659-24-903 Salisbury Steam Line Repl - Final Bid Drawings.pdf
PDF 29 MB Posted
- Solicitation number
- 36C24626B0016
About this file
This file is Final Bid Drawings for a construction project. Project 659-24-903 concerns the Steam Line Replacement at Salisbury VA Medical Center, located at 1601 Brenner Avenue, Salisbury, NC 28144. The drawings are dated September 27, 2024, at 100% Construction Documents phase and were prepared by Above Group, Inc. (Melbourne, Florida), the Architect/Engineer of Record, with support from multiple consultants including Force Protect Physical Security & Blast Design, Alpha Terra Environmental & Commissioning, Stanton Engineering Services, and OCMI Cost Estimating.
The project involves replacement of steam distribution piping and related infrastructure across seven phased construction stages. Key structural and mechanical work includes demolition and reconstruction of six existing manholes (MH-10B, MH-16A, MH-17B, MH-15A, MH-17C, and MH-15B) with new high-pressure steam and condensate piping installations to serve Buildings 15, 16, 17, and 18. Design is per VA Design Manual PG-18-10, IBC 2021, ASCE 7-22, and ACI 318-14 with Risk Category IV seismic design (SDC C). The drawings provide civil, structural, and mechanical plans with detailed specifications for concrete work, rebar reinforcement, pipe penetrations, waterproofing, traffic control, and phased sequencing to minimize service disruptions to active steam systems during construction. Deductive alternate bid items address exclusion of water monitoring systems and manhole abandonment options.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Steam Line Replacement BID OPENING Abstract_signed.pdf | ||
| 36C24626B0016 0003.docx | DOCX document | |
| 36C24626B0016 0002.docx | DOCX document | |
| 01 32 16.15 - VA Mark -up.docx | DOCX document | |
| RFI Questions - RESPONSES 04082026.docx | DOCX document | |
| 01 33 23 - VA Mark-up.docx | DOCX document | |
| Salisbury Steam Line Replacement - Final Specs - REVISED 10152025.pdf | ||
| 659-24-903 Salisbury Steam Line Repl - Final Bid Drawings_110.pdf | ||
| 36C24626B0016_2 0001.docx | DOCX document | |
| 659-24-903_Steam Line Replacement_Site Visit _Sign-In Sheet_03.25.2026.docx.pdf | ||
| Salisbury Steam Line Replacement - Final Specs REVISED 09052025.pdf | ||
| 36C24626B0016_2 solicitation.docx | DOCX document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
Department of Veterans Affairs Medical Center
ABOVE GROUP, INC.
MECHANICAL ELECTRICAL PLUMBING
305 EAST DRIVE, SUITE H
MELBOURNE, FL 32904
321.345.9026 P
305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
A u to d e s k D o c s /0
S a lis b u ry
S te a m
L in e R e p la c e m e n t/
V A
S a lis b u ry S tm L in e R e p l.
R
M E
.r v t
/2
/2
:0
:3
P
M
GI001
COVER SHEET STEAM LINE REPLACEMENT
SALISBURY VAMC
659-24-903
09/27/2024 BA JP
100% CONSTRUCTION
DOCUMENTS
STEAM LINE REPLACEMENT
VAMC - Salisbury 1601 Brenner Avenue - Salisbury, NC 28144 PROJECT #: 659-24-903
SHEET LIST
SHEET NUMBER SHEET NAME
GENERAL
GI001 COVER SHEET
CIVIL
C-3 EXISTING CONDITIONS
C-4 DEMOLITION PLAN
C-5 SITE PLAN
C-7.03 GRADING PLAN
C-7.02 GRADING PLAN
C-7.01 GRADING PLAN
C-7.04 GRADING PLAN
C-7.05 GRADING PLAN
C-8.01 UTILITY PLAN
C-8.02 UTILITY PLAN
C-8.03 UTILITY PLAN
C-8.04 UTILITY PLAN
C-8.05 UTILITY PLAN
C-8.06 UTILITY PLAN
C-8.07 UTILITY PLAN
C-10.1 TRAFFIC CONTROL PLAN
C-10.2 TRAFFIC CONTROL PLAN
C-10.3 TRAFFIC CONTROL PLAN
STRUCTURAL
S-001 GENERAL NOTES AND ABBREVIATIONS
SS101 MANHOLE MH-10B PLANS AND ELEVATIONS - PHASE 3
SS102 MANHOLE MH-16A PLANS AND ELEVATIONS - PHASE 4
SS103 MANHOLE MH-17B PLANS AND ELEVATIONS - PHASE 4
SS104 MANHOLE MH-15A PLANS AND ELEVATIONS - PHASE 5
SS105 MANHOLE MH-17C PLANS AND ELEVATIONS - PHASE 5
SS106 MANHOLE MH-15B PLANS AND ELEVATIONS - PHASE 6
S-301 CONCRETE DETAILS AND SECTIONS
MECHANICAL
M-001 MECHANICAL NOTES, LEGENDS, & SYMBOLS
M-101 MECHANICAL - PHASING
MD103 SITE PLAN - MECHANICAL - DEMOLITION - PHASE 3
MD104 SITE PLAN - MECHANICAL - DEMOLITION - PHASE 4
MD106 SITE PLAN - MECHANICAL - DEMOLITION - PHASE 6
MP101 SITE PLAN - MECHANICAL - NEW WORK - PHASE 1
MP102 SITE PLAN - MECHANICAL - NEW WORK - PHASE 2
MP103 SITE PLAN - MECHANICAL - NEW WORK - PHASE 3
MP104 SITE PLAN - MECHANICAL - NEW WORK - PHASE 4
MP105 SITE PLAN - MECHANICAL - NEW WORK - PHASE 5
MP106 SITE PLAN - MECHANICAL - NEW WORK - PHASE 6
MP107 SITE PLAN - MECHANICAL - NEW WORK - PHASE 7
MD401 MH-10B - MECH PLANS AND SECTIONS - DEMOLITION - PHASE 3
MD402 MH-16A - MECH PLANS AND SECTIONS - DEMOLITION - PHASE 3
MD403 MH-17B - MECH PLANS AND SECTIONS - DEMOLITION - PHASE 3
MD404 MH-1 - MECH PLANS AND SECTIONS - DEMOLITION - PHASE 4
MD405 MH-10A - MECH PLANS AND SECTIONS - DEMOLITION - PHASE 6
MD406 MH-C - MECH PLANS AND SECTIONS - DEMOLITION - PHASE 6
MD407 MH-10B - MECH PLANS AND SECTIONS - DEMOLITION - PHASE 6
MD408 MH-16A - MECH PLANS AND SECTIONS - DEMOLITION - PHASE 6
MD409 MH-17B - MECH PLANS AND SECTIONS - DEMOLITION - PHASE 6
MP401 MH-10B - MECH PLANS AND SECTIONS - NEW WORK - PHASE 3
MP402 MH-16A - MECH PLANS AND SECTIONS - NEW WORK - PHASE 3
MP403 MH-17B - MECH PLANS AND SECTIONS - NEW WORK - PHASE 3
MP404 MH-16A - MECH PLANS AND SECTIONS - NEW WORK - PHASE 4
MP405 MH-17B - MECH PLANS AND SECTIONS - NEW WORK - PHASE 4
MP406 MH-15A - MECH PLANS AND SECTIONS - NEW WORK - PHASE 5
MP407 MH-17C- MECH PLANS AND SECTIONS - NEW WORK - PHASE 5
MP408 MH-15B - MECH PLANS AND SECTIONS - NEW WORK - PHASE 6
MP409 B16 - MECH PLANS AND PHOTOS
MP410 B17 - MECH PLANS AND PHOTOS
M-501 MECHANICAL DETAILS
M-502 MECHANICAL EXISTING CONDITIONS DETAILS
M-801 MECHANICAL SCHEDULES
PROJECT LOCATION
© Google/Apple/Bing Maps
FORCE PROTECT
PHYSICAL SECURITY & BLAST DESIGN
10901 FRONT BEACH ROAD, SUITE 1415
PANAMA CITY BEACH, FL 32407
502.836.4232 P
ALPHA TERRA
ENVIRONMENTAL & COMMISSIONING
8626 TESORO DRIVE, SUITE 810
SAN ANTONIO, TX 78217
210.930.2834 P
STANTON ENGINEERING
SERVICES
LIFE SAFETY & CITP REVIEW
1028 OLD COLUMBIA ROAD, SUITE 275
COLUMBIA, MD 21046
410.290.9301 P
OCMI
COST ESTIMATING
2015 AYRSLEY TOWN BLVD., SUITE 202
CHARLOTTE, NC 28273
704.280.8356 P
Revisions Date
AB ANCHOR BOLT
ABV ABOVE
ACI AMERICAN CONCRETE INSTITUTE
ADDL ADDITIONAL
ADH ADHESIVE
ADJ ADJACENT, ADJUSTMENT
A/E ARCHITECT/ENGINEER
AESS ARCHITECTURALLY EXPOSED STRUCTURAL STEEL
AFF ABOVE FINISHED FLOOR
AGG AGGREGATE
AHJ AUTHORITY HAVING JURISDICTION
AISC AMERICAN INSTITUTE OF STEEL CONSTRUCTION
AISI AMERICAN IRON AND STEEL INSTITUTE
ALT ALTERNATE
ANCH ANCHOR
ANSI AMERICAN NATIONAL STANDARDS INSTITUTE
APA ENGINEERED WOOD ASSOCIATION
APRX APPROXIMATE
AR ANCHOR ROD
ARCH ARCHITECT(URAL)
ASCE AMERICAN SOCIETY OF CIVIL ENGINEERS
ASD ALLOWABLE STRESS DESIGN
