663A4-22-202 Drawings.pdf
PDF 19 MB Posted
- Solicitation number
- 36C26025R0053
About this file
These construction documents detail a fire sprinkler and water main connection project for Building 16 at the American Lake Veterans Affairs campus in Tacoma, Washington. The comprehensive set of 24 drawings, prepared by Spees Design Build, covers architectural, civil, mechanical, electrical, and fire protection aspects of installing a new sprinkler system and water service line. Key project elements include a fully sprinklered building, installation of a 4-inch fire service line, fire department connection (FDC), wet and dry sprinkler zone control valves, and associated electrical and mechanical infrastructure upgrades. The project involves working in an existing multi-story building with careful consideration for infection control requirements (ICRA), potential asbestos-containing materials, and maintaining building operations during construction.
The drawings indicate the project scope encompasses multiple building levels (Level 00, Level 01, Level 02, and Attic), with specific attention to integrating new systems into the existing facility. Electrical work includes replacing panelboards, installing heat trace systems, and connecting to the existing fire alarm system in an adjacent building. Civil drawings show utility connections and site layout, while architectural plans detail floor plans and building elevations. The project is fully documented for construction, with issue dates showing progression from initial design in January 2024 to final construction documents in June 2024, with an anticipated construction period following the 06/25/2024 document date.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C26025R0053 Site Walk Sign-In Sheet.pdf | ||
| 36C26025R0053 0001.docx | DOCX document | |
| 663A4-22-202 Install Sprinkler RFI and Responses 05.20.2025.docx | DOCX document | |
| Asbestos Report VA American Lake Bldg 16.pdf | ||
| LBP Inspection Bldg 16 Final Report 2009.pdf | ||
| S02 EXHIBIT B Past Performance Reference Form.docx | DOCX document | |
| S02 EXHIBIT A Project Information Sheet for Contractors.pdf | ||
| 36C26025R0053.docx | DOCX document | |
| 663A4-22-202 Specifications.pdf | ||
| WA20250111 03-21-2025.pdf | ||
| Additional Requirements for Asbestos-lead.docx | DOCX document | |
| Site Walk Map 36C26025R0053.pdf | ||
| SOW Construction 663A4-22-202 rev1.docx | DOCX document |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DRAWING INDEX
PAGE NUMBER SHEET NUMBER SHEET NAME
GENERAL
1 OF 24 G-001 COVER PAGE
CIVIL
2 OF 24 C-001 CIVIL GENERAL NOTES, LEGEND, AND ABBREVIATIONS
3 OF 24 CU101 SITE LAYOUT AND UTILITY PLAN
4 OF 24 C-501 CIVIL CONSTRUCTION DETAILS
ARCHITECTURAL
5 OF 24 AS101 ICRA DETAILS
6 OF 24 A-400 BUILDING 16 - LEVEL 00 -FLOOR PLAN
7 OF 24 A-401 BUILDING 16 - LEVEL 01 -FLOOR PLAN
8 OF 24 A-402 BUILDING 16 - LEVEL 02 -FLOOR PLAN
9 OF 24 A-403 BUILDING 16 - ATTIC -FLOOR PLAN
10 OF 24 A-404 BUILDING 16 - ELEVATION
11 OF 24 AW001 SIGNAGE DETAILS AND SCHEDULE
MECHANICAL
12 OF 24 FP001 FIRE PROTECTION GENERAL NOTES AND ABBREVIATIONS
13 OF 24 FP101 FOUNDATION PLAN - FIRE PROTECTION
14 OF 24 FP102 FLOOR PLAN LEVEL 1 FIRE PROTECTION
15 OF 24 FP103 FLOOR PLAN LEVEL 2 - FIRE PROTECTION
16 OF 24 FP104 FLOOR PLAN LEVEL 3 - FIRE PROTECTION
ELECTRICAL
17 OF 24 E-001 ABBREVIATIONS, GENERAL NOTES, AND SHEET INDEX
18 OF 24 E-002 ELECTRICAL LEGENDS
19 OF 24 E-100 BUILDING 16 -LEVEL 00 -ELECTRICAL FLOOR PLANS
20 OF 24 E-101 BUILDING 16 -LEVEL 01 -ELECTRICAL FLOOR PLANS
21 OF 24 E-102 BUILDING 16 -LEVEL 02 -ELECTRICAL FLOOR PLANS
22 OF 24 E-501 ELECTRICAL DETAILS
23 OF 24 E-601 BLDG 16 -ONE-LINE DIAGRAM
24 OF 24 E-701 ELECTRICAL SCHEDULES
SEWAGE NOTE:
PER AIB 1962 (12.13) BLDG. 80 W/4 CONC.
SWR. LN. TO LOCATION MH #58
E157
E163
148 149
95 134
T97
62 27
159 BO
28A
72A
BO
200 29
4 137
EXIST'G 2" WATER LINE
BURIED @ 12" DEPTH
N
3 71
11 55
37 120 10 54
42 60
E92
27 86
145 59
SEPTIC TANK
E162
E164
SHOWN (CLOSED WINTER)
IRRIGATION LINES NOT
SEPTIC TANK
500 GAL. SEPTIC TANK
M A
K S
P L
C I
(M
IL
IT
A
R Y
R E
S E
R V
A T
IO
N
F
O R
T L
E W
IS
T O
F T
L
E W
IS
S
E A
W A
G E
T R
E A
T M
E N
T P
L A
N T
(L A
S T
I N
L
IN
E M
H
M U
S S
E R
C T
P A
R K
IN
G
E N
G L E
W A
Y
C U
STIS
D R
E N
G L E
W A
Y
C I
E N
G L E
C T
P A
R K
IN
G
PARKING
12" TR
PARKING
4" TR
VETERANS DR.
IRRIGATION LINES NOT
SHOWN (CLOSED WINTER)
PARKING
PARKING
PATIENT
PARKING
6" CI
M U S
SER
A
VE
BO
TEMPORARY
PARKING
PARKING
MAIN PARKING
3"CHASE DR.
2" (P
O
LY
E
TH
Y
LE
N E
H B C
H A S E L
N
P A
R K
IN
G
IRRIGATION LINES NOT
SHOWN (CLOSED WINTER)
VETERANS DR.
ARCHITECTURAL
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
PHONE: (206) 590-2118
DESIGN TEAM
FIRE PROTECTION
SPEES DESIGN BUILD
STRUCTURAL
ELECTRICAL
SPEES DESIGN BUILD
MECHANICAL
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
PHONE: (206) 590-2118
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
PHONE: (206) 590-2118
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
PHONE: (206) 590-2118
CIVIL
POND AND COMPANY
3500 PARKWAY LANE SUITE 500
PEACHTREE CORNERS GEORGIA 30092
PHONE: (678) 336-7740
WSP USA, INC.
33301 9TH AVENUE SOUTH
FEDERAL WAY, WA 98003-2600
PHONE: (206) 431-2300
PROJECT INFORMATION
STATE:
COUNTY:
OWNER:
CODE ANALYSIS
PROJECT DESCRIPTION
THE PROPOSED DESIGN INSTALL SPRINKLER
AND WATER MAIN CONNECTION IN
BUILDING 16.
APPLICABLE BUILDING
BUILDING 16
ICRA CLASS REQUIREMENTS
REQUIREMENTS DEPENDENT ON
EACH INDIVIDUAL ROOM LOCATION,
CLASS I, II, III AND IV.
WASHINGTON
PIERCE COUNTY
DEPARTMENT OF VETERANS
AFFAIRS
GENERAL NOTES
1. COORDINATE WORK WITH ALL CONTRACT DOCUMENTS, INCLUDING BUT NOT LIMITED TO DRAWINGS &
SPECIFICATIONS.
2. SPECIFICATIONS SHALL SUPERSEDE DRAWINGS IN THE CASE OF ANY CONFLICTING INFORMATION.
BRING TO THE AWARENESS OF AND VERIFY WITH VA COR PRIOR TO PROCEEDING.
3. THE CONTRACTOR AND ANY SUB CONTRACTORS SHALL FAMILIARIZE THEMSELVES WITH EXISTING CONDITIONS AND PROJECT REQUIREMENTS PRIOR TO SUBMITTING A BID OR BEGINNING WORK. NO ALLOWANCES WILL BE MADE ON BEHALF OF THE CONTRACTOR OR SUB-CONTRACTORS FOR FAILURE
TO VISIT THE SITE.
4. THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS BEFORE BEGINNING WORK. ANY CONFLICTS BETWEEN EXISTING CONDITIONS AND THE CONTRACT DOCUMENTS SHALL BE BROUGHT
IMMEDIATELY TO THE ATTENTION OF THE COR.
5. ALL WORK SHALL BE PERFORMED WITH A HIGH-LEVEL OF WORKMANSHIP.
6. THE CONTRACTOR SHALL VERIFY ALL PRODUCT TYPES AND QUANTITIES DURING SITE WALK
THROUGH, PRIOR TO PURCHASING ANY MATERIALS, EQUIPMENT, PRODUCTS OR LABOR.
7. THE CONTRACTOR SHALL VERIFY AND COORDINATE WITH ALL INSTALLERS TO ENSURE COMPLIANCE
WITH THE CONTRACT DOCUMENTS.
COR
SIGNATURE LINE
BUILDING/S IN SCOPE
LOCATION MAP
AMERICAN LAKE CAMPUS, 9600 VETERANS
DRIVE SW. TACOMA, WA 98493
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
/0 /2
:3
:2 a m
A u to d e s k D o c s /6
A
- 2
-2
V
A W
A A m e ri c a n L a k e
B
S p ri n k le r/ V
A A
L
A
R
S D
B .r v t
G-001
COVER PAGE
DS OB
100% CONSTRUCTION
DOCUMENTS
01/04/2024
663A4-22-202VA WA AMERICAN LAKE
B16 SPRINKLER
AMERICAN LAKE CAMPUS, 9600 VETERANS DRIVE SW.
