CA_Death_Valley_PROJECT_DESCRIPTION.pdf

PDF 24 KB Posted

Attached to
CA NPS PP DEVA 2016(8), Pavement Preservation Death Valley Phase I Federal contract opportunity
Solicitation number
69056718B000001
Issued by
Department of Transportation Federal Highway Administration

View the file

Other files for this federal contract opportunity

Other files attached to CA NPS PP DEVA 2016(8), Pavement Preservation Death Valley Phase I, newest first.
File Type Posted
Bid_Opening_Summary_Death_Valley.pdf PDF
A004.pdf PDF
A003.pdf PDF
Q&A_11-8-17.pdf PDF
Q&A_11-7-17.pdf PDF
Q&A_11-1-17.pdf PDF
A002.pdf PDF
Q&A_10-30-17.pdf PDF
Q&A_10-20-17.pdf PDF
A001.pdf PDF
DEVA_C6_RipReport.pdf PDF
IFB_Death_Valley.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CA NPS PP DEVA 2016(8), Pavement Preservation Death Valley Phase I, Death Valley National Park, Inyo County, California

The work consists of preserving selected parking areas and approach roads with the application of microsurfacing and chip seal. Construction will include crack sealing, patching, pavement marking, and other small items of work. Contractor will also provide appropriate traffic control and phasing to minimize impacts to park visitors and operations.

Project length:

Base - 60.33 Option X - 0.85 Option Y - 10.07 Option Z - 17.36

Tentative Fixed Completion Date: Spring/Summer 2018 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)

Base and Options Estimated Price Range: Between $5million and $7million.

Location: Death Valley is approximately 60 miles east of Pahrump, NV

DESCRIPTION OF WORK in US

CUSTOMARY UNITS

FP-14

Base Option X Option Y Option Z

DIVISION 150 – Project Requirements 152 Construction Survey & Staking No No No No 153 Contractor Quality Control and Assurance Yes Yes Yes Yes 154 Contractor Sampling & Testing Yes Yes Yes Yes 155 Schedules for Construction Contracts (construction schedules) Yes Yes Yes Yes

DIVISION 400 – Asphalt Pavements & Surface Treatments 406 Fog Seal 450 TON 80 TON 170 TON 407 Chip Seal 692,500

SQYD

122,000

SQYD

260,000

SQYD

407 Emulsified Asphalt 1250 TON 220 TON 460 TON 407 Blotter 40 TON 10 TON 20 TON 409 Micro surfacing 127,000

SQYD

30,000

SQYD

3,700

SQYD

414 Asphalt Pavement Crack Sealing & Filling 250 LNFT 414 Asphalt Pavement Crack Sealing & Filling 23.0 MILE 2.5 MILE .2 MILE 418 Asphalt Concrete Pavement Patching 800 SQYD 370 SQYD 60 SQYD

DESCRIPTION OF WORK in US

CUSTOMARY UNITS

FP-14

Base Option X Option Y Option Z

DIVISION 600 – Incidental Construction 622 Rental Equipment Yes Yes Yes Yes 623 General Labor Yes Yes Yes Yes 634 Permanent Pavement Markings (traffic pavement marking)

2,450,000

LNFT

27,000

LNFT

438,000

LNFT

764,000

LNFT

634 Permanent Pavement Markings (symbols) 25 EA 25 EA 3 EA 4 EA 635 Temporary Traffic Control (Traffic Control Supervisor) Yes Yes Yes Yes 635 Temporary Traffic Control (Cone) 220 EA 635 Temporary Traffic Control (Pavement Markings)

310,000

LNFT

55,000

LNFT

94,000

LNFT

635 Temporary Traffic Control (Construction Sign) 450 SQFT 635 Temporary Traffic Control – Pilot Car 400 HR 20 HR 70 HR 120 HR 635 Temporary Traffic Control – Flagger

FXHR 200 FXHR 200 FXHR 400 FXHR

File details come from the government source that posted it. Updated .