ASTM AMERICAN SOCIETY FOR TESTING AND MATERIALS
AWC AMERICAN WOOD COUNCIL
AWPA AMERICAN WOOD PROTECTION AGENCY
AWS AMERICAN WELDING SOCIETY
AVG AVERAGE
B BOTTOM
B/ BOTTOM OF
B-B BACK-TO-BACK
BAL BALANCE
BEL BELOW
BF BRACED FRAME
BLDG BUILDING
BLK(G) BLOCK(ING)
BM BEAM
BOT BOTTOM
BP BASE PLATE, BEARING PLATE
BR BRACE(ING)
BRDG BRIDGING
BRG BEARING
BRK BRICK
BRKT BRACKET
BS BOTH SIDES
BSMT BASEMENT
BT BENT
BTWN BETWEEN
BYD BEYOND
C STEEL CHANNEL
CAIS CAISSON
CALC CALCULATION
CANT CANTILEVER
CAP CAPACITY
C-C CENTER-TO-CENTER
CE CONCRETE ENCASED
CFM COLD FORMED METAL
CHAM CHAMFER
CI CAST IRON
CIP CAST IN PLACE
CJ CONTROL/CONTRACTION JOINT
CL CENTERLINE, COLUMN LINE
CLG CEILING
CLR CLEAR
CM CONSTRUCTION MANAGER
CMU CONCRETE MASONRY UNIT
COL COLUMN
COMB COMBINED
COMP COMPOSITE
CONC CONCRETE
COND CONDITION
CONN CONNECTION
CONST CONSTRUCTION
CONT CONTINUOUS
CONTR CONTRACTOR
COORD COORDINATE
COV COVER
CP CAP PLATE
CRSI CONCRETE REINFORCING STEEL INSTITUTE
CSK COUNTERSUNK
CTR CENTER(ED)
CY CUBIC YARD
CYL CYLINDER
d PENNY (AS IN NAIL, Id)
DBL DOUBLE
DD DESIGN DEVELOPMENT
DEF DEFLECTION
DEG DEGREE
DEMO DEMOLITION/DEMOLISH
DEPR DEPRESS(ED)/DEPRESSION
DET(S) DETAIL(S)
DEV DEVELOP/DEVELOPMENT
DIA DIAMETER
DIAG DIAGONAL
DIM(S) DIMENSION(S)
DIR DIRECTION
DK DECK
DL DEAD LOAD
DN DOWN
do DITTO
DP DEEP
DWG(S) DRAWING(S)
DWL DOWEL
(E) EXISTING
E EAST
EA EACH
EF EACH FACE
EIFS EXTERIOR INSULATION FINISH SYSTEM
EJ EXPANSION JOINT
EL ELEVATION
ELEC ELECTRICAL
ELEV ELEVATOR
EMBED EMBEDMENT/EMBEDDED
ENGR ENGINEER
EO EDGE OF
EOD EDGE OF DECK
EOM EDGE OF MASONRY
EOS EDGE OF SLAB
EQ EQUAL
EQUIP EQUIPMENT
ES EACH SIDE
STRUCTURAL ABBREVIATIONS
ES EACH SIDE
EXCAV EXCAVATE/EXCAVATION
EXP EXPANSION
EXT EXTERIOR
EXIST EXISTING
EW EACH WAY
F/ FACE OF
FAB FABRICATE
FB FLAT BAR
FBO FURNISHED BY OTHERS
FDN FOUNDATION
FFE FINISHED FLOOR ELEVATION
FIN FINISH(ED)
FL(R) FLOOR
FLG FLANGE
FND FOUNDATION
FO FACE OF
FOC FACE OF CONCRETE
FOF FACE OF FINISH
FOM FACE OF MASONRY
FOS FACE OF STUD
FP FIREPROOFING
FRMG FRAMING
FRP FIBER-REINFORCED POLYMER
FRT FIRE RETARDANT TREATED
FS FAR SIDE
FT FEET
FTG FOOTING
FUT FUTURE
FV FIELD VERIFY
GA GAUGE
GALV GALVANIZE(D)
GB GRADE BEAM
GC GENERAL CONTRACTOR
GLB GLUE LAMINATED BEAM
GR GRADE
GYP GYPSUM
HD HEAVY DUTY
HDR HEADER
HEF HORIZONTAL EACH FACE
HGR HANGER
HI HIGH
HIF HORIZONTAL INSIDE FACE
HK HOOK(ED)
HOF HORIZONTAL OUTSIDE FACE
HORIZ HORIZONTAL
HP HIGH POINT
HS HIGH STRENGTH
HT HEIGHT
H&V HORIZONTAL & VERTICAL
HVAC HEATING, VENTILATING & AIR CONDITIONING
IBC INTERNATIONAL BUILDING COUNCIL
ICC INTERNATIONAL CODE COUNCIL
ID INSIDE DIAMETER
IF INSIDE FACE
IFC ISSUE FOR CONSTRUCTION
IN INCH
INCL INCLUDE(D)(ING)
INFO INFORMATION
INSTL INSTALL/INSTALLATION
INSUL INSULATION
INT INTERIOR
INV INVERT(ED)
JST(S) JOIST(S)
JT JOINT
k KIP (THOUSAND POUNDS)
KB KNEE BRACE
KSI KIPS PER SQUARE INCH
LB, # POUND
LDGR LEDGER (BOARD)
LEN LENGTH
LG LONG
LL LIVE LOAD
LLBB LONG LEGS BACK TO BACK
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LOCN LOCATION
LONGIT LONGITUDINAL
LP LOW POINT
LRFD LOAD AND RESISTANCE FACTOR DESIGN
LSL LONG SLOTTED HOLE,
LAMINATED STRAND LUMBER
LVL LAMINATED VENEER LUMBER
LW LONG WAY
LWC LIGHT WEIGHT CONCRETE
M MOMENT
MAS MASONRY
MATL MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MEP MECHANICAL, ELECTRICAL & PLUMBING
MEZZ MEZZANINE
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MO MASONRY OPENING
MONO MONOLITHIC
MPH MILES PER HOUR
MTL METAL
NA NOT APPLICABLE
NDS NATIONAL DESIGN SPECIFICATION FOR WOOD
CONSTRUCTION
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NS NEAR SIDE
NTS NOT TO SCALE
NWC NORMAL WEIGHT CONCRETE
OC ON CENTER
OD OUTSIDE DIAMETER
OF OUTSIDE FACE
O-O OUT-TO-OUT
OPG OPENING
OPP OPPOSITE
OSB ORIENTED STRAND BOARD
OSHA OCCUPATIONAL SAFETY AND HEALTH
ADMINISTRATION
OSL OUTSTANDING LEG,
ORIENTED STRAND LUMBER
OVS OVERSIZED HOLE
PAF POWDER ACTUATED FASTENER
PC PRECAST CONCRETE, PIECE
PCF POUNDS PER CUBIC FOOT
PED PEDESTAL
PERP PERPENDICULAR
PREFAB PREFABRICATE(D)
PL PLATE
PLF POUNDS PER LINEAR FOOT
PLYWD PLYWOOD
PMF PREMOLDED FILLER
PROJ PROJECT(ION)
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PSL PARALLEL STRAND LUMBER
PT PRESERVATIVE-TREATED,
POST-TENSIONED
PVC POLYVINYL CHLORIDE
QTY QUANTITY
R RADIUS
RCMU REINFORCED CONCRETE MASONRY UNIT
RCSC RESEARCH COUNCIL ON STRUCTURAL
CONNECTIONS
RD ROOF DRAIN
RDK ROOF DECK
REF REFERENCE
REINF REINFORCE(D)/REINFORCEMENT
REQ(D) REQUIRE(D)
RET RETAINING
REV REVISE(D)/REVISION
RO ROUGH OPENING
RQMT(S) REQUIREMENT(S)
RTU ROOFTOP UNIT
RXN REACTION
SAN SANITARY
SC SLIP-CRITICAL (CONNECTION)
SCHED SCHEDULE
SECT SECTION
SD STORM DRAIN
SDI STEEL DECK INSTITUTE
SF SQUARE FOOT
SHRG SHORING
SHTHG SHEATHING
SIM SIMILAR
SL SLOPE(D)
SLBB SHORT LEGS BACK TO BACK
SLV SLEEVE
SOD SLAB ON DECK
SOG SLAB ON GRADE
SPA SPACE(S)/SPACING
SPEC(S) SPECIFICATION(S)
SQ SQUARE
SS STAINLESS STEEL
SSL SHORT SLOTTED HOLE
STD STANDARD
STIFF STIFFENER
STIR STIRRUP
STL STEEL
STRUC STRUCTURAL
SUPT SUPPORT
SW SHORT WAY, SHEAR WALL
SYM SYMMETRICAL
T TOP
T/ TOP OF
T&B TOP AND BOTTOM
TB TRUSS BEARING
TC TERRA COTTA
TEMP TEMPORARY,TEMPERATURE
T&G TONGUE AND GROOVE
THD THREAD(ED)
THK THICK(NESS)
TMS THE MASONRY SOCIETY
TOS TOP OF SLAB
TYP TYPICAL
UNO UNLESS NOTED OTHERWISE
U-P UNDERPINNING
V SHEAR
VAR VARIES
VB VAPOR BARRIER
VEF VERTICAL EACH FACE
VERT VERTICAL
VIF VERTICAL INSIDE FACE,
VERIFY IN FIELD
VOF VERTICAL OUTSIDE FACE
VR VAPOR RETARDER
W/ WITH
W/O WITHOUT
WD WOOD
WI WROUGHT IRON
WP WORK POINT, WATERPROOFING
WT WEIGHT
WWF WELDED WIRE FABRIC
XS EXTRA STRONG
XXS DOUBLE EXTRA STRONG
∅ DIAMETER
± PLUS OR MINUS
ABBR. DESCRIPTION ABBR. DESCRIPTION ABBR. DESCRIPTIONGENERAL:
1. CONTRACTOR IS SOLELY RESPONSIBLE FOR MEANS AND METHODS
DURING THE COURSE OF THE WORK. DO NOT DAMAGE OR
ENDANGER THE STRUCTURAL INTEGRITY OF THE WORK.
2. CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROPER AND SAFE
DESIGN OF SHORING SYSTEMS FOR TRENCHES AND EXCAVATIONS.
3. THE BUILDING FRAME IS NOT SELF-SUPPORTING UNTIL THE ENTIRE
STRUCTURAL SYSTEM HAS BEEN INSTALLED. TEMPORARY BRACING
MUST BE PROVIDED BY THE CONTRACTOR TO SUPPORT THE FRAME
UNTIL THE STRUCTURAL SYSTEM HAS BEEN COMPLETED.
4. NOTIFY ENGINEER IN CASE OF DISCREPANCIES BETWEEN DRAWINGS,
THESE NOTES, AND PROJECT MANUAL BEFORE PROCEEDING WITH
THE WORK.
5. USE DRAWINGS OF OTHER TRADES IN CONJUNCTION WITH THE
STRUCTURAL DRAWINGS TO PROPERLY PERFORM THE WORK.
6. IF CONDITIONS DISCLOSED DURING EXCAVATION REVEAL
UNFORESEEN CONDITIONS, PROMPTLY REQUEST DIRECTION FROM
ENGINEER BEFORE PROCEEDING.
7. CONTRACTOR IS RESPONSIBLE FOR COORDINATING BETWEEN
TRADES.
8. DO NOT SCALE DRAWINGS.
9. SECTIONS AND DETAILS SHOWN, WHILE DRAWN FOR SPECIFIC
LOCATIONS, ARE INTENDED TO ESTABLISH THE GENERAL TYPES OF
DETAILS WILL APPLY TO OTHER LOCATIONS.
