Q&A_11-7-17.pdf

PDF 76 KB Posted

Attached to
CA NPS PP DEVA 2016(8), Pavement Preservation Death Valley Phase I Federal contract opportunity
Solicitation number
69056718B000001
Issued by
Department of Transportation Federal Highway Administration

View the file

Other files for this federal contract opportunity

Other files attached to CA NPS PP DEVA 2016(8), Pavement Preservation Death Valley Phase I, newest first.
File Type Posted
Bid_Opening_Summary_Death_Valley.pdf PDF
A004.pdf PDF
A003.pdf PDF
Q&A_11-8-17.pdf PDF
Q&A_11-1-17.pdf PDF
A002.pdf PDF
Q&A_10-30-17.pdf PDF
Q&A_10-20-17.pdf PDF
A001.pdf PDF
IFB_Death_Valley.pdf PDF
DEVA_C6_RipReport.pdf PDF
CA_Death_Valley_PROJECT_DESCRIPTION.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CA NPS PP DEVA 2016(8)

Pavement Preservation Death Valley Phase 1

# General Technical Question Answer Date 1 X I am requesting the reason for requiring a

Continuous operation, rather than Truck Mounted Units which are more suitable for this project.

This will be addressed in a forthcoming amendment.

10/20/17

2 X

On the cover it has the project is a Small Business Set‐Aside but on page A‐2 it talks about a price preference applied to large businesses. Is the project a small business set‐ aside?

This project is a small business set-aqside.

The price evaluation paragraph was included on page A-2 by mistake and will be removed in a future amendment.

10/27/17

X

Please Consider the equipment specification to be ISSA A-143 deleting the requirement for the self-loading machine.

Amendment A001 changed the equipment requirements for Micro Surfacing.

10/30/17

X The given quantities for the center line striping are for yellow paint only, will FHWA require black paint in‐between the yellow center line?

No. See pavement marking details on F sheets.

11/1/17

5 X

Will hauling of aggregate be allowed on Stateline Rd.‐Bob Rund Memorial Hwy‐Bell Vista Rd.? There are signs not allowing trucks over 13 tons to haul on this Route.

Comply with legal load restrictions. Please refer to Subsection 104.05 Load Restrictions.

11/1/17

Check General or Technical

6 X

My question is: the portable changeable message signs will be removed from the project once construction is complete correct? Or are the portable changeable message signs designed to be given to the park once construction is complete?

Remove once construction is complete.

11/7/2017