This is a Project Manual for selective roof repairs at Jasper County High School, prepared by the Jasper County Board of Education in Monticello, Georgia, with architectural services provided by WM Building Envelope Consultants, LLC. The project scope includes roof membrane repairs, demolition and replacement of sheet metal wall panels, sheet metal expansion joint closures, sheet metal coping systems, and selective removal and replacement of exterior sealants throughout various roof areas. A mandatory pre-bid conference is scheduled for April 14, 2022, at 10:00 a.m. at the project site. Sealed bids are due May 5, 2022, at 10:00 a.m., submitted to the Jasper County Board of Education at 1411 College Street, Monticello, Georgia 31064. The contract time for substantial completion is 45 calendar days from the date of commencement, with liquidated damages assessed at $300 per calendar day for delays beyond the completion deadline. All work must comply with NRCA standard practices and industry roof repair standards as detailed in the project drawings and specifications.
Bid security of 5 percent of the bid amount is required with each sealed bid submission, and bids remain valid for 60 days following opening. The successful contractor must provide both Performance and Payment Bonds, each equal to 100 percent of the Contract Sum, within 10 days of Notice of Intent to Award. Bids must include unit prices for designated items including 2x6 and 2x4 rough carpentry, base flashing replacement, pitch pan repairs, VTR repairs, coping cover plate repairs, and two-ply modified bitumen membrane repairs. A general lump sum allowance of $10,000 is included in the contract. The contract utilizes AIA standard documents (A101-2017, A201-2017, A310-2010, and G701-2017) and incorporates supplementary conditions specific to South Carolina contractor licensing requirements. Retainage of 3.5 percent is withheld from progress payments, and the contractor must provide a schedule of values for work breakdown and payment applications. The project is located in Georgia and is subject to South Carolina law regarding contractor qualifications and licensing.
Text of this file
PROJECT MANUAL
For
Jasper County High School
14477 State Hwy 11, Monticello, Georgia 31064
Selective Roof Repairs
Prepared for
Jasper County Board of Education
1411 College Street, Monticello, Georgia 31064
Prepared by
Columbia/Charleston
Final Construction Documents
School Code No. 0701
WMBE Project No. 2021-131
Issued: March 14, 2022
TABLE OF CONTENTS 000100 - 1
DOCUMENT 000100 – TABLE OF CONTENTS
PROCURMENT AND CONTRACTING DOCUMENTS
DOCUMENT 000101 - PROJECT TITLE PAGE
DOCUMENT 000107 - SEALS PAGE
DOCUMENT 001116 - INVITATION TO BID
DOCUMENT 002113 - INSTRUCTIONS TO BIDDERS
AIA DOCUMENT – AIA A701 - INSTRUCTIONS TO BIDDERS
DOCUMENT 002213 - SUPPLEMENTARY INSTRUCTIONS TO BIDDERS
AIA DOCUMENT – AIA A310 - BID BOND
BID FORM
AIA DOCUMENT – AIA A101 – 2007 – OWNER AND CONTRACTOR AGREEMENT
AIA DOCUMENT – AIA A201 – 2007 GENERAL CONDITIONS OF THE CONTRACT FOR
CONSTRUCTION
DOCUMENT – STANDARD SUPPLEMENTARY CONDITIONS
AIA DOCUMENT – AIA D401 – CERTIFICATION OF DOCUMENT’S AUTHENTICITY
DOCUMENT 002513 - PREBID MEETINGS
AIA DOCUMENT – AIA A312 – 2010 – PERFORMANCE BOND
AIA DOCUMENT – AIA A312 – 2010 – PAYMENT BOND
AIA DOCUMENT – AIA G701 – 2001 – CHANGE ORDER
AIA DOCUMENT – AIA G702 – 1992 – APPLICATION AND CERTIFICATE FOR PAYMENT
AIA DOCUMENT – AIA G703 – 1992 – CONTINUATION SHEET
AIA DOCUMENT – AIA G704 – 2000 – CERTIFICATE OF SUBSTANTIAL COMPLETION
ASBESTOS FREE WARRANTY
DIVISION 01 – GENERAL REQUIREMENTS
SECTION 011000 – SUMMARY
SECTION 012100 - ALLOWANCE
SECTION 012200 - UNIT PRICES
SECTION 012500 - SUBSTITUTION PROCEDURES
SECTION 012600 - CONTRACT MODIFICATION PROCEDURES
SECTION 012900 - PAYMENT PROCEDURES
SECTION 013100 - PROJECT MANAGEMENT AND COORDINATION
SECTION 013200 - CONSTRUCTION PROGRESS DOCUMENTATION
SECTION 013233 - PHOTOGRAPHIC DOCUMENTATION
SECTION 013300 - SUBMITTAL PROCEDURES
SECTION 014000 - QUALITY REQUIREMENTS
SECTION 015000 - TEMPORARY FACILITIES AND CONTROLS
SECTION 016000 - PRODUCT REQUIREMENTS
SECTION 017300 – EXECUTION
SECTION 017700 - CLOSEOUT PROCEDURES
SECTION 017839 - PROJECT RECORD DOCUMENTS
TABLE OF CONTENTS 000100 - 2
DIVISION 02 – EXISTING CONDITIONS
SECTION 024119 - SELECTIVE DEMOLITION
DIVISION 06 – WOOD, PLASTICS AND COMPOSITES
SECTION 061053 - MISCELLANEOUS ROUGH CARPENTRY
DIVISION 07 – THERMAL AND MOISTURE PROTECTION
SECTION 070191 - JOINT SEALANT REHABILITATION AND REPLACEMENT
SECTION 075216 – ROOF MEMBRANE REPAIRS
SECTION 076200 - SHEET METAL FLASHING AND TRIM
DRAWINGS
SHEET R-1.0 – COVER PAGE
SHEET R-1.1 – OVERALL EXISTING ROOF PLAN
SHEET R-1.2 – PARTIAL REPAIR ROOF PLAN
SHEET R-1.3 – PARTIAL REPAIR ROOF PLAN
SHEET R-1.4 – PARTIAL REPAIR ROOF PLAN
SHEET R-1.5 – PARTIAL REPAIR ROOF PLAN
SHEET D-1.1 – DETAILS
SHEET D-1.2 – DETAILS
SHEET D-1.3 – DETAILS
SHEET D-1.4 – DETAILS
SHEET D-1.5 – DETAILS
SHEET D-1.6 – DETAILS
END OF DOCUMENT 000100
PROJECT TITLE PAGE 000101 - 1
DOCUMENT 000101 - PROJECT TITLE PAGE
PROJECT MANUAL
Jasper County Board of Education
Selective Roof Repairs at Jasper County High School
School Code No. 0701
WMBE Project No. 2021-131
Daniel Atwell, RBEC (RRC, RWC, REWC), RRO, REWO, CDT
1501 Chapin Road, Chapin, SC 29036
Phone: (803) 422-7493
Email: Daniel@wmbeconsultants.com
Issued: March 14, 2022
END OF DOCUMENT 000101
SEALS PAGE 000107 - 1
DOCUMENT 000107 - SEALS PAGE
1.1 DESIGN PROFESSIONAL OF RECORD
CONSULTANT
Daniel Atwell, RBEC (RRC, RWC, REWC), RRO, REWO, CDT
WM Building Envelope Consultants
END OF DOCUMENT 000107
INVITATION TO BID 001116 - 1
DOCUMENT 001116 - INVITATION TO BID
1.1 PROJECT INFORMATION
A. Notice to Bidders: Your firm is one of the bidders invited to submit bids for the Project as described in this Document according to the Instructions to Bidders.