10. THE ENGINEER'S REVIEW OF A SUBMITTAL SHALL NOT RELIEVE THE
CONTRACTOR OF THEIR RESPONSIBILITY TO FOLLOW THE INTENT OF
THE CONTRACT DRAWINGS.
11. REPRODUCTION OF CONTRACT DOCUMENTS WILL NOT BE ACCEPTED
AS SHOP DRAWINGS.
GENERAL NOTES
DELEGATED DESIGN ITEMS:
1. EMPLOY OR RETAIN A LICENSED PROFESSIONAL ENGINEER IN THE
PROJECT JURISDICTION TO DESIGN AND DETAIL THE FOLLOWING
PERFORMANCE SPECIFIED STRUCTURAL COMPONENTS:
A. TEMPORARY EXCAVATION SUPPORT
2. SEE INDIVIDUAL MATERIAL SECTIONS FOR ADDITIONAL
REQUIREMENTS.
3. SHOP DRAWINGS AND CALCULATIONS SHALL BE SIGNED AND SEALED
BY A PROFESSIONAL ENGINEER REGISTERED IN THE LOCAL
JURISDICTION AND SUBMITTED FOR REVIEW.
EXISTING CONSTRUCTION:
1. ABOVE GROUP, INC. HAS PREPARED THESE PLANS BASED ON A
LIMITED AMOUNT OF FIELD EXPLORATION. THE CONTRACTOR SHALL
VERIFY THAT THE EXISTING MEMBERS SHOWN IN THE PLANS MATCH
EXISTING AS BUILT CONDITIONS PRIOR TO PREPARING SHOP
DRAWINGS. IF THE AS BUILT CONDITIONS DO NOT CONFORM TO THE
INFORMATION SHOWN IN THE PLANS, OR IF ANY STRUCTURAL
MEMBER IS FOUND TO BE IN POOR CONDITION, THE CONTRACTOR
SHALL INFORM ENGINEER OF THE ACTUAL SIZES AND/OR CONDITION.
RE-DESIGN AND ADDITIONAL FRAMING MAY BE REQUIRED IN THAT
CASE.
2. ALL NEW PENETRATIONS THROUGH THE EXISTING FRAMED SLAB AND
WALLS SHALL BE ACCURATELY LOCATED BY THE CONTRACTOR. THE
CONTRACTOR SHALL PREPARE SHOP DRAWINGS SHOWING ALL
PROPOSED OPENINGS AND SHALL SUBMIT THESE FOR REVIEW AND
APPROVAL PRIOR TO CUTTING ANY OPENINGS.
3. NEW PENETRATIONS SHOWN IN THE STRUCTURAL DRAWINGS ARE
PRINCIPAL OPENINGS. THE CONTRACTOR SHALL COORDINATE WITH
THE MECHANICAL DRAWINGS FOR ALL PENETRATIONS.
4. ALL NEW PIPE AND DUCT PENETRATIONS SHALL BE LOCATED BY THE
CONTRACTOR TO AVOID CONCRETE REINFORCEMENT. IF CUTTING OF
ANY REINFORCEMENT OR EXISTING SUPPORTING MEMBER CANNOT
BE AVOIDED, THEN PRIOR TO CUTTING, THE CONTRACTOR SHALL
PREPARE A DETAILED DRAWING SHOWING THE PROPOSED
PENETRATION AND ALL THE AFFECTED REINFORCEMENT AND
SUPPORTING MEMBERS AND SHALL SUBMIT THE DRAWING TO
ENGINEER FOR REVIEW AND APPROVAL. THE CONTRACTOR SHALL
NOT CUT ANY REINFORCEMENT OR MEMBER WITHOUT THE PRIOR
APPROVAL OF ENGINEER.
FOUNDATIONS:
1. FOUNDATIONS ARE DESIGNED FOR AN ASSUMED BEARING PRESSURE
OF 1500 PSF.
2. CONTRACTOR SHALL NOTIFY THE GEOTECHNICAL ENGINEER FOR
INSPECTION BEFORE PLACING ANY FOOTINGS. GEOTECHNICAL
ENGINEER SHALL INSPECT AND REPORT ON ADEQUACY OF BEARING
MATERIAL.
3. FOOTINGS SHOULD BE CAST ON THE SAME DAY IN WHICH
EXCAVATION FOR THEM IS COMPLETED. IF PLACING OF CONCRETE IS
DELAYED, FOOTING BOTTOM SHALL BE TRIMMED TO FIRM MATERIAL
IMMEDIATELY BEFORE CASTING.
4. PLACE CONCRETE IN DRY EXCAVATIONS ONLY. NOTE SOIL AND
WATER CONDITIONS AS SHOWN BY BORINGS AND DEPTHS OF
FOOTINGS AS SHOWN ON FOUNDATION PLANS. PENDING APPROVAL
BY THE OWNER, CONTRACTOR MAY ELECT TO CONDUCT FURTHER
SUBSURFACE INVESTIGATIONS AT THEIR OWN EXPENSE.
5. WHERE TRENCH BOTTOMS ARE DUG BELOW ADJACENT FOOTING
BOTTOMS ON A SLOPE STEEPER THAN ONE VERTICAL TO TWO
HORIZONTAL, THE TRENCH SHALL BE BACKFILLED WITH LEAN
CONCRETE TO THE POINT WHERE THE STATED SLOPE CROSSES THE
TRENCH.
6. FOOTINGS SHALL BE FORMED UNLESS OTHERWISE PERMITTED BY
THE ENGINEER.
7. PROVIDE CONTINUOUS KEYWAY AND DOWELS IN TOP OF WALL
FOOTING SUPPORTING CONCRETE WALLS.
8. REFER TO SPECIFICATIONS OR WATERPROOFING DETAILS AND
PROCEDURES. PROVIDE WATER STOP AT ALL JOINTS BELOW GRADE.
9. BACKFILLING:
A. BEFORE BACKFILLING WALLS, GROUT AND/OR CONCRETE SHALL
HAVE ATTAINED DESIGN STRENGTH, AND ALL SLABS AND BEAMS
THAT ARE NECESSARY FOR THE STABILITY OF THE WALLS SHALL
BE IN PLACE.
B. BACKFILL SHALL BE CARRIED UP EVENLY ON BOTH SIDES OF
WALL TO LOWER GRADE.
C. BACKFILL SHALL BE PLACED IN MAXIMUM OF 8" LOOSE LIFT
THICKNESS AND COMPACTED TO INFILL 98% OF STANDARD
PROCTOR.
D. TESTS SHALL BE PERFORMED FOR EACH LIFT AT A RATE OF TWO
TESTS PER LIFT MINIMUM AND NOT LESS THAN ONE TEST PER 100'
OF WALL LENGTH.
10. STRUCTURAL FILL INCLUDING UNDER FOOTINGS:
A. SHALL BE PLACED IN MAXIMUM OF 8" LOOSE LIFT THICKNESS AND
COMPACTED TO 98% OF STANDARD PROCTOR.
B. ON-SITE OR IMPORTED GRANULAR FILLS INCLUDING GW, GP, GM,
SW, SP, ND, SM CLASSIFIED IN ACCORDANCE WITH THE UNIFIED
SOIL CLASSIFICATION SYSTEM (USCS) AND WITHIN 2% OF
OPTIMUM MOISTURE. FURTHERMORE, THE MATERIAL TO BE
UTILIZED AS STRUCTURAL FILL SHOULD HAVE A PLASTICITY INDEX
(PI) LESS THAN 2, SUBJECT TO FINAL APPROVAL BY THE
GEOTECHNICAL ENGINEER.
11. FILL UNDER SLABS ON GRADE SHALL BE COMPACTED TO 98% OF
STANDARD PROCTOR DENSITY. TESTS SHALL BE PERFORMED FOR
EACH LIFT.
CONCRETE:
1. CONCRETE NOT OTHERWISE SPECIFIED SHALL BE f'c=3000 PSI
NORMAL WEIGHT CONCRETE. ALL CONCRETE EXPOSED TO THE
WEATHER SHALL BE f'c=5000 PSI MINIMUM AND SHALL BE AIR
ENTRAINED FOR EXPOSURE CLASS F2 PER ACI 318 "BUILDING CODE
REQUIREMENTS FOR STRUCTURAL CONCRETE".
2. ALL REINFORCING STEEL SHALL BE CONFORMING TO ASTM
DESIGNATION A615, GRADE 60. ALL REINFORCING STEEL SHALL BE
DETAILED, FABRICATED AND PLACED IN ACCORDANCE WITH ACI
SP-66, "ACI DETAILING MANUAL".
3. ALL SPLICES IN REINFORCING SHALL BE CLASS "B" SPLICES IN
ACCORDANCE WITH ACI 318, "BUILDING CODE REQUIREMENTS FOR
STRUCTURAL CONCRETE" EXCEPT AS OTHERWISE NOTED.
4. UNLESS OTHERWISE NOTED ON STRUCTURAL DRAWINGS, PROVIDE
CONCRETE PROTECTION FOR REINFORCING AS FOLLOWS:
A. CAST AGAINST EARTH = 3"
B. EXPOSED TO EARTH OR WEATHER:
1. NO. 6 AND LARGER BARS = 2"
2. NO. 5 AND SMALLER BARS = 1 1/2"
C. NOT EXPOSED TO EARTH OR WEATHER:
1. SLABS AND WALLS = 3/4"
2. BEAMS AND COLUMNS = 1 1/2" TO TIES, STIRRUPS OR SPIRALS
5. OPENINGS SHOWN ON THE STRUCTURAL DRAWINGS ARE PRINCIPAL
OPENINGS. SEE MECHANICAL DRAWINGS FOR HOLES IN SLABS AND
WALLS NOT SHOWN.
6. THE GENERAL CONTRACTOR SHALL SUBMIT PLANS SHOWING ALL
PENETRATIONS THROUGH THE FRAMED SLABS AND WALLS. THE
OPENINGS SHALL BE ACCURATELY LOCATED AND DIMENSIONED.
7. NO OPENINGS SHALL BE MADE THROUGH CONCRETE FRAMED SLABS
AND WALLS UNLESS THESE ARE SPECIFICALLY SHOWN ON THE
STRUCTURAL DRAWINGS OR ON THE APPROVED STRUCTURAL SHOP
DRAWINGS.
8. CONSTRUCTION JOINTS SHALL HAVE THE SURFACE OF THE FIRST
POUR ROUGHENED TO 1/4" AMPLITUDE, UNLESS OTHERWISE NOTED.
