657A5-21-401 - Drawings R2_Part2 - 16 pages.pdf

PDF 15 MB Posted

Attached to
Z2DA--657A5-21-401, Construct New Campus Chiller Plant, MRN
Solicitation number
36C25526R0129
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

METAL ROOF DECK OPENING FRAMING

NOTES:

1. ROOF DECK OPENING, SEE PLAN FOR LOCATION. OPENINGS LESS THAN 12"X12" DO NOT

REQUIRE SUPPLEMENTAL ANGLE FRAMING.

2. PROVIDE SUPPLEMENTAL ANGLE FRAMING BELOW DECK UNDER EACH EDGE OF OPENING.

SEE SECTION ABOVE FOR MORE INFORMATION.

3. WHERE EDGE OF OPENING ALIGNS WITH ROOF FRAMING MEMBER, SUPPLEMENTAL ANGLE

FRAMING NOT REQUIRED. WELD DECK TO ROOF MEMBER PER SECTION ABOVE.

SECTION, SUPPLEMENTAL ANGLE

FRAMING BELOW ROOF DECK OPENINGS

SCHEMATIC ROOF PLAN

SHOWING ROOF DECK OPENINGS

DECK OPENING,

REF NOTE 1 (TYP)

ROOF BEAM (TYP) SUPPLEMENTAL FRAMING,

SEE NOTE 2 (TYP)

L4X4X5/16 BELOW

OPENING EDGES PER

NOTES BELOWL6X6X5/16 X 4" LG, TYP.

TACK WELD TO ROOF

FRAMING MEMBER. AT

CONTRACTOR'S OPTION

FOR LOCATIONS

BETWEEN DECK FLUTES,

USE 2-L6X6X5/16 ANGLES

w/ 1/4" PLATE BETWEEN. ROOF FRAMING

MEMBER (TYP)

NOTE 3

OPENING

METAL DECKMETAL DECK PER PLAN

METAL FLOOR DECK OPENING FRAMING

NOTES:

1. FLOOR DECK OPENING, SEE PLAN FOR LOCATION. OPENINGS LESS THAN 8"X8" DO NOT REQUIRE

SUPPLEMENTAL ANGLE FRAMING.

2. PROVIDE SUPPLEMENTAL ANGLE FRAMING AT EACH EDGE OF OPENING. SEE SECTION ABOVE

FOR MORE INFORMATION.

3. WHERE EDGE OF OPENING ALIGNS WITH ROOF FRAMING MEMBER, SUPPLEMENTAL ANGLE

FRAMING BELOW DECK NOT REQUIRED. WELD DECK TO FLOOR MEMBER PER SECTION ABOVE.

SECTION, SUPPLEMENTAL ANGLE

FRAMING BELOW FLOOR DECK OPENINGS

SCHEMATIC FLOOR PLAN

SHOWING FLOOR DECK OPENINGS

DECK OPENING,

SEE NOTE 1 (TYP)

FLOOR BEAM (TYP) SUPPLEMENTAL FRAMING,

SEE NOTE 2 (TYP)

L4X4X5/16 BELOW OPENING

EDGES PERPENDICULAR TO

FLOOR BEAMS

L6X6X5/16 X 4" LG, TYP.

TACK WELD TO ROOF

FRAMING MEMBER. AT

CONTRACTOR'S OPTION

FOR LOCATIONS

BETWEEN DECK FLUTES,

USE 2-L6X6X5/16 ANGLES

w/ 1/4" PLATE BETWEEN.

3/16"

(TYP) FLOOR BEAM (TYP)

NOTE 3

OPENING

METAL DECKMETAL DECK PER PLAN

5/8" 6" OC

DECK TO

ANGLE

(TYP)

L5X3X1/4 (LLV) AT OPENING

PERIMETER EDGES (TYP)

ROOFTOP UNIT SUPPORT ON STEEL ROOF

NOTES:

1. ROOFTOP UNIT, SEE PLAN FOR LOCATION AND UNIT WEIGHT INFORMATION.

2. PROVIDE SUPPLEMENTAL ANGLE FRAMING BELOW DECK UNDER EACH EDGE OF ROOFTOP UNIT.

SEE SECTION ABOVE FOR MORE INFORMATION.

3. WHERE UNIT CURB ALIGNS WITH ROOF FRAMING MEMBER, SUPPLEMENTAL ANGLE FRAMING NOT

REQUIRED. WELD DECK TO ROOF MEMBER PER SECTION ABOVE.

SECTION, SUPPLEMENTAL ANGLE

FRAMING BELOW DECK

SCHEMATIC ROOF PLAN

SHOWING DIFFERENT ROOFTOP UNIT PLACEMENTS

ROOFTOP UNIT,

SEE NOTE 1 (TYP)

ROOF BEAM (TYP) SUPPLEMENTAL

FRAMING, SEE

NOTE 2 (TYP)

L4X4X5/16 BELOW

DECK PER NOTES

BELOW

L6X6X5/16 X 4" LG, TYP.

TACK WELD TO ROOF

FRAMING MEMBER. AT

CONTRACTOR'S OPTION

FOR LOCATIONS

BETWEEN DECK FLUTES,

USE (2) L6X6X5/16

ANGLES w/ 1/4" PLATE

BETWEEN.

ROOF BEAM (TYP)

5/8" 6" OC

DECK TO

ANGLE

(TYP)

NOTE 3

3/16"

(TYP)

3/16"

(TYP)

#4 CONT

HORZ (TYP.)

T-INTERSECTION

PLAN VIEW

CORNER

PLAN VIEW

CMU BOND BEAM CORNER AND T-INTERSECTION REINFORCING

CONTINUE

VERT REINF

THRU BOND

BEAM (TYP.)

#4 CONT

HORIZ (TYP.)

CONTINUE

VERT REINF

THRU BOND

BEAM (TYP.)

INTERIOR CMU WALL - SEE

PLAN AND ARCH DRAWINGS

FOR MORE INFORMATION

CONCRETE BEAM OR SLAB ON

GRADE - SEE FOUNDATION

PLAN FOR MORE INFORMATION

INTERIOR CMU WALL -

SEE PLAN AND ARCH

DRAWINGS FOR MORE

INFORMATION

SLAB PER PLAN

BEAM PER PLAN

DRILL AND GROUT

ALL VERT BARS INTO

SLAB, 3" EMBED

SLAB ON GRADE ELEVATED SLAB

BENT BAR DOWEL, MATCH

SIZE AND SPACING OF WALL

REINF

EQ

EQ

CMU WALL BASE REINFORCING

INTERIOR CMU WALL -

SEE PLAN FOR MORE

INFORMATION

METAL DECK

PER PLAN

BEAM PER

PLAN (TYP.)

L4X4X1/4 CONT. DO

NOT ANCHOR TO WALL.

T/WALL PARALLEL TO

FRAMING ABOVE

HSS3X1-1/2X3/16 (LDH) @

6'-0"OC IN DECK FLUTES

3/16

(TYP)

3/16

(TYP)

BEAM PER PLAN 3/16 3

L4X4X1/4 X 8" LG

AT EA BEAM. DO

NOT ANCHOR TO

WALL.

T/WALL PERPENDICULAR

TO FRAMING ABOVE

2" C

LR

INTERIOR CMU WALL -

SEE PLAN FOR MORE

INFORMATION

CMU T/WALL BRACING

LADDER TYPE,

HORIZONTAL JOINT

REINFORCING, 9 GA

CONTROL JOINT - SEE CMU

CONTROL JOINT DETAIL THIS

SHEET

SEE PLAN FOR VERT

REINF SIZE AND SPACING

JAMB BLOCK EACH SIDE

OF CONTROL JOINT

JAMB BLOCK

PROVIDE (2) #5

VERTICAL BARS AT

ALL OPENING JAMBS

MASONRY

WALL OPENING

GROUT ALL CELLS w/

REINF SOLID (TYP.)

CMU BOND BEAM CORNER AND T-INTERSECTION REINFORCING

CONTINUOUS SEALANT

& BACKER ROD (TYP)

1/2" FIBER BOARD FULL

HEIGHT OF JOINT

JAMB UNIT, EACH SIDE

OF CONTROL JOINT

#5 VERT BAR IN

EACH OF LAST

TWO CELLS

ADJACENT TO

CONTROL JOINT

(TYP.)

NOTCH BLOCK FULL HEIGHT

TO RECEIVE RUBBER

CONTROL JOINT MATERIAL

STOP LADDER TYPE HORIZ JOINT

REINF 1" MAX SHORT OF EA SIDE

OF CONTROL JOINT (TYP.)