B. Project Identification:
1. Project Location:
a. Jasper County High School – 14477 State Hwy 11, Monticello, GA 31064
C. Owner: Jasper County Board of Education, 1411 College Street, Monticello, Georgia 31064.
D. Consultant: Daniel Atwell, WM Building Envelope Consultants, LLC, 1501 Chapin Road, Chapin, SC. Phone: 803-422-7493 or daniel@wmbeconsultants.com
E. Project Description:
1. Scope of work includes roof repairs as noted on the drawings throughout all roof areas at
Jasper County High School.
2. Scope of work includes demolition and replacement of sheet metal wall panels, sheet metal expansion joint closures, sheet metal coping systems, etc. as noted on the drawings throughout selective roof areas at Jasper County High School.
3. All roof repairs will be completed per the required detail and in coordination with NRCA standard practice and repair methods, and industry roof repair standards.
1.2 BID SUBMITTAL AND OPENING
A. Owner will receive sealed bids until the bid time and date at the location indicated below.
Owner will consider bids prepared in compliance with the Instructions to Bidders issued by
Owner, and delivered as follows:
1. Bid Date: May 5, 2022
2. Bid Time: 10:00 a.m.
3. Location: Jasper County Board of Education – 1411 College Street, Monticello, Georgia
31064.
4. Attention: Jasper County Board of Education
1.3 BID SECURITY
A. Bid security shall be submitted with each bid in the amount of 5 percent of the bid amount. No bids may be withdrawn for a period of 60 days after opening of bids. Owner reserves the right to reject any and all bids and to waive informalities and irregularities.
mailto:daniel@wmbeconsultants.com
INVITATION TO BID 001116 - 2
1.4 PREBID CONFERENCE
A. A pre-bid conference for all bidders will be held at Jasper County High School – 14477 State
Hwy 11, Monticello, GA 31064 on April 14, 2022, at 10:00 a.m. Prospective bidders are required to attend.
1.5 DOCUMENTS
A. Printed Procurement and Contracting Documents: Documents will be provided to the bidders at the pre-bid conference; only complete sets of documents will be issued.
1.6 TIME OF COMPLETION AND LIQUIDATED DAMAGES
A. Bidders shall begin the Work on receipt of the Notice to Proceed and shall complete the Work within the Contract Time. Work is subject to liquidated damages.
1.7 BIDDER'S QUALIFICATIONS
A. Bidders must be properly licensed under the laws governing their respective trades and be able to obtain insurance and bonds required for the Work. A Performance Bond, a separate Labor and Material Payment Bond, and Insurance in a form acceptable to Owner will be required of the successful Bidder.
END OF DOCUMENT 001116
INSTRUCTIONS TO BIDDERS 002113 - 1
DOCUMENT 002113 - INSTRUCTIONS TO BIDDERS
1.1 INSTRUCTIONS TO BIDDERS
A. AIA Document A701, "Instructions to Bidders," is hereby incorporated into the Procurement and Contracting Requirements by reference.
1. A copy of AIA Document A701, "Instructions to Bidders," is bound in this Project
Manual.
END OF DOCUMENT 002113
Document G701™ – 2017 Change Order
AIA Document G701™ – 2017. Copyright © 1979, 1987, 2000 , 2001 and 2017 by The American Institute of Architects. All rights reserved. The “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This document was produced by AIA software at 09:38:03 ET on 01/09/2022 under Order No.2114239965 which expires on 09/28/2022, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org.
User Notes: (3B9ADA52)
PROJECT: (Name and address) CONTRACT INFORMATION: CHANGE ORDER INFORMATION:
Jasper County High School Selective Roof Repairs
Contract For: General Construction Change Order Number: 001
14477 State Hwy 11, Monticello, GA 31064.
Date: Date:
OWNER: (Name and address) ARCHITECT: (Name and address) CONTRACTOR: (Name and address) Jasper County Board of Education WM Building Envelope Consultants, LLC 1411 College Street, Monticello, Georgia 31064
1501 Chapin Road, Chapin SC 29036
THE CONTRACT IS CHANGED AS FOLLOWS:
(Insert a detailed description of the change and, if applicable, attach or reference specific exhibits. Also include agreed upon adjustments attributable to executed Construction Change Directives.)
The original Contract Sum was $ 0.00 The net change by previously authorized Change Orders $ 0.00 The Contract Sum prior to this Change Order was $ 0.00 The Contract Sum will be increased by this Change Order in the amount of $ 0.00 The new Contract Sum including this Change Order will be $ 0.00
The Contract Time will be increased by Zero (0) days.
