1315747A: JARDINE WATER PURIFICATION PLANT SEDIMENT FORCE MAIN IMPROVEMENTS
Solicitation number
67221,6
Issued by
Cook County, Illinois

About this file

This is a construction solicitation document issued by the City of Chicago Department of Water Management for the Jardine Water Purification Plant Sediment Force Main Improvements project (Specification Number 1315747A, DWM Project No. 18-302). The project involves rehabilitating the existing 18-inch diameter ductile iron sediment force main through close-fit HDPE liner insertion, installing new segments of 18-inch ductile iron force main where necessary, constructing a permanent 16-inch HDPE bypass pipeline, installing a new permanent bypass pump system within the plant building, and performing associated surface restoration work including concrete sidewalk and pavement removal/replacement, topsoil seeding, and temporary erosion control. The scope encompasses 28 line items with quantities ranging from individual lump sum items to linear footage measurements (e.g., 3,500 linear feet of compression-fit sliplining outside void space, 900 linear feet of horizontal directional drilling installation). The pre-bid conference is scheduled for April 29, 2026, at 10:00 a.m. Central Time at Jardine Water Purification Plant with an on-site visit immediately following at 11:00 a.m.; pre-registration closes April 28, 2026, at 2:00 p.m. The deadline for submitting questions is June 10, 2026, with the bid submittal deadline of July 17, 2026, at 11:00 a.m. Central Time via the City's eProcurement portal. The need-by date for project completion is June 4, 2027.

The contract requires a 5% bid deposit and a 100% performance bond of the total base bid. The project has contract-specific goals of 9.2% Minority Business Enterprise (MBE) participation and 1.4% Women Business Enterprise (WBE) participation. The work is funded through federal dollars via the USEPA Drinking Water State Revolving Loan Fund as administered by the Illinois Environmental Protection Agency (IEPA). The base bid must comply with Build America, Buy America (BABA) Act and American Iron and Steel Requirements (AISR), requiring all iron, steel, manufactured products, and construction materials to be produced in the United States. The contractor must submit verification documentation and maintain a log of all iron and steel components meeting AISR compliance. The contractor is responsible for obtaining all necessary permits including IEPA permits, Department of Underground Coordination (OUC) permits, Chicago Park District access permits, and must comply with NPDES permit requirements for emergency discharge. The project operates around a 24/7 functioning water treatment facility, requiring work during normal daytime hours only unless written approval from the Commissioner is obtained. The contractor must furnish and maintain a fully equipped Commissioner's Field Office of at least 600 square feet with specified equipment, furniture, and utilities throughout the contract period.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

City Of Chicago Solicitation #67221,6

BRANDON JOHNSON SHARLA ROBERTS

MAYOR CHIEF PROCUREMENT OFFICER

Specification Number: 1315747A Type of Funding: FEDERAL Title: 1315747A: JARDINE WATER PURIFICATION PLANT SEDIMENT FORCE MAIN

IMPROVEMENTS

Construction Solicitation #67221,6 (BID)

JARDINE WATER PURIFICATION PLANT SEDIMENT FORCE MAIN

IMPROVEMENTS DWM PROJECT NO.: 18-302

Specification Number:1315747A

Required for use by: DEPARTMENT OF WATER MANAGEMENT

Bid/Proposal Submittal Date and Time: 11:00 AM Central Time, 22-SEP-2026

Deadline for Questions: 10:29 AM Central Time, 23-JUL-2026 Buyer: SANDOVAL, SADI Email Address: sadi.sandoval@cityofchicago.org Phone Number: 312-744-0728 Pre-Solicitation Conference Date and Time: 10:00 AM Central Time, 29-APR-2026 Pre-Solicitation Conference Location: Jardine Water Purification Plant, 1000 East Ohio Stret, Chicago, IL

60611 Site Visit Date & Time: N/A Site Visit Location: N/A

Please submit your response to:

http://www.cityofchicago.org/eProcurement iSupplier vendor portal registration is required.

Allow 3 business days to complete registration.

Specification Number: 1315747A Page 2 Type of Funding: FEDERAL Title: 1315747A: JARDINE WATER PURIFICATION PLANT SEDIMENT FORCE MAIN

IMPROVEMENTS

Table of Contents

1 Header Information

1.1 General Information

1.2 Terms

1.3 Requirements

1.4 Attachments

1.5 Response Rules

2 Price Schedule

2.1 Line Information

2.2 Line Details

2.2.1 Line 1

2.2.2 Line 2

2.2.3 Line 3

2.2.4 Line 4

2.2.5 Line 5

2.2.6 Line 6

2.2.7 Line 7

2.2.8 Line 8

2.2.9 Line 9

2.2.10 Line 10

2.2.11 Line 11

2.2.12 Line 12

2.2.13 Line 13

2.2.14 Line 14

2.2.15 Line 15

2.2.16 Line 16

2.2.17 Line 17

2.2.18 Line 18

2.2.19 Line 19

2.2.20 Line 20

Specification Number: 1315747A Page 3 Type of Funding: FEDERAL Title: 1315747A: JARDINE WATER PURIFICATION PLANT SEDIMENT FORCE MAIN

IMPROVEMENTS

2.2.21 Line 21

2.2.22 Line 22

2.2.23 Line 23

2.2.24 Line 24

2.2.25 Line 25

2.2.26 Line 26

2.2.27 Line 27

2.2.28 Line 28

Specification Number: 1315747A Page 4 Type of Funding: FEDERAL Title: 1315747A: JARDINE WATER PURIFICATION PLANT SEDIMENT FORCE MAIN

IMPROVEMENTS

1 Header Information

1.1 General Information

Title 1315747A: JARDINE WATER PURIFICATION PLANT SEDIMENT

FORCE MAIN IMPROVEMENTS

Description JARDINE WATER PURIFICATION PLANT

SEDIMENT FORCE MAIN IMPROVEMENTS

DWM PROJECT NO.: 18-302

Amendment Date 01-SEP-2026 07:44:27 Amendment

Description ADDENDUM No. 5

Preview Date 20-APR-2026 10:00:00 Open Date 20-APR-2026 10:00:00 Close Date 11:00 AM Central

Time, 22-SEP-2026 Award Date Not Specified

Time Zone Central Time Buyer SANDOVAL, SADI Quote Style Sealed Email sadi.sandoval@cityofchicago.

org Event Construction Outcome Standard Purchase Order

1.2 Terms

Ship-To Address C09

VARIOUS NEW

CONSTRUCTION

SITES

CHICAGO, ILLINOIS

Chicago, IL United States

Bill-To Address C09

VARIOUS NEW

CONSTRUCTION SITES

CHICAGO, ILLINOIS

Chicago, IL United States

Payment Terms IMMEDIATE Carrier FOB Freight Terms

1.3 Requirements

<B>KEY SOLICITATION PARAMETERS</B>

BID DEPOSIT: 5%

Type No Response Required

PERFORMANCE BOND: 100% OF TOTAL BASE BID

Type No Response Required

CONTRACT SPECIFIC GOALS: 9.2% MBE / 1.4% WBE / 0% VBE

Type No Response Required

DPS UNIT: CONSTRUCTION

Type No Response Required

DRAWINGS: YES

Type No Response Required Value Type Numeric Value only

MAPS: SEE BOOK 2

Type No Response Required Value Type Numeric Value only

Specification Number: 1315747A Page 5 Type of Funding: FEDERAL Title: 1315747A: JARDINE WATER PURIFICATION PLANT SEDIMENT FORCE MAIN