CMU CONTROL JOINT DETAIL

3/8" CONTROL JOINT, SEE

CMU CONTROL JOINT

DETAIL THIS SHEET

PROVIDE (2) #5 VERT

BAR AT INTERSECTION

T-INTERSECTION

PLAN VIEW

PRE-FABRICATED

TEE HORIZ JOINT

REINF, 9 GAUGE (TYP) PROVIDE (3) #5 VERT

BAR AT CORNER

CORNER

PLAN VIEW

SEE PLAN FOR

WALL REINF SIZE

AND SPACING (TYP.)

GROUT ALL CELLS w/

REINF SOLID (TYP.)

CMU BOND BEAM CORNER AND T-INTERSECTION REINFORCING

3/8" CONTROL JOINT, SEE

CMU CONTROL JOINT

DETAIL THIS SHEETPRE-FABRICATED

CORNER HORIZ JOINT

REINF, 9 GAUGE (TYP)

SEE PLAN FOR

WALL REINF SIZE

AND SPACING (TYP.)

GROUT ALL CELLS w/

REINF SOLID (TYP.)

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Date:Revisions:No.

Au to de sk

D oc s:

//M ar io n

IL

V A

- N ew

E ne rg y

C en te r/F

FE

_M ar io n

IL

En er gy

C en te r_

ST

R

U C

T (2

6)

.rv t

5/ 6/

:2

6:

P M

SF601

FRAMING TYPICAL DETAILS

05/07/2026 KES EMO

CONSTRUCT NEW CAMPUS

CHILLER PLANT

657A5-21-401

2401 W MAIN ST, MARION, ILLINOIS 62959

CONTRACT

DOCUMENTS A

MARION VA

HEALTH CARE

SYSTEM Approved: Owner

1 CONTRACT DOCUMENTS 05/07/2026

AREA DECK

METAL ROOF DECK FASTENING SCHEDULE

MAIN ROOF

DFP-1 1.5B 36/9 (13) PER SPAN

1.

2.

3.

4.

NOTES:

SUPPORT FASTENERS: 5/8" DIAMETER PUDDLE WELDS, HILTI X-HSN 24, OR APPROVED

EQUAL.

SIDELAP FASTENERS: #10 SELF-DRILLING SCREWS, HILTI S-SLC 02 M HWH SIDELAP

CONNECTOR, OR APPROVED EQUAL.

IN ADDITION TO FASTENING PATTERN NOTED, PROVIDE SUPPORT FASTENERS @ 6"OC

AT ALL DECK EDGES (OPENINGS, DECK PERIMETER, ETC).

AT FLOOR CONSTRUCTION, HEADED STUD CAN REPLACE THE SUPPORT FASTENER

SHOWN ABOVE. WHERE STUD SPACING DOES NOT MEET ABOVE REQUIREMENTS,

SUPPLEMENT WITH SUPPORT FASTENERS AT MAX SPACING NOTED ABOVE.

ALL FLOOR

DECK 36/4 (2) PER SPAN

SUPPORT FASTENERS SIDELAP

FASTENERS

1.5VL

SIDELAP

FASTENERS

PER

SCHEDULE

SUPPORT

FASTENERS

PER SCHEDULE

METAL

DECK PER

PLAN

SUPPORT

MEMBER:

BEAM PER

PLAN, TYP

DECK SPAN

DECK UNIT

MAIN ROOF

DFP-2 1.5B 36/5 (7) PER SPAN

BP80

3/8

1" THICK PL

W10 COLUMN

3" 6" 3"

3" 6"

3"

BP10

1'

0"

1' - 0"

HOLES FOR 3/4"

DIA ANCHORS,

SEE ANCHOR

BOLT SCHED

3/8

1" THICK PL

HSS8X8 COL

2" 1' - 0" 2"

2" 6"

2"

1' - 4"

HOLES FOR 3/4"

DIA THRU BOLTS

(BP BOLTED TO

STEEL MEMBER

BELOW)

BASE PLATE SCHEDULE

BP50

3/8

1" THICK PL

HSS5X5 COL

1 1/2" 8" 1 1/2"

1/

4" 3"

1/

4"

1/

2"

11"

HOLES FOR 3/4"

DIA THRU BOLTS

(BP BOLTED TO

STEEL MEMBER

BELOW)

WASHER AND NUT

FULLY-THREADED

ANCHOR ROD

BASE PLATE PER

BASE PLATE

SCHEDULE

TOP OF

CONCRETE

WASHER AND

DOUBLE NUT

2" NON-SHRINK

GROUT, TYP.

5" M

IN

PR

O

JE

C

TI

O N

PE

R

S C

H

ED

M

IN

E M

BE

D

ANCHOR BOLT SCHEDULE

MARK LINTEL SIZE

LINTEL SCHEDULE AND DETAILS

L2

L1 16X8 CMU BOND BEAM

LINTEL

TYPE

A

BEARING

TYPE

Z

BEARING

WIDTH

8" MIN

BEARING

PLATE

LINTEL TYPE 'A'

BOND BEAM w/ (2)

#5 CONT + GROUT,

EXTEND 8" MIN

BEYOND EA SIDE

OF OPNG

MASONRY WALL w/

REINF + GROUT

PER ELEVATION,

TERMINATE w/ STD

HOOK INTO BOND

BEAM

1.

2.

NOTES:

REFER TO MECHANICAL, ELECTRICAL, PLUMBING DRAWINGS FOR LOCATION &

SIZE OF WALL OPENINGS NOT INDICATED ON THIS SET.

NOTIFY ARCHITECT & SEOR IF LINTEL IS NOT PROVIDED FOR OPENING.

BOND BEAM PER

LINTEL SCHEDULE

LINTEL SCHED

MIN BRG PER

8X8 CMU BOND BEAM A Z 8" MIN

T/OPNGLI

N

TE

L

SC

H

ED

BB

H

EI

G H

T

PE

R

BEARING TYPE 'Z'

MASONRY WALL w/

REINF PER ELEVATION

AND TYPICAL DETAILS

GROUT CELLS BELOW LINTEL

BEARING SOLID, 16"X16" MIN

(AT SIM, GROUT 16" WIDE AND

SOLID TO FLOOR BELOW)

ANCHOR

DIAMETER

3/4" 9"

MIN

EMBED

1" 12"

A

D

61 3

B

685PLF SHEAR AT ROOF DIAPHRAGM

PL

F

SH

EA

R A

T R

O O

F D

IA

PH

R

AG

M

685PLF SHEAR AT ROOF DIAPHRAGM

PL

F

SH

EA

R A

T R

O O

F D

IA

PH

R

AG

M

PL

F

SH

EA

R A

T M

EZ

Z

D

IA

PH

R

AG

M

560PLF SHEAR AT MEZZ DIAPHRAGM

560PLF SHEAR AT MEZZ DIAPHRAGM

1.

2.

3.

NOTES:

SHEAR WALLS ARE NONLOADBEARING AND TAKE NO VERTICAL FRAMING FORCES. SEE FRAMING

SECTIONS FOR MORE INFORMATION.

LOADS SHOWN ON PLAN ABOVE ARE LRFD-LEVEL EARTHQUAKE LOADS AND ACT PARALLEL TO THE

FACE OF THE WALL. WIND DOES NOT GOVERN DESIGN.

OUT-OF-PLANE WALL LOADS (ACTING PERPENDICULAR TO WALL FACE) ARE AS FOLLOWS: 52PSF ENTIRE WALL SURFACE; 1426PLF AT THE ROOF DIAPHRAGM, LRFD-LEVEL. WIND DOES NOT GOVERN DESIGN.

THESE LOADS HAVE NOT BEEN INCREASED BY THE WALL ANCHORAGE FORCE AMPLIFICATION FACTOR

OF ASCE 7-22 12.11.2.

SHEAR WALL LOADING SCHEDULE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Date:Revisions:No.

Au to de sk

D oc s:

//M ar io n

IL

V A

- N ew

E ne rg y

C en te r/F

FE

_M ar io n

IL

En er gy

C en te r_

ST

R

U C

T (2

6)

.rv t

5/ 6/

:2

6:

P M

SF701

FRAMING SCHEDULES

05/07/2026 KES EMO

CONSTRUCT NEW CAMPUS

CHILLER PLANT

657A5-21-401

2401 W MAIN ST, MARION, ILLINOIS 62959

CONTRACT

DOCUMENTS 49

MARION VA

HEALTH CARE

SYSTEM Approved: Owner

1 CONTRACT DOCUMENTS 05/07/2026

02.01

02.02

AD101

-B49

VE

R

IF

Y

IN

F

IE

LD

/2

VE

R

IF

Y

IN

F

IE

LD

VERIFY IN FIELD

62' - 3" +/-

GENERAL NOTES

A.

B.

C.

D.

E.

F.

G.

H.

REFER TO SHEET GI000 FOR GENERAL NOTES.

REFER TO SHEET GI001 FOR SYMBOL LEGEND.