The new date of Substantial Completion will be
NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract Time, that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive.
NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER.
WM Building Envelope Consultants, LLC Jasper County Board of Education ARCHITECT (Firm name) CONTRACTOR (Firm name) OWNER (Firm name)
SIGNATURE SIGNATURE SIGNATURE
Daniel Atwell, Project Manager
PRINTED NAME AND TITLE PRINTED NAME AND TITLE PRINTED NAME AND TITLE
DATE DATE DATE
SUPPLEMENTARY INSTRUCTIONS TO BIDDERS 002213 - 1
DOCUMENT 002213 - SUPPLEMENTARY INSTRUCTIONS TO BIDDERS
1.1 INSTRUCTIONS TO BIDDERS
A. Instructions to Bidders for Project consist of the following:
1. AIA Document A701, "Instructions to Bidders".
2. The following Supplementary Instructions to Bidders that modify and add to the requirements of the Instructions to Bidders.
1.2 SUPPLEMENTARY INSTRUCTIONS TO BIDDERS, GENERAL
A. The following supplements modify AIA Document A701, "Instructions to Bidders." Where a portion of the Instructions to Bidders is modified or deleted by these Supplementary
Instructions to Bidders, unaltered portions of the Instructions to Bidders shall remain in effect.
1.3 ARTICLE 2 - BIDDER'S REPRESENTATIONS
A. Add Section 2.1.3.1:
1. 2.1.3.1 - The Bidder has investigated all required fees, permits, and regulatory requirements of authorities having jurisdiction and has properly included in the submitted bid the cost of such fees, permits, and requirements not otherwise indicated as provided by Owner.
B. Add Section 2.1.5:
1. 2.1.5 - The Bidder is a properly licensed Contractor according to the laws and regulations of the state of South Carolina and meets qualifications indicated in the Procurement and
Contracting Documents.
C. Add Section 2.1.6:
1. 2.1.6 - The Bidder has incorporated into the Bid adequate sums for work performed by installers whose qualifications meet those indicated in the Procurement and Contracting
Documents.
1.4 ARTICLE 3 - BIDDING DOCUMENTS
A. 3.2 - Interpretation or Correction of Procurement and Contracting Documents:
1. Add Section 3.2.2.1:
a. 3.2.2.1 - Submit Bidder's Requests for Interpretation using form furnished with electronic bid forms and submitted via email.
SUPPLEMENTARY INSTRUCTIONS TO BIDDERS 002213 - 2
B. 3.4 - Addenda:
1. Delete Section 3.4.3 and replace with the following:
a. 3.4.3 - Addenda may be issued at any time prior to the receipt of bids.
2. Add Section 3.4.4.1:
a. 3.4.4.1 - Owner may elect to waive the requirement for acknowledging receipt of
3.4.4 Addenda as follows:
1) 3.4.4.1.1 - Information received as part of the Bid indicates that the Bid, as submitted, reflects modifications to the Procurement and Contracting
Documents included in an unacknowledged Addendum.
2) 3.4.4.1.2 - Modifications to the Procurement and Contracting Documents in an unacknowledged Addendum do not, in the opinion of Owner, affect the
Contract Sum or Contract Time.
1.5 ARTICLE 4 - BIDDING PROCEDURES
A. 4.1 - Preparation of Bids:
1. Add Section 4.1.1.1:
a. 4.1.1.1 - Printable electronic Bid Forms and related documents are available from
Consultant.
2. Add Section 4.1.8:
a. 4.1.8 - The Bid shall include unit prices when called for by the Procurement and
Contracting Documents. Owner may elect to consider unit prices in the determination of award. Unit prices will be incorporated into the Contract.
3. Add Section 4.1.9:
a. 4.1.9 - Owner may elect to disqualify a bid due to failure to submit a bid in the form requested, failure to bid requested alternates or unit prices, failure to complete entries in all blanks in the Bid Form, or inclusion by the Bidder of any alternates, conditions, limitations or provisions not called for.
4. Add Section 4.1.10:
a. 4.1.10 - Bids shall include sales and use taxes. Contractors shall show separately with each monthly payment application the sales and use taxes paid by them and their subcontractors in the form indicated. Reimbursement of sales and use taxes, if any, shall be applied for by Owner for the sole benefit of Owner.
B. 4.3 - Submission of Bids:
1. Add Section 4.3.1.2:
SUPPLEMENTARY INSTRUCTIONS TO BIDDERS 002213 - 3
a. 4.3.1.2 - Include Bidder's Contractor License Number applicable in Project jurisdiction on the face of the sealed bid envelope.
C. 4.4 - Modification or Withdrawal of Bids:
1. Add the following sections to 4.4.2:
a. 4.4.2.1 - Such modifications to or withdrawal of a bid may only be made by persons authorized to act on behalf of the Bidder. Authorized persons are those so identified in the Bidder's corporate bylaws, specifically empowered by the Bidder's charter or similar legally binding document acceptable to Owner, or by a power of attorney, signed and dated, describing the scope and limitations of the power of attorney. Make such documentation available to Owner at the time of seeking modifications or withdrawal of the Bid.
b. 4.4.2.2 - Owner will consider modifications to a bid written on the sealed bid envelope by authorized persons when such modifications comply with the following: the modification is indicated by a percent or stated amount to be added to or deducted from the Bid; the amount of the Bid itself is not made known by the modification; a signature of the authorized person, along with the time and date of the modification, accompanies the modification. Completion of an unsealed bid form, awaiting final figures from the Bidder, does not require power of attorney due to the evidenced authorization of the Bidder implied by the circumstance of the completion and delivery of the Bid.
D. 4.5 - Break-Out Pricing Bid Supplement:
1. Add Section 4.5:
a. 4.5 - Provide detailed cost breakdowns on forms provided no later than two business days following Architect's request.