IMPROVEMENTS

<B>KEY SOLICITATION PARAMETERS</B>

PRE-BID/PRE-PROPOSAL CONFERENCE: April 29, 2026,at 10:00 a.m., Central Time via in-person meeting at: Jardine Water Purification Plant, 1000 East Ohio Stret, Chicago, IL 60611. Immediately followed by on-site visit at 11:00 a.m., Central Timeat: Jardine Water Purification Plant, 1000 East Ohio Stret, Chicago, IL 60611. All Attendees must pre-register to participate. Registration closes at 2:00 p.m. on April 28, 2026.

Type No Response Required Enter the EDS number from your EDS Certificate and attach the certificate.

Value Type Numeric Value only Provide your answer below

1.4 Attachments

Name Data Type Description

ATTACHMENT 001:

ADDENDUM 03

File ATTACHMENT 001: ADDENDUM 03

ATTACHMENT 002 -

ADDENDUM 4

File ATTACHMENT 002 - ADDENDUM 4

ATTACHMENT 003:

ADDENDUM 5

File ATTACHMENT 003: ADDENDUM 5

ATTACHMENT 01:

ADDENDUM 1

File ATTACHMENT 01: ADDENDUM 1

ATTACHMENT 02: eProc

APPENDIX

File ATTACHMENT 02: eProc APPENDIX

ATTACHMENT 03: BOOK

File ATTACHMENT 03: BOOK 1

ATTACHMENT 04: BOOK

File ATTACHMENT 04: BOOK 2

ATTACHMENT 05: BOOK

File ATTACHMENT 05: BOOK 3

ATTACHMENT 06:

DRAWINGS

File ATTACHMENT 06: DRAWINGS

Attachment 00: Addendum

File Attachment 00: Addendum 02

1.5 Response Rules

Solicitation is restricted to invited suppliers Suppliers are allowed to view other suppliers' contract terms, notes and attachments Suppliers are allowed to respond to selected lines X Suppliers are required to respond with full quantity on each line X Suppliers are allowed to provide multiple responses Buyer may close the solicitation before the Close Date Buyer may manually extend the solicitation while it is open

Specification Number: 1315747A Page 6 Type of Funding: FEDERAL Title: 1315747A: JARDINE WATER PURIFICATION PLANT SEDIMENT FORCE MAIN

IMPROVEMENTS

2 Price Schedule

2.1 Line Information

Display Rank As No indicator displayed

Ranking Price Only Cost Factors None

Line Item, Rev Target Quantity

Unit Unit Price Amount

1 Lump Sum Price Work (Items

1 Lump Sum

2 Traffic Control and Protection

1 Lump Sum

3 18-INCH DUCTILE

IRON SEDIMENT

FORCE MAIN, OPEN-

CUT

INSTALLATION,

OUTSIDE OF VOID

SPACE

250 Linear Foot

4 18-INCH DUCTILE

IRON SEDIMENT

FORCE MAIN, OPEN-

CUT

INSTALLATION,

INSIDE OF VOID

SPACE

155 Linear Foot

5 18-INCH DUCTILE

IRON SEDIMENT

FORCE MAIN,

HORIZONTAL

DIRECTIONAL

DRILLING

INSTALLATION,

OUTSIDE OF VOID

SPACE

900 Linear Foot

6 18-INCH DUCTILE

IRON SEDIMENT

FORCE MAIN,

HORIZONTAL

DIRECTIONAL

DRILLING

INSTALLATION,

INSIDE OF VOID

SPACE

33 Linear Foot

7 18-INCH

SEDIMENT FORCE

MAIN,

COMPRESSION-FIT

SLIPLINING,

OUTSIDE OF VOID

SPACE

3,500 Linear Foot

8 18-INCH

SEDIMENT FORCE

MAIN,

COMPRESSION-FIT

SLIPLINING, INSIDE

OF VOID SPACE

800 Linear Foot

Specification Number: 1315747A Page 7 Type of Funding: FEDERAL Title: 1315747A: JARDINE WATER PURIFICATION PLANT SEDIMENT FORCE MAIN

IMPROVEMENTS

Line Item, Rev Target Quantity

Unit Unit Price Amount

9 AIR RELEASE

VALVE AND VAULT

REMOVAL AND

REPLACEMENT

1 Each

10 16-INCH HDPE

PERMANENT

BYPASS PIPING,

OPEN-CUT

INSTALLATION,

OUTSIDE OF VOID

SPACE

130 Linear Foot

11 16-INCH HDPE

PERMANENT

BYPASS PIPING,

OPEN-CUT

INSTALLATION,

INSIDE VOID SPACE

100 Linear Foot

12 16-INCH HDPE

PERMANENT

BYPASS PIPING,

HORIZONTAL

DIRECTIONAL

DRILLING

INSTALLATION,

OUTSIDE OF VOID

SPACE

956 Linear Foot

13 16-INCH HDPE

PERMANENT

BYPASS PIPING,

HORIZONTAL

DIRECTIONAL

DRILLING

INSTALLATION,

INSIDE VOID SPACE

880 Linear Foot

14 16-INCH HDPE

PERMANENT

ISOLATION VALVE

AND VALVE VAULT

2 Each

15 CONNECTION OF

16-INCH

PERMANENT

BYPASS PIPING TO

EXISTING SEWER

1 Lump Sum

16 EMERGENCY

BYPASS SYSTEM

1 Lump Sum

17 PERMANENT

BYPASS PUMP AND

ASSOCIATED

PIPING AND

APPURTENANCES

WITHIN JWPP

BUILDING

1 Lump Sum

18 ABANDONMENT

OF 18-INCH

SEDIMENT FORCE

MAIN

591 Linear Foot

Specification Number: 1315747A Page 8 Type of Funding: FEDERAL Title: 1315747A: JARDINE WATER PURIFICATION PLANT SEDIMENT FORCE MAIN

IMPROVEMENTS

Line Item, Rev Target Quantity

Unit Unit Price Amount

19 CONCRETE

SIDEWALK,

REMOVAL AND

REPLACEMENT

250 Square Yard

20 CONCRETE

PAVEMENT AND

MARKINGS,

REMOVAL AND

REPLACEMENT

150 Square Yard

21 HMA (HOT MIX

ASPHALT)

PAVEMENT AND

MARKINGS,

REMOVAL AND

REPLACEMENT

1,000 Square Yard

22 TOP SOIL AND

SEEDING

RESTORATION

100 Square Yard

23 TEMPORARY

EROSION AND

SEDIMENT

CONTROL

1 Lump Sum

24 Allowance Item No.

1 - SOIL TESTING

AND REMOVAL

AND DISPOSAL OF

HAZARDOUS SOILS.