REPRESENTATION OF EXISTING ELEMENTS ON DRAWINGS IS NOT EXHAUSTIVE, AND MUST BE FIELD VERIFIED BY THE

CONTRACTOR. COORDINATE ALL QUANTITIES AND AREAS IN FIELD.

ALL ELEMENTS OUTSIDE THE AREA OF DEMOLITION THAT SUFFER DAMAGE DURING DEMOLITION OR REMOVAL OF MATERIAL

SHALL BE REPAIRED OR REPLACED BY THE CONTRACTOR.

ALL UTILITY SYSTEM AND OTHER COMPONENTS THAT ARE SCHEDULED FOR DEMOLITION/ DISCONNECTION SHALL BE REMOVED IN THEIR ENTIRETY. CONTRACTOR SHALL NOT CAP AND/OR ABANDON IN PLACE UNLESS SPECIFICALLY INSTRUCTED BY THE VA.

COORDINATE ALL DEMOLITION WORK WITH OTHER DISCIPLINES.

CONTRACTOR TO COORDINATE WITH VA ON ALL SHUTDOWNS PRIOR TO BEGINNING WORK.

CONTRACTOR TO VERIFY WITH THE VA ON ALL EQUIPMENT THAT IS TO BE SALVAGED, REUSED, AND/OR TURNED OVER TO THE

GOVERMENT.

LEGEND

REMOVE / DEMOLISH EXISTING CONSTRUCTION

ST

R

U C

TU

R

E

TO

B E

D

EM

O

LI

SH

ED

, V

IF

8'

0"

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Date:Revisions:No.

Au to de sk

D oc s:

//M ar io n

IL

V A

- N ew

E ne rg y

C en te r/M ar io n

IL

_B

(2

6) .rv t 5/

7/

:4 4:

A

M

AD101 -B49

B49 - DEMOLITION FLOOR PLAN

AND ELEVATION

05/07/2026 SS KJ

CONSTRUCT NEW CAMPUS

CHILLER PLANT

657A5-21-401

MARION, ILLINOIS

CONSTRUCTION

DOCUMENTS 100% 49

MARION VA

HEALTH CARE

SYSTEM Approved: Owner

SITE KEY PLAN

NEW CHILLER PLANT

EXISTING CHILLER PLANT - BLDG 49

37MOD-5

MOD-1

49 MOD-4

MOD-6

NORTH

DRAWING NOTES

02.01 DEMOLISH EXISTING STRUCTURE IN ITS ENTIRETY INCLUDING ALL EQUIPMENT, FIXTURES, FOUNDATIONS, ETC. - SEE ALL

DISCIPLINES FOR RELATED WORK AND COORDINATE.

02.02 DEMOLISH EXISTING COURTYARD SLAB AND FENCES INCLUDING ALL EQUIPMENT, FIXTURE, AND SUPORT STRUCTURES -

SEE ALL DISCIPLINES FOR RELATED WORK

1/8" = 1'-0"1 B49 - DEMOLITION FLOOR PLAN

1/8" = 1'-0"2 B49 - EAST DEMOLITION ELEVATION

1 CONTRACT DOCUMENTS 05/07/2026

stidh eSeal_OH_Stidham_351290_Signed

UP

/4

8' - 3 3/4"

CHILLER PLANT

ELECTRICAL ROOM

ELECTRICAL ROOM

CONTROL ROOM

TOILET

TR

H.A.C.

AE301

AE301

AE301

AE301

AE301

AE301

105A

AE301

AE301

AE201

AE201 5

AE201

AE2016

08.01

05.01

38' - 9" 3' - 4" 6' - 8" 14' - 0" 46' - 3"

8'

0" 5'

5"

8'

0" 5'

0"

8'

0"

3/

4"

17' - 0" 19' - 6"

UP

R1

R1

B2

03.02

03.02

10.01

10.01

R1

A

D

632 54

B

C

R2

B1 8'

3/ 4"

B1

AE311

7'

4" 1'

3/ 4"

03.02

03.02

03.02

03.02

03.02

03.02 03.02 03.02

03.0203.02

03.03

AE310

AE310

05.05 05.05

03.04

03.04

03.04

03.04

AE321

03.05

AE321

CR

CR

/4

6'

8" 3'

1/ 4"

6'

8"

3/

4"

55' - 0 1/4" 3' - 4" 50' - 7 3/4"

19' - 0" 24' - 4" 23' - 11" 25' - 8" 14' - 5"

/2

/2

10' - 4" 1' - 4"

12' - 0 3/4"

100B

100A

4' - 4"

1' - 4"

6'

2"

11' - 4 1/4"

B2

9'

1/

4"

B2

2'

8"

4'

0"

3'

4" 5'

4"

3'

4" 3'

8"

3'

4" 5'

8"

B2

3'

- 0

6' - 0"

3' - 0" 7'

- 6

3' - 0" 7'

- 6

3' - 0" 7'

- 6

3' - 0" 3' - 0"

3' - 0"

6'

- 6

6'

- 6

6'

- 6

6' - 0"

6' - 0" 3'

- 0

3'

- 0

4'

- 5

3/ 4"

4'

- 5

3/ 4"1'

7"

4' - 6"

6' - 0" 1' - 3 3/4"

45' - 4"

106A

CR

08.04

2'

6" 6'

8"

08.06

3/ 4"

63' - 8"

110' - 9"

2' - 8" 3' - 4" 29' - 8" 3' - 4" 6' - 4"

32' - 0"

/4

1'

4"

OPEN

AE431

AE431

R3

09.08

1'

6"

GENERAL NOTES

A.

B.

C.

D.

E.

F.

G.

H.

I.

J.

ALL DIMENSIONS ARE FROM FINISHED FACE OF PARTITIONS.

ALL DIMENSIONS SHALL HAVE PREFERENCE OVER SCALE. DO NOT SCALE DRAWINGS.

THE EDGE OF ALL DOOR JAMBS AT STRIKE SIDE, UNLESS INDICATED OTHERWISE, ARE TO BE 18" MINIMUM FROM THE FACE OF

INTERSECTING WALLS.

IF THE GENERAL CONTRACTOR SHOULD DISCOVER ANY UNFORESEEN CONDITIONS DURING CONSTRUCTION, THE VA SHOULD BE NOTIFIED IMMEDIATELY AND THAT PARTICULAR WORK SHOULD BE DISCONTINUED UNTIL NECESSARY REVISIONS CAN BE DECIDED

UPON.

REFER TO MECHANICAL, ELECTRICAL AND PLUMBING SHEETS FOR ALL MECHANICAL, ELECTRICAL AND PLUMBING RELATED WORK.

REFER TO STRUCTURAL SHEETS FOR ALL STRUCTURAL RELATED WORK.

ALL GYPSUM BOARD WALLS SHALL RECEIVE A LEVEL 4 FINISH, UNLESS NOTES OTHERWISE.

ALL EXPOSED GYPSUM BOARD IN RESTROOMS SHALL BE MOISTURE RESISTANT.

ALL INTERIOR STUDS TO DECK SHALL BE MINIMUM 20 GAUGE.

SEE ROOM FINISH SCHEDULE FOR ALL FLOOR AND WALL FINISHES.

SEE COVER SHEET FOR DEDUCT ALTERNATE INFORMATION.

LEGEND

2 HOUR RATED WALL

CARD READER - SEE ELECTRICAL AND

TECHNOLOGY DRAWINGSCR

AE301

AE301

AE301

AE301

AE301

AE301

AE301

AE301

2049 SF

MEZZANINE

AE201

AE201 5

AE201

AE2016

05.01

05.02

OPEN TO

BELOW

05.03

A

D

632 54

B

C

AE310

AE310

AE310

08.03

AE321

05.06

19' - 0" 24' - 4" 23' - 11" 25' - 8" 14' - 5"

/2

/2

/4

6'

8"

OPEN TO

BELOW

2'

6" 8'

0"

AE202

63' - 8"44' - 8 1/2"

/4

109' - 0"

03.02

03.02

3/ 4"

110' - 9"

/4

5'

9'

1" 6'

2"

11' - 1" 19' - 2"

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Date:Revisions:No.