TACOMA, WA 98493
BLDG 16 INSTALL SPRINKLER AND WATER MAIN CONNECTION
AMERICAN LAKE CAMPUS, 9600 VETERANS DRIVE SW. TACOMA, WA 98493
PROJECT #: 663A4-22-202
1/4" = 1'-0"
SITE PLAN
TRUE
NORTH
TRUE
NORTH
Revisions: Date:
35% 01/16/2024
95% 02/26/2024
95% 04/01/2024
Issue Date 06/25/2024
01 OF 246/25/246/25/24
A/E:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
GENERAL CIVIL NOTES
1. THE CONTRACTOR SHALL COMPLY WITH ALL CITY, COUNTY, STATE AND
FEDERAL REGULATIONS APPLICABLE TO CONSTRUCTION OF THIS SITE.
2. ALL LABOR, MATERIALS, AND METHODS OF CONSTRUCTION SHALL BE IN
STRICT ACCORDANCE WITH THE MINIMUM ENGINEERING AND CONSTRUCTION
STANDARDS ADOPTED BY THE U.S. ARMY CORPS OF ENGINEERS (USACE).
WHERE CONFLICTS OR OMISSIONS EXIST, THE USACE STANDARDS SHALL
DICTATE. SUBSTITUTIONS AND DEVIATION FROM PLANS AND SPECIFICATIONS
SHALL BE PERMITTED ONLY WHEN WRITTEN APPROVAL HAS BEEN ISSUED BY
THE CONTRACTING OFFICER'S REPRESENTATIVE (COR).
3. ALL DIMENSIONS ARE TAKEN FROM/TO FENCE LINES, CENTERLINE OF UTILITY,
CENTER OF MANHOLE OR CATCH BASIN, CENTERLINE OF ROAD, FACE OF
BUILDING, FACE OF CURB, FACE OF WALL, OR CENTERLINE OF STRIPING
UNLESS OTHERWISE NOTED.
4. EXISTING CONDITIONS SHOWN ARE BASED UPON GIS INFORMATION
PROVIDED BY FACILITIES MANAGEMENT SERVICE, VA PUGET SOUND
HEALTHCARE SYSTEM (VAPSHCS). ALL EXISTING INFORMATION SHOULD BE
CONSIDERED APPROXIMATE AND MUST BE VERIFIED BY THE CONTRACTOR
PRIOR TO CONSTRUCTION OR ORDERING MATERIALS.
5. ALL REQUIRED EROSION AND SEDIMENT CONTROL MEASURES SHALL BE
PROVIDED, INSTALLED, AND MAINTAINED AS SHOWN ON THE APPLICABLE
EROSION, SEDIMENTATION AND POLLUTION CONTROL PLANS CONTAINED
WITHIN THESE CONSTRUCTION DOCUMENTS. CONTRACTOR TO MOVE ALL
CONSTRUCTION DEBRIS OFF THE AMERICAN LAKE VA CAMPUS IN
WASHINGTON.
6. PROPERTY AND DISPOSE DEBRIS AT A LEGAL, PERMITTED LANDFILL
CONSISTENT WITH ALL LOCAL, STATE, AND FEDERAL REQUIREMENTS.
7. NO BURNING IS ALLOWED ON AMERICAN LAKE VA CAMPUS.
8. CONTRACTOR TO ENSURE ALL EXISTING TOPS OF MANHOLES AND VALVE
BOXES ARE RAISED OR LOWERED TO BE FLUSH WITH FINISHED GRADES,
UNLESS NOTED OTHERWISE.
9. ALL NEW PAVEMENT AND SIDEWALKS SHALL BE CONSTRUCTED FLUSH WITH
EXISTING, WITH NO PONDING OF STORMWATER, UNLESS NOTED OTHERWISE.
10. CONTRACTOR SHALL GRADE ALL DISTURBED AREAS TO ENSURE POSITIVE
DRAINAGE AWAY FROM ALL BUILDINGS AND TO DRAINAGE STRUCTURES OR
DITCHES. NATURAL FLOW OF SURROUNDING WATERS SHALL NOT BE
DISTURBED DURING CONSTRUCTION, UNLESS SHOWN OTHERWISE.
11. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS, COORDINATES, AND
DIMENSIONAL INFORMATION PRIOR TO CONSTRUCTION. THE CONTRACTOR
SHALL BRING ALL DISCREPANCIES TO THE ATTENTION OF THE COR PRIOR TO
STARTING CONSTRUCTION.
12. ALL TRAFFIC SIGNS AND PAVEMENT MARKINGS SHALL BE IN ACCORDANCE
WITH THE "MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES" (MUTCD),
LATEST EDITION.
13. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING
INSTALLATION OF ALL NEW UTILITIES WITH THOSE THAT ARE EXISTING. IF
EXISTING UTILITIES ARE IN CONFLICT WITH NEW UTILITIES, THE SITE
CONTRACTOR SHALL NOTIFY THE COR BEFORE PROCEEDING WITH
CONSTRUCTION.
14. ALL TOPSOIL AND EXCAVATED MATERIAL SHALL BE STOCKPILED IN AN
APPROVED AREA DURING CONSTRUCTION. EXCESS OR UNUSABLE TOPSOIL
SHALL BE DISPOSED OF OFF-SITE IN A MANNER THAT IS LEGAL AND
CONSISTENT WITH ALL LOCAL, STATE AND FEDERAL REQUIREMENTS.
15. THE LOCATION OF ALL EXISTING UTILITIES AND STORM DRAINAGE SHOWN ON
THE PLANS HAVE BEEN DETERMINED FROM THE BEST INFORMATION
AVAILABLE AND ARE GIVEN FOR THE CONVENIENCE OF THE CONTRACTOR.
THE ENGINEER ASSUMES NO RESPONSIBILITY FOR INACCURACY. PRIOR TO
THE START OF ANY CONSTRUCTION ACTIVITY IT SHALL BE THE
CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE VARIOUS UTILITIES AND TO
MAKE THE NECESSARY ARRANGEMENTS FOR ANY RELOCATION OF THESE
UTILITIES WITH THE COR OF THE UTILITY. THE CONTRACTOR SHALL EXERCISE
CAUTION WHEN CROSSING UNDERGROUND UTILITIES, WHETHER SHOWN ON
THE PLAN OR LOCATED BY THE UTILITY COMPANY. ALL UTILITIES WHICH
INTERFERE WITH THE PROPOSED CONSTRUCTION SHALL BE BROUGHT TO
THE ATTENTION OF THE CONTRACTING OFFICER'S REPRESENTATIVE (COR).
ANY FEES ASSOCIATED WITH UTILITY RELOCATIONS SHALL BE BORNE BY THE
CONTRACTOR IN ACCORDANCE WITH RESPECTIVE UTILITY COMPANY
STANDARDS. THE CONTRACTOR SHALL COORDINATE DISCONNECTION OF
EXISTING UTILITIES WITH THE APPROPRIATE UTILITY PROVIDER.
16. UTILITIES INDICATED SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE
APPLICABLE PROVISIONS OF THE SPECIFICATIONS. GRADING SHALL BE AS
INDICATED, AND SHALL PRODUCE A FINISHED SURFACE WITH NO PONDING
OF WATER, READY TO RECEIVE PLANTING MATERIALS OR GRASSING.
17. IT WILL BE THE RESPONSIBILITY OF THE CONTRACTOR TO ENSURE THAT ALL
REQUIRED PERMITS ARE OBTAINED AND IN HAND BEFORE BEGINNING ANY
CONSTRUCTION. NO CONSTRUCTION OR FABRICATION OF ANY ITEM SHALL
BEGIN UNTIL THE CONTRACTOR HAS RECEIVED ALL PLANS AND ANY OTHER
DOCUMENTATION FROM ALL OF THE PERMITTING AND ANY OTHER
REGULATORY AUTHORITIES. ANY PENALTIES, STOP WORK ORDERS OR
ADDITIONAL WORK RESULTING FROM THE CONTRACTOR BEING IN VIOLATION
OF THE REQUIREMENTS ABOVE, SHALL BE FULLY BORNE BY THE
CONTRACTOR.
18. ALL CONTRACTORS/SUBCONTRACTORS THAT WILL BE ENGAGED IN LAND
DISTURBING ACTIVITIES SHALL COMPLY WITH ALL EROSION, SEDIMENTATION
AND POLLUTION CONTROL AND STORMWATER POLLUTION PREVENTION
REQUIREMENTS CONTAINED THROUGHOUT THE DRAWINGS, SPECIFICATIONS,
AND PERMITS.
19. AREAS DISTURBED BY THE CONTRACTOR, WHICH ARE NOT PART OF THIS
PROJECT, SHALL BE RETURNED TO PRE-CONSTRUCTION OR BETTER
CONDITION PRIOR TO THE COMPLETION OF THE PROJECT AS DETERMINED
BY THE COR.
20. THE CONTRACTOR'S MEANS, METHODS, SEQUENCE, TECHNIQUES OR
PROCEDURES IN PERFORMING THE WORK IS SOLELY THE RESPONSIBILITY
OF THE CONTRACTOR, WHO IS ALSO RESPONSIBLE FOR COMPLYING WITH
ALL HEALTH AND SAFETY PRECAUTIONS AS REQUIRED BY THE APPLICABLE
REGULATORY AGENCY.
21. THE DESIGN ADEQUACY AND SAFETY OF ALL BRACING, SHORING AND
TEMPORARY SUPPORTS, ETC. ARE THE SOLE RESPONSIBILITY OF THE
CONTRACTOR.