1 Lump Sum

25 Allowance Item No.

2 - REMOVE

EXISTING SEWER

MANHOLE OR

CATCH BASIN AND

REPLACE WITH

NEW STRUCTURE

1 Lump Sum

26 Allowance Item No.

3 - REMOVE

EXISTING SEWER

INLET AND

REPLACE WITH

NEW STRUCTURE

1 Lump Sum

27 Allowance Item No.

4 - TREE REMOVAL

AND

REPLACEMENT

1 Lump Sum

28 Allowance Item No.

5 - SUPPLEMENTAL

OPERATION OF

TEMPORARY

EMERGENCY

BYPASS SYSTEM

1 Lump Sum

Specification Number: 1315747A Page 9 Type of Funding: FEDERAL Title: 1315747A: JARDINE WATER PURIFICATION PLANT SEDIMENT FORCE MAIN

IMPROVEMENTS

2.2 Line Details

2.2.1 Line 1 Lump Sum Price Work (Items

Category 90626. Start Price (USD) Not Specified

Need-By Date 04-JUN-2027 00:00:00 to

04-JUN-2027 00:00:00

Target Price (USD) Not Specified

Ship-To Address C09

VARIOUS NEW

CONSTRUCTION

SITES

CHICAGO, ILLINOIS

Chicago, IL United States

2.2.2 Line 2 Traffic Control and Protection

Category 91360. Start Price (USD) Not Specified

Need-By Date Not Specified Target Price (USD) Not Specified Ship-To Address C09

VARIOUS NEW

CONSTRUCTION

SITES

CHICAGO, ILLINOIS

Chicago, IL United States

2.2.3 Line 3 18-INCH DUCTILE IRON SEDIMENT FORCE MAIN, OPEN-CUT INSTALLATION, OUTSIDE OF VOID SPACE

Category 91360. Start Price (USD) Not Specified Need-By Date Not Specified Target Price (USD) Not Specified

Ship-To Address C09

VARIOUS NEW

CONSTRUCTION

SITES

CHICAGO, ILLINOIS

Chicago, IL United States

2.2.4 Line 4 18-INCH DUCTILE IRON SEDIMENT FORCE MAIN, OPEN-CUT INSTALLATION, INSIDE OF VOID SPACE

Category 91360. Start Price (USD) Not Specified Need-By Date Not Specified Target Price (USD) Not Specified

Ship-To Address C09

VARIOUS NEW

CONSTRUCTION

SITES

CHICAGO, ILLINOIS

Chicago, IL United States

Specification Number: 1315747A Page 10 Type of Funding: FEDERAL Title: 1315747A: JARDINE WATER PURIFICATION PLANT SEDIMENT FORCE MAIN

IMPROVEMENTS

2.2.5 Line 5 18-INCH DUCTILE IRON SEDIMENT FORCE MAIN, HORIZONTAL

DIRECTIONAL DRILLING INSTALLATION, OUTSIDE OF VOID SPACE

Category 91360. Start Price (USD) Not Specified Need-By Date Not Specified Target Price (USD) Not Specified

Ship-To Address C09

VARIOUS NEW

CONSTRUCTION

SITES

CHICAGO, ILLINOIS

Chicago, IL United States

2.2.6 Line 6 18-INCH DUCTILE IRON SEDIMENT FORCE MAIN, HORIZONTAL

DIRECTIONAL DRILLING INSTALLATION, INSIDE OF VOID SPACE

Category 91360. Start Price (USD) Not Specified Need-By Date Not Specified Target Price (USD) Not Specified

Ship-To Address C09

VARIOUS NEW

CONSTRUCTION

SITES

CHICAGO, ILLINOIS

Chicago, IL United States

2.2.7 Line 7 18-INCH SEDIMENT FORCE MAIN, COMPRESSION-FIT SLIPLINING, OUTSIDE

OF VOID SPACE

Category 91360. Start Price (USD) Not Specified Need-By Date Not Specified Target Price (USD) Not Specified

Ship-To Address C09

VARIOUS NEW

CONSTRUCTION

SITES

CHICAGO, ILLINOIS

Chicago, IL United States

2.2.8 Line 8 18-INCH SEDIMENT FORCE MAIN, COMPRESSION-FIT SLIPLINING, INSIDE OF

VOID SPACE

Category 91360. Start Price (USD) Not Specified Need-By Date Not Specified Target Price (USD) Not Specified

Ship-To Address C09

VARIOUS NEW

CONSTRUCTION

SITES

CHICAGO, ILLINOIS

Specification Number: 1315747A Page 11 Type of Funding: FEDERAL Title: 1315747A: JARDINE WATER PURIFICATION PLANT SEDIMENT FORCE MAIN

IMPROVEMENTS

2.2.9 Line 9 AIR RELEASE VALVE AND VAULT REMOVAL AND REPLACEMENT Category 91360. Start Price (USD) Not Specified

Need-By Date Not Specified Target Price (USD) Not Specified Ship-To Address C09

VARIOUS NEW

CONSTRUCTION

SITES

CHICAGO, ILLINOIS

Chicago, IL United States

2.2.10 Line 10 16-INCH HDPE PERMANENT BYPASS PIPING, OPEN-CUT INSTALLATION, OUTSIDE OF VOID SPACE

Category 91360. Start Price (USD) Not Specified Need-By Date Not Specified Target Price (USD) Not Specified

Ship-To Address C09

VARIOUS NEW

CONSTRUCTION

SITES

CHICAGO, ILLINOIS

Chicago, IL United States

2.2.11 Line 11 16-INCH HDPE PERMANENT BYPASS PIPING, OPEN-CUT INSTALLATION, INSIDE VOID SPACE

Category 91360. Start Price (USD) Not Specified Need-By Date Not Specified Target Price (USD) Not Specified

Ship-To Address C09

VARIOUS NEW

CONSTRUCTION

SITES

CHICAGO, ILLINOIS

Chicago, IL United States

2.2.12 Line 12 16-INCH HDPE PERMANENT BYPASS PIPING, HORIZONTAL DIRECTIONAL

DRILLING INSTALLATION, OUTSIDE OF VOID SPACE

Category 91360. Start Price (USD) Not Specified Need-By Date Not Specified Target Price (USD) Not Specified

Ship-To Address C09

VARIOUS NEW

CONSTRUCTION

SITES

CHICAGO, ILLINOIS

Specification Number: 1315747A Page 12 Type of Funding: FEDERAL Title: 1315747A: JARDINE WATER PURIFICATION PLANT SEDIMENT FORCE MAIN

IMPROVEMENTS

2.2.13 Line 13 16-INCH HDPE PERMANENT BYPASS PIPING, HORIZONTAL DIRECTIONAL

DRILLING INSTALLATION, INSIDE VOID SPACE

Category 91360. Start Price (USD) Not Specified Need-By Date Not Specified Target Price (USD) Not Specified