Au to de sk

D oc s:

//M ar io n

IL

V A

- N ew

E ne rg y

C en te r/F

FE

_M ar io n

IL

En er gy

C en te r_

AR

C

H (2

6)

.rv t

5/ 6/

:0

1:

A M

AE101

FLOOR PLANS

05/07/2026 SPS KJ

CONSTRUCT NEW CAMPUS

CHILLER PLANT

657A5-21-401

2401 W MAIN ST, MARION IL 62959

CONSTRUCTION

DOCUMENTS

MARION VA

HEALTH CARE

SYSTEM Approved: Owner

1/8" = 1'-0"

FIRST FLOOR PLAN

SITE KEY PLAN

NEW CHILLER PLANT

EXISTING CHILLER PLANT - BLDG 49

37MOD-5

MOD-1

49 MOD-4

MOD-6

NORTH

1/8" = 1'-0"

MEZZANINE FLOOR PLAN

DRAWING NOTES

03.02 CONCRETE EQUIPMENT PAD - SEE STRUCTRUAL DRAWINGS

03.03 CONCRETE PIT FOR UNDERGROUND LINES - SEE SECTION DETAILS AND STRUCTRUAL DRAWINGS

03.04 POUR-THRU SLAB AT DOOR

03.05 EXTERIOR CONCRETE SLAB SLOPE AWAY FROM BUILDING AND ALL DOORS - SEE SECTION DETAILS

05.01 PRE ENGINEERED METAL GRATE STAIR WITH INTEGRATED GUARD AND HANDRAIL. STRINGERS AND GUARD RAIL TO

RECEIVE PAINT (P-5) - SEE FINISH LEGEND - SEE STRUCTURAL DRAWINGS

05.02 1 1/2" DIA. STEEL GUARD RAIL AT 42" AFF. - PAINT (P-5)

05.03 REMOVABLE 1 1/2" DIA. STEEL GUARD RAIL AT 42" AFF. - PAINT (P-5)

05.05 6" STEEL DIAMETER CONCRETE FILLED MANUFACTURED METAL BOLLARD - SEE SECTION DETAIL

05.06 ALIGN TOP OF METAL GRATE LANDING FLUSH TO TOP OF CONCRETE MEZANINE

08.01 4 1/2" ALUMINUM STOREFRONT WINDOW SYSTEM

08.03 PREFINISHED MECHANICAL LOUVER - SEE MECHANICAL DRAWINGS

08.04 INSULATED OVERHEAD COILING DOOR WITH INDEPENDENT COILING SECURITY SCREEN

08.06 30" X 30" 2HR RATED ACCESS PANEL WITH INTGRATED LOCK

09.08 4' X 8' X 3/4" FIRE RETARDANT PLYWOOD MOUNTED AT 4' A.F.F. ENTIRE WIDTH OF WALL

10.01 WALL MOUNTED FIRE EXTINGUISHER CABINET - 48" A.F.F. TO CENTER OF HANDLE

NORTH

1 CONTRACT DOCUMENTS 05/07/2026

GENERAL NOTES

A.

B.

C.

D.

E.

F.

G.

ALL DIMENSIONS ARE FROM FINISHED FACE OF PARTITIONS.

ALL DIMENSIONS SHALL HAVE PREFERENCE OVER SCALE. DO NOT SCALE DRAWINGS.

IF THE GENERAL CONTRACTOR SHOULD DISCOVER ANY UNFORESEEN CONDITIONS DURING CONSTRUCTION, THE VA SHOULD BE NOTIFIED IMMEDIATELY AND THAT PARTICULAR WORK SHOULD BE DISCONTINUED UNTIL NECESSARY REVISIONS CAN BE

DECIDED UPON.

REFER TO MECHANICAL, ELECTRICAL AND PLUMBING SHEETS FOR ALL MECHANICAL, ELECTRICAL AND PLUMBING RELATED

WORK. REFER TO STRUCTURAL SHEETS FOR ALL STRUCTURAL RELATED WORK.

SEE AE151 AND AE152 FOR DETAILS AND INTERIOR ELEVATION CALL OUTS.

SEE COVER SHEET FOR DEDUCT ALTERNATE INFORMATION.

FALL PROTECTION SYSTEM IS SHOWN FOR REFERENCE ONLY. FINAL DESIGN, DETAILING, AND SPECIFICATION OF FALL PROTECTION MUST BE COMPLETED AND APPROVED BY A QUALIFIED FALL PROTECTION DESIGN PROFESSIONAL IN

ACCORDANCE WITH APPLICABLE CODES AND REGULATIONS.

XX000

AE301

AE301

AE301

AE301

AE301

AE301

AE301

AE301

TYP.

07.01

08.02

07.02

A

D

632 54

B

C

1"

22.02 22.02 22.02

07.04

/2

/2

19' - 0" 24' - 4" 23' - 11" 25' - 8" 14' - 5"

7'

0" 7'

0"

27' - 3 1/2"

1/4" / 12"

22.04 22.04 22.04

1/ 4"

1/

4"

1/ 4"

1/ 4"

AE431

07.02

07.02

07.04

07.0407.04

07.04

6' - 0" 31' - 10" 5' - 0" 3' - 10"

7'

3/

4" 6'

0"

0"

/4

110' - 9"

18' - 6"

A

B

AE311

AE311

AE321301

7'

1/

4" 6'

/4

27' - 2 3/4"

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Date:Revisions:No.

Au to de sk

D oc s:

//M ar io n

IL

V A

- N ew

E ne rg y

C en te r/F

FE

_M ar io n

IL

En er gy

C en te r_

AR

C

H (2

6)

.rv t

5/ 6/

:3

7:

A M

AE102

ROOF PLAN

05/07/2026 SPS KJ

CONSTRUCT NEW CAMPUS

CHILLER PLANT

657A5-21-401

2401 W MAIN ST, MARION IL 62959

CONSTRUCTION

DOCUMENTS

MARION VA

HEALTH CARE

SYSTEM Approved: Owner

SITE KEY PLAN

NEW CHILLER PLANT

EXISTING CHILLER PLANT - BLDG 49

37MOD-5

MOD-1

49 MOD-4

MOD-6

NORTH

1/8" = 1'-0"

ROOF PLAN

DRAWING NOTES

07.01 EPDM ROOF MEMBRANE OVER MINIMUM 5" RIGID INSULATION OVER SLOPED METAL DECK

07.02 TAPERED INSULATION ROOF CRICKET - 1/4"=1'-0" MINIMUM SLOPE

07.04 INTEGRAL ROOF MEMBRANE WALKWAY

08.02 6' X 6' PRE-FINISHED EQUIPMENT ACCESS ROOF SCUTTLE

22.02 ROOF OVERFLOW DRAIN - SEE PLUMBING DRAWINGS

22.04 ROOF PRIMARY DRAIN - SEE PLUMBING DRAWINGS

1/8" = 1'-0"

PENTHOUSE PLAN

DN

NORTH

1 CONTRACT DOCUMENTS 05/07/2026

T

T

T

T

A

D

632 54

B

C

4843 SF

CHILLER PLANT

578 SF

ELECTRICAL ROOM

832 SF

ELECTRICAL ROOM

191 SF

CONTROL ROOM

73 SF

TOILET

100 SF

TR

74 SF

H.A.C.

8' - 0"

8' - 0"

8' - 0"

07.03

07.03

07.03

01.01

A

D

632 54

B

C

GENERAL NOTES

A.

B.

C.

D.

E.

SEE MEP & FP DRAWINGS FOR ADDITIONAL INFORMATION REGARDING FINAL INFORMATION, QUANTITIES AND LAYOUT OF ALL

FIXTURES/DEVICES TO BE INSTALLED IN CEILING.

SEE STRUCTURAL DRAWING FOR ALL STRUCTURAL RELATED ITEMS.

SEE ELECTRICAL FINISH SCHEDULE FOR ALL LIGHTING FIXTURE TYPES AND LIGHTING SPECIFICATIONS.

CENTER CEILING GRID WITHIN ROOM UNLESS NOTES OTHERWISE.

CENTER SPRINKLER HEAD WITHIN CEILING TILE UNLESS NOTED OTHERWISE.

LEGEND

INDICATES CEILING HEIGHT

ACOUSTIC CEILING TILE AND GRID -

SEE FINISH SCHEDULE

2'-0" x 2'-0" LIGHT FIXTURE - SEE

ELECTRICAL DRAWINGS

PENDANT LIGHT FIXTURE - SEE

ELECTRICAL DRAWINGS

1' - 0"

EMERGENCY PENDANT LIGHT

FIXTURE - SEE ELECTRICAL DRAWINGS

SUPPLY DIFFUSER - SEE

MECHANICAL DRAWINGS

EXHAUST - SEE MECHANICAL

DRAWINGS

RETURN - SEE MECHANICAL

DRAWINGS

EXHAUST FAN - SEE MECHANICAL

DRAWINGS

LINEAR PENDANT LIGHT FIXTURE - SEE

ELECTRICAL DRAWINGS

LINEAR EMERGENCY PENDANT LIGHT

FIXTURE - SEE ELECTRICAL DRAWINGS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Date:Revisions:No.

