CA_Death_Valley_PROJECT_DESCRIPTION.pdf
PDF 24 KB Posted
- Attached to
- CA NPS PP DEVA 2016(8), Pavement Preservation Death Valley Phase I Federal contract opportunity
- Solicitation number
- 69056718B000001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid_Opening_Summary_Death_Valley.pdf | ||
| A004.pdf | ||
| A003.pdf | ||
| Q&A_11-8-17.pdf | ||
| Q&A_11-7-17.pdf | ||
| Q&A_11-1-17.pdf | ||
| A002.pdf | ||
| Q&A_10-30-17.pdf | ||
| Q&A_10-20-17.pdf | ||
| A001.pdf | ||
| DEVA_C6_RipReport.pdf | ||
| IFB_Death_Valley.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CA NPS PP DEVA 2016(8), Pavement Preservation Death Valley Phase I, Death Valley National Park, Inyo County, California
The work consists of preserving selected parking areas and approach roads with the application of microsurfacing and chip seal. Construction will include crack sealing, patching, pavement marking, and other small items of work. Contractor will also provide appropriate traffic control and phasing to minimize impacts to park visitors and operations.
Project length:
Base - 60.33 Option X - 0.85 Option Y - 10.07 Option Z - 17.36
Tentative Fixed Completion Date: Spring/Summer 2018 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)
Base and Options Estimated Price Range: Between $5million and $7million.
Location: Death Valley is approximately 60 miles east of Pahrump, NV
DESCRIPTION OF WORK in US
CUSTOMARY UNITS
FP-14
Base Option X Option Y Option Z
DIVISION 150 – Project Requirements 152 Construction Survey & Staking No No No No 153 Contractor Quality Control and Assurance Yes Yes Yes Yes 154 Contractor Sampling & Testing Yes Yes Yes Yes 155 Schedules for Construction Contracts (construction schedules) Yes Yes Yes Yes
DIVISION 400 – Asphalt Pavements & Surface Treatments 406 Fog Seal 450 TON 80 TON 170 TON 407 Chip Seal 692,500
SQYD
122,000
SQYD
260,000
SQYD
407 Emulsified Asphalt 1250 TON 220 TON 460 TON 407 Blotter 40 TON 10 TON 20 TON 409 Micro surfacing 127,000
SQYD
30,000
SQYD
3,700
SQYD
414 Asphalt Pavement Crack Sealing & Filling 250 LNFT 414 Asphalt Pavement Crack Sealing & Filling 23.0 MILE 2.5 MILE .2 MILE 418 Asphalt Concrete Pavement Patching 800 SQYD 370 SQYD 60 SQYD
DESCRIPTION OF WORK in US
CUSTOMARY UNITS
FP-14
Base Option X Option Y Option Z
DIVISION 600 – Incidental Construction 622 Rental Equipment Yes Yes Yes Yes 623 General Labor Yes Yes Yes Yes 634 Permanent Pavement Markings (traffic pavement marking)
2,450,000
LNFT
27,000
LNFT
438,000
LNFT
764,000
LNFT
634 Permanent Pavement Markings (symbols) 25 EA 25 EA 3 EA 4 EA 635 Temporary Traffic Control (Traffic Control Supervisor) Yes Yes Yes Yes 635 Temporary Traffic Control (Cone) 220 EA 635 Temporary Traffic Control (Pavement Markings)
310,000
LNFT
55,000
LNFT
94,000
LNFT
635 Temporary Traffic Control (Construction Sign) 450 SQFT 635 Temporary Traffic Control – Pilot Car 400 HR 20 HR 70 HR 120 HR 635 Temporary Traffic Control – Flagger
FXHR 200 FXHR 200 FXHR 400 FXHR