Ship-To Address C09

VARIOUS NEW

CONSTRUCTION

SITES

CHICAGO, ILLINOIS

Chicago, IL United States

2.2.14 Line 14 16-INCH HDPE PERMANENT ISOLATION VALVE AND VALVE VAULT Category 91360. Start Price (USD) Not Specified

Need-By Date Not Specified Target Price (USD) Not Specified Ship-To Address C09

VARIOUS NEW

CONSTRUCTION

SITES

CHICAGO, ILLINOIS

Chicago, IL United States

2.2.15 Line 15 CONNECTION OF 16-INCH PERMANENT BYPASS PIPING TO EXISTING

SEWER

Category 91360. Start Price (USD) Not Specified Need-By Date Not Specified Target Price (USD) Not Specified

Ship-To Address C09

VARIOUS NEW

CONSTRUCTION

SITES

CHICAGO, ILLINOIS

Chicago, IL United States

2.2.16 Line 16 EMERGENCY BYPASS SYSTEM

Category 91360. Start Price (USD) Not Specified

Need-By Date Not Specified Target Price (USD) Not Specified Ship-To Address C09

VARIOUS NEW

CONSTRUCTION

SITES

CHICAGO, ILLINOIS

Specification Number: 1315747A Page 13 Type of Funding: FEDERAL Title: 1315747A: JARDINE WATER PURIFICATION PLANT SEDIMENT FORCE MAIN

IMPROVEMENTS

2.2.17 Line 17 PERMANENT BYPASS PUMP AND ASSOCIATED PIPING AND

APPURTENANCES WITHIN JWPP BUILDING

Category 91360. Start Price (USD) Not Specified Need-By Date Not Specified Target Price (USD) Not Specified

Ship-To Address C09

VARIOUS NEW

CONSTRUCTION

SITES

CHICAGO, ILLINOIS

Chicago, IL United States

2.2.18 Line 18 ABANDONMENT OF 18-INCH SEDIMENT FORCE MAIN

Category 91360. Start Price (USD) Not Specified

Need-By Date Not Specified Target Price (USD) Not Specified Ship-To Address C09

VARIOUS NEW

CONSTRUCTION

SITES

CHICAGO, ILLINOIS

Chicago, IL United States

2.2.19 Line 19 CONCRETE SIDEWALK, REMOVAL AND REPLACEMENT

Category 91360. Start Price (USD) Not Specified

Need-By Date Not Specified Target Price (USD) Not Specified Ship-To Address C09

VARIOUS NEW

CONSTRUCTION

SITES

CHICAGO, ILLINOIS

Chicago, IL United States

2.2.20 Line 20 CONCRETE PAVEMENT AND MARKINGS, REMOVAL AND REPLACEMENT Category 91360. Start Price (USD) Not Specified

Need-By Date Not Specified Target Price (USD) Not Specified Ship-To Address C09

VARIOUS NEW

CONSTRUCTION

SITES

CHICAGO, ILLINOIS

Specification Number: 1315747A Page 14 Type of Funding: FEDERAL Title: 1315747A: JARDINE WATER PURIFICATION PLANT SEDIMENT FORCE MAIN

IMPROVEMENTS

2.2.21 Line 21 HMA (HOT MIX ASPHALT) PAVEMENT AND MARKINGS, REMOVAL AND

REPLACEMENT

Category 91360. Start Price (USD) Not Specified Need-By Date Not Specified Target Price (USD) Not Specified

Ship-To Address C09

VARIOUS NEW

CONSTRUCTION

SITES

CHICAGO, ILLINOIS

Chicago, IL United States

2.2.22 Line 22 TOP SOIL AND SEEDING RESTORATION

Category 91360. Start Price (USD) Not Specified

Need-By Date Not Specified Target Price (USD) Not Specified Ship-To Address C09

VARIOUS NEW

CONSTRUCTION

SITES

CHICAGO, ILLINOIS

Chicago, IL United States

2.2.23 Line 23 TEMPORARY EROSION AND SEDIMENT CONTROL

Category 91360. Start Price (USD) Not Specified

Need-By Date Not Specified Target Price (USD) Not Specified Ship-To Address C09

VARIOUS NEW

CONSTRUCTION

SITES

CHICAGO, ILLINOIS

Chicago, IL United States

2.2.24 Line 24 Allowance Item No. 1 - SOIL TESTING AND REMOVAL AND DISPOSAL OF

HAZARDOUS SOILS.

Category 91360. Start Price (USD) Not Specified Need-By Date Not Specified Target Price (USD) Not Specified

Ship-To Address C09

VARIOUS NEW

CONSTRUCTION

SITES

CHICAGO, ILLINOIS

Specification Number: 1315747A Page 15 Type of Funding: FEDERAL Title: 1315747A: JARDINE WATER PURIFICATION PLANT SEDIMENT FORCE MAIN

IMPROVEMENTS

2.2.25 Line 25 Allowance Item No. 2 - REMOVE EXISTING SEWER MANHOLE OR CATCH

BASIN AND REPLACE WITH NEW STRUCTURE

Category 91360. Start Price (USD) Not Specified Need-By Date Not Specified Target Price (USD) Not Specified

Ship-To Address C09

VARIOUS NEW

CONSTRUCTION

SITES

CHICAGO, ILLINOIS

Chicago, IL United States

2.2.26 Line 26 Allowance Item No. 3 - REMOVE EXISTING SEWER INLET AND REPLACE

WITH NEW STRUCTURE

Category 91360. Start Price (USD) Not Specified Need-By Date Not Specified Target Price (USD) Not Specified

Ship-To Address C09

VARIOUS NEW

CONSTRUCTION

SITES

CHICAGO, ILLINOIS

Chicago, IL United States

2.2.27 Line 27 Allowance Item No. 4 - TREE REMOVAL AND REPLACEMENT Category 91360. Start Price (USD) Not Specified

Need-By Date Not Specified Target Price (USD) Not Specified Ship-To Address C09

VARIOUS NEW

CONSTRUCTION

SITES

CHICAGO, ILLINOIS

Chicago, IL United States

2.2.28 Line 28 Allowance Item No. 5 - SUPPLEMENTAL OPERATION OF TEMPORARY

EMERGENCY BYPASS SYSTEM

Category 91360. Start Price (USD) Not Specified Need-By Date Not Specified Target Price (USD) Not Specified

Ship-To Address C09

VARIOUS NEW

CONSTRUCTION

SITES

CHICAGO, ILLINOIS

ADDENDUM NO. 2 / SPECIFICATION NO. 1315747A

V. 12.14.24

June 1, 2026

ADDENDUM NO. 2

FOR

Jardine Water Purification Plant Sediment Force Main Improvements

SPECIFICATION NO. 1315747A RFQ 67221, 3

For which Bids are scheduled to be received electronically on the eProcurement site, http://www.cityofchicago.org/eProcurement no later than 11:00 a.m., Central Time on June 12, 2026.