E. 4.6 - Subcontractors, Suppliers, and Manufacturers List Bid Supplement:
1. Add Section 4.6:
a. 4.6 - Provide list of major subcontractors, suppliers, and manufacturers furnishing or installing products on forms provided no later than two business days following
Architect's request. Include those subcontractors, suppliers, and manufacturers providing work totaling three percent or more of the Bid amount. Do not change subcontractors, suppliers, and manufacturers from those submitted without approval of Architect.
1.6 ARTICLE 5 - CONSIDERATION OF BIDS
A. 5.2 - Rejection of Bids:
1. Add Section 5.2.1:
a. 5.2.1 - Owner reserves the right to reject a bid based on Owner's and Architect's evaluation of qualification information submitted following opening of bids.
SUPPLEMENTARY INSTRUCTIONS TO BIDDERS 002213 - 4
Owner's evaluation of the Bidder's qualifications will include: status of licensure and record of compliance with licensing requirements, record of quality of completed work, record of Project completion and ability to complete, record of financial management including financial resources available to complete Project and record of timely payment of obligations, record of Project site management including compliance with requirements of authorities having jurisdiction, record of and number of current claims and disputes and the status of their resolution, and qualifications of the Bidder's proposed Project staff and proposed subcontractors.
1.7 ARTICLE 6 - POSTBID INFORMATION
A. 6.1 - Contractor's Qualification Statement:
1. Add Section 6.1.1:
a. 6.1.1 - Submit Contractor's Qualification Statement no later than two business days following Architect's request.
B. 6.3 - Submittals:
1. Add Section 6.3.1.4:
a. 6.3.1.4 - Submit information requested in Sections 6.3.1.1, 6.3.1.2, and 6.3.1.3 no later than two business days following Architect's request.
1.8 ARTICLE 7 - PERFORMANCE BOND AND PAYMENT BOND
A. 7.1 - Bond Requirements:
1. Add Section 7.1.1.1:
a. 7.1.1.1 - Both a Performance Bond and a Payment Bond will be required, each in an amount equal to 100 percent of the Contract Sum.
B. 7.2 - Time of Delivery and Form of Bonds:
1. Delete the first sentence of Section 7.2.1 and insert the following:
a. The Bidder shall deliver the required bonds to Owner no later than 10 days after the date of Notice of Intent to Award and no later than the date of execution of the
Contract, whichever occurs first. Owner may deem the failure of the Bidder to deliver required bonds within the period of time allowed a default.
2. Delete Section 7.2.3 and insert the following:
a. 7.2.3 - Bonds shall be executed and be in force on the date of the execution of the
Contract.
SUPPLEMENTARY INSTRUCTIONS TO BIDDERS 002213 - 5
1.9 ARTICLE 9 - EXECUTION OF THE CONTRACT
A. Add Article 9:
1. 9.1.1 - Subsequent to the Notice of Intent to Award, and within 10 days after the prescribed Form of Agreement is presented to the Awardee for signature, the Awardee shall execute and deliver the Agreement to Owner through Architect, in such number of counterparts as Owner may require.
2. 9.1.2 - Owner may deem as a default the failure of the Awardee to execute the Contract and to supply the required bonds when the Agreement is presented for signature within the period of time allowed.
3. 9.1.3 - Unless otherwise indicated in the Procurement and Contracting Documents or the executed Agreement, the date of commencement of the Work shall be the date of the executed Agreement.
4. 9.1.4 - In the event of a default, Owner may declare the amount of the Bid security forfeited and elect to either award the Contract to the next responsible bidder or re-advertise for bids.
END OF DOCUMENT 002213
Document A310™ – 2010 Bid Bond
Init.
AIA Document A310™ – 2010. Copyright © 1963, 1970 and 2010 by The American Institute of Architects. All rights reserved. The “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This document was produced by AIA software at 09:40:55 ET on 01/09/2022 under Order No.2114239965 which expires on 09/28/2022, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org.
User Notes: (3B9ADA41)
ADDITIONS AND DELETIONS:
The author of this document has added information needed for its completion. The author may also have revised the text of the original AIA standard form. An Additions and Deletions Report that notes added information as well as revisions to the standard form text is available from the author and should be reviewed. A vertical line in the left margin of this document indicates where the author has added necessary information and where the author has added to or deleted from the original AIA text.
This document has important legal consequences. Consultation with an attorney is encouraged with respect to its completion or modification.
Any singular reference to Contractor, Surety, Owner or other party shall be considered plural where applicable.
CONTRACTOR:
(Name, legal status and address)
SURETY:
(Name, legal status and principal place of business)
OWNER:
(Name, legal status and address) Jasper County Board of Education 1411 College Street, Monticello, GA 31064
BOND AMOUNT: $
PROJECT:
(Name, location or address, and Project number, if any) Jasper County High School Selective Roof Repairs 14477 State Hwy 11, Monticello, GA 31064.
The Contractor and Surety are bound to the Owner in the amount set forth above, for the payment of which the Contractor and Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, as provided herein. The conditions of this Bond are such that if the Owner accepts the bid of the Contractor within the time specified in the bid documents, or within such time period as may be agreed to by the Owner and Contractor, and the Contractor either (1) enters into a contract with the Owner in accordance with the terms of such bid, and gives such bond or bonds as may be specified in the bidding or Contract Documents, with a surety admitted in the jurisdiction of the Project and otherwise acceptable to the Owner, for the faithful performance of such Contract and for the prompt payment of labor and material furnished in the prosecution thereof; or (2) pays to the Owner the difference, not to exceed the amount of this Bond, between the amount specified in said bid and such larger amount for which the Owner may in good faith contract with another party to perform the work covered by said bid, then this obligation shall be null and void, otherwise to remain in full force and effect. The Surety hereby waives any notice of an agreement between the Owner and Contractor to extend the time in which the Owner may accept the bid. Waiver of notice by the Surety shall not apply to any extension exceeding sixty (60) days in the aggregate beyond the time for acceptance of bids specified in the bid documents, and the Owner and Contractor shall obtain the Surety’s consent for an extension beyond sixty
(60) days.