22. PROTECT ALL EXISTING FEATURES AND EXISTING LANDSCAPING THAT WILL
REMAIN. ANY ITEM DAMAGED DURING THE PERFORMANCE OF THE WORK
SHALL BE RESTORED TO PRE-CONSTRUCTION CONDITION, OR REPLACED
WITH NEW AT THE CONTRACTOR'S EXPENSE. CONTRACTOR SHALL TAKE
PRECAUTIONS TO AVOID OVERLOADING PAVEMENTS WHICH WILL REMAIN.
23. CONTRACTOR SHALL INSPECT ALL SEDIMENT AND EROSION CONTROL
MEASURES DAILY AND DURING PROLONGED PERIODS OF CONTINUOUS
RAINFALL EVENTS TO ENSURE THAT ALL CONTROLS ARE FUNCTIONING
PROPERLY. DAMAGED CONTROLS SHALL BE REPLACED BY THE END OF THE
WORKDAY.
24. EACH SHEET IS PART OF A MULTI-SHEET SET OF CONSTRUCTION PLANS AND
SHALL BE READ WITH THE FULL SET TO BEST ENSURE PROPER
INTERPRETATION.
25. SHEET KEYNOTES ON THE PLANS ARE SPECIFIC TO THAT SHEET ONLY.
MISSING SEQUENTIAL NUMBERS DO NOT APPLY TO THAT SHEET.
GENERAL CIVIL DEMOLITION NOTES
1. "DEMOLISH" SHALL MEAN TO REMOVE AN OBJECT IN ITS ENTIRETY. RESTORE
GRADES AND SURFACE IMPROVEMENTS TO MATCH EXISTING CONDITIONS OR
PER REQUIREMENTS OF NEW WORK, WHICHEVER IS APPLICABLE.
2. EROSION AND SEDIMENTATION CONTROL MEASURES AND TEMPORARY
CONSTRUCTION FENCING SHALL BE IN PLACE PRIOR TO COMMENCEMENT OR
CONCURRENT WITH DEMOLITION.
3. CONTRACTOR SHALL ESTABLISH SURVEY CONTROL NETWORK OUTSIDE
LIMITS OF DEMOLITION PRIOR TO COMMENCEMENT OF WORK. THIS WORK
MUST BE PERFORMED BY LICENSED & REGISTERED SOUTH DAKOTA LAND
SURVEYOR.
4. ALL DEMOLITION WORK SHALL BE COORDINATED WITH CONTRACTOR'S
SCHEDULE, LOGISTICS PLAN (APPROVED BY COR), EROSION, SEDIMENTATION
AND POLLUTION CONTROL PLAN PRIOR TO WORK.
5. ALL TEMPORARY FENCING, TRASH, AND LITTER TO BE FULLY DEMOLISHED
AND REMOVED FROM SITE TO A LEGAL LANDFILL. PERIMETER FENCING TO
REMAIN UNLESS OTHERWISE NOTED.
GENERAL CIVIL SITE NOTES
1. CONTRACTOR SHALL FURNISH AND MAINTAIN ANY AND ALL NECESSARY
BARRICADES AROUND THE WORK AND PROVIDE PROTECTION AGAINST
WATER DAMAGE AND SOIL EROSION.
2. ALL BUILDING DIMENSIONS SHALL BE VERIFIED AND COORDINATED WITH THE
ARCHITECTURAL PLANS.
3. PAVEMENT MARKINGS, INCLUDING ANY STANDARD HANDICAP SYMBOLS,
PARKING STRIPING AND TRAFFIC ARROWS, SHALL BE PAINTED ON PAVEMENT
AT LOCATIONS SHOWN.
4. ALL SIGNAGE SHALL CONFORM TO THE MOST RECENT WASHINGTON STATE
DEPARTMENT OF TRANSPORTATION (WSDOT) AND MUTCD STANDARDS AND
SPECIFICATIONS.
GRADING AND DRAINAGE NOTES
1. POSITIVE DRAINAGE SHALL BE MAINTAINED AT ALL TIMES TO PREVENT
SATURATION OF EXPOSED SOILS IN CASE OF SUDDEN RAINS, AND FOR ALL
FINISHED GRADING. CONTRACTOR SHALL LOCATE ALL EXISTING UTILITIES
PRIOR TO ANY EXCAVATION.
2. CONTRACTOR SHALL INSTALL ALL PERIMETER EROSION AND SEDIMENT
CONTROL MEASURES PRIOR TO ANY SITE CLEARING OR EXCAVATION.
3. ALL BACKFILL AND FILL MATERIAL SHALL BE FREE OF ORGANIC MATTER AND
WASTE.
4. THE CONTRACTOR SHALL REMOVE ALL EROSION AND SEDIMENT CONTROL
FENCING FROM THE SITE PRIOR TO FINAL PROJECT ACCEPTANCE, AND
SHALL SMOOTH THE GROUND SURFACE WHERE THE FENCE WAS REMOVED;
THEN, MULCH OR SEED & STRAW (SEASON APPROPRIATE GRASS) THE
RESTORED SURFACE AS SUNLIGHT CONDITIONS WARRANT.
5. CONTRACTOR SHALL MARK, PRESERVE AND PROTECT ALL SURVEY
BENCHMARKS.
6. IF BENCHMARK MUST BE DEMOLISHED FOR CONSTRUCTION, CONTRACTOR
SHALL RELOCATE BENCHMARK AND PROVIDE NEW DATA ON AS-BUlLTS.
7. ALL CUT AND FILL SLOPES SHALL BE 2:1 OR FLATTER (SEE PLANS).
8. ALL SPOT ELEVATIONS NOTED ARE FINISH GRADE.
GENERAL UTILITY NOTES:
1. CONTRACTOR IS RESPONSIBLE FOR COORDINATING ALL BUILDING
CONNECTIONS WITH BUILDING CONTRACTOR AND THE INFORMATION
PROVIDED ON MECHANICAL AND ELECTRICAL SHEETS.
2. CONTRACTOR SHALL PROVIDE A MINIMUM NOTICE OF 30 DAYS FOR ALL
REQUIRED UTILITY SHUTDOWNS FOR UTILITY CONNECTIONS WITH THE
CONTRACTING OFFICER.
3. ALL OTHER EQUIPMENT SHALL BE PAINTED TO MATCH BASE STANDARD.
4. ANY CHANGES TO PROPOSED UTILITY DESIGN SHALL BE APPROVED BY THE
CONTRACTING OFFICER IN WRITING.
5. CONTRACTOR IS RESPONSIBLE FOR COORDINATING AND PAYING ALL UTILITY
CONNECTION FEES AND OBTAINING ALL PERMITS REQUIRED FOR THE UTILITY
CONSTRUCTION AND CONNECTIONS. THIS INCLUDES ALL FEES ASSOCIATED
WITH CONNECTION CHARGES AND METERS.
6. ALL UNDERGROUND UTILITIES ARE SUBJECT TO ACCEPTANCE TESTING AND
INSPECTION METHODS DETAILED IN THE SPECIFICATIONS, WHICH MAY
INCLUDE VIDEO CAMERA INSPECTION. COORDINATE CAMERA AND
EQUIPMENT WITH THE SITE SECURITY MANAGER AND CONTRACTING
OFFICER PRIOR TO BRINGING ANY PHOTOGRAPHY OR VIDEO EQUIPMENT ON
SITE.
7. ALL WATER CONSTRUCTION WORK ON THIS PROJECT SHALL BE PERFORMED
IN ACCORDANCE WITH ALL APPLICABLE INDUSTRY CODES AND STANDARDS.
THESE CODES AND STANDARDS INCLUDE BUT ARE NOT LIMITED TO THE
FOLLOWING: AMERICAN WATER WORKS ASSOCIATION (AWWA), AMERICAN
NATIONAL STANDARDS INSTITUTE (ANSI), AMERICAN SOCIETY FOR TESTING
AND MATERIALS (ASTM), OCCUPATIONAL SAFETY AND HEALTH
ADMINISTRATION (OSHA), AMERICAN ASSOCIATION OF STATE HIGHWAY AND
TRANSPORTATION OFFICIALS (AASHTO), NATIONAL FIRE PROTECTION
ASSOCIATION (NFPA), UNIFIED FACILITIES CRITERIA (UFC), ENVIRONMENTAL
PROTECTION AGENCY (EPA) AND USACE EM 385-1-1 SAFETY AND HEALTH
REQUIREMENT MANUAL. THE MOST STRINGENT SHALL BE APPLIED IN ALL
CASES ESPECIALLY FOR ISSUES RELATED TO SAFETY.
WATER UTILITY NOTES:
1. THRUST BLOCKS OR JOINT RESTRAINTS ARE REQUIRED AT ALL TEES, BENDS,
OR ELBOWS OF PRESSURIZED PIPING IN ACCORDANCE WITH THE DRAWINGS,
SPECIFICATIONS, AND MANUFACTURER'S RECOMMENDATIONS. SEE SHEET
C-501 FOR TYPICAL THRUST BLOCK DETAIL. MECHANICAL JOINT RESTRAINTS
ARE ALLOWED IN AREAS WHERE PROXIMITY OF ADJACENT UTILITIES OR
STRUCTURES WILL MAKE PLACEMENT OF THRUST BLOCKS DIFFICULT. USE
OF JOINT RESTRAINTS SHALL BE APPROVED BY THE CONTRACTING OFFICER.
2. WATER LINES SHALL BE INSTALLED A MINIMUM OF 3 FEET BEHIND THE EDGE
OF PAVEMENT OR FACE OF CURB UNLESS INDICATED OTHERWISE. SEE
SPECIFICATIONS FOR ADDITIONAL CLEARANCE REQUIREMENTS FOR WATER
PIPING.
EROSION CONTROL NOTES:
1. EROSION CONTROL MEASURES MUST BE IN PLACE PRIOR TO ANY
DISTURBANCE.