The following questions/answers will be incorporated in the above-referenced Specification (the “Contract Documents”) as noted. All other provisions and requirements as originally set forth, except as amended by previous addenda, remain in full force and are binding. Any additional work required by this Addendum shall conform to the applicable provisions of the original Contract Documents. Any and all addenda must be acknowledged by the Respondent in the Cover Letter of its response by referencing receipt of each Addendum number.

The City’s answers to submitted questions will be forthcoming in a future Addendum.

RESPONDENT MUST ACKNOWLEDGE RECEIPT OF THIS ADDENDUM

IN THE PROPOSAL PAGE IN iSUPPLIER

SECTION 1. NOTICE OF REVISIONS/CHANGES/CLARIFICATIONS

REVISION DESCRIPTIONS

1. Revised Bid Due Date to July 17, 2026

2. Revised Questions Due Date to June 10, 2026

3.

Book 3 – Technical Specifications

1. Table of Contents:

a. Add Section 01 11 10 (American Iron and Steel Requirements) and 01 11 20

(Build America Buy America).

4.

Book 3 – Technical Specifications

1. Section 01 10 00, Summary

a. Replaced Summary language – Attachment A

5.

Book 3 – Technical Specifications

1. Add Section 01 11 10, American Iron and Steel Requirements as attached to this Addendum – Attachment B

6.

Book 3 – Technical Specifications

1. Add Section 01 11 20, Build America, Buy America Act as attached to this Addendum

– Attachment C

7.

1. Drawing G-1, INDEX OF DRAWINGS

1. Add the following lines to Index:

REFERENCE

57-103 RF-01 through RF-46 Reference Drawings

8.

1. Drawing C-13, PROPOSED PLAN

a. Delete note that reads “CONTRACTOR TO DESIGN AND PROVIDE ERS

PER SECTION 02 33 44”

b. Add note to read “CONTRACTOR TO DESIGN AND PROVIDE ERS PER

SECTION 02 03 44”

9.

1. Drawing C-13, PROPOSED SFM PROFILE

a. Delete note that reads “CONTRACTOR TO DESIGN AND PROVIDE ERS

PER SECTION 02 33 44”

b. Add note to read “CONTRACTOR TO DESIGN AND PROVIDE ERS PER

SECTION 02 03 44”

10.

1. Drawing C-13, PROPOSED BYPASS PROFILE

a. Delete note that reads “CONTRACTOR TO DESIGN AND PROVIDE ERS

PER SECTION 02 33 44”

b. Add note to read “CONTRACTOR TO DESIGN AND PROVIDE ERS PER

SECTION 02 03 44”

11. 1. Add Reference Drawings RF-1 through RF-46 as attached to this Addendum –

Attachment D - DrawingsAttachment D - Drawings

Attachment D - Drawings

Attachment D - Drawings

Attachment D - Drawings

Attachment D - Drawings

SECTION 2. QUESTIONS AND ANSWERS/CLARIFICATIONS

The following questions and requests for clarification were submitted in accordance with the instructions provided in the Contract Documents. The City’s response follows each question or request for clarification in the table below:

Question 1: Can the bid due date be extended 1-month?

Answer: The bid due date has been extended to July 17th, 2026.

Question 2: Sheet 19 of 56 Points to two locations and states “Contractor to design and provide ERS per Section 02 33 44. I did not see that 02 33 44 exists in the documentation shared. Please share.

Answer: Refer to Specification Section 02 03 44 Shoring, Sheeting, and Bracing.

Question 3: The Existing Force Main Profile is not shared from Sheet 19 to sheet 21 where the pipe connects back to the existing Steel Force Main. It is unclear what the depth of the existing main is and at what elevation it goes through the wall at STA 118+60. Can that information be provided?

Answer: Refer to Sheet 19 (C-13), CAP EXISTING 18” DI SFM (TO BE VERIFIED IN THE FIELD). The existing force main will be capped and abandoned at this location, refer to Note 3. Sheet 21 (C-15) Section A-A indicates an Invert Elevation of -9.75 for the 18” DI SFM. Section B-B indicates an Invert Elevation of -9.5 for the 18” DI SFM. The Contractor is responsible for field verification.

Limited reference drawings are provided with this addendum but may not reflect current conditions.

Question 4: Are the records of the existing 10” Sewer identified on Sheets 19-21. The pipe is nearly touching the existing 18” SFM from stations STA. 117+00 to STA. 109+55. Is it at the same elevation? Is it further away? Is it above head?

Answer: The 10” Sewer centerline elevation is approximately El. -8.5 through this area and is buried, similar to the 18” SFM. Note that work on SFM piping in this area is HDPE lining inside existing piping. Limited reference drawings are provided with this addendum but may not reflect current conditions.

Question 5: The only access identified to get underneath the deck/beams is show on Sheet 20 of 56 “Access Stairwell”. Can you identify the dimension of this doorway and any other access points to gain access to the excavation pits in this space?

Large amount of material to be installed, excavation required, large horizontal direction drill machine, pull equipment for the Compression FIT liner in this space.

Answer: Access to “void space” requires travel through overhead doors (119” W x 94” H) and then double “man” doors (66” W x 81” H) within the lower dock area of the plant. CDWM will also consider removal of masonry walls within this area to provide access with design sealed by a Structural Engineer licensed in the state of Illinois and restoration to existing conditions following construction. Sheet 20 (C-

14) indicates the stairwell is between columns 30 and 31.

Question 6: Can the height from dirt floor to column be identified on the drawings at the pit locations?

Answer: The height from dirt floor to column is 80” at the location of the stairwell. Note that conditions change towards either end of the “void space” from this location.

Limited reference drawings are provided with this addendum but may not reflect current conditions.

Question 7: Under the decking, in lieu of a HDPE liner, can a new HDPE line be installed to be the Sediment Force Main? If so, can this be installed via open cut and/or mounting to ceiling. Also, can the new Bypass line be installed via, open cut and/or mounting to ceiling under the decking?

Answer: Bid the installation per contract documents. Installation of unburied piping within the “void space” will not be considered based on freeze condition concerns.

Question 8: Has this project been consider to bid as a Design-Build given the challenges?

Answer: The existing construction contract was pursued as the most appropriate method to accomplish the work.

Question 9: Please extend the question deadline a minimum of six(6) weeks, as additional time is required to review the bid documents and submit questions to City of Chicago.

Answer: Based on extended bid due date, questions will be accepted excluding the 10 days preceding the new July 17th, 2026 bid due date. Therefore, the last day to submit questions is Friday, June 5, 2026.

Question 10: Please extend the bid opening deadline a minimum of six(6) weeks, as additional time is required to review the bid documents for constructability.

Answer: The bid due date has been extended to July 17, 2026.

