668-24-102_AE SOW_Attachment E.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
C1DA--AE-NRM-668-24-102 Replace Windows Building 1 FY24-Tier-2
Solicitation number
36C26024R0054
Issued by

About this file

This document is a Request for Qualifications (RFQ) for Architect-Engineer (A-E) services to support a federal contract opportunity from the Department of Veterans Affairs (VA) to replace windows at Building 1 of the Mann-Grandstaff VA Medical Center in Spokane, Washington.

The VA is seeking A-E services for preliminary concept and program development, investigative services, design narratives/analysis, planning consultations and visits, design work, calculations, preparation of contract drawings and specifications, sample boards, cost estimates, construction period services, site visits, and project phasing. The contract is expected to be awarded in June 2024 with a 205-calendar day period of performance for design completion. The construction cost estimate range is between $5-10 million. The procurement is a 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside. Firms must submit an SF 330 qualification package by April 29, 2024, and will be evaluated on professional qualifications, specialized experience, past performance, construction period services experience, and knowledge of the local area.

View the file

Other files

File Type Posted
36C26024R0054 0001.pdf PDF
668-24-102_AE SOW_Attachment A.pdf PDF
668-24-102_AE SOW V3-1.pdf PDF
668-24-102_AE SOW_Attachment B.pdf PDF
36C26024R0054.docx DOCX document
668-24-102_AE SOW_Attachment C.docx DOCX document
668-24-102_AE SOW_Attachment D.xlsx XLSX spreadsheet
PPQ 668-24-102.docx DOCX document
668-24-102 A-E Presolicitation 02.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cost Estimate review

https://www.gao.gov/assets/710/705312.pdfKEY
VA or A/E provided evidence that satisfied the entire criterion =Met
VA or A/E provided evidence that satisfies a larger portion of the criterion =Substantially Met
VA or A/E provided evidence that satisfied half of the criterion =Partially Met
VA or A/E provided evidence that satisfied a small portion of the criterion =Minimally Met
VA or A/E provided no evidence that satisfied any of the criterion =Not Met
GAO Cost Estimating and Assessment Guide (GAO-20-195G) March 202010% Design Construction Cost Estimate35% Design Construction Cost Estimate65% Design Construction Cost Estimate95% Design Construction Cost Estimate100% Design Construction Cost Estimate
Four Characteristics of a high-quality and reliable cost estimateBest Practices in Chapter 16: Auditing and Validating the Cost Estimate (Go to page 196 of 476)Individual AssessmentIndividual AssessmentIndividual AssessmentIndividual AssessmentIndividual Assessment
ComprehensiveThe cost estimate includes all life cycle costs
The technical baseline description completely defines the program, reflects the current schedule, and is technically reasonable.
The cost estimate is based on a WBS that is product-oriented, traceable to the statement of work, and at an appropriate level of detail to ensure that cost elements are neither omitted nor double counted.
The cost estimate documents all cost-influencing ground rules and assumptions.
Well documentedThe documentation should show the source data used, the reliability of the data, and the estimaring methodology used to derive each element's cost.
The documentation describes how the estimate was developed so that a cost analyst unfamiliar with the program could understand what was done and replicate it.
The documentation describes step by step how the estimate was developed so that a cost analyst unfamiliar with the program could understand what was done and replicate it.
The documentation discusses the technical baseline description and the data in the technical baseline are consistent with the cost estimate
The documentation provides evidence that the cost estimate is reviewed and accepted by management.
AccurateThe cost model was developed by estimating each WBS element using the best methodology from the data collected.
The estimate has been adjusted properly for inflation.
The estimate contains few, if any, minor mistakes.
The cost estimate is regularly updated to ensure it reflects program changes and actual costs.
Variances between planned and actual costs are documented, explained, and reviewed.
The estimate is based on a historical record of cost estimating and actual experiences from other comparable programs.
CredibleThe cost estimate included a sensitivity analysis that identifies a range of possible costs based on varying major assumptions, parameters, and data inputs.
A risk and uncertainty analysis was conducted that quantified the imperfectly understood risks and identified the effects of changing key cost driver assumptions and factors.
Major cost elements were crossed checked to see if results were similar.
An independent cost estimate (ICE) was conducted by a group outside the acquiring organization to determine whether other estimating methods produce similar results.

&F &A page &P of &N https://www.gao.gov/assets/710/705312.pdf