PST
PSC
PS
POT
POS
POC
pl.
PI
PCS
PCC
PC
pavement point of tangent point of spiral to tangent point of spiral to curve point of tangent to spiral point on tangent point on spiral point on curve plate point of intersection point of curve to spiral point of compound curve point of curve rte.
rt. or RT reqd.
reinf.
rdwy.
R/W
R.
R route right required reinforcement roadway right-of-way range radius typ.
Ts
TS
thd.
TBM
T.
T typical tangent distance (spiraled curve) point of tangent to spiral thread temporary bench mark township tangent distance
VPI
vph
V vertical point of intersection vehicles per hour design speed yd3 yd2 cubic yard(s) square yard sym.
STS
struc.
stiff.
stgr.
std.
STA, Sta.
ST
SS
SRS
SQYD
SQFT
spa.
SLRY
shldr.
sec.
SC
SADT
S symmetrical point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot spacing, spaces or spaced slurry unit shoulder section point of spiral to curve seasonal average daily traffic south
CUYD
culv.
CUFT
cubic yard(s) culvert cubic foot (feet) mon.
min.
MGAL
max.
matl.
monument minimum thousand gallon maximum material
NOTE:
on the appropriate plan sheet.
Other symbols used in the plans will be shown in a legend 1.
Property Line w/Found Property Corner
Section Corner (Found, Projected)16
Section Line16
Section Corner (Found, Projected)4
Section Line4
Parcel Number
National Park Boundary
National Forest Boundary
National Wildlife Refuge Boundary
Trail
Lake, Pond or Reservoir; Marshland
Spring or Seep
Material Source; Bore Hole; Test Pit
Section Line
Indian Reservation Boundary
Existing Roadway (Road, Paved, Gravel)
Section Corner (Found, Projected)
Large Creek or River
Spot Elevation; Coordinate Grid Tick
Above Ground Tank; Underground Tank
Treeline; Individual Trees
Boulder; Well; Satellite Dish; Grave
Cooking Grate; Garbage Can; Picnic Table
Flagpole; Fire Hydrant
Gas & Water Meter; Gas & Water Valve
Silt Fence
National Boundary
State Boundary
County Boundary
City Boundary
Township or Range Line
BLM Lands Boundary
Railroad
Intermittent Drainage or Small Creek
Control Point (Terrestrial and GPS); Jump Hub θs Ø
∆c spiral central angle diameter curve central angle total central angle approach ahead average daily traffic abutment appr.
AH
ADT
abut.
bearing bridge balance point bench mark back brg.
br.
BP
BM
BK
ctrs.
CS
cont.
constr. jt.
conn.
conc.
col.
CMP
clr.
cc or c. to c.
centers point of curve to spiral continuous construction joint connection concrete column corrugated metal pipe clear centerline center to center mile post main line
M.P.
M.L.
STEAM = steam, T = telephone, TV = CATV, W = water
P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, UP = transformer or junction box, WF = water fountain
EM = electric meter, T = telephone pedestal, TV = CATV pedestal, Light, Support w/Anchor)
Poles (Power, Telephone, Joint Use, EXISTING PROPOSED
Transition
Toe of Fill
Top of Cut
CL
North Arrow
Fence
Gate with Fence
Cattleguard
Guardrail
Retaining Wall
Pipe Culvert (arrow shows flow)
Pipe Culvert with End Section
Pipe Culvert with Headwall
Underdrain
Concrete Barrier
Slope Stake Limits
Pipe Culvert with Drop Inlet
Box Culvert
Delineators
Underground Utilities
Overhead/Above Ground Utilities
Signs (single, double post; portable)
Miscellaneous Utility Features
Building
Right-of-Way Line with Monument
Permanent Easement
Construction Easement
Riprap
Fiber Roll or Wattle
PRELIMINARY25
-F
N
To C le E lu m m ile s
VICINITY MAPS
SHEET 1 of 3
N
N
Rive r
Vicinity Map for Site:
FSR-MP (LATITUDE, LONGITUDE)
Vicinity Map for Site:
FSR-MP (LATITUDE, LONGITUDE)
A.3
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 a c .d g n