9. THE CONTRACTOR MUST SUBMIT A CONCRETE DESIGN MIX IN
ACCORDANCE WITH ACI 318. SUCH DESIGN MIX SHALL BE
ACCOMPANIED BY THE APPROPRIATE GRAPHS AND BACKGROUND
DATA. CONCRETE DESIGN MIX SHALL INDICATE 7 AND 28 DAY
STRENGTHS, CEMENT CONTENT, WATER-CEMENT RATIO, FINE AND
COARSE AGGREGATES AND ADMIXTURES FOR EACH DESIGN
STRENGTH. THE ADDITION OF WATER AT THE PLANT OR IN THE FIELD
GREATER THAN THE SPECIFIED WATER CONTENT IS STRICTLY
PROHIBITED.
10. ALL CONCRETE WORK SHALL CONFORM TO THE LATEST LOCAL
APPROVED EDITIONS OF THE FOLLOWING ACI AND ASTM
DOCUMENTS:
A. ACI-301 SPECIFICATIONS FOR STRUCTURAL CONCRETE
B. ACI-318 CODE
C. ACI-214 COMPRESSIVE TEST
D. ACI-306 COLD WEATHER
E. ACI SP-66 DETAILING
F. ACI-347 FORMWORK
G. ACI-305 HOT WEATHER
H. ACI-211 PROPORTIONS OF CONCRETE
I. ACI-304 PLACING CONCRETE
J. ASTM C-94 READY-MIX CONCRETE
11. ALL FIELD AND LAB TESTING OF CONCRETE SHALL CONFORM TO THE
LATEST LOCAL APPROVED EDITIONS OF ASTM:
A. ASTM C-31 FIELD CYLINDER SPECIMENS
B. ASTM C-143 SLUMP TEST
C. ASTM C-231 AIR CONTENT (WHEN REQUIRED)
D. ASTM C-39 LAB TESTING CYLINDERS
E. ASTM C-172 SAMPLING FRESH CONCRETE
F. ASTM C-42 HARDENED CORES (WHEN REQUIRED)
TEST RESULTS SHALL BE SIGNED AND SEALED BY A
PROFESSIONAL ENGINEER REGISTERED IN THE LOCAL
JURISDICTION.
12. ALL FORMWORK SHALL BE IN ACCORDANCE WITH ACI 347, "GUIDE TO
FORMWORK FOR CONCRETE".
POST-INSTALLED ANCHORS:
1. DRILL AND INSTALL POST-INSTALLED ANCHORS ACCORDING TO
MANUFACTURER'S PRINTED INSTALLATION INSTRUCTIONS AND PER
MANUFACTURER'S ON-SITE TRAINING.
2. ALL INSTALLERS OF POST-INSTALLED ANCHORS SHALL BE ACI/CRSI
ADHESIVE ANCHOR INSTALLER CERTIFIED. SUBMIT CERTIFICATES FOR
RECORD.
3. ALL POST-INSTALLED ANCHORS SHALL MEET ICC-ES COMPLIANCE
FOR EACH TYPE OF APPLICATION.
4. SUBMIT PRODUCT INFORMATION AND ICC-ES EVALUATION REPORT
FOR EACH ANCHOR.
5. ALL ANCHOR DESIGNS ARE FOR INSTALLATION IN THE FOLLOWING
CONDITIONS, UNLESS NOTED OTHERWISE. WRITTEN APPROVAL MUST
BE RECEIVED FROM ENGINEER PRIOR TO INSTALLATION OF ADHESIVE
ANCHORS IN ALTERNATE CONDITIONS.
A. DRY CONCRETE, UNLESS NOTED OTHERWISE.
B. CONCRETE TEMPERATURE AT TIME OF INSTALLATION MUST BE
BETWEEN 14° F AND 104° F. SEE MANUFACTURER’S PRINTED
INSTALLATION INSTRUCTION FOR ADHESIVE GEL AND CURE
TIMES.
C. ANCHOR HOLES TO BE HAMMER DRILLED.
D. ANCHOR HOLES TO BE CLEANED PER MANUFACTURER’S PRINTED
INSTALLATION INSTRUCTIONS PRIOR TO ADHESIVE INJECTION.
E. ANCHORS/POST-INSTALLED REINFORCING SHALL NOT BE LOADED
UNTIL CONCRETE OR GROUT HAS BEEN ALLOWED TO CURE FOR
21 DAYS AND/OR HAS ATTAINED 70% OF ITS DESIGN STRENGTH.
6. ALL POST-INSTALLED ANCHORS IN CONCRETE SHALL BE SUITED FOR
USE IN SEISMIC AND CRACKED CONCRETE APPLICATIONS.
7. ADHESIVE ANCHORS IN CONCRETE SHALL BE HILTI HIT HY-200, OR
APPROVED EQUAL.
8. EXPANSION ANCHORS IN CONCRETE SHALL BE HILTI KWIK BOLT TZ2,
OR APPROVED EQUAL.
9. PROVIDE STANDARD AISC HOLES IN ALL STEEL MEMBERS RECEIVING
POST-INSTALLED ANCHORS. IF OVERSIZED HOLES ARE PROVIDED TO
EASE INSTALLATION OF THE ANCHORS, A PLATE WASHER (1/4"X2"X2")
WITH AN AISC STANDARD HOLE SHALL BE INSTALLED AND 1/8" FILLET
WELDED (ALL AROUND) TO THE MEMBER.
10. ALL ANCHORS AND REINFORCING SHALL BE INSTALLED IN
ACCORDANCE WITH THE SPACING AND EDGE DISTANCES SHOWN IN
THE DRAWINGS. THE CONTRACTOR SHALL INFORM THE ARCHITECT
PRIOR TO INSTALLING THE ANCHORS IF THE SPACING AND EDGE
DISTANCES SHOWN IN THE DRAWINGS CANNOT BE ACHIEVED. IF THIS
IS THE CASE, RE-DESIGN MIGHT BE REQUIRED AND THE ANCHORS
SHOULD NOT BE INSTALLED UNTIL APPROVAL HAS BEEN PROVIDED
BY THE ENGINEER.
11. DO NOT CUT ANY REINFORCING UNLESS IT IS SPECIFICALLY
INDICATED IN THE DRAWINGS OR IS APPROVED BY THE ENGINEER.
12. POST INSTALLED ANCHORS AND REINFORCING SHALL ONLY BE USED
WHERE SPECIFIED IN THE CONTRACT DRAWINGS. THE CONTRACTOR
SHALL OBTAIN APPROVAL FROM THE ENGINEER PRIOR TO INSTALLING
POST INSTALLED ANCHORS WHERE CAST-IN PLACE ANCHORS ARE
MISSING, MISPLACED OR DAMAGED.
DESIGN CODES:
VA DESIGN MANUAL STRUCTURAL
PG-18-10 (OCTOBER 1, 2022 REV JULY 1, 2023)
VA SEISMIC DESIGN REQUIREMENTS
H18-8 (JULY 1, 2023)
INTERNATIONAL BUILDING CODE:
IBC 2021
MINIMUM BUILDING DESIGN LOADS AND ASSOCIATED CRITERIA FOR
BUILDINGS AND OTHER STRUCTURES:
ASCE 7-22
BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE:
ACI 318-14
DESIGN LOADS:
RISK CATEGORY IV
SEISMIC DESIGN DATA:
EQUIVALENT LATERAL FORCE PROCEDURE
SOIL SITE CLASS ASSUMED 'D'
SEISMIC DESIGN CATEGORY C
SEISMIC IMPORTANCE FACTOR, Ie = 1.5
MAPPED SPECTRAL RESPONSE ACCELERATION PARAMETERS:
Ss = 0.240g S1 = 0.081g
DESIGN SPECTRAL RESPONSE ACCELERATION PARAMETERS:
Sds = 0.200g Sd1 = 0.110g
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
A u to d e s k D o c s /0
S a lis b u ry S te a m L in e R e p la c e m e n t/
V
A S a lis b u ry
S tm
L in e R e p l.
R
S
.r v t
/2
/2
:5
:5
A
M
S-001
GENERAL NOTES AND
ABBREVIATIONS
STEAM LINE REPLACEMENT
SALISBURY, NC VA
659-24-903
09/27/2024 RAS SLS
100% CONSTRUCTION
DOCUMENTS
SHEET LIST
Sheet Number Sheet Name
S-001 GENERAL NOTES AND ABBREVIATIONS
SS101 MANHOLE MH-10B PLANS & ELEVATIONS - PHASE 3
SS102 MANHOLE MH-16A PLANS & ELEVATIONS - PHASE 4
SS103 MANHOLE MH-17B PLANS & ELEVATIONS - PHASE 4
SS104 MANHOLE MH-15A PLANS & ELEVATIONS - PHASE 5
SS105 MANHOLE MH-17C PLANS & ELEVATIONS - PHASE 5
SS106 MANHOLE MH-15B PLANS & ELEVATIONS - PHASE 6
S-301 CONCRETE DETAILS AND SECTIONS
SALISBURY VAMC
9' - 8"
SS101
SS1017
SS101
SS101 8
SS1014
SS101
SS101 5
8" DIA.
8" DIA.
1'
/2
1' - 8 1/2"
1'
/8
1' - 0 7/8"
SS101
SS1017
SS101
SS101 8
9' - 8"
3 4
4' - 6"
SS1014
SS101
SS101 5
7'
EX MH-10B TOP
695'
EX MH-10B BOT
687.67'
1'
/2
2'
2'
3/ 8"
2' - 2" 8"
1' - 8 7/8"
13" DIA.
EX 20" DIA.
EX MH-10B TOP
695'
EX MH-10B BOT
687.67'
3'
/2
1'
/4
3'
3' - 6 1/2" 8"
2' - 5 3/8"
26 1/2" DIA.
EX MH-10B TOP
695'
EX MH-10B BOT
687.67'
EX 18" DIA. EX 15" DIA.
EX MH-10B TOP
695'
EX MH-10B BOT
687.67'
2'
V .I.
F
3' - 0" V.I.F.4' - 5 1/4" V.I.F.
7'
EX MH-10B TOP
695'
EX MH-10B BOT
687.67'
2'
1'
/2
2' - 2" 8"
EX 20" DIA.
EX MH-10B TOP
695'
EX MH-10B BOT
687.67'
3'
/2
1'
/4
3' - 6 1/2" 8"
EX MH-10B TOP
695'
EX MH-10B BOT
687.67'
EX 20" DIA.
2'
V .I.
F
3' - 0" V.I.F.4' - 5 1/4" V.I.F.
4/ S-301
5/ S-301
4/ S-301
PROGRESS PRINT
NOT FOR CONSTRUCTION
PROGRESS PRINT
NOT FOR CONSTRUCTION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
A u to d e s k D o c s /0
S a lis b u ry S te a m L in e R e p la c e m e n t/
V
A S a lis b u ry
S tm
L in e R e p l.