2. EROSION CONTROL DEVICES SHALL BE USED FOR THE STAGING AREA AND
ANY MATERIAL STOCK PILES WHEN NECESSARY TO CONTROL EROSION AND
STORM WATER RUNOFF.
3. LIMITS OF CONSTRUCTION IS DEFINED AS THOSE AREAS AFFECTED BY THE
CONTRACTOR'S OPERATIONS INVOLVING EXCAVATION, EMBANKMENT, AND
FINAL GRADING REQUIRED TO COMPLETE THE WORK IN ACCORDANCE WITH
THE ELEVATIONS, GRADES, AND SECTIONS SHOWN IN THESE DRAWINGS.
4. CONTRACTOR SHALL SEED AND FERTILIZE AREAS DISTURBED DURING
CONSTRUCTION OUTSIDE THE LIMITS OF PAVED AREAS IN ACCORDANCE
WITH THE CONTRACT SPECIFICATIONS AFTER COMPLETION OF ALL PAVING
AND TOPSOIL FINISH GRADING WORK FOR EACH PHASE OF THE PROJECT.
5. THE CONTRACTOR SHALL SEED ALL DISTURBED AREAS WITHIN THE SITE
LIMITS, INCLUDING ALL CUT AND FILL SECTIONS IN ACCORDANCE WITH THE
PLANS AND SPECIFICATIONS. CONTRACTOR SHALL MAINTAIN GRASS UNTIL A
PERMANENT VEGETATION COVER HAS BEEN ESTABLISHED PRIOR TO FINAL
ACCEPTANCE OF THE PROJECT. ESTABLISHMENT OF A PERMANENT
VEGETATION COVER SHALL INCLUDE: PLACEMENT OF TOPSOIL, APPLICATION
OF FERTILIZER, PLANTING OF GRASS SPECIES SELECTED, IRRIGATIONS AS
REQUIRED, AND RAKING OR HAND FINISHING.
6. CONTRACTORS STAGING AREA SHALL BE RETURNED TO ORIGINAL
CONDITIONS AS APPROVED BY THE CONTRACTING OFFICERS AT
COMPLETION OF CONSTRUCTION.
7. CONTRACTOR SHALL CONTROL DUST WITHIN THE CONSTRUCTION SITE TO
MITIGATE BLOWING MATERIAL ONTO ADJACENT AIRFIELD OPERATIONS
AREAS BY WETTING SOILS OR OTHER MITIGATION MEASURES.
8. ALL TEMPORARY SOIL EROSION AND SEDIMENT CONTROL MEASURES SHALL
BE REMOVED ONCE AN AREA OF DISTURBANCE HAS BEEN STABILIZED.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
100% SUBMITTAL
03/28/2024
663A4-22-202UPGRADE FIRE SPRINKLER
IN B16
VA STATION AMERICAN LAKE
Revisions: Date:
3500 Parkway Lane Suite 500
Peachtree Corners Georgia 30092
Pond & Company
(678) 336-7740 C-001
KH CP
CIVIL GENERAL NOTES, LEGEND,
AND ABBREVIATIONS
AT
AND
DIAMETER
ABANDONED
ASPHALT CONCRETE
APRON GROUNDING POINT
ENGINEER IN CHARGE
APPROVED
APPROXIMATELY
BUILDING
BENCHMARK
BOTTOM
BYPASS
CLEARED AMERICAN GUARDS
COMPOST AMENDED VEGETATED FILTER STRIP
CATCH BASIN
CENTERLINE
CUBIC FEET
CORRUGATED METAL PIPE
CATHODIC PROTECTION TEST STATION
CONCRETE
CONTRACTING OFFICER'S REPRESENTATIVE
CEMENT TREATED BASE
DROP INLET
DIAMETER
DUCTILE IRON PIPE
DESIGNER
DEFENSE LOGISTICS AGENCY
DIRECTORATE OF PUBLIC WORKS
DUPLICATE
EASTING
ENGINEERED DISPERSION
EXISTING GRADE
ELEVATION
EDGE OF PAVEMENT
EASEMENT
EXISTING
FINISHED FLOOR ELEVATION
FINISHED GRADE
FIRE HYDRANT
FEET
GRADED-CRUSHED AGGREGATE BASE COURSE
GEOGRAPHIC INFORMATION SYSTEM
GROUND SERVICE EQUIPMENT
HIGH DENSITY POLYETHYLENE PIPE
HORIZONTAL
HEIGHT
INSIDE BOTTOM OF WALL
INSIDE DIAMETER
INVERT ELEVATION
INCH
INCORPORATED
INVERT
IRON PIN FOUND
IRON PIN SET
JUNCTION BOX
CONTRACTING OFFICER
LINEAR FEET
B-21 LOW OBSERVABLE RESTORATION FACILITY
LIMITS OF DISTURBANCE
LIGHTNING PROTECTION
MAXIMUM
MITERED END SECTION
MINIMUM
MONUMENT
MONITORING WELL
NORTHING
NOW OR FORMERLY
NUMBER
NOT TO SCALE
OUTSIDE BOTTOM OF WALL
ON CENTER
ON CENTER EACH WAY
OUTSIDE DIAMETER
OFFSET
OIL/WATER SEPARATOR
PORTLAND CEMENT CONCRETE
POST INDICATOR VALVE
POINT OF BEGINNING
PROPOSED
POUNDS PER SQUARE FOOT
POUNDS PER SQUARE INCH
POWER-TELEPHONE POLE
POLYVINYL CHLORIDE
QUALITY CONTROL
REINFORCED CONCRETE PIPE
RADIUS POINT
RIGHT OF WAY
STORM DRAIN
SQUARE FEET
SPECIFICATIONS
SQUARE
SANITARY SEWER
SANITARY SEWER MANHOLE
STATION
STANDARD
SOIL VAPOR EXTRACTION
TEMPORARY BENCHMARK
TYPICAL
VERTICAL
WATER METER
WATER VALVE
WELDED WIRE FABRIC
WITH
WATER TO CEMENT
YEAR
Ø
ABND
AC
AG
EIC
APPR
APPROX.
BLDG
BM
BOT
BP
CAGS
CAVFS
CB
CF
CMP
CPTS
CONC
COR
CTB
DI
DIA
DIP
DES
DLA
DPW
DUP
E
ED
EG
EL OR ELEV
EP
ESMT
EX
FFE
FG
FH
FT
GCAB
GIS
GSE
HDPE
HORZ
HT
IBW
ID
IE
IN
INC
INV
IPF
IPS
JB
KO
LF
LO
LOD
LP
MAX
MES
MIN
MON
MW
N N/F
NO
NTS
OBW
OC
OCEW
OD
OFST
OWS
PCC
PIV
POB
PROP
PSF
PSI
PTP
PVC
QC
RCP
RP
R/W
SD
SF
SPEC
SQ
SS
SSMH
STA
STD
SVE
TBM
TYP
VERT
WM
WV
WWF
W/ W/C
YR
ABBREVIATIONS
FENCE
MINOR CONTOUR
INDEX CONTOUR
STORM DRAIN
WATER VALVE
DESCRIPTIONPROPOSED ITEM
SPOT ELEVATION267.54
DROP INLET
LEGEND
NORTH ARROW
CONTROL POINT
LIMITS OF DISTURBANCE
SANITARY SEWER MANHOLE
SANITARY SEWER CLEANOUTCO
FIRE HYDRANT
HEADWALL
AC PAVING
300'
EXISTING ITEM
UNDER DRAIN CLEAN OUT
UNDER DRAIN MANHOLE
300'
WATER LINE
UNDERGROUND COMMUNICATION UTILITY LINE
UNDERGROUND ELECTRICAL CONDUIT
VTANG LEASE LINE
UNDERGROUND ELECTRICAL CONDUIT (ABANDONED)
CO
SOIL BORING/PAVEMENT CORE
NATURAL GAS LINE
SANITARY SEWER LINE
FAA RTR UNDERGROUND CABLEFAA FAA
UNDERGROUND FIBER OPTICS
ELECTRICAL MANHOLE
ELECTRICAL HAND HOLE OR VAULT
STORM SEWER MANHOLE
MW MONITORING WELL
CONCRETE PAVING
FIRE WATER LINE
STORM SEWER
INDUSTRIAL WASTE
SANITARY SEWER
LOD
UE
I INDUSTRIAL WASTE MANHOLE
AG APRON GROUNDING POINT
TELEPHONE MANHOLE
ELECTRICAL MANHOLE
SAN
GROUND ROD TEST WELL
3/4" GROUND ROD
S
NORTH
LIMITS OF CONSTRUCTION
SEE SHEETS CU101 & C-501
IW
N/A
N/A
SHEET NAMING CONVENTION
C-001
2 DIGIT SEQUENTIAL # (01-99)
(FIRST DIGIT INDICATES PLAN
TYPE. SECOND DIGIT INDICATES
FLOOR)
1 DIGIT SHEET TYPE DESIGNATOR
0 - GENERAL
2 - PROFILES
3 - SECTIONS
4 - ENLARGED PLANS
6 - SCHEDULES AND DIAGRAMS
9 - 3D VIEWS (ISO, PERSPECTIVES,
PHOTOS)
2 DIGIT DESCIPLINE
DESIGNATOR
(IF ONLY ONE LETTER IS
USED, THE SECOND
LETTER IS REPLACED
WITH A DASH "-" AS A
PLACEHOLDER)**
PROJECT CONTACTS:
CIVIL ENGINEER FOR THIS PROJECT IS:
POND & COMPANY
3500 PARKWAY LANE, SUITE 500
PEACHTREE CORNERS, GA 30092
P: (678) 336.7740
CONTACT: KEVIN HENDRIX, PE
SURVEYOR FOR THIS PROJECT IS:
N/A
GEOTECH FOR THIS PROJECT IS:
N/A
1 - PLANS
5 - DETAILS
7 - USER DEFINED
8 - USER DEFINED
Issue Date
01/04/2024
Issue Date 06/25/2024
A/E:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
W W
W W
W W
W W
W W
W W
W W
W W
W
W W W W W W W W W W W W W W W W W W W
SM
SM
SM
SM
SM
SM
SM
SM
SM
SM
SM
SM
SM
SM
SM
WWWWW
SMSMSMSMSMSMSMSM
W
WWW
SMSMSM
SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS
SS
W W
SS
SM
UEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUE
UEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUE
UE
U E
U E
U E
UE
UE
U E
U E
U E
UE
U E
U E
UE
UE
UE
UE
U E
U E
U E
U E
U E
U E
U E
UE
U E
U E
U E
U E
U E
U E
U E
U E
UE
E E
E
E E E
E E
E E E E E E E E E E E E
ST
ST
ST
ST
ST
STSTSTSTSTST
SMSMSMSMSMSM
SM
16 17
UE
UE
UE
UE
UE
UE
UE
U
E U
E
UE
EN
G
LE
W
AY
FW
FW
FW
FW FW FW FW FW FW FW FW
FW
FW FW FW
LOD
LO
D
LODLOD
LO
D
LO
DLODLODLODLODLODLODLOD
LOD
LOD
LO
D
LO
D
LO
D
LOD
LO
D
LO
D
LO
D
LOD LOD LOD LOD LOD LOD
LO
D
LOD LOD LO
D
PIV
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
100% SUBMITTAL
03/28/2024
663A4-22-202UPGRADE FIRE SPRINKLER
IN B16
VA STATION AMERICAN LAKE
Revisions: Date:
3500 Parkway Lane Suite 500
Peachtree Corners Georgia 30092
Pond & Company
(678) 336-7740
SCALE: 1" = 10' 0 5' 30'20'10'A1 SITE LAYOUT AND UTILITY PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
100% SUBMITTAL
03/28/2024
663A4-22-202UPGRADE FIRE SPRINKLER
IN B16
VA STATION AMERICAN LAKE
Revisions: Date:
3500 Parkway Lane Suite 500
Peachtree Corners Georgia 30092
Pond & Company
(678) 336-7740
NORTH
GENERAL SHEET NOTES
1. REFER TO SHEET C-001 FOR CIVIL LEGEND AND
ABBREVIATIONS.