Au to de sk

D oc s:

//M ar io n

IL

V A

- N ew

E ne rg y

C en te r/F

FE

_M ar io n

IL

En er gy

C en te r_

AR

C

H (2

6)

.rv t

5/ 6/

0:

:1

AM

AE141

FIRST FLOOR REFLECTED

CEILING PLAN

05/07/2026 SPS SPS

CONSTRUCT NEW CAMPUS

CHILLER PLANT

657A5-21-401

2401 W MAIN ST, MARION IL 62959

CONSTRUCTION

DOCUMENTS

MARION VA

HEALTH CARE

SYSTEM Approved: Owner

1/8" = 1'-0"

FIRST FLOOR - RCP

1/8" = 1'-0"

SECOND FLOOR - RCP

DRAWING NOTES

01.01 PROVIDE SEISMIC BRACING FOR SUSPENDED CEILINGS PER ASTM E580 AND ASCE 7 - COORDINATE WITH STRUCTURAL.

07.03 3" OF CLOSED CELL SPRAY FOAM INSULATION WITH INTUMESCENT COATING ON METAL DECK IN INTERSTITIAL SPACE ABOVE

CEILING

1 CONTRACT DOCUMENTS 05/07/2026

01-FIRST FLOOR

470' - 6"

02-MEZZANINE

481' - 7"

03-ROOF

490' - 6"

AE301

AE301

1 632 54

8'

03.08

TYP.

03.15

03.08

B C1 D E F G HAA2 A A

07.09

100B

111' - 5"

01-FIRST FLOOR

470' - 6"

02-MEZZANINE

481' - 7"

03-ROOF

490' - 6"

AE301

AE301

AE301

AE301

AE301

AE301

A DB C

8'

03.08

TYP.

03.15

03.08

08.05

G F D2 D1 CH1 B1

07.09

105A 106A

32.05

66' - 4 3/4"

01-FIRST FLOOR

470' - 6"

02-MEZZANINE

481' - 7"

03-ROOF

490' - 6"

AE301

AE301

16 3 25 4

8'

32.0432.05 08.0403.08 03.08

TYP.

03.15

A A A B D3 E F G HJA1

07.09

100A

111' - 5 1/2"

01-FIRST FLOOR

470' - 6"

02-MEZZANINE

481' - 7"

03-ROOF

490' - 6"

AE301

AE301

AE301

AE301

AE301

AE301

AD BC

8'

03.08

TYP.

03.15

03.08

G F E D CH1 B1

07.09

32.05

66' - 4 3/4"

GENERAL NOTES

A.

B.

C.

D.

VERIFY ALL CONDITIONS PRIOR TO FABRICATION, ERECTION, AND INSTALLATION.

SEE STRUCTURAL DRAWINGS FOR DEPTHS OF FOUNDATIONS, FOOTINGS, COLUMN SIZES AND LOCATIONS.

SEE ELECTRICAL DRAWINGS FOR ADDITIONAL EXTERIOR LIGHT FIXTURE INFORMATION.

SEE MECHANICAL DRAWINGS FOR EXTERIOR LOUVER TYPES, SIZES, AND COORDINATION.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Date:Revisions:No.

Au to de sk

D oc s:

//M ar io n

IL

V A

- N ew

E ne rg y

C en te r/F

FE

_M ar io n

IL

En er gy

C en te r_

AR

C

H (2

6)

.rv t

5/ 6/

:0

2:

A M

AE201

EXTERIOR ELEVATIONS

05/07/2026 SPS SPS

CONSTRUCT NEW CAMPUS

CHILLER PLANT

657A5-21-401

2401 W MAIN ST, MARION IL 62959

CONSTRUCTION

DOCUMENTS

MARION VA

HEALTH CARE

SYSTEM Approved: Owner

DRAWING NOTES

03.08 CONCRETE FOUNDATION - SEE STRUCTURAL DRAWINGS

03.15 PRECAST INSULATED CONCRETE WALL PANEL - REFER TO EXTERIOR WALL PANEL DETAILS FOR MORE INFORMATION.

07.09 PREFINISHED METAL COPING

08.04 INSULATED OVERHEAD COILING DOOR WITH INDEPENDENT COILING SECURITY SCREEN

08.05 PREFINISHED MECHANICAL LOUVER WITH BIRD BLOCK

32.04 6" CONCRETE CURB - SEE CIVIL DRAWINGS

32.05 6" DIA. STEEL BOLLARDS WITH STEEL CAP - ENCASED IN CONCRETE BELOW GRADE - PAINT SAFETY YELLOW

NORTH

1/8" = 1'-0"3 SOUTH ELEVATION

1/8" = 1'-0"5 WEST ELEVATION

1/8" = 1'-0"1 NORTH ELEVATION

1/8" = 1'-0"6 EAST ELEVATION

1 CONTRACT DOCUMENTS 05/07/2026

9' - 11 1/4"

4'

0"

9' - 11 1/4"

8'

0"

9' - 11 1/4"

9' - 11 1/4"

9' - 11 1/4"

9' - 11 1/4"

8'

0"

/4

9' - 11 1/4"

4'

0"

9' - 11 1/4"

A B C

D E F

G H H1

4'

0"

7' - 11 1/4"

B1

7' - 3 1/4"

A1

13' - 11 1/4"

J

9' - 11 1/4"

D1

2' - 4 3/4" 6' - 8" 10 3/4"

1'

6"

6'

0"

MECHANICAL LOUVER

B.O. PANEL

4'

0"

7' - 11 1/4"

9' - 11 1/4"

D3

B.O. BEVEL EDGE

B.O. BEVEL EDGE

B.O. BEVEL EDGE

B.O. BEVEL EDGE

B.O. BEVEL EDGE

B.O. BEVEL EDGE

B.O. BEVEL EDGE

6' - 7 3/4" 3' - 3 3/4"

7'

2"

9' - 11 1/4"

D2

3' - 3" 6' - 8 1/4"3' - 3" 6' - 8 1/4"

DOOR OPENING

10' - 8 1/4"

A2

8'

0"

9' - 11 1/4"

C1

B.O. BEVEL EDGE

DOOR OPENING

3' - 3" 1' - 6 1/4"

B.O. BEVEL EDGE

7'

2"

7'

2" 4'

7'

2" 4'

DOOR OPENING DOOR OPENING

B.O. BEVEL EDGE B.O. BEVEL EDGE B.O. BEVEL EDGE

B.O. PANEL

B.O. BEVEL EDGE

GARAGE DOOR OPENING

B.O. BEVEL EDGE

B.O. PANEL

B.O. PANEL

B.O. PANEL B.O. PANEL

GENERAL NOTES

A.

B.

C.

D.

VERIFY ALL CONDITIONS PRIOR TO FABRICATION, ERECTION, AND INSTALLATION.

SEE STRUCTURAL DRAWINGS FOR DEPTHS OF FOUNDATIONS, FOOTINGS, COLUMN SIZES AND LOCATIONS.

SEE ELECTRICAL DRAWINGS FOR ADDITIONAL EXTERIOR LIGHT FIXTURE INFORMATION.

SEE MECHANICAL DRAWINGS FOR EXTERIOR LOUVER TYPES, SIZES, AND COORDINATION.

B.O. BEVEL EDGE

7 1/2" 3" 4"

2"

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Date:Revisions:No.

Au to de sk

D oc s:

//M ar io n

IL

V A

- N ew

E ne rg y

C en te r/F

FE

_M ar io n

IL

En er gy

C en te r_

AR

C

H (2

6)

.rv t

5/ 6/

:0

2:

A M

AE202

EXTERIOR WALL PANEL DETAILS

05/07/2026 SPS SPS

CONSTRUCT NEW CAMPUS

CHILLER PLANT

657A5-21-401

2401 W MAIN ST, MARION IL 62959

CONSTRUCTION

DOCUMENTS

MARION VA

HEALTH CARE

SYSTEM Approved: Owner

1/8" = 1'-0"1 EXTERIOR PRECAST WALL PANEL ELEVATIONS

1" = 1'-0"2 EXTERIOR WALL PANEL SECTION (TYPICAL)

Panel Schedule

Mark Count Height

BEVEL

OFFSET MATERIAL WIDTH

A 3 32' - 0" 0' - 0" PRECAST CONCRETE 10' - 0"

A1 1 32' - 0" 0' - 0" PRECAST CONCRETE 7' - 6"

B 1 28' - 0" 4' - 0" PRECAST CONCRETE 10' - 0"

B1 2 28' - 0" 4' - 0" PRECAST CONCRETE

C 2 24' - 0" 8' - 0" PRECAST CONCRETE

D 1 20' - 0" 12' - 0" PRECAST CONCRETE

D1 1 20' - 0" 12' - 0" PRECAST CONCRETE

D3 1 20' - 0" 12' - 0" PRECAST CONCRETE

E 3 16' - 0" 16' - 0" PRECAST CONCRETE

F 3 12' - 0" 20' - 0" PRECAST CONCRETE

G 3 8' - 0" 24' - 0" PRECAST CONCRETE

H 1 4' - 0" 28' - 0" PRECAST CONCRETE

H1 2 4' - 0" 28' - 0" PRECAST CONCRETE

J 1 18' - 0" 14' - 0" PRECAST CONCRETE

Grand total: 25

1 CONTRACT DOCUMENTS 05/07/2026

GENERAL NOTES

A.