ATTACHEMENT A

SECTION 01 10 00

SUMMARY

JWPP SEDIMENT FORCE

MAIN IMPROVEMENTS

MAY 2026 01 10 00-1 SUMMARY

SECTION 01 10 00

SUMMARY

PART 1 GENERAL

1.01 SCOPE OF WORK

The Scope of Work under this Contract consists of but is not limited to furnishing all labor, materials and equipment to rehabilitate, replace or provide the following.

1. Improvements to the Jardine Water Purification Plant’s (JWPP) sediment disposal system by rehabilitating the existing 18-inch diameter sediment force main and providing a new permanent bypass pump and a new 16-inch HDPE bypass pipeline that can be used when the existing sediment force main is taken out of service for rehabilitation or in the future for maintenance.

2. The existing 18-inch diameter ductile iron sediment force main will be rehabilitated by insertion of a close fit HDPE liner. Insertion of the liner will be at access pit openings created at various locations along the force main route (both inside the JWPP void space and in the public right-of-way). For areas that have difficulty to be rehabilitated by lining, a new segment of 18” ductile iron force main will be installed. Various appurtenances including but not limited to line valves, air release valves, fittings and manholes shall be provided on the rehabilitated pipeline.

3. A permanent 16-inch HDPE bypass pipeline from the JWPP will be installed and connected to an existing 24-inch sanitary sewer along Streeter Ave between Grand Ave and Illinois St. The bypass pipeline will be installed by horizontal directional drilling (HDD) and open cut construction as shown on the plans. A transition manhole with a flap gate will be installed to transition from force main to gravity sewer. A level sensor will be installed to monitor permanent bypass pumping in the existing sewer and integrated into JWPP’s SCADA system to assist for plant operations. A backflow valve and vault structure will be installed on the permanent bypass line upstream of the connection point to the existing 24-inch sanitary sewer to prevent sanitary sewer backups into the bypass line in JWPP and will only be open when the bypass pipeline is active.

Contractor shall submit CCTV of the existing sanitary sewer segment that the permanent bypass line is connecting into along with downstream segments prior and after the installation of the permanent bypass line connection, including a total of approximately 800-ft long for 24-inch, 27-inch, and 30-inch existing sewers. CCTVs shall be submitted to City of Chicago Sewer Department for review and approval. Repairs or lining of the existing sewer must be made as necessary prior to the connection of the bypass pipeline as requested by the City of Chicago Sewer Department. Contractor shall also maintain the existing conditions of the existing sewer during and after the permanent bypass line connection. Contractor shall provide a total of three (3) cleanings for the existing sewer, including two (2) cleanings for approximately 800-ft existing

MAY 2026 01 10 00-2 SUMMARY

sewer immediately downstream of the connection point during the installation, and one (1) cleaning for approximately 2,800 ft existing sewer along Illinois St from Streeter Drive to the MWRDGC sewer near St. Clair Street after the construction is complete.

4. One new horizontal solids handling screw centrifugal pump and associated appurtenances will be installed in the JWPP -15.0 elevation level adjacent to the existing sediment wet well pumps. The new pump will be a permanent bypass pump that will be used when the bypass line is in operation and its discharge rate will be controlled by modulating the valve manually.

5. The 12-inch steel emergency discharge piping will connect to the new permanent 16-inch HDPE pipeline via a tee in the void space and have permanent piping to the outside wall of the void space near the road. Temporary piping and filtration system for the emergency bypass will connect to the 12-inch emergency piping at the outside wall of the void space near the road. The NPDES Permit obtained from IEPA is included in Appendix C. Contractor shall install a temporary filtration system that can handle up to 1,800 gpm, including but not limited to temporary piping to the filtration system, road crossing ramp, barge(s), sediment and waste disposal and associated testing, start-up and testing, staff training, to comply with the NPDES permit. No filtration equipment is allowed on the roadway between the void space and the slip. This set up shall be ready on site for emergency discharge during the entire duration when the existing sediment force main is taken out of service for rehabilitation until the rehabilitated sediment force main is back in service as approved by the Commissioner. Supplier Rain-for-Rent is the basis of design for the filtration system as shown in the Contract documents. The filtration layout will be determined by the Contractor with the final selection of their supplier.

Contractor shall prepare monthly Discharge Monitoring Reports (DMR) throughout the entire duration of the entire project, with or without the emergency outlet being used. If the emergency outlet is used, Contractor shall monitor the parameters and test and record the sample(s) including but not limited to flow, pH, total residual chlorine, and total suspended solids per the NPDES permit. Changes of the filtration process or addition of any chemicals are not allowed without written approval from IEPA.

6. Other miscellaneous project work will include alterations to walls, floors or slabs within the JWPP to accommodate the pipeline routings, alterations to existing discharge piping to facilitate connections and electrical and instrumentation work required for the bypass pumping system.

7. The existing sediment force main is to be taken out of service for rehabilitation in the summer months of June through August during the low turbidity season of Lake Michigan, unless otherwise approved by the Commissioner. The new permanent bypass pump and pipeline system and the temporary bypass and filtration system must be installed and fully operational as approved by the Commissioner before the existing sediment force main can be taken out of service for rehabilitation. The project construction phasing requirements must

MAY 2026 01 10 00-3 SUMMARY

comply with the requirements in Specification SECTION 01 12 16 – WORK

SEQUENCE.

The Contractor must construct this Project in phases in accordance with the phasing requirements listed under these Specification SECTIONS.

The Contractor must provide items, articles, materials, operations and methods required by the Contract Drawings and Specification SECTIONS which must include labor, equipment, supplies and incidentals necessary for completion of the Work under this Contract.

Apparatus, appliance, material or Work not shown on the Drawings, but stated in these Specification SECTIONS, or any incidental accessories necessary to make the Work complete and ready for operation, even though not specified or shown on the Drawings must be furnished and installed without additional cost to the City.

Should there be any discrepancies or a question of intent, the Contractor must refer the matter to the Commissioner for decision before ordering any equipment, materials or before starting any related Work.

The Jardine Water Purification Plant operates 24 hours per day, 7 days per week, 52 weeks per year. The Contractor's operations under this Contract must not at any time interfere, stop or prevent the Jardine Water Purification Plant from filtering and processing water.

The Contractor’s Work hours under this Contract must be during the plant’s normal daytime working hours. Refer to Instructions and Execution Documents – Book 2.

The Contractor must obtain written approval by the Commissioner to Work during non-normal Working hours.

The Contractor must submit a written detailed “method of procedure” for each phase to the Commissioner for review a minimum of 30 days prior to starting that phase of Work.

The Contractor must submit a written procedure for the method of maintaining the utilities at the Jardine Water Purification Plant during construction.

1. This written procedure must include any electrical service interruptions. The

Contractor must maintain the existing electric utility service connection until the new electric service feeders are installed and appropriate loads are transferred.

2. This written procedure must include all temporary facilities required to maintain uninterrupted service at the Jardine Water Purification Plant during pipeline rehabilitation.

3. This written procedure must include temporary and emergency bypass pumping in the event the sediment force is offline and sediment discharge is necessary.