2. REFER TO SHEET C-001 FOR CIVIL GENERAL NOTES.
3. THIS SHEET IS PART OF A MULTI-SHEET SET OF
CONSTRUCTION PLANS AND SHALL BE READ WITH THE FULL
SET TO BEST ENSURE PROPER INTERPRETATION.
SHEET KEYNOTES
4 1. NEW 4" DIP FIRE WATER LINE, INSTALLED WITH 36" MINIMUM
COVER. SEE PLUMBING/FIRE PROTECTION PLANS FOR
CONTINUATION INTO BUILDING. SEE PIPE BEDDING DETAIL
(DETAIL C1/C-501)
2. 6" x 4" TAPPING SLEEVE. SEE ASBESTOS PIPING NOTE BELOW.
3. CONCRETE THRUST BLOCKS AT ALL BENDS AND TEES, TYPICAL.
(DETAIL C5/C-501)
4. FIRE DEPARTMENT CONNECTION (BUILDING MOUNTED) SEE
PLUMBING/FIRE PROTECTION PLANS.
5. PROVIDE NEW STREET SIDE ISOLATION VALVE AND ACCESS BOX
ON EXISTING 2" DOMESTIC WATER SERVICE
6. PROVIDE GRASSING AND TEMPORARY MULCHING TO STABILIZE
DISTURBED AREAS PER WSDOT EROSION AND SEDIMENT
CONTROL MANUAL. (DETAIL F1/C-501)
7. POST INDICATOR VALVE (PIV)
8. CLEANLY SAW CUT AND DEMOLISH EXISTING PAVEMENT AS
SHOWN FOR INSTALLATION OF NEW PIPE. PROVIDE PAVEMENT
PATCH ONCE NEW PIPE IS IN PLACE (DETAIL F6/C-501). MATCH
ELEVATIONS OF EXISTING, ENSURING NO PONDING OF STORM
WATER AND POSITIVE DRAINAGE AWAY FROM ALL STRUCTURES.
9. DEPTH OF SEWER LINE IS CURRENTLY UNKNOWN, CONTRACTOR
TO VERIFY PRIOR TO CONSTRUCTION. 18" VERTICAL
SEPARATION REQUIRED. CONTRACTOR TO NOTIFY OWNER IF
DISCREPANCIES ARE FOUND.
10. DEPTH OF EXISTING UNDERGROUND UTILITY IS CURRENTLY
UNKNOWN, CONTRACTOR TO VERIFY PRIOR TO CONSTRUCTION.
18" VERTICAL SEPARATION REQUIRED. CONTRACTOR TO NOTIFY
OWNER IF DISCREPANCIES ARE FOUND.
CU101
KH CP
SITE LAYOUT AND UTILITY PLAN
ASBESTOS PIPING NOTES
1. THE EXISTING WATER MAIN MATERIALS IS UNKNOWN,
BUT MAY CONSIST OF ASBESTOS CONCRETE PIPING.
2. THE CONTRACTOR IS RESPONSIBLE FOR IDENTIFYING
THE MATERIAL OF THE EXISTING WATER MAIN PRIOR
TO CONSTRUCTION AND DETERMINING IS ASBESTOS IS
PRESENT.
3. IF ASBESTOS IS PRESENT, THE CONTRACTOR IS
RESPONSIBLE FOR ENSURING THAT ALL APPLICABLE
LOCAL, STATE, AND FEDERAL REQUIREMENTS ARE
FOLLOWED IN MAKING THE NEW WATER LINE
CONNECTION.
Issue Date
01/04/2024
Issue Date 06/25/2024
A/E:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
100% SUBMITTAL
03/28/2024
663A4-22-202UPGRADE FIRE SPRINKLER
IN B16
VA STATION AMERICAN LAKE
Revisions: Date:
3500 Parkway Lane Suite 500
Peachtree Corners Georgia 30092
Pond & Company
(678) 336-7740
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
100% SUBMITTAL
03/28/2024
663A4-22-202UPGRADE FIRE SPRINKLER
IN B16
VA STATION AMERICAN LAKE
Revisions: Date:
3500 Parkway Lane Suite 500
Peachtree Corners Georgia 30092
Pond & Company
(678) 336-7740 C-501
KH CP
CIVIL CONSTRUCTION DETAILS
NOTES:
1. PROVIDE CONTRACTION AND EXPANSION JOINTS WITHIN NEW CONCRETE PAVEMENT, MATCHING
LAYOUT OF THE JOINTS WITHIN THE EXISTING PAVEMENT.
2. PROVIDE EXPANSION JOINTS BETWEEN NEW CONCRETE PAVEMENT AND STRUCTURES AND EXISTING
RIGID PAVEMENT.
Issue Date
01/04/2024
Issue Date 06/25/2024
A/E:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
1. COMPLY WITH ALL REQUIREMENTS LISTED IN THE
INFECTION CONTROL SECTION OF SPECIFICATION 01 35
26 -SAFETY REQUIREMENTS.
2. CONSTRUCTION ZONE ENTRANCES AND EXITS SHALL BE
LOCKED AT ALL TIMES UNLESS IN USE BY THE
CONTRACTOR. WHEN IN USE, ACCESS WILL BE
CONTROLLED AND MONITORED BY THE CONTRACTOR.
3. ADHESIVE WALK OFF CONSTRUCTION MATS TO BE USED
AT ALL CONSTRUCTION ZONE AND ANTE ROOM
ENTRANCES AND EXITS.
4. TEMP BARRIERS AND DOORS MAY ONLY BE DEMOLISHED
ONCE GIVEN FINAL APPROVAL BY THE VA COR.
( + ) PRESSURE
CONSTRUCTION ZONE, ( - - ) PRESSURE
ANTE ROOM, ( - ) PRESSURE
TEMPORARY ICRA BARRIER
TEMPORARY ICRA DOOR
CONSTRUCTION TACKY MATT
NEGATIVE AIR MACHINE
INSTALL TEMPORARY 1 HR CONSTRUCTION ICRA BARRIER
TO SEPARATE CONSTRUCTION AREA FROM OCCUPIED
SPACE.
INSTALL TEMPORARY PLASTIC FIRE RESISTANT, DUST
BARRIER. MAY ONLY BE DURING NON FUNCTIONAL
MEDICAL CENTER HOURS.
INSTALL FIRE RESISTANT TEMPORARY DOOR AT OPENING
AND MATCH RATING OF ICRA BARRIER, TYPICAL.
PLACE TACKY CONSTRUCTION WALK-OFF MATS AT
ENTRANCE AND EXIT SIDE OF CONSTRUCTION ACTIVITY
AREAS, TYPICAL.
FOR CLASS III & IV, NEGATIVE AIR MACHINE IS REQUIRED
AND SHALL BE LOCATED EITHER AT THE ICRA BARRIER OR
AT AN EXTERIOR WINDOW. COORDINATE WITH VA
INFECTIOUS PREVENTION TEAM AND COR.
