65DPS-S3288-cost-schedule.xlsx
XLSX spreadsheet 20 KB Posted
- Attached to
- Uninterruptable Power Supply State and local contract opportunity
- Solicitation number
- 65DPS-S3288
- Issued by
- Nevada
About this file
The document is a cost schedule spreadsheet (65DPS-S3288-cost-schedule.xlsx) associated with a state or local government procurement opportunity. The spreadsheet appears to be a pricing template requiring vendor completion of shaded areas with proposed pricing, with 16 line items and an estimated travel costs section. The document indicates that travel will be reimbursed at current GSA rates and provides a framework for vendors to calculate and submit their proposed pricing for the contract.
The cost schedule lacks specific details about the total estimated project value, with placeholders showing "$-0" across multiple columns. The vendor is explicitly instructed to ensure all calculations are correct when completing the pricing template. While the spreadsheet provides a structured format for pricing submission, it does not include specific details about the scope of work, contract duration, or specific service requirements. The reference to GSA.gov suggests this may be a government procurement document, potentially for a federal, state, or local agency procurement process.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| Terms-and-conditions-for-services~3.pdf | ||
| Certification-regarding-lobbying~3.pdf | ||
| Quote Instructions.pdf | ||
| Standard-form-contract~3.docx | DOCX document | |
| 65DPS-S3288-informal-solicitation-2025-04-08.docx | DOCX document | |
| Insurance Schedule - 3288.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cost schedule
| 65DPS-S3288 Cost schedule | |||||
| Vendor | |||||
| Please complete shaded areas with proposed pricing. Vendor is responsible for ensuring calculations are correct. | |||||
| Line | Description and term | Type | Price | Est. Usage | Extended |
| 1 | $ - 0 | ||||
| 2 | $ - 0 | ||||
| 3 | $ - 0 | ||||
| 4 | $ - 0 | ||||
| 5 | $ - 0 | ||||
| 6 | $ - 0 | ||||
| 7 | $ - 0 | ||||
| 8 | $ - 0 | ||||
| 9 | $ - 0 | ||||
| 10 | $ - 0 | ||||
| 11 | $ - 0 | ||||
| 12 | $ - 0 | ||||
| 13 | $ - 0 | ||||
| 14 | $ - 0 | ||||
| 15 | $ - 0 | ||||
| 16 | Estimated travel costs | per year | 4 | $ - 0 | |
| Estimated project value | $ - 0 | ||||
| Travel is allowed as a billable costs of this contract, at then current GSA rates. | |||||
| gsa.gov |
&"Times New Roman,Italic"&10Page &P of &N http://www.gsa.gov/
File details come from the government source that posted it. Updated .