R
S
.r v t
/2
/2
:5
:5
A
M
9/27/2024 11:51:56 AM9/27/2024 11:51:56 AM
SS101
MANHOLE MH-10B PLANS &
ELEVATIONS - PHASE 3
STEAM LINE REPLACEMENT
SALISBURY, NC VA
659-24-903
09/27/2024 RAS SLS
100% CONSTRUCTION
DOCUMENTS
CODED NOTES:
EXISTING ACCESS DOOR
CORE DRILL HOLES IN TOP OF EXISTING MANHOLE FOR VENT. GPR SCAN TOP OF MANHOLE AND LOCATE HOLE SUCH THAT NO REBAR IS CUT. CONTACT COR IF AREA IS TOO CONGESTED, VENT MAY
NEED TO BE RELOCATED IN THAT CASE.
EXISTING SUMP PIT
NEW RUNG LADDER, REFER TO SPECIFICATIONS.
REMOVE EXISTING WALL RUNGS AND PATCH CONCRETE TO PROVIDE A SMOOTH SURFACE.
REMOVE PORTION OF CONCRETE WALL TO RECEIVE NEW CONCRETE WALL WITH PIPE
PENETRATION, REFER TO DETAIL .
REMOVE PORTION OF CONCRETE WALL AFTER EXISTING PIPE HAS BEEN TAKEN OFF LINE, REFER TO
DETAIL .
NEW CONCRETE WALL, REFER TO DETAIL .
DRAWING NOTES:
1. MANHOLE IS EXISTING. SIZE TO BE CONFIRMED BY CONTRACTOR PRIOR TO COMMENCING WORK.
2. SIDES OF MANHOLE EXPOSED DURING PIPE REPLACEMENT ARE TO RECEIVE NEW WATERPROOFING.
3. COORDINATE LOCATION OF PIPE PENETRATIONS WITH MECHANICAL DRAWINGS AND EXISTING
CONDITIONS.
N 0 1' 2' 4' 6'
1/2" = 1'-0"
Revisions Date
1/2" = 1'-0"
TOP OF MANHOLE - MH-10B
1/2" = 1'-0"
BOTTOM OF MANHOLE - MH-10B
1/2" = 1'-0"7
NORTH ELEVATION - MH-10B
1/2" = 1'-0"6
EAST ELEVATION - MH-10B
1/2" = 1'-0"9
WEST ELEVATION - MH-10B
1/2" = 1'-0"8
SOUTH ELEVATION - MH-10B
1/2" = 1'-0"4
NORTH ELEVATION - MH-10B - DEMO
1/2" = 1'-0"
EAST ELEVATION - MH-10B - DEMO
1/2" = 1'-0"5
SOUTH ELEVATION - MH-10B -DEMO
1/ S-301
SS1023
SS102
SS102 6
SS102
10' - 7"
4'
1' - 7 1/8"
1' - 5 1/8"
1'
1'
/4
SS1023
SS102
SS102 6
SS102
4'
12' - 7"
26 1/2" DIA.
16" DIA.
MH-16A TOP
697.07'
MH-16A BOT
684.53'
2' - 8 1/8" 2' - 11 3/4"
4'
/8
4'
/8
/2
MH-16A TOP
697.07'
MH-16A BOT
684.53'
2' - 3"2' - 0 3/4"7' - 9"
3' - 7 3/4"
1'
/4
7'
/4
7'
/8
14" DIA. TO
BLDG 16
14" DIA. TO
BLDG 16
18" DIA. TO
BLDG 16
23" DIA.
MH-16A TOP
697.07'
MH-16A BOT
684.53'
24" DIA.
1'
/4
4' - 5 3/4"
MH-16A TOP
697.07'
MH-16A BOT
684.53'
14" DIA.
26 1/2" DIA.
16" DIA.
3' - 0 1/8"2' - 7 3/4"2' - 2"
7'
7'
/8
7'
/4
PROGRESS PRINT
NOT FOR CONSTRUCTION
PROGRESS PRINT
NOT FOR CONSTRUCTION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
A u to d e s k D o c s /0
S a lis b u ry S te a m L in e R e p la c e m e n t/
V
A S a lis b u ry
S tm
L in e R e p l.
R
S
.r v t
/2
/2
:5
:5
A
M
9/27/2024 11:51:58 AM9/27/2024 11:51:58 AM
SS102
MANHOLE MH-16A PLANS &
ELEVATIONS - PHASE 4
STEAM LINE REPLACEMENT
SALISBURY, NC VA
659-24-903
09/27/2024 RAS SLS
100% CONSTRUCTION
DOCUMENTS
CODED NOTES:
DRAWING NOTES:
N 0 1' 2' 4' 6'
1/2" = 1'-0"
Revisions Date
30"x48" BILCO DOOR FOR PERSONNEL ACCESS
30"x30" BILCO DOOR FOR SUMP PIT ACCESS
30"x30" SUMP PIT
RUNG LADDER, REFER TO SPECIFICATIONS.
1. NEW MANHOLE, REFER TO DETAIL .
2. COORDINATE LOCATION ON MANHOLE WITH CIVIL DRAWINGS.
3. COORDINATE LOCATION OF PIPE PENETRATIONS WITH MECHANICAL DRAWINGS AND EXISTING
CONDITIONS.
4. CONTRACTOR TO NOTE THAT NEW PENETRATIONS IN EXISTING BUILDING 16 BASEMENT WALL WILL
BE REQUIRED FOR LINES INDICATED ON NORTH ELEVATION. THE EXISTING BASEMENT WALL
EXTENDS 8'-0" BELOW THE FIRST FLOOR AND IS 12" THICK CONCRETE REINFORCED WITH #4 AT 14" O.C. PER ORIGINAL CONSTRUCTION DOCUMENTS. IF THE EXISTING CONDITION IS DETERMINED TO BE
DIFFERENT THAN STATED ABOVE DURING EXCAVATION, CONTACT TO COR FOR REVIEW OF THE
EXISTING CONDITION AND DETERMINATION OF PENETRATION LOCATION.
1/2" = 1'-0"1
TOP OF MANHOLE - MH-16A
1/2" = 1'-0"2
BOTTOM OF MANHOLE - MH-16A
1/2" = 1'-0"
EAST ELEVATION - MH-16A
1/2" = 1'-0"3
NORTH ELEVATION - MH-16A
1/2" = 1'-0"
SOUTH ELEVATION - MH-16A
1/2" = 1'-0"
WEST ELEVATION - MH-16A
SS103
SS1033
SS103
SS103
15' - 0"
4' - 10"
8" DIA.
8" DIA.
1'
7/ 8"
3' - 2 3/8"
1'
2' - 0 3/8"
SS103
SS1033
SS103
SS103
17' - 0"
4' - 10"
MH-17B TOP
704.15'
MH-17B BOT
693.65'
20" DIA.
16" DIA.
6'
1/ 8"
4'
/8
8' - 2 5/8"
MH-17B TOP
704.15'
MH-17B BOT
693.65'
MH-17B BOT
693.65'
MH-17B TOP
704.15'
4'
26 1/2" DIA.
14" DIA.
4' - 8" 3' - 0 1/2"
3'
1"
MH-17B TOP
704.15'
MH-17B BOT
693.65'
7'
/8
14" DIA. TO
BLDG 17
14" DIA. TO
BLDG 17
16" DIA.
20" DIA.
6'
1/ 8"
8'
3' - 4 1/8" 2' - 2" 3' - 0 7/8" 8' - 2 3/8"
PROGRESS PRINT
NOT FOR CONSTRUCTION
PROGRESS PRINT
NOT FOR CONSTRUCTION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
A u to d e s k D o c s /0
S a lis b u ry S te a m L in e R e p la c e m e n t/
V
A S a lis b u ry
S tm
L in e R e p l.
R
S
.r v t
/2
/2
:5
:0
A
M
9/27/2024 11:52:00 AM9/27/2024 11:52:00 AM
SS103
MANHOLE MH-17B PLANS &
ELEVATIONS - PHASE 4
STEAM LINE REPLACEMENT
SALISBURY, NC VA
659-24-903
09/27/2024 RAS SLS
100% CONSTRUCTION
DOCUMENTS
CODED NOTES:
DRAWING NOTES:
N 0 1' 2' 4' 6'
1/2" = 1'-0"
Revisions Date
30"x48" BILCO DOOR FOR PERSONNEL ACCESS
30"x30" BILCO DOOR FOR SUMP PIT ACCESS
30"x30" SUMP PIT
RUNG LADDER, REFER TO SPECIFICATIONS.
1. NEW MANHOLE, REFER TO DETAIL .
2. COORDINATE LOCATION ON MANHOLE WITH CIVIL DRAWINGS.
3. COORDINATE LOCATION OF PIPE PENETRATIONS WITH MECHANICAL DRAWINGS AND EXISTING
CONDITIONS.
4. CONTRACTOR TO NOTE THAT NEW PENETRATIONS IN EXISTING BUILDING 17 FOUNDATION WALL WILL
BE REQUIRED FOR LINES INDICATED ON SOUTH ELEVATION. THE EXISTING FOUNDATION WALL
EXTENDS APPROXIMATELY 2'-0" BELOW GRADE AND IS 12" THICK CONCRETE REINFORCED WITH #4 AT 12" O.C. PER ORIGINAL CONSTRUCTION DOCUMENTS. IF THE EXISTING CONDITION IS DETERMINED TO BE DIFFERENT THAN STATED ABOVE DURING EXCAVATION, CONTACT TO COR FOR REVIEW OF
THE EXISTING CONDITION AND DETERMINATION OF PENETRATION LOCATION.
1/2" = 1'-0"
TOP OF MANHOLE - MH-17B
1/2" = 1'-0"
BOTTOM OF MANHOLE - MH-17B
1/2" = 1'-0"
NORTH ELEVATION - MH-17B
1/2" = 1'-0"
EAST ELEVATION - MH-17B
1/2" = 1'-0"
WEST ELEVATION - MH-17B
1/2" = 1'-0"
SOUTH ELEVATION - MH-17B
SS104
SS1043
SS104
SS104 6
16' - 9"
8' - 4 1/2" 1
8" DIA.
8" DIA.
1'
/4
1' - 5 5/8"
1' - 7 3/8"
1'
SS104
SS1043
SS104
SS104 6
18' - 9"
8' - 4 1/2"
8'
/4
MH-15A TOP
689.56'
MH-15A BOT
681.46'
16" DIA.
26 1/2" DIA.
2'
/4
2'
3' - 10 3/4" 2' - 9 5/8"
MH-15A TOP
689.56'
MH-15A BOT
681.46'
MH-15A TOP
689.56'
MH-15A BOT
681.46'
MH-15A TOP
689.56'
MH-15A BOT
681.46'
26 1/2" DIA.