DIGITAL/ANALOG PRESSURE GAUGE. CALCULATE CFM
FOR NEGATIVE PRESSURE AT
10 ACH.
EXISTING SUSPENDED
CEILING TO REMAIN ON
CORRIDOR SIDE
EXISTING
WALLS TO
REMAIN
EXISTING
WALLS TO
REMAIN
EXISTING DOOR BEHIND
VISQUEEN BARRIER
NON-SKID PLATE JACK
SCREWED FROM END OF
POLE TO TOP OF CEILING,
TYPICAL
FIRE RESISTANT PLASTIC
DUST BARRIER
SURROUNDING DOOR,
TYPICAL
EXTENSION POLES, TYPICAL
NON-SKID PLATE JACK
SCREWED FROM END OF
POLE TO BOTTOM OF
FLOOR, TYPICAL
BOTTOM OF CEILING
ZIPPER OPENING, TYPICAL
STICKY TACKY MATT
INFRONT OF VISQUEEN
BARRIER
TAPE TOP OF
CONSTRUCTION BARRIER
TO BOTTOM OF CEILING
CONSTRUCTION BARRIER
SURROUNDING EXIST
DOOR, TYPICAL
TAPE BOTTOM OF
CONSTRUCTION BARRIER TO
FLOOR SURFACE, TYPICAL
STICKY TACKY MATT IN FRONT
OF FIRE RESISTANT PLASTIC
BARRIER, TYPICAL
NEGATIVE AIR MACHINE,
TYPICAL (INSTALL AT ICRA
BARRIER IF EXTERIOR
WINDOW IS NOT AVAILABLE).
TEMPORARY FIRE
RATED DOOR, TYPICAL
DIGITAL/ANALOG PRESSURE
GAUGE. CALCULATE CFM FOR
NEGATIVE PRESSURE AT
10 ACH.
PROJECT AREA
PROJECT AREA
PATCH, REPAIR AND PAINT GWB WHERE ICRA
BARRIERS ARE CONSTRUCTED AND REMOVED.
PATCH AND REPAIR CEILINGS AND FLOORS AS
REQUIRED WHERE ICRA BARRIERS ARE
CONSTRUCTED AND REMOVED.
PROJECT AREA
PATCH, REPAIR AND PAINT GWB WHERE ICRA
BARRIERS ARE CONSTRUCTED AND REMOVED.
PATCH AND REPAIR CEILINGS AND FLOORS AS
REQUIRED WHERE ICRA BARRIERS ARE
CONSTRUCTED AND REMOVED.
ANTE
ROOM
PROJECT AREA
OUTSIDE
PROJECT AREA
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
AS101
ICRA DETAILS
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
DS OB
LEGEND
GENERAL NOTES
KEY NOTES (THIS SHEET ONLY)
CLASS I ICRA REQUIREMENTS
A. DURING CONSTRUCTION WORK:
1. NOTIFY THE CONTRACTING OFFICER REPRESENTATIVE.
2. EXECUTE WORK BY METHODS TO MINIMIZE RAISING DUST FROM CONSTRUCTION OPERATIONS.
3. CEILING TILES: IMMEDIATELY REPLACE A CEILING TILES DISPLACED FOR VISUAL INSPECTION.
B. UPON COMPLETION:
1. CLEAN WORK AREA UPON COMPLETION OF TASK.
2. NOTIFY THE CONTRACTING OFFICER REPRESENTATIVE.
CLASS II ICRA REQUIREMENTS
A. DURING CONSTRUCTION WORK:
1. NOTIFY THE CONTRACTING OFFICER REPRESENTATIVE.
2. PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM DISPERSING INTO
ATMOSPHERE. SUCH AS WET METHODS OR TOOL MOUNTED DUST COLLECTORS WHERE
POSSIBLE.
3. WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING.
4. SEAL UNUSED DOORS WITH DUCT TAPE.
5. BLOCK OFF AND SEAL AIR VENTS.
6. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.
B. UPON COMPLETION:
1. WIPE WORK SURFACES WITH CLEANER/DISINFECTANT.
2. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED
CONTAINERS.
3. WET MOP AND/OR VACUUM WITH HEPA FILTERED VACUUM BEFORE LEAVING WORK
AREA.
4. UPON COMPLETION, RESTORE HVAC SYSTEM WHERE WORK WAS PERFORMED.
5. NOTIFY THE CONTRACTING OFFICER REPRESENTATIVE.
CLASS III ICRA REQUIREMENTS
A. DURING CONSTRUCTION WORK:
1. REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT
CONTAMINATION OF DUCT SYSTEM.
2. COMPLETE ALL CRITICAL BARRIERS I.E. SHEETROCK, PLYWOOD, PLASTIC, TO SEAL AREA
FROM NON WORK AREA OR IMPLEMENT CONTROL CUBE METHOD (CART WITH PLASTIC
COVERING AND SEALED CONNECTION TO WORK SITE WITH HEPA VACUUM FOR VACUUMING
PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS.
3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR
FILTRATION UNITS.
4. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.
5. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.
B. UPON COMPLETION:
1. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS INSPECTED
BY THE SAFETY DEPARTMENT AND INFECTION CONTROL, THOROUGHLY CLEANED BY THE VA
ENVIRONMENTAL SERVICES DEPARTMENT.
2. REMOVE BARRIER MATERIAL CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS
ASSOCIATED WITH CONSTRUCTION.
3. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.
4. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS.
5. WET MOP AREA WITH DISINFECTANT.
6. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.
CLASS IV ICRA REQUIREMENTS
A. DURING CONSTRUCTION WORK:
1. ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION
OF DUCT SYSTEM.
2. COMPLETE ALL CRITICAL BARRIERS I.E. SHEETROCK, PLYWOOD, PLASTIC, TO SEAL AREA
FROM NON WORK AREA OR IMPLEMENT CONTROL CUBE METHOD (CART WITH PLASTIC
COVERING AND SEALED CONNECTION TO WORK SITE WITH HEPA VACUUM FOR VACUUMING
PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS.
3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR
FILTRATION UNITS.
4. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES APPROPRIATELY.
5. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS THROUGH THIS ROOM SO
THEY CAN BE VACUUMED USING A HEPA VACUUM CLEANER BEFORE LEAVING WORK SITE OR
THEY CAN WEAR CLOTH OR PAPER COVERALLS THAT ARE REMOVED EACH TIME THEY LEAVE
THE WORK SITE.
6. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR SHOE COVERS. SHOE
COVERS MUST BE CHANGED EACH TIME THE WORKER EXITS THE WORK AREA.
B. UPON COMPLETION:
1. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS INSPECTED
BY THE SAFETY DEPARTMENT AND INFECTION CONTROL, THOROUGHLY CLEANED BY THE VA
ENVIRONMENTAL SERVICES DEPARTMENT.
2. REMOVE BARRIER MATERIAL CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS
ASSOCIATED WITH CONSTRUCTION.
3. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.
4. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.
5. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS.
6. WET MOP AREA WITH DISINFECTANT.
7. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.
1/2" = 1'-0"
ICRA CLASS I DETAIL
1/2" = 1'-0"
ICRA CLASS II DETAIL
1/2" = 1'-0"
ICRA CLASS III/IV DETAIL
1/2" = 1'-0"
TYPICAL ICRA CLASS II BARRIER - PLAN VIEW
1/2" = 1'-0"
TYPICAL ICRA CLASS III DETAIL - PLAN VIEW
1/2" = 1'-0"
TYPICAL ICRA CLASS IV BARRIER - PLAN VIEW
100% CONSTRUCTION
DOCUMENTS
01/04/2024
Revisions: Date:
35% 01/16/2024
95% 02/26/2024
95% 04/01/2024
VA WA AMERICAN LAKE
B16 SPRINKLER
Location
AMERICAN LAKE CAMPUS, 9600 VETERANS DRIVE SW.
TACOMA, WA 98493
663A4-22-202
Issue Date 06/25/2024
05 OF 246/25/246/25/24
A/E:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
1 2 3 4 5 6
A
B
C
D
BOTTOM OF COLUMN FOOTINGS NOT OTHERWISE
INDICATED, TO BE 5'-6" BELOW LEVEL OF 1ST
FLOOR
WALL FOOTING: 24" x 12" COLUMN FOOTING: 36" x 36" x 24"
REINFORCED
CONC. SLAB
OVER
PIPE AND
VALVE PIT
BOTTOM OF FOOTING 11'-6"
BELOW LEVEL OF 1ST FLOOR
BOTTOM OF FOOTING 8'-6"
BELOW LEVEL OF 1ST FLOOR
D.S.
D.S. D.S.
D.S. D.S.
ACCESS HATCH ABOVE
A-404
1 ELEVATION A
A-4042
E L E
V A
T
IO
N B
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
/0 /2
:3
:2 a m
A u to d e s k D o c s /6
A
- 2
-2
V
A W
A A m e ri c a n L a k e
B
S p ri n k le r/ V
A A
L
A
R
S D
B .r v t
A-400
BUILDING 16 - LEVEL 00 - FLOOR
PLAN 16
DS OB
100% CONSTRUCTION
DOCUMENTS
01/04/2024
663A4-22-202VA WA AMERICAN LAKE
B16 SPRINKLER
AMERICAN LAKE CAMPUS, 9600 VETERANS DRIVE SW.
TACOMA, WA 98493
1/4" = 1'-0"
BUILDING 16 - LEVEL 00 - FLOOR PLAN
PROJECT
NORTH
0' 2' 4' 8'
ICRA: LEVEL 2 GENERAL NOTES
1. CONCRETE STEM WALL ASSUMED TO BE FINISHED WITH
LEAD-BASED PAINT.
2. ACM CONTAMINATED SPACE UNDER IN-PLACE VAPOR
BARRIER.
3. GROUND ASBESTOS DEBRIS ARE PRESENT IN THE CRAWL
SPACE UNDER THE PLASTIC SHEETING. PROPER TRAINING
AND PPE REQUIRED FOR ENTRY.
Revisions: Date:
35% 01/16/2024
95% 02/26/2024
95% 04/01/2024
Issue Date 06/25/2024
06 OF 246/25/246/25/24
A/E:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
262 SF
OFFICE
157 SF
OFFICE
13 SF
CLOSET
112A
117 SF
OFFICE
8 SF
CLOSET
113A
8 SF
CLOSET
114A
117 SF
OFFICE
142 SF
OFFICE
8 SF
CLOSET
115A
7 SF
CLOSET
115B
8 SF
CLOSET
116A
129 SF
OFFICE
148 SF
OFFICE
44 SF
FIRE RISER
50 SF
WOMEN
6 SF
CLOSET
110A
174 SF
OFFICE
103 SF
OFFICE
28 SF
H.A.C.