WA FS ERFO 2016(1)-20(4)
u n e
K
H a r r is o n
J
B u r k e
C h e c k e d b y
D e s ig n e d b y
North
Fo rk
8 9
16 14
302526
Snoqualmie
SCALE IN MILES SCALE IN MILES
T20N
T19N
R
E
R ne er G re vi R y a d n u S seniL noissimsnarT neerG r e viR pirts gnidnaL daorliaR
S N O Q U A L M I E
N A T I O N A L
F O R E S T
-2
Cr ee k
LESTER
0.5 1.0 1.50.00.5 yad nu
S k e erC
Katrine
Loch
Lake
Sunday k e e r
C N A T I O N A L F O R E S T
S N O Q U A L M I E
P h ilip p a
Nor th
Fork County Road
NF 5700-1
N F
N F
S u n d a y C re e k R d
N F
R
E
R
E
G R E E N R I V E R W A T E R S H E D
0.5 0.0 0.5 1.0 1.5
To N orth
Ben d
18 m iles
52-6.1 (47.193567, -121.403256) 57-23.03 (47.652789, -121.56896)
FSR 52-6.1
FSR 57-23.03
Q u a rtz
Creek Ta yl or
R iv e r
MID
DLE
FORK
RIVER
C reek
R ainy
SN
O
Q U
ALM
IE
VICINITY MAPS
N A T I O N A L F O R E S T
S N O Q U A L M I E
SHEET 2 of 3
N
Vicinity Map for Site:
FSR-MP (LATITUDE, LONGITUDE)
A.4
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 a d .d g n
WA FS ERFO 2016(1)-20(4)
M a y
K
H a r r is o n
J
B u r k e
C h e c k e d b y
D e s ig n e d b y
N F
NF 110
NF 5640
9 10
15 1416
20 21 22
28 27 26
32 33 34 35
SCALE IN MILES
T24N
T23N
Nine Hour
Lake
To
Be nd
Mile s
5640-0.04 (47.556336, -121.5365)
FSR 5640-0.04
& waste site
Material/stockpile
VICINITY MAPS
SHEET 3 of 3
N
R
E
R
E
20 miles
To North Bend
Vicinity Map for Site:
FSR-MP (LATITUDE, LONGITUDE)
N F
A.5
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 a e .d g n
WA FS ERFO 2016(1)-20(4)
u n e
K
H a r r is o n
J
B u r k e
C h e c k e d b y
D e s ig n e d b y
FSR 9035-0.8
20 21
22 23
SCALE IN MILES
0.0 0.5 1.00.5
Tinkham
Rd
Asahel Curtis
NF
Ir o n
Horse Trail
P a ci fi c
C re s t
Tra il
N F
A n n e tte
L a k e
T r a il
Lake
Surveyors
Lake
Divide
Lake
Rockdale
Lake
Lodge
N F
N F
9000219-0.132 (47.39019, -121.39033)
9035-0.8 (47.39505, -121.46920)
FSR 9000219-0.132
Keechelus Lake
POINT
NUMBER NORTH EAST ELEVATION DESCRIPTION
17101 69335.859 1509450.506 2654.775 5/8" IR W/FHWA ALUM CAP
17102 69462.659 1509675.773 2678.012 5/8" IR W/FHWA ALUM CAP
17103 69652.463 1509718.589 2693.757 5/8" IR W/FHWA ALUM CAP
17101 9881.668 20057.715 1987.835 5/8" IR W/FHWA ALUM CAP
17102 10000.000 20000.000 1999.902 5/8" IR W/FHWA ALUM CAP
17103 10131.614 19949.928 2010.976 5/8" IR W/FHWA ALUM CAP
17101 4832.600 10038.650 1994.670 5/8" IR W/FHWA ALUM CAP
17102 5000.000 10000.000 2000.000 5/8" IR W/FHWA ALUM CAP
17103 5144.814 9921.993 2005.265 5/8" IR W/FHWA ALUM CAP
17104 5300.109 9911.490 2008.659 5/8" IR W/FHWA ALUM CAP
17101 144723.799 1483083.755 1915.337 5/8" IR W/FHWA ALUM CAP
17102 144740.977 1482969.433 1913.203 5/8" IR W/FHWA ALUM CAP
17103 144726.221 1482860.172 1910.717 5/8" IR W/FHWA ALUM CAP
52 Road MP 6.1 (Washington North SPCS)
57 Road MP 23
65 Road MP 0.15
9035 Road MP 0.8
PROJECT : Snoqualmie ERFO 2018 DATE OF FIELD WORK :July and October 2017
PROJECT UNITS : US SURVEY FOOT
COORDINATE SYSTEM : Assumed and Washington North SPCS VERTICAL DATUM : Assumed
PROJECT COORDINATES
c:
\m yf ile s\ pw
_p ro du ct io n\ d0
W
A E
R
FO
6-
(4 co nt ro ls he et
.x ls x] Sh ee t
-M ar -2
7:
A M
W
FL
H D
S ur ve y
/0
/2
W
FL
H D
S ur ve y
/0
/2
D es ig ne d by
C he ck ed b y:
STATE PROJECT
A.6
SHEET
NUMBER
FS ERFO 2016-20(4)WA
SURVEY CONTROL
TYPICAL SECTION
FSR 52-6.1
FSR 52-6.1
21+60.00 to 22+25.00
1:3
[1]
[1]2% [1]2%
1:3 [1]
FOOTNOTE:
C.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 c a .d g n
WA FS ERFO 2016(1)-20(4)
u n e
K
H a r r is o n
B u r k e
C h e c k e d b y
D e s ig n e d b y
LC
Existing ground
Profile grade
Travel way
12' (min.)