B.

C.

D.

E.

F.

G.

ALL DIMENSIONS ARE FROM FINISHED FACE OF WALLS TO FINISHED FACE OF STRUCTURE.

ALL DIMENSIONS SHALL HAVE PREFERENCE OVER SCALE. DO NOT SCALE DRAWINGS.

VERIFY ALL CONDITIONS PRIOR TO FABRICATION, ERECTION, AND INSTALLATION.

SEE STRUCTURAL DRAWINGS FOR DEPTHS OF FOUNDATIONS, FOOTINGS, COLUMN SIZES AND LOCATIONS..

SEE ELECTRICAL DRAWINGS FOR ADDITIONAL EXTERIOR LIGHT FIXTURE INFORMATION.

SEE MECHANICAL DRAWINGS FOR EXTERIOR LOUVER TYPES, SIZES, AND COORDINATION.

ALL STRUCTURAL COLUMNS AND BEAMS ON THE FIRST FLOOR TO RECEIVE 2 HOUR SPRAY APPLIED FIREPROOFING.

ALL STRUCTURAL COLUMNS AND BEAMS ON THE MEZZANINE LEVEL TO RECEIVE 1 HOUR SPRAY APPLIED

FIREPROOFING.

01-FIRST FLOOR

470' - 6"

02-MEZZANINE

481' - 7"

03-ROOF

490' - 6"

AD BC

8'

03.12

32.05

08.04

03.0803.08 03.0803.08

07.17 08.02

03.0703.07

2' - 0"

07.09

104 103 102

6" 6"

01-FIRST FLOOR

470' - 6"

02-MEZZANINE

481' - 7"

03-ROOF

490' - 6"

8'

16 3 25 4

03.12

03.08

07.17 08.02

03.0803.0803.0803.0803.08

03.12

03.07 03.0703.02

07.09

101100B

01-FIRST FLOOR

470' - 6"

02-MEZZANINE

481' - 7"

03-ROOF

490' - 6"

16 3 25 4

8'

03.12

03.08

07.17 08.02

03.0803.0803.0803.0803.08

07.17

03.0703.07

07.09

100B 101 105

01-FIRST FLOOR

470' - 6"

02-MEZZANINE

481' - 7"

03-ROOF

490' - 6"

16 3 25 4

8'

07.17

03.12

03.08

07.17

03.0803.0803.0803.0803.08

03.12

03.06

03.0703.07

07.09

106100B

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Date:Revisions:No.

Au to de sk

D oc s:

//M ar io n

IL

V A

- N ew

E ne rg y

C en te r/F

FE

_M ar io n

IL

En er gy

C en te r_

AR

C

H (2

6)

.rv t

5/ 6/

:0

2:

A M

AE301

BUILDING SECTIONS

05/07/2026 SPS KJ

CONSTRUCT NEW CAMPUS

CHILLER PLANT

657A5-21-401

2401 W MAIN ST, MARION IL 62959

CONSTRUCTION

DOCUMENTS

MARION VA

HEALTH CARE

SYSTEM Approved: Owner

SITE KEY PLAN

NEW CHILLER PLANT

EXISTING CHILLER PLANT - BLDG 49

37MOD-5

MOD-1

49 MOD-4

MOD-6

NORTH

DRAWING NOTES

03.02 CONCRETE EQUIPMENT PAD - SEE STRUCTRUAL DRAWINGS

03.06 CONCRETE SLAB ON METAL DECKING - SEE STRUCTURAL DRAWINGS

03.07 6" CONCRETE SLAB ON GRADE OVER 15 MIL VAPOR BARRIER OVER 6" GRAVEL

03.08 CONCRETE FOUNDATION - SEE STRUCTURAL DRAWINGS

03.12 PRECAST INSULATED CONCRETE WALL PANEL - SEE STRUCTURAL DRAWING

07.09 PREFINISHED METAL COPING

07.17 BLACK EPDM ROOF MEMBRANE OVER 1/2" GYPSUM COVERBOARD OVER 5" CONTINUOUS POLYISOCYANURATE INSULATION

OVER METAL DECKING

08.02 6' X 6' PRE-FINISHED EQUIPMENT ACCESS ROOF SCUTTLE

08.04 INSULATED OVERHEAD COILING DOOR WITH INDEPENDENT COILING SECURITY SCREEN

32.05 6" DIA. STEEL BOLLARDS WITH STEEL CAP - ENCASED IN CONCRETE BELOW GRADE - PAINT SAFETY YELLOW 1/8" = 1'-0"1 BUILDING SECTION

1/8" = 1'-0"2 BUILDING SECTION

1/8" = 1'-0"4 BUILDING SECTION

1/8" = 1'-0"3 BUILDING SECTION

1 CONTRACT DOCUMENTS 05/07/2026

02-MEZZANINE

481' - 7"

03-ROOF

490' - 6"

STRUCTURAL STEEL - SEE

STRUCTURAL DRAWINGS

5" CONTINUOUS

POLYISOCYANURATE INSULATION

OVER METAL DECKING

CONTINUOUS SEALANT

PREFINISHED MECHANICAL LOUVER -

SEE MECHANICAL DRAWINGS

CONTINUOUS VAPOR BARRIER

OVER METAL ROOF DECK - SEE

STRUCTURAL DRAWINGS

6" CONCRETE SLAB ON GRADE

OVER 15 MIL VAPOR BARRIER

OVER 6" GRAVEL

CONCRETE FOUNDATION - SEE

STRUCTURAL DRAWINGS

CONCRETE SLAB ON METAL

DECKING - SEE STRUCTURAL

DRAWINGS

STRUCTURAL STEEL - SEE

STRUCTURAL DRAWINGS

FULLY ADHERED TPO ROOF

MEMBRANE OVER 1/2" GYPSUM

COVERBOARD

SLOPE

PRECAST INSULATED CONCRETE WALL

PANEL - SEE STRUCTURAL DRAWING

CONTINUOUS STAINLESS STEEL

FLASHING WITH DRIP AT REGELT

PRECAST INSULATED CONCRETE WALL

PANEL - SEE STRUCTURAL DRAWING

TO

P

O F

ST

EE

L

TO

R

EG

LE

T

3'

4"

EXTERIOR CONCRETE SLAB ON GRADE

OVER CRUSHED GRAVEL- SLOPE

AWAY FROM BUILDING - SEE CIVIL

DRAWINGS

AE401

PREFINISHED METAL COPING

CONTINUOUS PRESSURE TREATED

WOOD BLOCKING AS REQUIRED

1/

4"

3/

4"

EXTERIOR ACRYLIC ELASTOMERIC

COATING AT ALL PRECAST WALL

WITIHIN ROOF AREA

01-FIRST FLOOR

470' - 6"

02-MEZZANINE

481' - 7"

03-ROOF

490' - 6"

CONTINUOUS SEALANT

5" CONTINUOUS

POLYISOCYANURATE INSULATION

OVER METAL DECKING

CONTINUOUS VAPOR BARRIER

OVER METAL ROOF DECK - SEE

STRUCTURAL DRAWINGS

STRUCTURAL STEEL - SEE

STRUCTURAL DRAWINGS

STEEL BENT PLATE - SEE

STRUCTURAL DRAWINGS

6" CONCRETE SLAB ON GRADE

OVER 15 MIL VAPOR BARRIER

OVER 6" GRAVEL

CONCRETE FOUNDATION - SEE

STRUCTURAL DRAWINGS

STRUCTURAL STEEL - SEE

STRUCTURAL DRAWINGS

CONCRETE SLAB ON METAL

DECKING - SEE STRUCTURAL

DRAWINGS

FULLY ADHERED TPO ROOF

MEMBRANE OVER 1/2" GYPSUM

COVERBOARD

PRECAST INSULATED CONCRETE WALL

PANEL - SEE STRUCTURAL DRAWING

CONTINUOUS STAINLESS STEEL

FLASHING WITH DRIP AT REGELT

PRECAST INSULATED CONCRETE WALL

PANEL - SEE STRUCTURAL DRAWING

TO

P

O F

ST

EE

L

TO

R

EG

LE

T

3'

4"

BACKFILL - SEE CIVIL DRAWINGS

SLOPE

PREFINISHED METAL COPING

CONTINUOUS PRESSURE TREATED

WOOD BLOCKING AS REQUIRED

1/

4"

3/

4"

EXTERIOR ACRYLIC ELASTOMERIC

COATING AT ALL PRECAST WALL

WITIHIN ROOF AREA

01-FIRST FLOOR

470' - 6"