If this Bond is issued in connection with a subcontractor’s bid to a Contractor, the term Contractor in this Bond shall be deemed to be Subcontractor and the term Owner shall be deemed to be Contractor.
When this Bond has been furnished to comply with a statutory or other legal requirement in the location of the Project, any provision in this Bond conflicting with said statutory or legal requirement shall be deemed deleted herefrom and provisions conforming to such statutory or other legal requirement shall be deemed incorporated herein. When so furnished, the intent is that this Bond shall be construed as a statutory bond and not as a common law bond.
Init.
AIA Document A310™ – 2010. Copyright © 1963, 1970 and 2010 by The American Institute of Architects. All rights reserved. The “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This document was produced by AIA software at 09:40:55 ET on 01/09/2022 under Order No.2114239965 which expires on 09/28/2022, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org.
User Notes: (3B9ADA41)
Signed and sealed this day of , (Contractor as Principal) (Seal)
(Witness) (Title)
(Surety) (Seal)
(Witness) (Title)
BID FORM
Bid Form Page 1
BID SUBMITTED BY:
BID SUBMITTED TO: Jasper County Board of Education
FOR: PROJECT NAME: Selective Roof Repairs at Jasper County High School
School Code Number: 0701
PROJECT NUMBER: WMBE 2021-131
OFFER
A. In response to the Invitation for Construction Services and in compliance with the Instructions to Bidders for the subject project, the Bidder agrees, if this Bid is accepted, to enter into a Contract with the Owner on the terms and conditions included in the Bidding Documents, and to perform all Work as specified in the Bidding
Documents, for the price and within the time frames indicated in this Bid and in accordance with the other requirements of the Bidding Documents.
B. The Bidder has submitted Bid Security as follows in the amount and form required by the Bidding Documents:
Bid Bond with Power of Attorney
Electronic Bid Bond
Cashier's Check
C. The Bidder acknowledges the receipt of the following Addenda to the Bidding Documents and has incorporated any and all changes included in the Addenda into this Bid:
LIST ALL ADDENDA RECEIVED:
D. Bidder accepts all terms and conditions of the Invitation for Bids, including, without limitation, those dealing with the disposition of Bid Security. Bidder agrees that this Bid, including all Bid Alternates, if any, may not be revoked or withdrawn after the opening of bids, and shall remain open for acceptance for a period of 60
Days following the Bid Date, or for a longer period of time that Bidder may agree to in writing upon request of the Owner.
E. Bidder offers to provide all labor, materials, equipment, tools of trades and labor, accessories, appliances, warranties and guarantees, and to pay all royalties, fees, permits, licenses and applicable taxes necessary to complete the following items of construction work:
F. BASE BID WORK (Generally described as follows): Scope of work includes roof repairs as noted on the drawings throughout all roof areas at Jasper County High School. Scope of work includes demolition and replacement of sheet metal wall panels, sheet metal expansion joint closures, sheet metal coping systems, etc. as noted on the drawings throughout selective roof areas at Jasper County High
School. All roof repairs will be completed per the required detail and in coordination with NRCA standard practice and repair methods, and industry roof repair standards.
$ , which sum is hereafter called the Base Bid.
(Insert Base Bid Amount)
Bid Form Page 2
H. UNIT PRICES:
BIDDER offers for the Owner’s consideration and use, the following UNIT PRICES. The UNIT PRICES offered by BIDDER indicate the amount to be added or deducted from the CONTRACT SUM for each item. UNIT PRICES include all costs, including those for materials, labor, equipment, tools of trades and labor, fees, taxes, insurance, bonding, overhead, profit, etc. The Owner reserves the right to include or not to include any of the following UNIT PRICES in the Contract and to negotiate the UNIT PRICES with BIDDER.
Unit of
No. Quantity Item Measure Add/Deduct
1. 200 2x6 Rough Carpentry LF $
2. 200 2x4 Rough Carpentry LF $
3. 150 Base Flashing Replacement LF $
4. 5 Pitch Pan Repair EA $
5. 5 VTR Repair EA $
6. 30 Coping Cover Plate Repair EA $
7. 500 Two-Ply Modified Bitumen Membrane Repair SQ.FT. $
I. SUBCONTRACTORS
a. Definition of Subcontractor: A subcontractor is an entity who will perform work or render service to the prime contractor to or about the construction site pursuant to a contract with the prime contractor. Bidder should not identify sub-subcontractors in the spaces provided on the bid form but only those entities with which bidder will contract directly. Likewise, do not identify material suppliers, manufacturers, and fabricators that will not perform physical work at the site of the project but will only supply materials or equipment to the bidder or proposed subcontractor(s).
b. Subcontractor Qualifications: Bidder must only list subcontractors who possess a South Carolina
Contractor’s license with the license classification and/or subclassification identified in the left column. The subcontractor license must also be within the appropriate license group for the work of the specialty. If Bidder lists a subcontractor who is not qualified to perform the work, the Bidder will be rejected as non-responsible.
c. Use of Own forces: If under the terms of the Bidding Documents, Bidder is qualified to perform the work of a listed specialty and Bidder does not intend to subcontract such work but to use Bidder’s own employees to perform such work, the Bidder must insert its own name in the space provided for that specialty.
d. If bidder is awarded the contract, bidder will not be allowed to substitute another subcontractor in place of a subcontractor listed above unless approved by the Owner.
e. Bidder’s failure to identify a subcontractor or themselves to perform the work of a subcontractor specialty listed in the first column on the left will render the Bid non-responsive.
Bid Form Page 3
LISTING OF PROPOSED SUBCONTRACTORS
Bidder shall use the below-listed Subcontractors in the performance of the Subcontractor Classification work listed:
SUBCONTRACTOR
CLASSIFICATION
By License Classification and/or Subclassification
SUBCONTRACTOR'S
PRIME CONTRACTOR'S
NAME
(To be completed by Bidder)
SUBCONTRACTOR'S
PRIME CONTRACTOR'S
SC LICENSE NUMBER
(To be completed by Bidder)
BASE BID
“SUBCONTRACTOR LISTING
REQUIRED”
If a Bid Alternate is accepted, Subcontractors listed for the Bid Alternate shall be used for the work of both the
Alternate and the Base Bid work.