Roadway aggregate, method 1, 6" compacted depth
NO SCALE
Unclassified borrow (Government furnished), 12" compacted depth
Special Rock Embankment, mechanically placed.
See Sheet C.3
Geotextile filter, class 1, type A (non-woven)
Construct slopes as shown in the Staking Report.[1]
PRELIMINARYGPS
17102
CP
17103
GPS
17101
2685 2
BH
BH
+9.78 21%
,6
.4
,6
.7
P O
T
.0
P C
.6
P T
.7
8 P C
.0
P C
C
.2
P T
.7
D
Curve= C3
R= 110.00'
L= 91.11'
T= 48.35'
D
Curve= C4
T= 47.26'
L= 93.26'
R= 233.00'
D
R= 707.46'
T= 75.49'
L= 150.42'
Curve= C5
FSR 52-6.1
CUYD
EXC.
CUYD
EMB.
24+0023+0022+0021+0020+0019+0018+00
2650 2650
2660 2660
2670 2670
2680 2680
2690 2690
2700 2700
2710 2710
2720 2720
2730 2730
C.2
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 c b .d g n
WA FS ERFO 2016(1)-20(4)
M a y
K
H a r r is o n
J
B u r k e
C h e c k e d b y
D e s ig n e d b y
BEGIN WORK
END WORK
22+25.00
FSR 52-6.1
21+60.00
FSR 52-6.1
See Sheet C.3
Special rock embankment
Line to be constructed
Profile grade
Existing ground
Slope staking limits
FSR-52
Proposed edge of gravel
Remove concrete barricade (by others), typ.
See Sheet C.3 mechanically placed.
Special Rock Embankment, El.=2,684.42
E=1,509,688
N=69,551
Existing edge of gravel under Section 622 as directed by CO, Ditch cleaning, L = 72', El. 2679.47
22+08, 16.02' Rt
28.39' Rt., El. 2665.86
Toe of SRE 21+92
24.27' Rt., El. 2670.40
Toe of SRE 21+96
20.14' Rt., El. 2674.93
Toe of SRE 22+00
11.90' Rt., El. 2684.82
Toe of SRE 22+16
11.89' Rt., El. 2680.47
Toe of SRE 21+72
16.02' Rt., El. 2676.70
Toe of SRE 21+76
20.14' Rt., El. 2672.93
Toe of SRE 21+80
24.27' Rt., El. 2669.18
Toe of SRE 21+84
28.39' Rt., El. 2665.47
Toe of SRE 21+88
El.=2,690.78
E=1,509,707.43
N=69,616.25
NO SCALE
WELDED WIRE REINFORCEMENT
1 [1]
1 [1]
MECHANICALLY-PLACED
SPECIAL ROCK EMBANKMENT,
SPECIAL ROCK EMBANKMENT
SPECIAL ROCK EMBANKMENT
C.3
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 c c .d g n
WA FS ERFO 2016(1)-20(4)
M a y
K
H a r r is o n
J
B u r k e
C h e c k e d b y
D e s ig n e d b y
Existing ground
PLAN VIEW
LC
F a c e o f
S lo p e
Bench Width
LC
x x x x x x x x
Finished face
Toe elevationVaries
Typical Section
See Sheet C.1 for
Geotextile filter, class 1, type A (non-woven)
:1 (m a x x x x x x x x x
Roadway x x x
Welded wire reinforcement
Existing roadway
W9.4 x W9.4 wire on 12" c-c
8' (min.)
Rock for Special Rock Embankment
Allow 10-inch setback from finished face.[2] short term backslope will be open more than 30 days.
Part 1926. Subpart P, excavation). Shoring may be required if the
Short term backslope ratio per OSHA Safety Requlations (29CFR,[1]
Special rock embankment
2' (min.)