141 SF
MEN
112 SF
OFFICE
12 SF
CLOSET
102A
13 SF
CLOSET
104A
140 SF
STAIRS
S101
446 SF
CORRIDOR
100PORCH
RAMP
1 2 3 4 5 6
A
B
C
D
ACCESS
HATCH
IN-04.01-1
IN-03.01-1
A-404
1 ELEVATION A
EN-06.07-1EN-06.07-1
EN-06.07-2
A-4042
E L E
V A
T
IO
N B
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
/0 /2
:3
:2 a m
A u to d e s k D o c s /6
A
- 2
-2
V
A W
A A m e ri c a n L a k e
B
S p ri n k le r/ V
A A
L
A
R
S D
B .r v t
A-401
BUILDING 16 - LEVEL 01 - FLOOR
PLAN 16
DS OB
100% CONSTRUCTION
DOCUMENTS
01/04/2024
663A4-22-202VA WA AMERICAN LAKE
B16 SPRINKLER
AMERICAN LAKE CAMPUS, 9600 VETERANS DRIVE SW.
TACOMA, WA 98493
1/4" = 1'-0"
BUILDING 16 - LEVEL 01 - FLOOR PLAN
PROJECT
NORTH
0' 2' 4' 8'
ICRA: LEVEL 2 GENERAL NOTES
1. PAINTED SURFACES OF ROOM PENETRATIONS ARE
ASSUMED TO BE FINISHED WITH LEAD-BASED PAINT.
2. FLOOR TILES AND MASTIC CONTAIN ACM.
3. PATCH, REPAIR, AND TOUCH-UP PAINT AT WALLS WHERE
EXISTING SURFACES ARE DAMAGED DURING INSTALLATION
OF SPRINKLER WORK OR OTHERWISE VISIBLE OR NOT
COVERED BY SPRINKLER ESCUTCHEONS.
4. SEAL ALL NEW EXTERIOR AND INTERIOR PENETRATIONS TO
BE AIR AND WATER TIGHT.
Revisions: Date:
35% 01/16/2024
95% 02/26/2024
95% 04/01/2024
Issue Date 06/25/2024
07 OF 246/25/246/25/24
A/E:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
140 SF
STAIRS
S101
127 SF
OFFICE
174 SF
OFFICE
119 SF
OFFICE
28 SF
H.A.C.
141 SF
MEN
44 SF
FIRE RISER
25 SF
STORAGE
157 SF
OFFICE
309 SF
CONF. RM
128 SF
OFFICE
129 SF
OFFICE
128 SF
OFFICE
309 SF
CLASS RM
140 SF
STAIRS
S101
23 SF
STORAGE
442 SF
CORRIDOR
1" / 1'-0"
1 2 3 4 5 6
A
B
C
D
IN-03.01-2
IN-04.01-2
A-404
1 ELEVATION A
A-4042
E L E
V A
T
IO
N B
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
/0 /2
:3
:2 a m
A u to d e s k D o c s /6
A
- 2
-2
V
A W
A A m e ri c a n L a k e
B
S p ri n k le r/ V
A A
L
A
R
S D
B .r v t
A-402
BUILDING 16 - LEVEL 02 - FLOOR
PLAN 16
DS OB
100% CONSTRUCTION
DOCUMENTS
01/04/2024
663A4-22-202VA WA AMERICAN LAKE
B16 SPRINKLER
AMERICAN LAKE CAMPUS, 9600 VETERANS DRIVE SW.
TACOMA, WA 98493
1/4" = 1'-0"
BUILDING 16 - LEVEL 02 - FLOOR PLAN
PROJECT
NORTH
0' 2' 4' 8'
ICRA: LEVEL 2
Revisions: Date:
35% 01/16/2024
95% 02/26/2024
95% 04/01/2024
GENERAL NOTES
1. PAINTED SURFACES OF ROOM PENETRATIONS ARE
ASSUMED TO BE FINISHED WITH LEAD-BASED PAINT.
2. FLOOR TILES AND MASTIC CONTAIN ACM.
3. PATCH, REPAIR, AND TOUCH-UP PAINT AT WALLS WHERE
EXISTING SURFACES ARE DAMAGED DURING INSTALLATION
OF SPRINKLER WORK OR OTHERWISE VISIBLE OR NOT
COVERED BY SPRINKLER ESCUTCHEONS.
4. SEAL ALL NEW EXTERIOR AND INTERIOR PENETRATIONS TO
BE AIR AND WATER TIGHT.
Issue Date 06/25/2024
08 OF 246/25/246/25/24
A/E:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
B
C
D
ATTIC
ACCESS
6" / 1'-0" 6" / 1'-0"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
/0 /2
:3
:2 a m
A u to d e s k D o c s /6
A
- 2
-2
V
A W
A A m e ri c a n L a k e
B
S p ri n k le r/ V
A A
L
A
R
S D
B .r v t
A-403
BUILDING 16 - ATTIC - FLOOR
PLAN 16
DS OB
100% CONSTRUCTION
DOCUMENTS
01/04/2024
663A4-22-202VA WA AMERICAN LAKE
B16 SPRINKLER
AMERICAN LAKE CAMPUS, 9600 VETERANS DRIVE SW.
TACOMA, WA 98493
1/4" = 1'-0"
BUILDING 16 - ATTIC - FLOOR PLAN
PROJECT
NORTH
0' 2' 4' 8'
ICRA: LEVEL 2 GENERAL NOTES
1. PIPE ELBOWS AND FITTINGS CONTAMINATED WITH ACM.
Revisions: Date:
35% 01/16/2024
95% 02/26/2024
95% 04/01/2024
Issue Date 06/25/2024
09 OF 246/25/246/25/24
A/E:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
Level 2 10' - 6"
Attic 20' - 5"
Roof 31' - 3 3/32"
Level 1 0' - 0"
1 2 3 4 5 6
EXTERIOR SIGNAGE
EN-06.07-1
EXTERIOR SIGNAGE
EN-06.07-1
EXTERIOR SIGNAGE
EN-06.07-2
Level 2 10' - 6"
Attic 20' - 5"
Roof 31' - 3 3/32"
Level 1 0' - 0"
ABCD
EXTERIOR SIGNAGE
EN-06.07-2
EXTERIOR SIGNAGE
EN-06.07-1
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
/0 /2
:3
:2 a m
A u to d e s k D o c s /6
A
- 2
-2
V
A W
A A m e ri c a n L a k e
B
S p ri n k le r/ V
A A
L
A
R
S D
B .r v t
A-404
BUILDING 16 - ELEVATION
DS OB
100% CONSTRUCTION
DOCUMENTS
01/04/2024
663A4-22-202VA WA AMERICAN LAKE
B16 SPRINKLER
AMERICAN LAKE CAMPUS, 9600 VETERANS DRIVE SW.
TACOMA, WA 98493
1/4" = 1'-0"
ELEVATION A
Revisions: Date:
35% 01/16/2024
95% 02/26/2024
95% 04/01/2024
1/4" = 1'-0"
ELEVATION B
Issue Date 06/25/2024
10 OF 246/25/246/25/24
A/E:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
9" (228.600 mm)
5/8" (15.875 mm)
1/4" (6.350 mm)
3/8" (9.525 mm)
1 1/4" (31.750 mm)
1/2" (12.700 mm)
3/4" (19.050 mm)
3" (76.200 mm)RM 107
BRAILLE GRADE 2
DOMED
HELVETICA REGULAR
RAISED TACTILE TEXT
3/8" MIN. CLEARANCE
ALL SIDES
3/4" (19.05mm) 3/8" (9.525 mm) -
SIGN PROFILE
IN-03.01-1 & 2
9" (228.600 mm)
5/8" (15.875 mm)
1/4" (6.350 mm)
3/8" (9.525 mm)
1 1/4" (31.750 mm)
1/2" (12.700 mm)
3/4" (19.050 mm)
3" (76.200 mm)RM 107
3/4" (19.05mm) 3/8" (9.525 mm) -
6" (152.400 mm)
3/4" (19.050 mm)
3/4" (19.050 mm)
3/8" (9.525 mm)
3/4" (19.050 mm)
3/8" (9.525 mm)
3/4" (19.050 mm)
3/8" (9.525 mm)
3/4" (19.050 mm)
1 1/8" (28.575 mm)
SIGN PROFILE
IN-04.01-1
FIRE RISER
ACCESS
ROOM 108
9" (228.600 mm)
5/8" (15.875 mm)
1/4" (6.350 mm)
3/8" (9.525 mm)
1 1/4" (31.750 mm)
1/2" (12.700 mm)
3/4" (19.050 mm)
3" (76.200 mm)RM 206
6" (152.400 mm)
3/4" (19.050 mm)
3/4" (19.050 mm)
3/8" (9.525 mm)
3/4" (19.050 mm)
3/8" (9.525 mm)
3/4" (19.050 mm)
3/8" (9.525 mm)
3/4" (19.050 mm)
1 1/8" (28.575 mm)
IN-04.01-2
FIRE RISER
ACCESS
ROOM 207
1' - 6" (457.200 mm)
FIRE RISER
ACCESS
ROOM 108 &
ROOM 207
(76.200 mm)3"
(50.800 mm)2"
(25.400 mm)1"
(50.800 mm)2"
(25.400 mm)1"
(50.800 mm)2"
(25.400 mm)1"
(50.800 mm)2"
(101.600 mm)4"
1' - 6" (457.200 mm)
EN-06.07-1
(31.750 mm) 1 1/4"
1' - 6" (457.200 mm)
1' - 6" (457.200 mm) FDC
(31.750 mm) 1 1/4"
(76.200 mm)3"
(152.400 mm)6"
(50.800 mm)2"
(101.600 mm)4"
(76.200 mm)3"
EN-06.07-2
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
/0 /2
:3
:2 a m
A u to d e s k D o c s /6
A
- 2
-2
V
A W
A A m e ri c a n L a k e
B
S p ri n k le r/ V
A A
L
A
R
S D
B .r v t
AW001
INTERIOR AND EXTERIOR
SIGNAGE DETAILS 16
DS OB
100% CONSTRUCTION
DOCUMENTS
01/04/2024
663A4-22-202VA WA AMERICAN LAKE
B16 SPRINKLER
AMERICAN LAKE CAMPUS, 9600 VETERANS DRIVE SW.