16" DIA.
2'
2'
/4
3' - 10 5/8"2' - 9 1/4"
PROGRESS PRINT
NOT FOR CONSTRUCTION
PROGRESS PRINT
NOT FOR CONSTRUCTION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
A u to d e s k D o c s /0
S a lis b u ry S te a m L in e R e p la c e m e n t/
V
A S a lis b u ry
S tm
L in e R e p l.
R
S
.r v t
/2
/2
:5
:0
A
M
9/27/2024 11:52:03 AM9/27/2024 11:52:03 AM
SS104
MANHOLE MH-15A PLANS &
ELEVATIONS - PHASE 5
STEAM LINE REPLACEMENT
SALISBURY, NC VA
659-24-903
09/27/2024 RAS SLS
100% CONSTRUCTION
DOCUMENTS
CODED NOTES:
30"x48" BILCO DOOR FOR PERSONNEL ACCESS
30"x30" BILCO DOOR FOR SUMP PIT ACCESS
30"x30" SUMP PIT
RUNG LADDER, REFER TO SPECIFICATIONS.
DRAWING NOTES:
Revisions Date
N 0 1' 2' 4' 6'
1/2" = 1'-0"
1. NEW MANHOLE, REFER TO DETAIL .
2. COORDINATE LOCATION ON MANHOLE WITH CIVIL DRAWINGS.
3. COORDINATE LOCATION OF PIPE PENETRATIONS WITH MECHANICAL DRAWINGS AND EXISTING
CONDITIONS.
1/2" = 1'-0"1
TOP OF MANHOLE - MH-15A
1/2" = 1'-0"2
BOTTOM OF MANHOLE - MH-15A
1/2" = 1'-0"3
NORTH ELEVATION - MH-15A
1/2" = 1'-0"4
EAST ELEVATION - MH-15A
1/2" = 1'-0"5
WEST ELEVATION - MH-15A
1/2" = 1'-0"6
SOUTH ELEVATION - MH-15A
SS105 6
SS105
SS1053
SS105
16' - 9"
8' - 8"
1'
/8
1' - 5"
1' - 6 7/8"
1'
/8
SS105 6
SS105
SS1053
SS105
18' - 9"
8' - 8"
9'
/4
MH-17C TOP
694.19'
MH-17C BOT
685.09'
16" DIA.
26 1/2" DIA.
3' - 9 1/4" 2' - 9 1/4"
2'
2'
/4
MH-17C TOP
694.19'
MH-17C BOT
685.09'
MH-17C TOP
694.19'
MH-17C BOT
685.09'
MH-17C TOP
694.19'
MH-17C BOT
685.09'
3' - 8 3/4"2' - 10 5/8"
2'
2'
/4
26 1/2" DIA.
16" DIA.
PROGRESS PRINT
NOT FOR CONSTRUCTION
PROGRESS PRINT
NOT FOR CONSTRUCTION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
A u to d e s k D o c s /0
S a lis b u ry S te a m L in e R e p la c e m e n t/
V
A S a lis b u ry
S tm
L in e R e p l.
R
S
.r v t
/2
/2
:5
:0
A
M
9/27/2024 11:52:04 AM9/27/2024 11:52:04 AM
SS105
MANHOLE MH-17C PLANS &
ELEVATIONS - PHASE 5
STEAM LINE REPLACEMENT
SALISBURY, NC VA
659-24-903
09/27/2024 RAS SLS
100% CONSTRUCTION
DOCUMENTS
CODED NOTES:
DRAWING NOTES:
N 0 1' 2' 4' 6'
1/2" = 1'-0"
Revisions Date
30"x48" BILCO DOOR FOR PERSONNEL ACCESS
30"x30" BILCO DOOR FOR SUMP PIT ACCESS
30"x30" SUMP PIT
RUNG LADDER, REFER TO SPECIFICATIONS.
1. NEW MANHOLE, REFER TO DETAIL .
2. COORDINATE LOCATION ON MANHOLE WITH CIVIL DRAWINGS.
3. COORDINATE LOCATION OF PIPE PENETRATIONS WITH MECHANICAL DRAWINGS AND EXISTING
CONDITIONS.
1/2" = 1'-0"
TOP OF MANHOLE - MH-17C
1/2" = 1'-0"
BOTTOM OF MANHOLE - MH-17C
1/2" = 1'-0"
NORTH ELEVATION - MH-17C
1/2" = 1'-0"
EAST ELEVATION - MH-17C
1/2" = 1'-0"
WEST ELEVATION - MH-17C
1/2" = 1'-0"
SOUTH ELEVATION - MH-17C
12' - 0"
SS1063SS106 6
SS106
SS106
1'
/4
1' - 6 3/4"
1' - 5 1/4"
1'
6' - 6 1/8"
SS1063SS106 6
SS106
SS106
14' - 0"
6' - 6"
MH-15B TOP
695'
MH-15B BOT
682.75'
3'
/2
2' - 8 3/8"
17" DIA.
MH-15B TOP
695'
MH-15B BOT
682.75'
16" DIA.
2'
/2
2' - 10 5/8"
MH-15B TOP
695'
MH-15B BOT
682.75'
14" DIA.
2'
/8
1' - 11 1/8"
MH-15B TOP
695'
MH-15B BOT
682.75'
4'
/8
3' - 2 1/8"
14" DIA.
PROGRESS PRINT
NOT FOR CONSTRUCTION
PROGRESS PRINT
NOT FOR CONSTRUCTION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
A u to d e s k D o c s /0
S a lis b u ry S te a m L in e R e p la c e m e n t/
V
A S a lis b u ry
S tm
L in e R e p l.
R
S
.r v t
/2
/2
:5
:0
A
M
9/27/2024 11:52:05 AM9/27/2024 11:52:05 AM
SS106
MANHOLE MH-15B PLANS &
ELEVATIONS - PHASE 6
STEAM LINE REPLACEMENT
SALISBURY, NC VA
659-24-903
09/27/2024 RAS SLS
100% CONSTRUCTION
DOCUMENTS
CODED NOTES:
DRAWING NOTES:
N 0 1' 2' 4' 6'
1/2" = 1'-0"
Revisions Date
30"x48" BILCO DOOR FOR PERSONNEL ACCESS
30"x30" BILCO DOOR FOR SUMP PIT ACCESS
30"x30" SUMP PIT
RUNG LADDER, REFER TO SPECIFICATIONS.
1. NEW MANHOLE, REFER TO DETAIL .
2. COORDINATE LOCATION ON MANHOLE WITH CIVIL DRAWINGS.
3. COORDINATE LOCATION OF PIPE PENETRATIONS WITH MECHANICAL DRAWINGS AND EXISTING
CONDITIONS.
1/2" = 1'-0"1
TOP OF MANHOLE - MH-15B
1/2" = 1'-0"2
BOTTOM OF MANHOLE - MH-15B
1/2" = 1'-0"3
NORTH ELEVATION - MH-15B
1/2" = 1'-0"
EAST ELEVATION - MH-15B
1/2" = 1'-0"
WEST ELEVATION - MH-15B
1/2" = 1'-0"
SOUTH ELEVATION - MH-15B
STAINLESS STEEL
PIPE SLEEVE
CONCRETE WALL, REFER TO
ADJACENT SECTIONS FOR
REINFORCEMENT
2"
1/4" STAINLESS STEEL
PLATE WATER STOP
AND ANCHOR COLLAR
3/16"
NEAR SIDE &
FAR SIDE, TYP.
ADDED BARS PER CONCRETE
SLAB/WALL OPENING DETAIL
RESILIENT WATERPROOF
CAULKING
MODULAR TYPE WALL
PENETRATION SEAL
WITH STAINLESS BOLTS
PIPE CLAMP AND STRAP
5/8" DIA. HILTI HAS THREADED
ROD IN HILTI HIT RE-500
ADHESIVE (3 1/8" MIN. EMBED)
PIPE, REFER TO
MECHANICAL DRAWINGS
COLD FLUID-APPLIED WATERPROOFING
WITH PROTECTION DRAIN BOARD,
PROVIDE REINFORCING FABRIC AND
SEALANT AROUND PENETRATIONS PER
MANFACTURER'S DETAILING
REQUIREMENTS
2" C
LE
A
R
INTERRUPTED BARSINTERRUPTED BARS
INTERRUPTED BARS
INTERRUPTED BARS
PROVIDE ADDED BARS EACH
SIDE OF OPENING EQUAL TO
1/2 QUANTITY OF THE BARS
INTERRUPTED BY THE
OPENING OF THE SAME SIZE
AND LENGTH (2 MINIMUM)
PROVIDE (2) #5 x 4'-0" AT
EACH CORNER WHERE
OPENING EXCEED 1'-0" ON
ANY SIDE
2/ S-301
3/ S-301
2/ S-301
3" C
LE
A
R
3" CLEAR
1'
1' - 0" TYP.
2"
2" CLEAR, TYP.
MUD SLAB
GRAVEL
ELASTOMERIC SHEET WATERPROOFING,
LAP ON VERTICAL OF FOUNDATION SLAB
WITH WALL WATERPROOFING
RUNG LADDER,
CENTER OF SIDE RAIL
7" FROM FACE OF WALL
1' - 4" MIN.
(1 0"
M
IN
M
A X
T Y
P
1'
M A
X
1'
M A
X
ADDED BARS PER
CONCRETE SLAB/WALL
OPENING DETAIL #5 AT 10" O.C.#5 AT 10" O.C.
#5 AT 12" O.C.#5 AT 12"
O.C.
ADDED BARS PER
CONCRETE SLAB/WALL
OPENING DETAIL
PIPE, REFER TO
MECHANICAL DRAWINGS
PIPE SLEEVE PER PIPE
PENETRATION BELOW
GRADE DETAIL
OPENING ABOVE SUMP PIT,
30" x 30" BILCO DOOR WITH LOCK
ACCESS OPENING,
30" x 48" BILCO DOOR WITH LOCK
#5 AT 12" O.C.#5 AT 12"
O.C.
COLD FLUID-APPLIED WATERPROOFING
WITH PROTECTION DRAIN BOARD,
PROVIDE REINFORCING FABRIC AND
SEALANT AT CORNERS PER
MANFACTURER'S DETAILING
REQUIREMENTS
30"x30"
SUMP PIT
#5 AT 12" O.C.#5 AT 12"
O.C.
#5 AT 12" O.C.#5 AT 12"
O.C.