Staking limits
6"
P a y l im it s
H e ig h t v a r ie s
SECTION VIEW
ELEVATION VIEW
x
[2]at 4' vertical spacing
Welded wire reinforcement
12" compacted depth
(Government furnished), Unclassified borrow
See sheet C.2 Toe of SRE
[1]4'
1:31:3
N
B
NOTE:
B
1:
1.
SECTION B-B
SECTION D-D
BERM DETAIL
D D
D
D
B
B
C
C
SECTION C-C
PLAN
NO SCALE
A
A
PLAN AND SECTIONS
FSR 5640-0.04
1:
1.
1:3 1:3
1:31:3
1:1.25
Sections are a sketch, no survey was provided. See SCR 152.05A.
Plan and profile are a sketch, no survey was provided.
SECTION A-A
(TYPICAL)
1:2
D.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 d a .d g n
WA FS ERFO 2016(1)-20(4)
u n e
H a r r is
B u r
C h e c k e d b y
D e s ig n e d b y ditch to remain
Existing eroded
2.
1.
LC
Existing ground
Existing ground ground
Existing
Existing eroded ditch
See detail
Replace berm, See detail
Replace berm, LC ground
Existing
1:2 (max.)
30'30'
Existing berm
Proposed edge of gravel Riprap dip
60'
Placed riprap, method A, class 2
Placed riprap, method A, class 2
Placed riprap, method A, class 2
Exist Match
Exist Match
Original grade
Exist Match
Exist Match
NF 5640
LC
Exist Match
Exist Match
1:2
6" compacted depth
Roadway aggregate, method 1 edge of road
Existing
14'3'
10'±14'3'
14'
2'
Existing ground
(Government furnished)
Unclassified borrow, Existing ground
2'
Construct low point as directed by the CO.
6" compacted depth
Roadway aggregate, method 1
6" compacted depth
Roadway aggregate, method 1
6" compacted depth
Roadway aggregate, method 1
Ripr ap d ip 60'
Roadway recond itioning
Roadway reconditioning
Roa dway r eco ndit ioni ng
(Government furnished)
Unclassified borrow
Existing eroded ditch to remain flow towards dip/ditch orient to direct
Construct berm - 12 LNFT class 1, type A (non-woven)
Separation-stabilization geotextile, class 1, type A (non-woven)
Separation-stabilization geotextile, class 1, type A (non-woven)
Separation-stabilization geotextile, 2% 2%
2% 2%
1:3
FSR 57-23.03
1:20
OHW
TYPICAL SECTION
FSR 57-23.03
:1
1:3
[1] S ta k in g l im it s
CONNECTION DETAIL
E.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 e a .d g n
WA FS ERFO 2016(1)-20(4)
u n e
H a r r is
B u r
C h e c k e d b y
D e s ig n e d b y
:1 [3
:1 m a x
[3
1:3 1:201:3
[1] S ta k in g l im it s
S ta k in g l im it s
FSR 57-23.03
S ta k in g l im it s
C o n s tr u c ti o n l im it s
[1]
[1]
LC
Profile grade
50+10 to 51+87
Travel way
12'
Roadway aggregate, method 1, 6" compacted depth
Unclassified borrow, (Government furnished)
Existing roadway 6" compacted depth
Roadway aggregate, method 1, Geotextile filter, class 1, type A
(Government furnished)
Unclassified borrow, [2]method a, class 9 (Mechanically)
Placed riprap, LC
Existing ground
Profile grade
Travel way
12'
Roadway aggregate, method 1, 6" compacted depth
Unclassified borrow, (Government furnished)
Turf establishment
Turf establishment
Existing ground
51+87 to 51+97
50+00 to 50+10 required along backslope within bedrock areas.
Cut slope shown for areas not in bedrock. Geotextile not[3]
Place according to Section 251.04A.[2]
Construct slopes as shown in Staking Report.[1]
CP
C P
CP
17101
2005 2
5 2030
,9
.7
.5
.5
,0
.3
+5.
80' VC
K = 20
SSD = 311'
,0
.9
P C
.0
1 P
C C
.9
P T
.2
LENNOX CREEK
END WORK
BEGIN WORK
N
51+97.00
FSR 57-23.03
50+50.00
FSR 57-23.03
CUYD
EXC.
CUYD
EMB.