J. TIME OF CONTRACT PERFORMANCE AND LIQUIDATED DAMAGES
a) CONTRACT TIME
The Date of Commencement of the Work shall be established in a Notice to Proceed. Substantial completion of the Work shall be within (45) Calendar Days from the Date of Commencement. Substantial completion is subject to changes as provided in the Contract Documents.
b) LIQUIDATED DAMAGES
The Owner shall retain as Liquidated Damages the amount of $300 for each Calendar Day the actual construction time required to achieve Substantial Completion exceeds the specified or adjusted time for
Substantial Completion.
K. AGREEMENTS
a) Bidder agrees that this bid is subject to the requirements of the laws of the State of South Carolina.
b) Bidder agrees that at any time prior to the issuance of the Notice to Proceed for this Project, this Project may be canceled for the convenience of, and without cost to, the Owner.
c) The Owner, employees, representatives, consultants, agents, etc. shall not be responsible for any bid preparation costs or charges of any type, if all bids are rejected or the Project is canceled for any reason prior to the issuance of the Notice to Proceed.
Bid Form Page 4
CONTRACTOR'S CLASSIFICATIONS AND SUBCLASSIFICATIONS WITH LIMITATION
SC Contractor’s License No.:
Classification(s) & Limits.:
Subclassification(s) & Limits:
Bidder’s Legal Name:
Address:
Telephone:
Email:
Signature: DATE:
Print Name:
Title:
Document A101® – 2017 Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum
Init.
AIA Document A101® – 2017. Copyright © 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. The “American Institute of Architects,” “AIA,” the AIA Logo, "A101," and “AIA Contract Documents” are registered trademarks and may not be used without permission. This document was produced by AIA software at 09:53:14 ET on 01/09/2022 under Order No.2114239965 which expires on 09/28/2022, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org.
User Notes: (3B9ADA45)
ADDITIONS AND DELETIONS:
The author of this document has added information needed for its completion. The author may also have revised the text of the original AIA standard form. An Additions and Deletions Report that notes added information as well as revisions to the standard form text is available from the author and should be reviewed. A vertical line in the left margin of this document indicates where the author has added necessary information and where the author has added to or deleted from the original AIA text.
This document has important legal consequences. Consultation with an attorney is encouraged with respect to its completion or modification.
The parties should complete A101®–2017, Exhibit A, Insurance and Bonds, contemporaneously with this Agreement. AIA Document A201®–2017, General Conditions of the Contract for Construction, is adopted in this document by reference. Do not use with other general conditions unless this document is modified.
AGREEMENT made as of the day of in the year (In words, indicate day, month and year.)
BETWEEN the Owner:
(Name, legal status, address and other information)
Jasper County Board of Education 1411 College Street, Monticello, GA 31064 and the Contractor:
(Name, legal status, address and other information) for the following Project:
(Name, location and detailed description)
Jasper County High School Selective Roof Repairs 14477 State Hwy 11, Monticello, GA 31064.
Scope of work includes roof repairs as noted on the drawings throughout all roof areas at Jasper County High School.
Scope of work includes demolition and replacement of sheet metal wall panels, sheet metal expansion joint closures, sheet metal coping systems, etc. as noted on the drawings throughout selective roof areas at Jasper County High School.
Scope of work includes selective removal and replacement of vertical and horizontal exterior sealants as noted on the roof repair drawings.
All roof repairs will be completed per the required detail and in coordination with NRCA standard practice and repair methods, and industry roof repair standards.
The Architect:
(Name, legal status, address and other information)
WM Building Envelope Consultants, LLC 1501 Chapin Road, Chapin SC 29036
The Owner and Contractor agree as follows.
AIA Document A101® – 2017. Copyright © 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. The “American Institute of Architects,” “AIA,” the AIA Logo, "A101," and “AIA Contract Documents” are registered trademarks and may not be used without permission. This document was produced by AIA software at 09:53:14 ET on 01/09/2022 under Order No.2114239965 which expires on 09/28/2022, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org.
User Notes: (3B9ADA45)
TABLE OF ARTICLES
1 THE CONTRACT DOCUMENTS
2 THE WORK OF THIS CONTRACT
3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION
4 CONTRACT SUM
5 PAYMENTS
6 DISPUTE RESOLUTION
7 TERMINATION OR SUSPENSION
8 MISCELLANEOUS PROVISIONS
9 ENUMERATION OF CONTRACT DOCUMENTS
EXHIBIT A INSURANCE AND BONDS
ARTICLE 1 THE CONTRACT DOCUMENTS
The Contract Documents consist of this Agreement, Conditions of the Contract (General, Supplementary, and other Conditions), Drawings, Specifications, Addenda issued prior to execution of this Agreement, other documents listed in this Agreement, and Modifications issued after execution of this Agreement, all of which form the Contract, and are as fully a part of the Contract as if attached to this Agreement or repeated herein. The Contract represents the entire and integrated agreement between the parties hereto and supersedes prior negotiations, representations, or agreements, either written or oral. An enumeration of the Contract Documents, other than a Modification, appears in Article 9.
ARTICLE 2 THE WORK OF THIS CONTRACT
The Contractor shall fully execute the Work described in the Contract Documents, except as specifically indicated in the Contract Documents to be the responsibility of others.
ARTICLE 3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION
§ 3.1 The date of commencement of the Work shall be:
(Check one of the following boxes.)
[ ] The date of this Agreement.
[ ] A date set forth in a notice to proceed issued by the Owner.
[ ] Established as follows:
(Insert a date or a means to determine the date of commencement of the Work.)
If a date of commencement of the Work is not selected, then the date of commencement shall be the date of this Agreement.
§ 3.2 The Contract Time shall be measured from the date of commencement of the Work.