2/ S-301
CONCRETE INFILL TO MATCH
EXISTING WALL THICKNESS
#5 AT 12" O.C. (3 MINIMUM) OR
MATCH EXISTING REBAR
SPACING IF CLOSER SPACING
DRILL INTO EXISTING WALL
AND DOWEL IN REBAR WITH
HILTI HIT-RE 500 ADHESIVE
DRILL INTO EXISTING WALL
AND DOWEL IN REBAR WITH
HILTI HIT-RE 500 ADHESIVE
1'
M
IN
. L A
P
8"
8"
#5 AT 18" O.C. STAGGERED EACH
SIDE OF WALL (3 MINIMUM),
DRILL INTO EXISTING WALL AND
DOWEL IN REBAR WITH HILTI HIT-
RE 500 ADHESIVE EACH END,
LAP SPLICE IN THE MIDDLE SIM
TO VERTICAL BARS
1 1/2" CLEAR
EXISTING PIPE PENETRATION
EXISTING CONCRETE WALL
EXISTING CONCRETE WALL
EXISTING NEW
C O
O R
D
IN
A T
E W
IT
H
E X
IS
T
IN
G
P
IP
E P
E N
E T
R A
T
IO
N
R E
M O
V E
E X
IS
T
IN
G
C O
N C
R E
T E
W A
LL
P
E R
E
LE
V A
T
IO
N S
8" M
IN
REMOVE EXISTING PIPE SLEEVE AND
ALL ASSOCIATED ATTACHMENTS
DRILL INTO EXISTING WALL
AND DOWEL IN REBAR WITH
HILTI HIT-RE 500 ADHESIVE
DRILL INTO EXISTING WALL
AND DOWEL IN REBAR WITH
HILTI HIT-RE 500 ADHESIVE
(2) #5, DRILL INTO EXISTING
WALL AND DOWEL IN REBAR
WITH HILTI HIT-RE 500 ADHESIVE
EACH END, LAP SPLICE IN THE
MIDDLE SIM TO VERTICAL BARS
EXISTING CONCRETE WALL
EXISTING CONCRETE WALL
EXISTING NEW
C O
O R
D
IN
A T
E W
IT
H
N E
W W
O R
K
R E
M O
V E
E X
IS
T
IN
G
C O
N C
R E
T E
W A
LL
P
E R
E
LE
V A
T
IO
N S
PIPE SLEEVE PER PIPE
PENETRATION BELOW
GRADE DETAIL
PIPE, REFER TO
MECHANICAL DRAWINGS
#5 AT 12" O.C. WITH HOOK AT
END (3 MINIMUM) OR MATCH
EXISTING REBAR SPACING IF
CLOSER SPACING
2 3/4" CLEAR
8" M
IN
3/ S-301
PROGRESS PRINT
NOT FOR CONSTRUCTION
PROGRESS PRINT
NOT FOR CONSTRUCTION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
A u to d e s k D o c s /0
S a lis b u ry S te a m L in e R e p la c e m e n t/
V
A S a lis b u ry
S tm
L in e R e p l.
R
S
.r v t
/2
/2
:5
:0
A
M
9/27/2024 11:52:07 AM9/27/2024 11:52:07 AM
S-301
CONCRETE DETAILS AND
SECTIONS
STEAM LINE REPLACEMENT
SALISBURY, NC VA
659-24-903
09/27/2024 RAS SLS
100% CONSTRUCTION
DOCUMENTS
Revisions Date
N.T.S.
CONCRETE PIPE PENETRATION BELOW GRADE DETAIL
N.T.S.
CONCRETE SLAB/WALL OPENING DETAIL
N.T.S.
MANHOLE DETAIL
N.T.S.
CONCRETE WALL OPENING INFILL DETAIL
4 N.T.S.
NEW PENETRATION IN EXISTING CONCRETE WALL DETAIL
NOTE: SOME SYMBOLS AND ABBREVIATIONS SHOWN MAY NOT PERTAIN TO THIS PROJECT
HVAC ABBREVIATIONS
SYMBOL SYMBOL DESCRIPTION
BASIC MATERIALS
CONNECT TO EXISTING
DEMOLISH TO POINT INDICATED
EXISTING TO BE REMOVED (HEAVY, DASHED LINE)
EXISTING TO REMAIN (THIN, HALFTONED, SOLID LINE)
NEW (HEAVY, SOLID LINE)
VIEW NUMBER
DRAWING NUMBER WHERE SHOWN
SECTION LETTER
H1
H1
A
SHEET NUMBER
DRAWING SYMBOLS
REVISION REFERENCE1
SHEET NOTE CALLOUT1
1. DRAWINGS ARE DIAGRAMMATIC AND INDICATE GENERAL ARRANGEMENT OF SYSTEMS. PROVIDE
COMPONENTS INDICATED IN DETAILS, RISER DIAGRAMS, CONTROL DIAGRAMS, AND/OR FLOW
DIAGRAMS WHETHER OR NOT INDICATED ON PLANS AND VICE VERSA. WHERE A DISCREPANCY OR
CONFLICT IS FOUND BETWEEN ONE DRAWING AND ANOTHER, OR BETWEEN A DRAWING AND
APPLICABLE SPECIFICATIONS, NOTIFY THE ARCHITECT/ENGINEER IMMEDIATELY IN WRITTEN FORM. IN
GENERAL, THE MOST STRINGENT REQUIREMENT SHALL GOVERN UNLESS THE DISCREPANCY
CONFLICTS WITH APPLICABLE CODES OR OWNER'S DESIGN STANDARDS, WHEREIN THE CODE OR
OWNER'S DESIGN STANDARDS SHALL GOVERN.
2. CONNECTION TO EQUIPMENT SHALL BE VERIFIED WITH MANUFACTURER'S CERTIFIED DRAWINGS.
TRANSITIONS TO ALL EQUIPMENT SHALL BE VERIFIED AND PROVIDED FOR EQUIPMENT FURNISHED.
3. DIMENSIONS SHALL BE FIELD-VERIFIED AND COORDINATED PRIOR TO PROCUREMENT OR
FABRICATION. COORDINATE THE WORK WITH OTHER TRADES INVOLVED. FIELD MODIFICATIONS SUCH AS OFFSETS IN PIPING NEEDED DUE TO OBSTRUCTIONS OR INTERFERENCES SHALL BE PROVIDED AT
NO ADDITIONAL COST.
4. PROVIDE 1.5R ELBOWS IN PIPING AS INDICATED.
5. ALL EQUIPMENT, PIPING, ETC., SHALL BE SUPPORTED AS DETAILED AND/OR SPECIFIED. PROVIDE
ADDITIONAL SUPPORTS AS REQUIRED TO PROVIDE A VIBRATION-FREE, RIGID INSTALLATION.
6. ALL PIPING IS SHOWN SCHEMATICALLY. PROVIDE ALL TRANSITIONS, ELBOWS, FITTINGS, ETC., TO
ALLOW SMOOTH FLOWS.
7. COORDINATE SIZE REQUIREMENTS OF ALL CONCRETE PADS UNDER PIPE SUPPORTS.
8. SLEEVE AND SEAL ALL PIPING PENETRATIONS THROUGH BUILDING PARTITIONS. SEE STRUCTURAL
DRAWINGS FOR DETAILS AND SPECIFICATIONS.
9. MAINTAIN CLEARANCE OF A MINIMUM OF 6" BETWEEN PIPING.
GENERAL NOTES
DESCRIPTION
A/E ARCHITECT / ENGINEER
ABD ABANDONED
ADA AMERICANS WITH DISABILITIES ACT
AFF ABOVE FINISHED FLOOR
AFR ABOVE FINISHED ROOF
AHU AIR HANDLING UNIT
AP ACCESS PANEL
APPROX APPROXIMATE
ASTM AMERICAN STANDARDS TESTING MATERIALS
BAS BUILDING AUTOMATION SYSTEM
BOP BOTTOM OF PIPE
BHP BRAKE HORSEPOWER
BFV BUTTERFLY VALVE
BTU BRITISH THERMAL UNIT
CAV CONSTANT AIR VOLUME
CD CONDENSATE
CFM CUBIC FEET PER MINUTE
CL CENTER LINE
CO CLEAN OUT
COR CONTRACTING OFFICER'S REPRESENTATIVE
CT COOLING TOWER
CU CONDENSING UNIT
DB DRY BULB
DDC DIRECT DIGITAL CONTROLS
DN DOWN
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
ECC ENGINEERING CONTROL CENTER
EER ENERGY EFFICIENCY RATING
EQUIP EQUIPMENT
ESP EXTERNAL STATIC PRESSURE
ETR EXISTING TO REMAIN
EWT ENTERING WATER TEMPERATURE
EX EXISTING
ºF DEGREES FAHRENHEIT
FAS FIRE ALARM SYSTEM
FE FLUE EXHAUST
FLA FULL LOAD AMPS
FPM FEET PER MINUTE
FT FEET
GPM GALLONS PER MINUTE
HP HORSEPOWER
HPC HIGH PRESSURE CONDENSATE
HPS HIGH PRESSURE STEAM
HR HOUR
HZ HERTZ
IN INCHES
KW KILOWATT
LWT LEAVING WATER TEMPERATURE
MAX MAXIMUM
MBH THOUSAND BTUs PER HOUR
MCA MINIMUM CIRCUIT AMPS
MIN MINIMUM
MOCP MAXIMUM OVER CURRENT PROTECTION
MOD MOTORIZED CONTROL DAMPER
NA NOT APPLICABLE
NC NORMALLY CLOSED
NIC NOT IN CONTRACT
NO NORMALLY OPEN
NTS NOT TO SCALE
OA OUTSIDE AIR
OAT OUTSIDE AIR TEMPERATURE
PC PUMPED CONDENSATE
PH PHASE
PRV PRESSURE REDUCING VALVE
PRS PRESSURE REDUCING STATION
PSI POUNDS PER SQUARE INCH
PSIG PSI GAUGE
PTAC PACKAGED TERMINAL AIR CONDITIONER
PVC POLYVINYL CHLORIDE PIPE
RA RETURN AIR
RH RELATIVE HUMIDITY
RHC REHEAT COIL
RHP ROOFTOP HEAT PUMP
RPM REVOLUTIONS PER MINUTE
RS/L REFRIGERANT SUCTION & LIQUID LINES
RTU ROOFTOP AIR CONDITIONING UNIT
SA SUPPLY AIR
SF SQUARE FEET
SP STATIC PRESSURE
SPEC SPECIFICATION
SS STAINLESS STEEL
STD STANDARD
TA TRANSFER AIR
TDH TOTAL DYNAMIC HEAD
TEMP TEMPERATURE
TSP TOTAL STATIC PRESSURE
TYP TYPICAL
UL UNDERWRITER'S LABORATORY
U/G UNDERGROUND
UNO UNLESS NOTED OTHERWISE
V/PH VOLTS/PHASE
VA U.S. DEPARTMENT OF VETERANS AFFAIRS
VAV VARIABLE AIR VOLUME
VFD VARIABLE FREQUENCY DRIVE
VRF VARIABLE REFRIGERANT FLOW
W WATTS
W/ WITH
WB WET BULB
AHU-1
TU-5
TYPICAL UNIT NUMBER; AHU NO. 1
EQUIPMENT ABBREVIATION. AN "EX" SHOWN IN FRONT OF EQUIPMENT TAGS
NOTIFIES THAT EQUIPMENT IS EXISTING.