51+5051+0050+5050+00
49+5049+00 52+00
El= 2,011.92
E= 19,940.54
N= 10,138.04
Curve= C29
D
R= 1,900.00'
T= 75.02'
L= 149.97' Curve= C30
D
R= 322.22'
T= 29.24'
L= 58.32'
FSR 57-23.03
2001 2006
El= 1,995.75
E= 20,016.64
N= 9,956.66
E.2
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 e b .d g n
WA FS ERFO 2016(1)-20(4)
u n e
K
H a r r is o n
J
B u r k e
C h e c k e d b y
D e s ig n e d b y
Proposed edge of gravel
FSR 57
Existing edge of gravel
Line to be constructed
Placed riprap, method A, class 9
24" compacted depth
(government furnished), Unclassified borrow
Profile grade
Profile grade
Profile grade
Existing ground
Existing ground
Existing ground
Slope stake limits
Construction limits
1:1
CP
17101
CP
17102
CP
17103
N
SECTION B-BSECTION A-A
NAME NORTHING EASTING ELEVATION
PLAN AND SECTIONS
FSR 9035-0.8
FOOTNOTE:
[3]PAVEMENT CONTROL POINTS
F.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 fa .d g n
WA FS ERFO 2016(1)-20(4)
u n e
H a r r is
B u r
C h e c k e d b y
D e s ig n e d b y
1,482,945.06
1,482,947.32
1,482,943.60
1,482,929.71
1,482,908.55
1,482,892.63
1,482,894.92
144,714.29
144,715.36
144,723.23
144,725.04
144,717.94
144,694.61
144,693.61
CP-7
CP-6
CP-5
CP-4
CP-3
CP-2
CP-1
1913.35
1913.36
1913.42
1913.26
1912.73
1911.74
1911.71
A
A
B
B
NO SCALE
Cutting, willow poles, typ.
Placed riprap, method A, class 5
SOUTH F
ORK S
NOQUALMIE
RIV
ER
:1 streambed material
Backfill with conserved
Placed riprap, method A, class 5
6" Existing edge of pavement
Varies pavement
Existing
CP-2
CP-3
CP-4
CP-1
of pavement
Existing edge
CP-5
Existing stream bottom
Control line
Sawcut
Geotextile filter, class 1, type A
E=1,482,982
N=144,762
E=1,482,953
N=144,747
E=1,482,913
N=144,737
E=1,482,880
N=144,731
.3
R
E=1,482,805
N=144,744
R
E=1,482,934
N=144,670
FSR 903
Mitigation, log deflector ground
Existing
8" compacted depth
Roadway aggregate, method 2
Staking limits
Mitigation, log deflector, typ.
Remove and reset boulders
6'
Sawcut and tack coat
Tack coat
OHWM
1V:
1.
5H
(max.)
5'-6"
[1]Willow poles (typ.)
[1]
[2]Mitigation, root wad [2]
[3]
Install as shown, drive through riprap and geotextile.
Leave tips exposed above streambed material.
Excavation for embedment is subsidiary to item riprap.
Sawcut locations as approved by CO.
(OHWM) 1908
Mitigation, root wad at 5'± spacing c-c, typ.
and revegetate topsoil, 8" depth Furnish and place
Embedment
10' (min.)
1900.5
(Control line) constructed
Line to be
CP-6
CP-7
Sawcut
4" compacted depth. Placed in two equal lifts
Asphalt concrete pavement, type 2
SECTION A-A
PLAN AND SECTION
FSR 9000216-0.132
G.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 g a .d g n
WA FS ERFO 2016(1)-20(4)
u n e
H a r r is
B u r
C h e c k e d b y
D e s ig n e d b y
A
A
NO SCALE
Existing edge of pavement below top of pavement
Subexcavate 18" depth
12" compacted depth
Roadway aggregate, method 2
Sawcut and tack coat Sawcut and tack coat lifts minimum, tack coat between lifts.
6" compacted depth. Place in 2 equal
Asphalt concrete pavement, type 2
F S
R levels:GSCOLORFILL|GSBWFILL|GSOUTLINE
2685 2
N
FSR 52-6.1
EROSION CONTROL PLAN
[1]
H.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 h a .d g n
WA FS ERFO 2016(11)-20(4)
M a y
K
H a r r is o n
J
B u r k e
C h e c k e d b y
D e s ig n e d b y
SIGN PANEL
SWPPP ALUMINUM
Sheet K.8 for mounting instructions.
See SCR Subsection 107.01A(d) for installation location and [1]
BEGIN WORK
END WORK
22+25.00
FSR 52-6.1
21+60.00
FSR 52-6.1
FSR-52
Existing edge of gravel
Proposed edge of gravel
NO SCALE
Soil erosion control, check dam
Soil erosion control, fiber rolls
Flow direction
Soil erosion control, fiber roll, (typ.)
Soil erosion control, check dam, (typ.)