02-MEZZANINE

481' - 7"

03-ROOF

490' - 6"

4 1/2" ALUMINUM STOREFRONT

WINDOW SYSTEM

3'

6"

4" 1'

7"

1'

7"

2'

4"

1/ 2"

2' - 6"

1 1/4"

1/4" JOINT SEALANT AND BACKER ROD

SOLID SURFACE SILL WITH

CONTINUOUS PLYWOOD SUB

SUPPORT

SOLID SURFACE COUNTERTOP OVER

PLYWOOD SUBSTRIGHT

FLOATING COUNTERTOP SUPPORT

BRACKET AT 32" OC

5/8" TYPE X GYPSUM BOARD

WALL BASE – SEE ROOM FINISH

SCHEDULE

CONTINUOUS SEALANT

7 5/8" CONCRETE MASONRY UNIT

CLOSED CELL SPRAY FOAM

INSULATION WITH INTUMESCENT

COATING - MIN 2 1/2"

3 5/8" METAL STUD FRAMING

6" CONCRETE SLAB ON GRADE

OVER 15 MIL VAPOR BARRIER

OVER 6" GRAVEL

CONCRETE FOUNDATION - SEE

STRUCTURAL DRAWINGS

5" CONTINUOUS

POLYISOCYANURATE INSULATION

OVER METAL DECKING

STRUCTURAL STEEL - SEE

STRUCTURAL DRAWINGS

CONTINUOUS VAPOR BARRIER

OVER METAL ROOF DECK - SEE

STRUCTURAL DRAWINGS

FULLY ADHERED TPO ROOF

MEMBRANE OVER 1/2" GYPSUM

COVERBOARD

3'

4"

AE401

3'

1/

4"

1'

0"

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Date:Revisions:No.

Au to de sk

D oc s:

//M ar io n

IL

V A

- N ew

E ne rg y

C en te r/F

FE

_M ar io n

IL

En er gy

C en te r_

AR

C

H (2

6)

.rv t

5/ 6/

:0

2:

A M

AE310

WALL SECTIONS

05/07/2026 SPS SPS

CONSTRUCT NEW CAMPUS

CHILLER PLANT

657A5-21-401

2401 W MAIN ST, MARION IL 62959

CONSTRUCTION

DOCUMENTS

MARION VA

HEALTH CARE

SYSTEM Approved: Owner

3/4" = 1'-0"2 WALL SECTION

3/4" = 1'-0"1 WALL SECTION

3/4" = 1'-0"3 WALL SECTION

1 CONTRACT DOCUMENTS 05/07/2026

6"

8'

6"

CONCRETE FOUNDATION WALL -

SEE STRUCTURAL DRAWINGS

6" CONCRETE SLAB ON GRADE OVER

15 MIL VAPOR BARRIER OVER 6"

GRAVEL

REMOVABLE METAL FLOOR GRATE

OVER EQUIPMENT PIT - REFER TO

STRUCTURAL DRAWINGS

FLUID APPLIED AIR AND MOISTURE

BARRIERFLUID APPLIED AIR AND MOISTURE

BARRIER

CONCRETE FOUNDATION WALL - SEE

STRUCTURAL DRAWINGS

SECTION

3' - 0"

SECTION

3' - 0"

SECTION

3' - 0"

CONCRETE FOUNDATION - SEE

STRUCTURAL DRAWINGS

CONCRETE FOUNDATION - SEE

STRUCTURAL DRAWINGS

8"8"

GALVANIZED WALL MOUNTED PIT

LADDER - SECURE TO CONCRETE

WALL STRUCTURE

6"

2' - 4"

UNDERSLAB 15 MIL VAPOR BARRIER

03-ROOF

490' - 6"

5" CONTINUOUS

POLYISOCYANURATE INSULATION

OVER METAL DECKING

STRUCTURAL STEEL - SEE

STRUCTURAL DRAWINGS

5" CONTINUOUS POLYISOCYANURATE

INSULATION OVER METAL DECKING

CONTINUOUS VAPOR BARRIER OVER

METAL ROOF DECK - SEE STRUCTURAL

DRAWINGS

PREFINISHED METAL COPING

FULLY ADHERED TPO ROOF

MEMBRANE OVER 1/2" GYPSUM

COVERBOARD

CLOSED CELL SPRAY FOAM

INSULATION WITH INTUMESCENT

COATING - MIN 2 1/2"

PREFINISHED NON INSULATED

METAL PANEL WALL SYSTEM

AE401

AE401

03-ROOF

490' - 6"

STRUCTURAL STEEL - SEE

STRUCTURAL DRAWINGS

5" CONTINUOUS POLYISOCYANURATE

INSULATION OVER METAL DECKING

CONTINUOUS VAPOR BARRIER

OVER METAL ROOF DECK - SEE

STRUCTURAL DRAWINGS

PREFINISHED METAL COPING

FULLY ADHERED TPO ROOF

MEMBRANE OVER 1/2" GYPSUM

COVERBOARD

5" CONTINUOUS

POLYISOCYANURATE INSULATION

OVER METAL DECKING

NEW 5" X 5" STAINLESS STEEL GUTTER

CLOSED CELL SPRAY FOAM

INSULATION WITH INTUMESCENT

COATING - MIN 2 1/2"

CLOSED CELL SPRAY FOAM

INSULATION WITH INTUMESCENT

COATING - MIN 2 1/2"

PREFINISHED NON INSULATED METAL

PANEL WALL SYSTEM

1" 3/4"

AE401

AE401

AE401

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Date:Revisions:No.

Au to de sk

D oc s:

//M ar io n

IL

V A

- N ew

E ne rg y

C en te r/F

FE

_M ar io n

IL

En er gy

C en te r_

AR

C

H (2

6)

.rv t

5/ 6/

:0

2:

A M

AE311

WALL SECTIONS

05/07/2026 SPS SPS

CONSTRUCT NEW CAMPUS

CHILLER PLANT

657A5-21-401

2401 W MAIN ST, MARION IL 62959

CONSTRUCTION

DOCUMENTS

MARION VA

HEALTH CARE

SYSTEM Approved: Owner

3/4" = 1'-0"1 WALL SECTION - PIT

3/4" = 1'-0"3 WALL SECTION - PENTHOUSE

3/4" = 1'-0"2 WALL SECTION - PENTHOUSE

1 CONTRACT DOCUMENTS 05/07/2026

1 2

B

5'

0" 5'

0"

6' - 6"

(18) EQ TREADS AT 0' - 11"

16' - 6"

AE321

PRE ENGINEERED METAL GRATE

STAIR WITH INTEGRATED GUARD

AND HANDRAIL. STRINGERS AND

GUARD RAIL TO

RECEIVE PAINT (P-0) - SEE FINISH

LEGEND

1 1/2" DIA. STEEL GUARD AT 42"

AFF. WITH 1 1/2" DIA. STAINLESS

STEEL HANDRAIL AT 32" AFF. -

STEEL GUARD TO RECEIVE PAINT

(P-0). HANDRAIL DOES NOT

RECEIVE PAINT

1 1/2" DIA. STEEL GUARD AT 42" AFF. -

STEEL GUARD TO RECEIVE PAINT (P-0)

01-FIRST FLOOR

470' - 6"

02-MEZZANINE

481' - 7"

03-ROOF

490' - 6"

11"

7"

(1 8)

E Q

RI

SE

RS

A

T 7"

/2

(1 7)

E Q

RI

SE

RS

A

T 7"

3'

6"

2'

8"

3'

6"

3'

6"

2'

8"

PRECAST INSULATED CONCRETE WALL

PANEL - SEE STRUCTURAL DRAWING

BLACK EPDM ROOF MEMBRANE OVER

1/2" GYPSUM COVERBOARD OVER 5"

CONTINUOUS POLYISOCYANURATE

INSULATION OVER METAL DECKING

1 1/2" DIA. STEEL GUARD AT 42"

AFF. WITH 1 1/2" DIA. STAINLESS

STEEL HANDRAIL AT 32" AFF. -

STEEL GUARD TO RECEIVE PAINT

(P-0). HANDRAIL DOES NOT

RECEIVE PAINT

1 1/2" DIA. STEEL GUARD AT 42"

AFF. - STEEL GUARD TO RECEIVE

PAINT (P-0)

1 1/2" DIA. STEEL GUARD AT 42" AFF.