MAY 2026 01 10 00-4 SUMMARY

The Contractor must secure and pay for all required permits, governmental fees, taxes, and licenses necessary for proper execution and completion of the Work.

The Contractor must also provide all Work in accordance with Specification

SECTION 01 12 16 - WORK SEQUENCE.

Any specific references to environmental, health, or safety standards, laws, or regulations throughout this Volume III in no way limits the Contractor’s obligation with all Applicable Laws (Book 1, Section XXI.A.), including but not limited to all Environmental Laws (Book 1, Section XVII.A.), all applicable health and safety laws (Book 1, Section XVI).

1.02 RELATED DOCUMENTS

Work under this Specification SECTION is subject to requirements of the Contract Documents.

1.03 RELATED WORK

SECTION 01 11 10 – AMERICAN IRON AND STEEL REQUIREMENTS

SECTION 01 11 20 – BUILD AMERICA, BUY AMERICA ACT

SECTION 01 12 16 – WORK SEQUENCE

1.04 SUBMITTALS

Submittals must comply with the requirements of Specification SECTION 01 33

00 – SUBMITTAL PROCEDURES.

1.05 REFERENCES

Not Used.

1.06 DEFINITIONS

Not Used.

1.07 QUALITY ASSURANCE

Not Used.

1.08 WARRANTY

The Contractor must provide a warranty as required by the Terms and Conditions for Construction Contract - Book 1.

The Contractor must provide additional warranty requirements as detailed in each

MAY 2026 01 10 00-5 SUMMARY

individual Specification SECTION.

1.09 SYSTEM PERFORMANCE REQUIREMENTS

Not Used.

1.10 DELIVERY, STORAGE, AND HANDLING

Not Used.

1.11 FIELD MEASUREMENTS

Not Used.

1.12 PROJECT CONDITIONS

Not Used.

1.13 EXTRA MATERIALS

Not Used.

1.14 PHASING REQUIREMENTS

Project phasing must comply with the requirements under Specification SECTION

01 12 16 – WORK SEQUENCE.

1.15 PHASING CONSTRUCTION REQUIREMENTS

The Jardine Water Purification Plant operates 24 hours per day, 7 days per week, 52 weeks per year.

1. The Contractor's operations under this Contract must not at any time interfere, stop or prevent the Jardine Water Purification Plant from filtering the process water or discharging sediment.

2. Temporary interruptions or shutdown of any utility, or electrical/mechanical systems must be requested in writing from the Commissioner fourteen calendar days prior to the desired time.

a. The request must state the reason, date, exact time of, and approximate duration of such interruption.

b. The temporary interruptions or shutdowns must be done only at times and in the manner prescribed by the Commissioner.

c. The temporary interruptions or shutdowns must be done only after the

Contractor has received written permission from the Commissioner.

d. Each interruption or shutdown must require a separate written permission from the Commissioner.

MAY 2026 01 10 00-6 SUMMARY

3. The Contractor must construct temporary/dust tight partitions prior to the start of demolition for areas inside the JWPP building. The dust tight partitions must remain in place until the completion of that phase or subsequent phases where required.

4. The Contractor must perform all Work in or adjacent to the plant’s occupied areas in such a manner as to ensure that the City's operating personnel will have full access to the plant.

a. The continuous and uninterrupted use of occupied areas must include the applicable mechanical and electrical systems serving these areas which must be maintained.

b. This protection must be provided for personnel and equipment in occupied areas from the hazards and dust associated with a construction environment.

c. The Work areas must be kept clear, clean and free of loose debris, construction materials and partially installed Work which would create a safety hazard or interfere with personnel duties and traffic.

d. The Contractor must sweep/mop the areas clean at the end of each workday and make every effort to keep dust to a minimum at all times. The Contractor must make special effort to keep all Work areas clean at all times.

5. The sequence of Work must be in accordance with these Specification SECTIONS and as shown on the Drawings and as shown in the Contractor’s approved “method of procedure”. The Contractor must complete all Work in each phase with the Commissioner inspecting and accepting the Work prior to the Contractor proceeding to the next scheduled phase of Work.

6. The Contractor must maintain existing utility services for the Jardine Water Purification Plant at all times. The Contractor must provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uninterrupted services. Where necessary to cut existing water, steam, gases, sewer or air pipes, or conduits, wires, cables, etc. of utility services or of fire protection systems and communications systems (including telephone), they must be cut and capped at suitable places where shown; or, in absence of such indication, where directed by the Commissioner.

a. No utility service such as water, gas, steam, sewers or electricity, or fire protection systems or communications systems must be interrupted without prior written approval of the Commissioner.

b. The Contractor must submit a request to interrupt any such services as described in this Specification SECTION.

c. The Contractor will be advised (in writing) the approval for the request as described in this Specification SECTION. Interruption time approved by Commissioner may occur at other than Contractor's normal working hours.

d. In case of a Contractor construction emergency, service will be interrupted only on approval of the Commissioner. Such approval must be confirmed in writing as soon as practical.

MAY 2026 01 10 00-7 SUMMARY

7. Abandoned Lines:

a. All service lines such as wires, cables, conduits, ducts, pipes and their hangers or supports, which must be abandoned, must be entirely removed.

An exception is the section of existing sediment force main shown on the drawings to be abandoned, which is to be abandoned per Section 02 41 17.

b. All conduits, pipes, ducts that are embedded in the existing floor, wall, and ceiling construction must be abandoned in place, cut-off flush with the surface and capped flush with the surface at both ends.

8. To minimize interference of construction activities with flow of the plant traffic, the Contractor must comply with the following:

a. The Contractor must keep roads, walks and entrances to grounds, to parking and to occupied areas of buildings clear of construction materials, debris and standing construction equipment and vehicles.

b. Wherever excavation for new duct banks and other underground utilities cross existing roads, at least one lane must be open to traffic at all times.

c. The method and scheduling of required cutting, altering and removal of existing roads, walks and entrances must be approved in writing by the Commissioner.

9. The Contractor must coordinate the Work for this Contract with other construction operations. This must include the scheduling of traffic and the use of roadways, as required in this Specification SECTION.

Dust-Tight Partitions

1. Temporary dust tight construction partitions must be installed as required to provide a dust-tight separation from the Contractor's operations and adjoining areas of the plant.

2. The Contractor must construct the temporary dust-tight partitions utilizing a rigid frame and suitable covering that is sealed to prevent the migration of dust from the construction area.

a. The Contractor must provide hinged doors for access through the dust-tight partitions.

b. The Contractor must temporarily blank off ducts and diffusers to prevent circulation of dust into occupied areas.

c. When the temporary partitions are required by the Chicago Building Code to have a fire rating, the temporary dust-tight partitions must be constructed of materials and design to provide the required fire rating.

Fire Safety Precautions

1. Exits and paths of egress for occupied areas of the buildings must not be blocked by the construction or by construction materials.

a. Exits may be blocked temporarily, if it is unavoidable, adequate alternate measures must be provided such as signage, instructions to occupants and a heat detection system.

b. Exits may be blocked temporarily only upon written permission from the Commissioner.