3"
4"C
3"
2"C
2"
2"C
14"
"2
3'-6"
"8
3IN =
"8
5TH =
"8 1R = 1
BORDER
LEGEND:
(adjust text as needed for specific project information)
White Background
Black Foreground
"B2
N
FSR 9035-0.8
EROSION CONTROL PLAN
PLAN
H.2
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 h b .d g n
WA FS ERFO 2016(1)-20(4)
u n e
K
H a r r is o n
J
B u r k e
C h e c k e d b y
D e s ig n e d b y
NO SCALE
FSR 903
REVIR EIMLAUQONS KROF HTUOS
Cutting, willow pole, typ.
temporary diversion berm Soil erosion control, OHW
LEGEND:
Fiber rolls
Flow direction
157-6
STANDARD APPROVED FOR USE 6/2005
REVISED: 6/2007
CHECK DAM
S (ft)
NO SCALE
SPACING
CHECK DAM
6%
5%
4%
3%
2%
2% or above 6% ditch grades.
* Do not use Check Dams below
(G)
GRADE
DITCH
STATE PROJECT
NUMBER
SHEET
H.3
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
FS ERFO 2016(1)-20(4)WA
U S
C c m y fi le s p w p r o d u c ti o n d w a e f1 h c .d g n
M a y
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
(S)
CHECK DAM SPACING
DITCHV DITCH
TRAPEZOIDAL DITCH
PROFILE VIEWCROSS SECTION
CROSS SECTION
Class 1 riprap
Class 1 riprap
1V:1.2H (typ.)
Ponded water
Class 1 riprap
:2 ty p.
DITCH GRADE (G)
REVISED: 7/2016
DETAIL APPROVED FOR USE --/----
WESTERN FEDERAL LANDS HIGHWAY DIVISION
W157-17
METHODS
TEMPORARY DIVERSION BERM
NO SCALE
U.S. CUSTOMARY DETAIL
DETAIL
STATE PROJECT
NUMBER
SHEET
H.4
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
FS ERFO 2016(1)-20(4) WA
U S
C c m y fi le s p w p r o d u c ti o n d w a e f1 h d .d g n
M a y m in
4'-6" m in m in
6" (min.) freeboard. Submit temporary stream diversion m in
Existing ground
Water surface elevation
OPTION B
OPTION A
OPTION C
OPTION D
Existing ground
Sandbag (typ.)
Sandbag (typ.)
Sandbag (typ.)
Sandbag (typ.)
Concrete barrier
Concrete barrier
Concrete barrier
Water surface elevation
Water surface elevation membrane
Waterproof
Water surface elevation
Existing abutment or pier elevation (min.)
Top of berm
Existing ground at time of construction Diverted water level at time of construction Diverted water level
Existing ground at time of construction Diverted water level
Limit of work zone
Limit of work zone
Limit of work zone elevation (min.)
Top of berm elevation (min.)
Top of berm at time of construction Diverted water level
(anchoring method to be approved)
Waterproof membrane membrane
Waterproof
NOTE:
1 4.
3.
2.
1.
membrane
Waterproof height of the sandbag barrier.
directed. Remove sediment when deposits reach half the berm daily. Repair as needed after rainfall events or as
While in use, inspect and maintain the temporary diversion given time.
Place a maximum of one diversion in the stream at any upper rows of sandbags above the joints in lower rows.
of bottom rows as there are vertical course. Overlap the
Place sandbags to form a pyramid by laying equal numbers plans for approval prior to installation.
minimum height equal to the water surface elevation with
As a minimum, provide a temporary diversion berm with a prefabricated or portable diversion berms, dams, etc.).
methods may be chosen (including any approved during construction operations. Alternate stream diversion
These options suggest configurations for diverting a stream
NO SCALE
Spacing Slope
STAKES REQUIRED
1:1
1:2
1:3
1:4 or flatter for each roll
Stakes required
FIBER ROLL SPACING
Fiber roll length
DRAFT: 7/2016
REVISED:
DETAIL APPROVED FOR USE 10/2014
WESTERN FEDERAL LANDS HIGHWAY DIVISION
FIBER ROLL
(FT)
(FT)
W157-21
U.S. CUSTOMARY DETAIL
DETAIL
STATE PROJECT
NUMBER
SHEET
H.5
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
FS ERFO 2016(1)-20(4) WA
U S
C c m y fi le s p w p r o d u c ti o n d w a e f1 h e .d g n
M a y
Fl ow
T o e o f fi ll s lo p e
ELEVATION
PLAN
disturbed areas
Runoff from
INSTALLATION BEYOND TOE OF SLOPE
INSTALLATION ALONG SLOPES
FIBER ROLL STAKING DETAIL
PROPERLY STAKED AND ENTRENCHED FIBER ROLL
Existing ground (typ.)