ITEM (TERMINAL UNIT SHOWN)
TYPICAL UNIT NUMBER; TU NO. 5
CONDENSATE
CHILLED WATER RETURN
CONDENSER WATER SUPPLY
CHILLED WATER SUPPLY
CONDENSER WATER RETURN
PIPING LEGEND
SYMBOLSYMBOL DESCRIPTION
CWS
CWR
CHWS
CHWR
CD
HEATING HOT WATER RETURN
HEATING HOT WATER SUPPLYHHWS
HHWR
FLOW METER
PRESSURE GAUGE WITH SHUTOFF
ELBOW, TURNED DOWN
INLINE PUMP
CAP
ELBOW, 90°
ELBOW, TURNED UP
TEE, OUTLET DOWN
FM
ELBOW, 45°
TEE, OUTLET UP
45° PIPE RISE (R)/DROP (D)
PIPE ANCHORS
CONCENTRIC REDUCER
ECCENTRIC REDUCER
R R
FLANGES
FLOW DIRECTION
UNION
THERMOMETER
FLEX CONNECTION (DOUBLE SPHERE FOR
PIPES 6" AND LARGER; SINGLE SPHERE FOR
PIPES 4" AND SMALLER
RELIEF VALVE
TEST PLUG (PRESSURE/TEMPERATURE)
MANUAL VENT
EQUIP. P-TRAP
FLOW SWITCH
PRESSURE SWITCH
AUTOMATIC AIR VENT
HOSE CONNECTION
ANGLE GLOBE VALVE
REFRIGERANT LIQUID AND SUCTION LINESR
TEE, SIDE CONNECTION
BUTTERFLY VALVE
PRESSURE REGULATING VALVE
CIRCUIT SETTER VALVE
CHECK VALVE
GATE VALVE
BALL VALVE
GLOBE VALVE
MOTORIZED ACTUATOR
PNEUMATIC ACTUATOR
SOLENOID VALVE (2-POSTION W/ ACTUATOR)
STRAINER
THREE-WAY VALVE
DESCRIPTION
6" HPS
INTERIOR PIPE SIZE IN INCHES.
TYPICAL PIPE TAG
SYSTEM TYPE (HPS = HIGH PRESSURE STEAM , HPC = HIGH PRESSURE
CONDENSATE, PC = PUMPED CONDENSATE)
APPLICABLE CODES
1. VA HVAC DESIGN MANUAL (HVACDM) 2024
2. VA SEISMIC DESIGN REQUIREMENTS (SDR) 2023 EDITION
3. VA SUSTAINABLE DESIGN MANUAL (SDM) REV. AUGUST 18, 2017
4. AMERICAN SOCIETY OF HEATING, REFRIGERATION AND AIR-CONDITIONING ENGINEERS (ASHRAE):
A. SAFETY STANDARD FOR REFRIGERATION SYSTEMS (ASHRAE 15 & 34) 2022 EDITION
B. VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY (ASHRAE 62.1) 2022 EDITION
C. ENERGY STANDARD FOR BUILDINGS (ASHRAE 90.1) 2022 EDITION
D. VENTILATION OF HEALTH CARE FACILITIES (ASHRAE 170) 2021 EDITION
5. NATIONAL FIRE PROTECTION ASSOCIATION (NFPA):
A. COMPRESSED GASES AND CRYOGENIC FLUIDS CODE, NFPA 55 2020 2016 EDITION
B. NATIONAL ELECTRICAL CODE (NEC) 2023 EDITION
C. NATIONAL FIRE ALARM CODE (NFPA 72) 2022 EDITION
D. STANDARD FOR THE INSTALLATION OF AIR-CONDITIONING AND VENTILATING SYSTEMS (NFPA 90A)
2021 EDITION
E. STANDARD FOR THE INSTALLATION OF WARM AIR HEATING AND AIR-CONDITIONING SYSTEMS
(NFPA 90B) 2021 EDITION
F. STANDARD FOR SMOKE CONTROL SYSTEMS (NFPA 92) 2021 EDITION
G. STANDARD FOR VENTILATION CONTROL AND FIRE PROTECTION OF COMMERCIAL COOKING (NFPA
96) 2023 EDITION
H. HEALTH CARE FACILITIES CODE (NFPA 99) 2021 EDITION
I. LIFE SAFETY CODE (NFPA 101) 2021 EDITION
6. APPLICABLE PUBLICATIONS INCLUDING BUT NOT LIMITED TO:
A. ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARD (ABAAS)
B. AMERICANS WITH DISABILITIES ACT (ADA)
C. AIR-CONDITIONING, HEATING, AND REFRIGERATION INSTITUTE (AHRI)
D. AIR MOVEMENT AND CONTROL ASSOCIATION (AMCA)
E. AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)
F. ASSOCIATION FOR RUBBER PRODUCTS MANUFACTURERS (ARPM)
G. AMERICAN SOCIETY OF TESTING AND MATERIALS (ASTM)
H. MANUFACTURERS STANDARDIZATION SOCIETY OF THE VALVE AND FITTINGS INDUSTRY, INC. (MSS)
I. OCCUPATIONAL SAFETY AND HEALTH ACT (OSHA)
J. SHEET METAL AND AIR CONDITIONING CONTRACTORS' NATIONAL ASSOCIATION (SMACNA)
7. APPLICABLE STANDARDS, REGULATIONS, AND PRACTICES OF THE OWNER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
A u to d e s k D o c s /0
S a lis b u ry
S te a m
L in e R e p la c e m e n t/
V A
S a lis b u ry S tm L in e R e p l.
R
M E
.r v t
/2
/2
:1
:1
A
M
M-001
MECHANICAL NOTES, LEGENDS, & SYMBOLS STEAM LINE REPLACEMENT
SALISBURY VAMC
659-24-903
09/27/2024 GC DG
100% CONSTRUCTION
DOCUMENTS
SHEET LIST
SHEET NUMBER SHEET NAME
M-001 MECHANICAL NOTES, LEGENDS, & SYMBOLS
M-101 MECHANICAL - PHASING
MD103 SITE PLAN - MECHANICAL - DEMOLITION - PHASE 3
MD104 SITE PLAN - MECHANICAL - DEMOLITION - PHASE 4
MD106 SITE PLAN - MECHANICAL - DEMOLITION - PHASE 6
MP101 SITE PLAN - MECHANICAL - NEW WORK - PHASE 1
MP102 SITE PLAN - MECHANICAL - NEW WORK - PHASE 2
MP103 SITE PLAN - MECHANICAL - NEW WORK - PHASE 3
MP104 SITE PLAN - MECHANICAL - NEW WORK - PHASE 4
MP105 SITE PLAN - MECHANICAL - NEW WORK - PHASE 5
MP106 SITE PLAN - MECHANICAL - NEW WORK - PHASE 6
MP107 SITE PLAN - MECHANICAL - NEW WORK - PHASE 7
MD401 MH-10B - MECH PLANS AND SECTIONS - DEMOLITION - PHASE 3
MD402 MH-16A - MECH PLANS AND SECTIONS - DEMOLITION - PHASE 3
MD403 MH-17B - MECH PLANS AND SECTIONS - DEMOLITION - PHASE 3
MD404 MH-1 - MECH PLANS AND SECTIONS - DEMOLITION - PHASE 4
MD405 MH-10A - MECH PLANS AND SECTIONS - DEMOLITION - PHASE 6
MD406 MH-C - MECH PLANS AND SECTIONS - DEMOLITION - PHASE 6
MD407 MH-10B - MECH PLANS AND SECTIONS - DEMOLITION - PHASE 6
MD408 MH-16A - MECH PLANS AND SECTIONS - DEMOLITION - PHASE 6
MD409 MH-17B - MECH PLANS AND SECTIONS - DEMOLITION - PHASE 6
MP401 MH-10B - MECH PLANS AND SECTIONS - NEW WORK - PHASE 3
MP402 MH-16A - MECH PLANS AND SECTIONS - NEW WORK - PHASE 3
MP403 MH-17B - MECH PLANS AND SECTIONS - NEW WORK - PHASE 3
MP404 MH-16A - MECH PLANS AND SECTIONS - NEW WORK - PHASE 4
MP405 MH-17B - MECH PLANS AND SECTIONS - NEW WORK - PHASE 4
MP406 MH-15A - MECH PLANS AND SECTIONS - NEW WORK - PHASE 5
MP407 MH-17C- MECH PLANS AND SECTIONS - NEW WORK - PHASE 5
MP408 MH-15B - MECH PLANS AND SECTIONS - NEW WORK - PHASE 6
MP409 B16 - MECH PLANS AND PHOTOS
MP410 B17 - MECH PLANS AND PHOTOS
M-501 MECHANICAL DETAILS
M-502 MECHANICAL EXISTING CONDITIONS DETAILS
M-801 MECHANICAL SCHEDULES
PROGRESS PRINT
NOT FOR CONSTRUCTION
PROGRESS PRINT
NOT FOR CONSTRUCTION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
A u to d e s k D o c s /0
S a lis b u ry
S te a m
L in e R e p la c e m e n t/
V A
S a lis b u ry S tm L in e R e p l.
R
M E
.r v t
/2
/2
:1
:1
A
M
9/27/2024 11:10:13 AM9/27/2024 11:10:13 AM
M-101
MECHANICAL - PHASING STEAM LINE REPLACEMENT
SALISBURY VAMC
659-24-903
09/27/2024 GC DG
100% CONSTRUCTION
DOCUMENTS
PERFORM FINAL COMMISSIONING OF SYSTEM, PREPARE SITE FINISHING, RESEEDING AND REPAVING.
HAND OVER SYSTEM TO THE COR FOR USE.
X X X X X - X X X X X X - - NR NR
1) FINAL GRADING AND SEED/SOD
2) FINAL PAVING, LINES, SIGNAGE, AND PERMANENT TRAFFIC CONTROL RESTORATION.
3) FINAL LABELING OF PIPING AND MANHOLES.
4) COMMISSIONING
5) TRAINING AND TURNOVER
7 SITE FINISHING, CX, AND FINAL TURNOVER
DEMOLISH EXISTING MANHOLE 10A…