MAY 2026 01 10 00-8 SUMMARY

c. Each exit that is temporarily blocked and each time that an exit is blocked must require a separate written permission.

2. At the end of each workday, combustible packaging and crating materials for building products and equipment to be installed must be removed from any occupied building.

3. The necessary number and appropriate type of portable fire extinguishers as required by the Chicago Building Code must be provided for all construction areas.

4. All temporary heating equipment must be installed in accordance with requirements of the Chicago Building Code and applicable NFPA Standards and manufacturers' instructions.

5. All flammable liquids must be handled, stored and used in accordance with applicable provisions of the Chicago Building Code.

6. All temporary electrical wiring and equipment used for construction must be installed and used in accordance with pertinent provisions of the Chicago Electrical Code.

7. The Contractor must maintain the construction site to permit access of fire department vehicles as necessary. The Contractor must clear building construction areas of unnecessary obstructions so that all portions are accessible for fire department apparatus and permit emergency egress of construction and other personnel.

8. All construction activities not already covered above must be in accordance with the Chicago Building Code and the latest edition of NFPA No. 241, "Standard for Safeguarding Construction, Alteration, and Demolition Operations", in effect at time of Contract award.

Operations and Storage Areas

1. Short term building storage area for day to day working materials will be permitted to the Contractor. The Contractor must provide off-site or temporary buildings for long term storage of materials.

2. Temporary buildings (e.g., storage sheds, shops, offices) and utilities may be erected by the Contractor only with the written approval of the Commissioner and must be built with labor and materials furnished by the Contractor without expense to the City. The temporary buildings and utilities must remain the property of the Contractor and must be removed by the Contractor at no additional cost to the City upon completion of the Work.

3. The Contractor must execute the Work so as not to interfere with the normal functioning of the plant as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others.

a. The Contractor must not store materials and equipment in other than assigned areas.

b. The Contractor must store materials in secure areas to prevent damage and loss to stored items.

MAY 2026 01 10 00-9 SUMMARY

c. The Contractor must schedule delivery of materials and equipment to immediate construction working areas within buildings in use by the City in quantities sufficient for not more than two Work days.

d. The Contractor must provide unobstructed access to plant areas required to remain in operation.

e. Where access by City personnel to vacated portions of buildings is not required, storage of Contractor's materials and equipment will be permitted subject to fire and safety requirements.

Alterations:

1. Before any Work is started, the Contractor must make a thorough survey with the Commissioner of areas of buildings in which alterations occur and areas which are anticipated routes of access, and must furnish a report to the Commissioner.

a. This report must list by rooms and spaces the existing condition and types of resilient flooring, doors, windows, walls and other surfaces not required to be altered throughout affected areas of building.

b. This report must list, by rooms and spaces, existence and conditions of items such as plumbing fixtures and accessories, electrical fixtures, windows, doors, equipment, etc., required by the Drawings to be either reused, relocated, or both.

c. This report must note any discrepancies between Drawings and existing conditions at site.

d. This report must designate areas for working space, materials storage and routes of access to areas within buildings where alterations occur and which must have been agreed upon by Contractor and Commissioner.

2. Any items required by the Drawings to be either reused or relocated or both, found during this survey to be nonexistent, or in opinion of Commissioner, to be in such condition that their use is impossible or impractical, must be furnished and/or replaced by Contractor with new items in accordance with directives issued by the Commissioner.

3. Ten days before each expected partial or final inspection date for each Phase, the Contractor and Commissioner together will make a thorough re-survey of the areas of buildings involved.

a. The Contractor must furnish a report on the original conditions of resilient flooring, doors, windows, walls and other surfaces as compared with conditions of same as noted in first condition survey report.

b. The re-survey report must also list any damage caused by Contractor to such flooring and other surfaces, despite protection measures; and, must form basis for determining extent of repair Work required of the Contractor to restore damage caused by Contractor's workmen in executing the Work of this Contract.

4. The Contractor must provide protective measures which must include but must not be limited to the following.

MAY 2026 01 10 00-10 SUMMARY

a. Wherever existing roof surfaces must be disturbed, the surface must be protected against water infiltration. In case of leaks, the surface must be repaired immediately upon discovery.

b. The Contractor must provide temporary protection to prevent damage to portions of existing structures (above and below grade), utilities (above and below grade), and grounds where Work must be done, materials handled and equipment moved and/or relocated.

c. The Contractor must not place any materials or equipment, other than that shown to be installed in its permanent location, nor operate any construction equipment on any existing or previously placed floors or roofs. Should the Contractor find it necessary to place any materials or equipment, other than that shown to be installed in its permanent location or operate any construction equipment on existing or previously placed floors or roofs, it must be at the Contractor’s own risk. The Contractor must submit for information to the Commissioner, calculations sealed and signed by a Structural Engineer licensed in the State of Illinois as evidence that the existing structure can safety support any superimposed loads that the Contractor may impose on the structure in the execution of his work including all superimposed loads from moving equipment into the structures.

d. The Contractor must provide protection of the existing interior structures at all times, from damage, dust and weather inclemency. Wherever Work is performed, floor surfaces that are to remain in place must be adequately protected prior to starting Work, and this protection must be maintained intact until all Work in the area is completed.

e. The Contractor must dampen debris as necessary to control dust.

Restoration:

1. The Contractor must remove, cut, alter, replace, patch and repair existing facilities as necessary to install the new Work.

a. Except as otherwise shown on the Drawings or required in these

Specification SECTIONS, the Contractor must not cut, alter or remove any structural Work, and must not disturb any ducts, plumbing, steam, gas, or electric Work without approval of the Commissioner.

b. Existing facilities to be altered or extended and that is found to be defective in any way, must be reported to the Commissioner before it is disturbed.

c. Materials and workmanship used in restoring Work must conform in type and quality to that of original existing construction, except as otherwise shown on the Drawings or required in these Specification SECTIONS.

2. Upon completion of Contract, the Contractor must deliver the Work complete and undamaged. Existing facilities (walls, ceilings, partitions, floors, mechanical and electrical Work, lawns, paving, roads, walks, etc.) disturbed or removed as a result of performing required new Work, must be patched, repaired, reinstalled, or replaced with new Work, and refinished and left in as good condition as existed before commencing the Work.

MAY 2026 01 10 00-11 SUMMARY

3. The Contractor must immediately restore to service and repair any damage caused by Contractor's workmen to existing piping and conduits, wires, cables, of City’s systems, or of utility services, or of fire protection systems and communications systems (including telephone) which are not scheduled for discontinuance or abandonment. This Work must be done at no additional cost to the City.

Use of Roadways:

1. The Contractor must use only established public roads and roads on the plant property for hauling. When authorized by the Commissioner, temporary roads which are necessary in the performance of Contract Work must comply with the following.

a. Temporary roads must be constructed by the Contractor at Contractor's expense.

b. When necessary to cross curbing, sidewalks, or similar construction, they must be protected by well-constructed bridges.