§ 3.3 Substantial Completion § 3.3.1 Subject to adjustments of the Contract Time as provided in the Contract Documents, the Contractor shall achieve Substantial Completion of the entire Work:
AIA Document A101® – 2017. Copyright © 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. The “American Institute of Architects,” “AIA,” the AIA Logo, "A101," and “AIA Contract Documents” are registered trademarks and may not be used without permission. This document was produced by AIA software at 09:53:14 ET on 01/09/2022 under Order No.2114239965 which expires on 09/28/2022, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org.
User Notes: (3B9ADA45)
(Check one of the following boxes and complete the necessary information.)
[ ] Not later than ( ) calendar days from the date of commencement of the Work.
[ ] By the following date:
§ 3.3.2 Subject to adjustments of the Contract Time as provided in the Contract Documents, if portions of the Work are to be completed prior to Substantial Completion of the entire Work, the Contractor shall achieve Substantial Completion of such portions by the following dates:
Portion of Work Substantial Completion Date
§ 3.3.3 If the Contractor fails to achieve Substantial Completion as provided in this Section 3.3, liquidated damages, if any, shall be assessed as set forth in Section 4.5.
ARTICLE 4 CONTRACT SUM
§ 4.1 The Owner shall pay the Contractor the Contract Sum in current funds for the Contractor’s performance of the Contract. The Contract Sum shall be ($ ), subject to additions and deductions as provided in the Contract Documents.
§ 4.2 Alternates § 4.2.1 Alternates, if any, included in the Contract Sum:
Item Price None N/A
§ 4.2.2 Subject to the conditions noted below, the following alternates may be accepted by the Owner following execution of this Agreement. Upon acceptance, the Owner shall issue a Modification to this Agreement.
(Insert below each alternate and the conditions that must be met for the Owner to accept the alternate.)
Item Price Conditions for Acceptance None N/A N/A
§ 4.3 Allowances, if any, included in the Contract Sum:
(Identify each allowance.)
Item Price General Lump Sum $10,000
§ 4.4 Unit prices, if any:
(Identify the item and state the unit price and quantity limitations, if any, to which the unit price will be applicable.)
Item Units and Limitations Price per Unit ($0.00) 2x6 Rough Carpentry 2x4 Rough Carpentry Base Flashing Replacement Pitch Pan Repair VTR Repair Coping Cover Plate Repair Two Ply Modified Bitumen Roof Membrane Repair
200 LF
200 LF
150 LF
5 Each 5 Each 30 Each 500 Sq. FT.
§ 4.5 Liquidated damages, if any:
(Insert terms and conditions for liquidated damages, if any.)
$300 per Calendar Day pass Substantial Completion Date.
AIA Document A101® – 2017. Copyright © 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. The “American Institute of Architects,” “AIA,” the AIA Logo, "A101," and “AIA Contract Documents” are registered trademarks and may not be used without permission. This document was produced by AIA software at 09:53:14 ET on 01/09/2022 under Order No.2114239965 which expires on 09/28/2022, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org.
User Notes: (3B9ADA45)
§ 4.6 Other:
(Insert provisions for bonus or other incentives, if any, that might result in a change to the Contract Sum.)
None
ARTICLE 5 PAYMENTS
§ 5.1 Progress Payments § 5.1.1 Based upon Applications for Payment submitted to the Architect by the Contractor and Certificates for Payment issued by the Architect, the Owner shall make progress payments on account of the Contract Sum to the Contractor as provided below and elsewhere in the Contract Documents.
§ 5.1.2 The period covered by each Application for Payment shall be one calendar month ending on the last day of the month, or as follows:
§ 5.1.3 Provided that an Application for Payment is received by the Architect not later than the last day of a month, the Owner shall make payment of the amount certified to the Contractor not later than the last day of the following month. If an Application for Payment is received by the Architect after the application date fixed above, payment of the amount certified shall be made by the Owner not later than thirty ( 30 ) days after the Architect receives the Application for Payment.
(Federal, state or local laws may require payment within a certain period of time.)
§ 5.1.4 Each Application for Payment shall be based on the most recent schedule of values submitted by the Contractor in accordance with the Contract Documents. The schedule of values shall allocate the entire Contract Sum among the various portions of the Work. The schedule of values shall be prepared in such form, and supported by such data to substantiate its accuracy, as the Architect may require. This schedule of values shall be used as a basis for reviewing the Contractor’s Applications for Payment.
§ 5.1.5 Applications for Payment shall show the percentage of completion of each portion of the Work as of the end of the period covered by the Application for Payment.
§ 5.1.6 In accordance with AIA Document A201™–2017, General Conditions of the Contract for Construction, and subject to other provisions of the Contract Documents, the amount of each progress payment shall be computed as follows:
§ 5.1.6.1 The amount of each progress payment shall first include:
.1 That portion of the Contract Sum properly allocable to completed Work;
.2 That portion of the Contract Sum properly allocable to materials and equipment delivered and suitably stored at the site for subsequent incorporation in the completed construction, or, if approved in advance by the Owner, suitably stored off the site at a location agreed upon in writing; and
.3 That portion of Construction Change Directives that the Architect determines, in the Architect’s professional judgment, to be reasonably justified.
§ 5.1.6.2 The amount of each progress payment shall then be reduced by:
.1 The aggregate of any amounts previously paid by the Owner;
.2 The amount, if any, for Work that remains uncorrected and for which the Architect has previously withheld a Certificate for Payment as provided in Article 9 of AIA Document A201–2017;
.3 Any amount for which the Contractor does not intend to pay a Subcontractor or material supplier, unless the Work has been performed by others the Contractor intends to pay;
.4 For Work performed or defects discovered since the last payment application, any amount for which the Architect may withhold payment, or nullify a Certificate of Payment in whole or in part, as provided in Article 9 of AIA Document A201–2017; and
.5 Retainage withheld pursuant to Section 5.1.7.
AIA Document A101® – 2017. Copyright © 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. The “American Institute of Architects,” “AIA,” the AIA Logo, "A101," and “AIA Contract Documents” are registered trademarks and may not be used without permission. This document was produced by AIA software at 09:53:14 ET on 01/09/2022 under Order No.2114239965 which expires on 09/28/2022, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org.