TACOMA, WA 98493
6" = 1'-0"
SIGNAGE DETAILS - IN-03.01
6" = 1'-0"
SIGNAGE DETAILS - IN-04.01
Revisions: Date:
35% 01/16/2024
95% 02/26/2024
95% 04/01/2024
SIGNAGE MESSAGE SCHEDULE
SIGNAGE LEVEL ROOM NUMBER MESSAGE DESCRIPTION
EN-06.07-1 Level 1 BUILDING EXTERIOR FIRE RISER ACCESS ROOM 108 & 207 SAFETY RED BACKGROUND WITH WHITE LETTERING
EN-06.07-1 Level 1 BUILDING EXTERIOR FIRE RISER ACCESS ROOM 108 & 207 SAFETY RED BACKGROUND WITH WHITE LETTERING
EN-06.07-2 Level 1 BUILDING EXTERIOR FCD (with arrow sign) SAFETY RED BACKGROUND WITH WHITE LETTERING
IN-03.01-1 Level 1 108 - -
IN-03.01-2 Level 2 207 - -
IN-04.01-1 Level 1 107 FIRE RISER ACCESS ROOM 108 SAFETY RED BACKGROUND WITH WHITE LETTERING
IN-04.01-2 Level 2 206 FIRE RISER ACCESS ROOM 207 SAFETY RED BACKGROUND WITH WHITE LETTERING
1 1/2" = 1'-0"
SIGNAGE DETAILS - EN-06.07
1/8" MIN. LETTER SPACING
Issue Date 06/25/2024
11 OF 246/25/246/25/24
A/E:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
VALVE BOX W/ VALVE (AS SPECIFIED)
CONNECTION TO EXISTING
CIRCUIT SETTER
HOSE BIBB
CAP
SOLENOID VALVE
PRESSURE & TEMPERATURE (RELIEF VALVE)
PRESSURE REDUCING VALVE (POINTS TOWARDS LOW PRESSURE)
GAS VALVE
CHECK VALVE
CIRCULATING PUMP (POINTS IN DIRECTION OF FLOW)
CLEAN-OUT (WALL OR CEILING)
FLOOR DRAIN
VALVE (AS INDICATED OR SPECIFIED)
CLEAN-OUT (FLUSH TO FLOOR OR GRADE)
CONCENTRIC REDUCER/INCREASER
ECCENTRIC REDUCER/INCREASER
RISE/DROP IN PIPE
VENT THRU ROOF
UNION
TEE UP
TEE DOWN
ELBOW UP
ELBOW DOWN
PLUMBING/PIPING SYMBOLS
S
EXTENSION & CONTINUATION
RISE/DROP IN PIPE & 90° TURN
DIRECTION OF FLOW LINE
GENERAL FIRE PROTECTION NOTES
1. FOR THE PURPOSES OF CLEARNESS AND LEGIBILITY,DRAWINGS ARE DIAGRAMMATIC AND FOR
DESIGN INTENT ONLY. CONTRACTOR MUST VERIFY ALL DIMENSIONS BY FIELD MEASUREMENT
BEFORE BEGINNING ANY FABRICATION OR CONSTRUCTION.
2. ALL WORK SHALL BE COMPLETED IN STRICT ACCORDANCE WITH THE CURRENT VA GUIDES AND
LOCAL FIRE PROTECTION CODES AND ORDINANCES.
3. CONTRACTOR SHALL INSTALL ALL EQUIPMENT IN STRICT ACCORDANCE WITH MANUFACTURERS
RECOMMENDATIONS.
4. COORDINATE EXACT LOCATION OF PIPING WITH OTHER TRADES.
5. THE CONTRACTOR SHALL PROVIDE FIRE CAULKING AT ALL PIPING PENETRATIONS OF FIRE RATED ASSEMBLIES OR PROVIDE FIRE RATED SEALS FOR NON-RATED PLASTIC PIPING PENETRATIONS OR
RATED ASSEMBLIES AS REQUIRED.
6. NFPA STANDARDS: FIRE-SUPPRESSION-SYSTEM,SPECIALTIES, ACCESSORIES, INSTALLATION, AND TESTING SHALL COMPLY WITH NFPA 13 EDITION 2022 "INSTALLATION OF SPRINKLER SYSTEMS."
7. ALL AREAS WITHIN BUILDING 16 ARE LIGHT HAZARD LEVEL UNLESS NOTED OTHERWISE. TELECOM
ROOMS ARE CONSIDERED LIGHT HAZARD GROUP, STORAGE AREAS ARE ORDINARY HAZARD GROUP
2 AND ELECTRICAL AND MECHANICAL ROOMS ARE ORDINARY HAZARD FOR SPRINKLER HEAD
DENSITY.
8. TELECOM ROOMS SHALL HAVE STANDARD RESPONSE SPRINKLER HEADS W/ MECHANICAL GUARDS.
*SEE FP101 FOR FIRE RISER DIAGRAM
PIPE THRU FLOOR DETAIL2
1/2"
1/2"
FIRE RESISTANT SEALANT
PIPE RISER
PIPE SLEEVE
FLOOR OPENING
SCALE: NTS
EXIST WALL
PIPE SLEEVE
PIPE INSULATION
(IF PRESENT)
PIPE
MINERAL WOOL
INSIDEOUTSIDE
CAULK (TYP)
PIPE INSULATION
WITH JACKET
PIPE THRU WALL DETAIL 1
CAULK (TYP)
SCALE: NTS
SCALE: NOT TO SCALE
BELOW GRADE PIPE THROUGH WALL DETAIL3
FIRE RISER DOUBLE CHECK DETECTOR BACKFLOW DEVICE
EQUIPMENT TAG BASIS OF DESIGN MANUFACTURER MODEL MODEL SIZE VALVES REMARKS
DCDA -01 ZURN/WILKINS 350DA 4" GATE -
NOTE: DO NOT DAMAGE (E) SLAB REINFORCEMENT
NOTE: DO NOT DAMAGE (E) WALL REINFORCEMENT
RISER CLAMP
NOTE: DO NOT DAMAGE (E) WALL REINFORCEMENT
EXTERIOR SIDE OF WALL
RESILIENT
WATERPROOF
CAULKING
PIPE CENTERED
IN SLEEVE
STANDARD WEIGHT GAL.
STEEL PIPE SLEEVE
CHEMICAL ANCHOR
MODULAR TYPE WALL
PENETRATION SEAL
INTERIOR SIDE OF WALL
STAINLESS STEEL BOLTS,
NUTS & WASHERS IRON PIPE CLAMP
EXIST WALL
PIPE SLEEVE
FP
PIPING
MINERAL WOOL
INSIDEOUTSIDE
CAULK (TYP)
CONTINUATION
TO EXTERIOR
FIXTURE
SCALE: NOT TO SCALE
PIPE THROUGH EXTERIOR WALL DETAIL4
NOTE: DO NOT DAMAGE (E) WALL REINFORCEMENT
DEDUCTIVE ALTERNATES
THIS PROJECT INCLUDES THE FOLLOWING DEDUCTIVE ALTERNATES
DEDUCT ITEMS DESCRIPTION
D1
CRAWL SPACE
FIRE
SUPPRESSION
SYSTEM
THIS DEDUCT WILL REMOVE THE DRY PIPE SYSTEM IN THE CRAWL SPACE
FOR BUILDING 16. THIS DEDUCT WILL INCLUDE THE REMOVAL OF ALL
UNDER STRUCTURE SCH 40 DRY-PIPE SUPPRESSION SYSTEM TO INCLUDE
ALL ASSOCIATED ELECTRICAL AND SENSORS FOR THE DRY SYSTEM
COMPRESSOR. THIS DEDUCT ONLY APPLIES TO SUPPRESSION SYSTEM.
THIS DEDUCT DOES NOT EFFECT THE SERVICE ENTRY PIPING AND THE
FDC PIPING.
D2
ACM
ABATEMENT IN
CRAWL SPACE
THIS DEDUCT REMOVES FROM SCOPE THE 60MM EPDM AIRTIGHT
MEMBRANE TO BE PLACED OVER THE TOP OF EXPOSED SOIL SURFACES
AS CALLED OUT IN THE ENVIRONMENTAL SPECIFICATIONS AND BASIS OF
DESIGN.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
100% CONSTRUCTION
DOCUMENTS
06/25/2024
663A4-22-202UPGRADE FIRE SPRINKLER
IN B16
VA STATION AMERICAN LAKE
Revisions: Date:
35% SCHEMATIC DESIGN 2 SUBMISSION:
95% DESIGN DEVELOPMENT 2 SUBMISSION:
100% CONSTRUCTION DOCUMENT SUBMISSION:
01/12/24 03/04/24 04/01/24
FP001
FIRE PROTECTION GENERAL NOTES
AND ABBREVIATIONS
6/25/24
Issue Date 06/25/2024
A/E:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S.
This is the start of the file's text. The full file is on GovTribe.