Fiber roll
Flow direction
Slope
Direction of runof f from distur bed area s sp ac in g ch ar t
S ee F ib er R ol l
Fiber roll ff o n ur f o n oi t c er i
D along contours
Install fiber rolls
Fiber roll
Slope
Fi ll slo pe
Direction of runoff ground
Existing soil to match ground level
Backfilled and compacted
Flow larger than fiber roll wood stakes. See Note 2.
Pay lim its
Pay lim its
SLOPE PROTECTION INSTALLATION
ALTERNATE FIBER ROLL JOINT DETAIL
FIBER ROLL LAPPING DETAIL
on uphill side of fiber roll
Place excavated material Stagger joints (typ.)
2.
1.
permanent installations. Do not crush fiber roll while staking.
roll is secure to slope. Live stakes may be used for and install fiber rolls
Step 1: Excavate trench Step 2: Backfill soil against fiber rolls
2" (min.) Excavate trench 2"
1" x 1" or 1" Ø ove rlap
12" (m in.)
t o m in m in
1" x 1" Wood stake as specified in plans
3' min. or
3' (min.)
Drive stakes at each end and at 4-foot spacing until fiber fiber roll and space stakes at 4-foot max.
6-inches from fiber roll end angles towards the adjacent
Overlap fiber rolls 12-inch minimum. Drive stakes at
NOTE:
PRELIMINARYNF-52
C le E lu m m ile s
FSR 52-6.1
N
CLOSED
ROAD
1000 FT
CLOSED
ROAD
500 FT
ROAD
CLOSED
ROAD
CLOSED
-2
CLOSED
ROAD
AHEAD
CLOSED
ROAD
500 FT
CLOSED
ROAD
1000 FT
CLOSED
ROAD
AHEAD
SHEET 1 of 4
TRAFFIC CONTROL PLAN
J.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1
J a d .d g n
WA FS ERFO 2016(1)-20(4)
u n e
K
H a r r is o n
J
B u r k e
C h e c k e d b y
D e s ig n e d b y
8 9
11 12
47.193567, -121.403256
0.5 0.0 0.5 1.0 1.5
SCALE IN MILES
T20N
T19N
R
E
R ne er G re vi R y a d n u S seniL noissimsnarT neerG r e viR pirts gnidnaL daorliaR
S N O Q U A L M I E
N A T I O N A L
F O R E S T
-2
Cr ee k
LESTER
To Easton
8 miles
36"x36"
W20-3
48"x30"
R11-2
Barricade type 3
36"x36"
W20-3
R
E
R
E
-1
36"x36"
W20-3
WORK ZONE
FSR 52-6.1
by the CO.
Sign locations are approximate, final location to be determined
1.
FSR 57-23.03
CLOSED
ROAD
AHEAD
CLOSED
ROAD
1000 FT
CLOSED
ROAD
500 FT
ROAD
CLOSED
ROAD
CLOSED
TRAFFIC CONTROL PLAN
SHEET 2 of 4
J.2
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1
J a d .d g n
WA FS ERFO 2016(1)-20(4)
u n e
K
H a r r is o n
J
B u r k e
C h e c k e d b y
D e s ig n e d b y
N
North For k
SCALE IN MILES
47.652786, -121.56896
0.5 1.0 1.50.00.5 yad nu
S k e erC
Katrine
Loch
Lake
Sunday k e e r
C
N A T I O N A L F O R E S T
S N O Q U A L M I E
P h ilip p a
Nor th
Fork County Road
NF 5700-1
N F
N F
S u n d a y C re e k R d
N F
R
E
R
E
36"x36"
W20-3
36"x36"
W20-3
36"x36"
W20-3
WORK ZONE
FSR 57-23.03
Barricade type 3
48"x30"
R11-2 by the CO.
Sign locations are approximate, final location to be determined
North Ben d
18 m iles
Q u a rtz
Creek Ta yl or
R iv e r
MID
DLE
FORK
RIVER
C reek
R ainy
SN
O
Q U
ALM
IE
N A T I O N A L F O R E S T
S N O Q U A L M I E
FSR 5640-0.04
N
CLOSED
ROAD
1000 FT
CLOSED
ROAD
500 FT
ROAD
CLOSED
ROAD
CLOSED
CLOSED
ROAD
AHEAD
TRAFFIC CONTROL PLAN
SHEET 3 of 4
J.3
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1
J a d .d g n
WA FS ERFO 2016(1)-20(4)
u n e
K
H a r r is o n
J
B u r k e
C h e c k e d b y
D e s ig n e d b y
N F
NF 110
NF 5640
9 10
15 14
20 21 22
28 27 26
32 33 34 35
SCALE IN MILES
T24N
T23N
Nine Hour
Lake
47.556336, -121.5365
Be nd
Mile s
WORK ZONE
FSR 5640-0.04
36"x36"
W20-3
36"x36"
W20-3
Barricade type 3
48"x30"
R11-2
36"x36"
W20-3 by the CO.
Sign locations are approximate, final location to be determined
FSR 9035-0.8
90906
ROAD
CLOSED
ROAD
CLOSED
CLOSED
ROAD
1000 FT
CLOSED
ROAD
500 FT
CLOSED
ROAD
AHEAD
CLOSED
ROAD
500 FT
CLOSED
ROAD
1000 FT
CLOSED
ROAD
AHEAD
N F
FSR 9000219-0.132
TRAFFIC CONTROL PLAN
SHEET 4 of 4
20 miles
To North Bend
CLOSED
ROAD
1000 FT CLOSED
ROAD
500 FT
CLOSED
ROAD
AHEAD
ROAD
CLOSED
ROAD
CLOSED
J.4
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1
J a d .d g n
WA FS ERFO 2016(1)-20(4)
u n e
K
H a r r is o n
J
B u r k e
C h e c k e d b y
D e s ig n e d b y
47.39505, -121.4692
SCALE IN MILES
0.0 1.0 2.01.0
N F
N F
SCALE IN MILES
0.0 0.5 1.00.5
Keechelus Lake
WORK ZONE
FSR 9000219-0.132
Barricade type 3
48"x30"
R11-2
36"x36"
W20-3
36"x36"
W20-3
36"x36"
W20-3
36"x36"
W20-3
36"x36"
W20-3
36"x36"
W20-3
47.39019, -121.39033 by the CO.
Sign locations are approximate, final location to be determined
NF 9
A n n e tte
L a k e
T r a il
NF 5
36"x36"
W20-336"x36"
W20-3
36"x36"
W20-3
WORK ZONE
FSR 9035-0.8
48"x30"
R11-2
Barricade type 3
Horse
Iron
Tra il
WIDTH
"X"
AREA
NUMBER
OF POSTS
POST SIZE D HOLE SIZE
WOOD POST SELECTION TABLE
NO SCALE
635-14
STANDARD APPROVED FOR USE 6/2005
DRAFT: 10/2017
REVISED:
Diamond ≤ 48"
> 30'
> 17'
12' - 16'
> 13'
< 10
65 - 95
65 - 95
50 - 65
50 - 65
20 - 50
10 - 20
10 - 20
6 x 6
4 x 6
4 x 6
6 x 6
4 x 6
4 x 4
6 x 6
4 x 6
4 x 4
(INCH) (INCH)
(INCH)(SQFT)
Other Shapes ≤ 48" Diamond ≤ 36"
Other Shapes ≤ 12' Diamond ≤ 48"
WOOD POSTS
SIGN INSTALLATION
TEMPORARY TRAFFIC CONTROL
1.5
1.5
1.5
1.5
STATE PROJECT
NUMBER
SHEET
J.5
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
FS ERFO 2016(1)-20(4)WA
U S
C c m y fi le s p w p r o d u c ti o n d S td
.d g n u n e
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
SINGLE POST SIGN TWO POST SIGN
SIGN INSTALLATION ANGLE
POST DETAIL
S e e N o te
S e e N o te
See Note 4 E d g e o f tr a v e le d w a y
E d g e o f p a v e d s h o u ld e r
CL Post
Local tangent
Bottom of sign panel
X
H
H
D
H
0.75X
X
X
H
Y D
H
0.2X
0.6X
0.2X
D
See post detail (typ.)
Break-away holes.
Long side of post
D
90°
93°
6" x 6" or larger.
Use 7' minimum spacing between posts for sign posts and 6' minimum mounting height for secondary sign.
use 7' minimum mounting height for main sign a minimum lateral distance of 1' behind the face of lateral offset of 2' may be used. In areas with curbs, 200' m in m in
6' - 12'
" dia. bolts 4 1Attach sign panels with a minimum of 2 - 1.
2.
3.
4.
5.
6.
7. State standards may be used as an alternative if approved by the CO.
per post.
H1 and H2 = Overall post length.
Select post lengths to fit field conditions.
D = Post embedment depth for average soil conditions.
In areas where lateral distance is limited, a minimum the curb may be used.
In pedestrian locations, or in areas with obstructed views, NOTE:
See table for hole size parallel to sign face.
Field drill holes through post
File details come from the government source that posted it.