User Notes: (3B9ADA45)
§ 5.1.7 Retainage § 5.1.7.1 For each progress payment made prior to Substantial Completion of the Work, the Owner may withhold the following amount, as retainage, from the payment otherwise due:
(Insert a percentage or amount to be withheld as retainage from each Application for Payment. The amount of retainage may be limited by governing law.)
3.5%
§ 5.1.7.1.1 The following items are not subject to retainage:
(Insert any items not subject to the withholding of retainage, such as general conditions, insurance, etc.)
None
§ 5.1.7.2 Reduction or limitation of retainage, if any, shall be as follows:
(If the retainage established in Section 5.1.7.1 is to be modified prior to Substantial Completion of the entire Work, including modifications for Substantial Completion of portions of the Work as provided in Section 3.3.2, insert provisions for such modifications.)
None
§ 5.1.7.3 Except as set forth in this Section 5.1.7.3, upon Substantial Completion of the Work, the Contractor may submit an Application for Payment that includes the retainage withheld from prior Applications for Payment pursuant to this Section 5.1.7. The Application for Payment submitted at Substantial Completion shall not include retainage as follows:
(Insert any other conditions for release of retainage upon Substantial Completion.)
None
§ 5.1.8 If final completion of the Work is materially delayed through no fault of the Contractor, the Owner shall pay the Contractor any additional amounts in accordance with Article 9 of AIA Document A201–2017.
§ 5.1.9 Except with the Owner’s prior approval, the Contractor shall not make advance payments to suppliers for materials or equipment which have not been delivered and stored at the site.
§ 5.2 Final Payment § 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when
.1 the Contractor has fully performed the Contract except for the Contractor’s responsibility to correct Work as provided in Article 12 of AIA Document A201–2017, and to satisfy other requirements, if any, which extend beyond final payment; and
.2 a final Certificate for Payment has been issued by the Architect.
§ 5.2.2 The Owner’s final payment to the Contractor shall be made no later than 30 days after the issuance of the Architect’s final Certificate for Payment, or as follows:
N/A
§ 5.3 Interest Payments due and unpaid under the Contract shall bear interest from the date payment is due at the rate stated below, or in the absence thereof, at the legal rate prevailing from time to time at the place where the Project is located.
(Insert rate of interest agreed upon, if any.)
None % None
AIA Document A101® – 2017. Copyright © 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. The “American Institute of Architects,” “AIA,” the AIA Logo, "A101," and “AIA Contract Documents” are registered trademarks and may not be used without permission. This document was produced by AIA software at 09:53:14 ET on 01/09/2022 under Order No.2114239965 which expires on 09/28/2022, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org.
User Notes: (3B9ADA45)
ARTICLE 6 DISPUTE RESOLUTION
§ 6.1 Initial Decision Maker The Architect will serve as the Initial Decision Maker pursuant to Article 15 of AIA Document A201–2017, unless the parties appoint below another individual, not a party to this Agreement, to serve as the Initial Decision Maker.
(If the parties mutually agree, insert the name, address and other contact information of the Initial Decision Maker, if other than the Architect.)
§ 6.2 Binding Dispute Resolution For any Claim subject to, but not resolved by, mediation pursuant to Article 15 of AIA Document A201–2017, the method of binding dispute resolution shall be as follows:
(Check the appropriate box.)
[ X ] Arbitration pursuant to Section 15.4 of AIA Document A201–2017
[ ] Litigation in a court of competent jurisdiction
[ ] Other (Specify)
If the Owner and Contractor do not select a method of binding dispute resolution, or do not subsequently agree in writing to a binding dispute resolution method other than litigation, Claims will be resolved by litigation in a court of competent jurisdiction.
ARTICLE 7 TERMINATION OR SUSPENSION
§ 7.1 The Contract may be terminated by the Owner or the Contractor as provided in Article 14 of AIA Document A201–2017.
§ 7.1.1 If the Contract is terminated for the Owner’s convenience in accordance with Article 14 of AIA Document A201–2017, then the Owner shall pay the Contractor a termination fee as follows:
(Paragraph Deleted)
§ 7.2 The Work may be suspended by the Owner as provided in Article 14 of AIA Document A201–2017.
ARTICLE 8 MISCELLANEOUS PROVISIONS
§ 8.1 Where reference is made in this Agreement to a provision of AIA Document A201–2017 or another Contract Document, the reference refers to that provision as amended or supplemented by other provisions of the Contract Documents.
§ 8.2 The Owner’s representative:
(Name, address, email address, and other information)
§ 8.3 The Contractor’s representative:
(Name, address, email address, and other information)
AIA Document A101® – 2017. Copyright © 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. The “American Institute of Architects,” “AIA,” the AIA Logo, "A101," and “AIA Contract Documents” are registered trademarks and may not be used without permission. This document was produced by AIA software at 09:53:14 ET on 01/09/2022 under Order No.2114239965 which expires on 09/28/2022, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org.
User Notes: (3B9ADA45)
§ 8.4 Neither the Owner’s nor the Contractor’s representative shall be changed without ten days’ prior notice to the other party.
§ 8.5 Insurance and Bonds § 8.5.1 The Owner and the Contractor shall purchase and maintain insurance as set forth in AIA Document A101™– 2017, Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum, Exhibit A, Insurance and Bonds, and elsewhere in the Contract Documents.
§ 8.5.2 The Contractor shall provide bonds as set forth in AIA Document A101™–2017 Exhibit A, and elsewhere in the Contract Documents.
§ 8.6 Notice in electronic format, pursuant to Article 1 of AIA Document A201–2017, may be given in accordance with AIA Document E203™–2013, Building Information Modeling and Digital Data Exhibit, if completed, or as otherwise set forth below:
(Paragraphs Deleted)
ARTICLE 9…
This is the start of the file's text. The full file is on GovTribe.
Other files
| File | Type | Posted |
|---|---|---|
| 679-22-0108-1a addendum | — | |
| Award Information | — | |
| 679-22-0108-1-2 | — |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .