This is a Scope of Work document for Project 658-19-103, a surgical suite renovation at Salem VA Medical Center in Salem, Virginia, with a performance period of 840 calendar days from Notice to Proceed. The contractor must furnish all labor, material, equipment, and qualified supervision to complete the work as defined in the contract documents and drawings/specifications.
The project encompasses comprehensive renovation and expansion of an existing surgical suite across multiple trades. Architectural work includes demolition and construction of a hybrid operating room, orthopedic operating room, six general operating rooms, support spaces, and pre/post-operative areas, along with exterior shafts for ductwork on the high roof (level 5). Structural work involves steel support for new HVAC equipment and modifications to existing roof structures for exhaust duct risers. Mechanical work includes upgrading the HVAC system to support 100% outside air pandemic mode operation, with new rooftop air handling units, air-cooled chillers, ductwork distribution, terminal units, utility piping, controls, and underground fuel oil tanks for a new generator. Plumbing work covers modifications to domestic water distribution, storm water, sanitary, waste and vent systems, plus medical gas system modifications for operating rooms and pre-operative/recovery areas. Electrical work involves modifications to normal and emergency distribution systems, transmission/distribution systems, and replacement of the existing emergency generator for Building 143, including a temporary generator provision. Fire protection work includes modifications to sprinkler systems in Building 143 and a new fire protection service to Building 140 for emergency generators. Fire alarm modifications are required in Buildings 140 and 143 to accommodate renovations. General construction work includes alterations and selective demolition as indicated in contract documents.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24626Q0301-Sources Sought-Renovate Surgical Suite Phase II 658-19-103.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project 658-19-103 Renovate Surgical Suite Phase II
Scope of Work
Contractor shall furnish all labor, material, equipment, and qualified supervision necessary to perform work as shown in the drawings and specifications for Project 658- 19-103 Renovate Surgical Suite Phase II located at the Salem VA Medical Center in Salem, VA.
GENERAL CONSTRUCTION: Work includes general construction, alterations, selective demolition, and certain other items as indicated in the Contract Documents.
STRUCTURAL: Work includes providing steel support for new HVAC equipment, rooftop ductwork and ductwork risers and modifications to existing roof structures to accommodate the new exhaust duct risers.
ARCHITECTURAL: The Architectural scope is to expand and renovate an existing surgical suite to comply with current VA design guidelines and provide innovative functional spaces. Interior renovation will in include demolition and new work to build a hybrid operating room, an orthopedic operating room, six general operating rooms, support spaces, and pre/post-operative (PACU) areas. Exterior renovations will include demolition and new work to provide exterior shafts for new ductwork to reach new mechanical equipment on the high roof (level 5).
FIRE SUPPRESSION: Work includes modification to the existing fire protection sprinkler system in Building 143 to accommodate the renovations as well as a new Fire Protection Service to Building 140 housing the emergency generators.
PLUMBING: Work includes but is not limited to modifications to the domestic hot-water and cold-water distribution, storm water, sanitary, waste and vent systems to accommodate the OR and HVAC renovation. The project also includes modification of medical gases systems to accommodate the renovations to the OR’s Pre-Op and PACU Suites.
MECHANICAL: Work involves upgrading the existing HVAC system serving the OR suite to accommodate 100% OA Pandemic Mode operation. This includes, but is not limited to, a new Rooftop AHU, New Air-Cooled Chillers, New Air Handling Units in Mechanical Rooms, new Ductwork distribution, terminal units, utility piping and controls.
Work also includes the installation of new underground fuel oil tanks for the new generator and all associated appurtenances.
ELECTRICAL: Work includes modifications to the existing normal and emergency electrical distribution systems, T/D systems and replacement of the existing emergency generator serving Building 143 OR Suite. This includes the provision of a temporary generator with all required appurtenances.
FIRE ALARM: Work includes modification to the existing fire alarm systems in Building 140 and 143 to accommodate the renovations.
The period of performance for this project is 840 calendar days from issuance of NTP.