WITH 1 1/2" DIA. STAINLESS STEEL

HANDRAIL AT 32" AFF. - STEEL GUARD

TO RECEIVE PAINT (P-0). HANDRAIL

DOES NOT RECEIVE PAINT

PRE ENGINEERED METAL GRATE

STAIR WITH INTEGRATED GUARD

AND HANDRAIL. STRINGERS AND

GUARD RAIL TO

RECEIVE PAINT (P-0) - SEE FINISH

LEGEND

D

R 3' - 0

AE321

SERVICE SINK - SEE PLUMBING

DRAWINGS

B2

R1

B1

WALL MOUNTED ACCESSIBLE

WATER CLOSET - SEE PLUMBING

DRAWINGS

30" X 30" 2HR RATED ACCESS

PANEL WITH INTGRATED LOCK

2'

0"

1' - 4"

B

C

191 SF

CONTROL ROOM

AE321

SOLID SURFACE COUNTERTOP OVER

PLYWOOD SUBSTRIGHT

SOLID SURFACE SILL WITH

CONTINUOUS PLYWOOD SUB

SUPPORT

4 1/2" ALUMINUM STOREFRONT

WINDOW SYSTEM

FLOATING COUNTERTOP SUPPORT

BRACKET AT 32" OC

1 2

AE311

AE321

6' - 6"

(17) EQ TREADS AT 0' - 11"

15' - 7" 4' - 3"

PRE ENGINEERED METAL GRATE

STAIR WITH INTEGRATED GUARD

AND HANDRAIL. STRINGERS AND

GUARD RAIL TO

RECEIVE PAINT (P-0) - SEE FINISH

LEGEND

1 1/2" DIA. STEEL GUARD AT 42"

AFF. WITH 1 1/2" DIA. STAINLESS

STEEL HANDRAIL AT 32" AFF. -

STEEL GUARD TO RECEIVE PAINT

(P-0). HANDRAIL DOES NOT

RECEIVE PAINT

4'

8"

14' - 0"

2'

4"

1'

0"

SOLID SURFACE COUNTERTOP

OVER PLYWOOD SUBSTRIGHT

4 1/2" ALUMINUM STOREFRONT

WINDOW SYSTEM

SOLID SURFACE SILL WITH

CONTINUOUS PLYWOOD SUB

SUPPORT

2'

4"

SOLID SURFACE COUNTERTOP

OVER PLYWOOD SUBSTRIGHT

SOLID SURFACE SILL WITH

CONTINUOUS PLYWOOD SUB

SUPPORT

WALL MOUNTED ACCESSIBLE

WATER CLOSET - SEE PLUMBING

DRAWINGS

WALL MOUNTED ACCESSIBLE WATER

CLOSET - SEE PLUMBING DRAWINGS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Date:Revisions:No.

Au to de sk

D oc s:

//M ar io n

IL

V A

- N ew

E ne rg y

C en te r/F

FE

_M ar io n

IL

En er gy

C en te r_

AR

C

H (2

6)

.rv t

5/ 6/

:0

2:

A M

AE321

ENLARGED PLANS, SECTIONS,

AND ELEVATIONS

05/07/2026 SPS SPS

CONSTRUCT NEW CAMPUS

CHILLER PLANT

657A5-21-401

2401 W MAIN ST, MARION IL 62959

CONSTRUCTION

DOCUMENTS

MARION VA

HEALTH CARE

SYSTEM Approved: Owner

1/4" = 1'-0"1 ENLARGED STAIR PLAN - MEZZANINE

1/4" = 1'-0"2 STAIR SECTION

1/4" = 1'-0"3 ENLARGED PLAN - RESTROOM

1/4" = 1'-0"4 ENLARGED PLAN - CONTROL ROOM

1/4" = 1'-0"5 ENLARGED STAIR PLAN - PENTHOUSE

1/4" = 1'-0"6 INTERIOR ELEVATION - CONTROL ROOM

1/4" = 1'-0"7 INTERIOR ELEVATION - CONTROL ROOM

1/4" = 1'-0"8 RESTROOM ELEVATION - NORTH

1/4" = 1'-0"9 RESTROOM ELEVATION - WEST

1/4" = 1'-0"10 RESTROOM ELEVATION - EAST

1/4" = 1'-0"11 RESTROOM ELEVATION - SOUTH

1 CONTRACT DOCUMENTS 05/07/2026

02-MEZZANINE

481' - 7"

2' X 2' ACT CEILING

5/8" TYPE X GYPSUM BOARD

CLOSED CELL SPRAY FOAM

INSULATION WITH INTUMESCENT

COATING - MIN 2 1/2"

1 1/2" DIA. STEEL GUARD RAIL AT 42"

AFF. - PAINT (P-5)

7 5/8" CONCRETE MASONRY UNIT

CONTINUOUS SEALANT

CONCRETE SLAB ON METAL DECKING -

SEE STRUCTURAL DRAWINGS

4" 1'

7"

1'

7"

3'

6"

4 1/2" ALUMINUM STOREFRONT

WINDOW SYSTEM

STRUCTURAL STEEL - SEE

STRUCTURAL DRAWINGS

2'

5"

01-FIRST FLOOR

470' - 6"

01-FIRST FLOOR

470' - 6"

CONCRETE FOUNDATION - SEE

STRUCTURAL DRAWINGS

PRECAST INSULATED CONCRETE WALL

PANEL - SEE STRUCTURAL DRAWING

15 MILL VAPOR BARRIER

6" CONCRETE SLAB ON GRADE

6" GRAVEL

EXTERIOR CONCRETE SLAB ON

GRADE

CRUSHED GRAVEL - SLOPE AWAY

FROM BUILDING - SEE CIVIL

DRAWINGS

STAINLESS STEEL THRESHOLD -

MINIMUM 6" WIDE

1" CHAMFER AT PERIMETER

1/2" EXPANSION JOINT MATERIAL

STRUCTURAL STEEL - SEE

STRUCTURAL DRAWINGS

5" CONTINUOUS POLYISOCYANURATE

INSULATION

FLUID APPLIED AIR AND MOISTURE

BARRIER - SEAL ALL JOINTS

PREFINISHED METAL COPING

FULLY ADHERED TPO ROOF

MEMBRANE OVER 1/2" GYPSUM

COVERBOARD

PREFINISHED NON INSULATED

METAL PANEL WALL SYSTEM

CONTINUOUS PRESSURE TREATED

WOOD BLOCKING AS REQUIRED

STRUCTURAL METAL DECK - SEE

STRUCTURAL DRAWINGS

5"

5" CONTINUOUS

POLYISOCYANURATE INSULATION

OVER METAL DECKING

PRE ENGINEERED METAL GRATE

STAIR WITH INTEGRATED GUARD

AND HANDRAIL. STRINGERS AND

GUARD RAIL TO

RECEIVE PAINT (P-0) - SEE FINISH

LEGEND

CLOSED CELL SPRAY FOAM

INSULATION WITH INTUMESCENT

COATING - MIN 2 1/2"

STAINLESS STEEL THRESHOLD -

MINIMUM 6" WIDE

5/8" TYPE X GYPSUM BOARD

METAL STUD BOX HEADER

6" 18 GA. METAL STUD FRAMING AT

16" O.C.

FULLY ADHERED TPO ROOF

MEMBRANE OVER 1/2" GYPSUM

COVERBOARD

5" CONTINUOUS POLYISOCYANURATE

INSULATION

FLUID APPLIED AIR AND MOISTURE

BARRIER - SEAL ALL JOINTS

STRUCTURAL METAL DECK - SEE

STRUCTURAL DRAWINGS

PREFINISHED METAL COPING

PREFINISHED NON INSULATED

METAL PANEL WALL SYSTEM

CONTINUOUS PRESSURE TREATED

WOOD BLOCKING AS REQUIRED

STRUCTURAL STEEL - SEE

STRUCTURAL DRAWINGS

CLOSED CELL SPRAY FOAM

INSULATION WITH INTUMESCENT

COATING - MIN 2 1/2"

FULLY ADHERED TPO ROOF

MEMBRANE OVER 1/2" GYPSUM

COVERBOARD

NEW 5" X 5" STAINLESS STEEL GUTTER

5" CONTINUOUS

POLYISOCYANURATE INSULATION

FLUID APPLIED AIR AND MOISTURE

BARRIER - SEAL ALL JOINTS

STRUCTURAL METAL DECK - SEE

STRUCTURAL DRAWINGS

STRUCTURAL STEEL - SEE

STRUCTURAL DRAWINGS

PREFINISHED NON INSULATED METAL

PANEL WALL SYSTEM

PREFINISHED METAL COPING

CLOSED CELL SPRAY FOAM

INSULATION WITH INTUMESCENT

COATING - MIN 2 1/2"

CONTINUOUS PRESSURE TREATED

WOOD BLOCKING AS REQUIRED

PREFINISHED METAL FLASHING

FULLY ADHERED TPO ROOF

MEMBRANE OVER 1/2" GYPSUM

COVERBOARD

03-ROOF

490' - 6"

1"

STRUCTURAL METAL DECK - SEE

STRUCTURAL DRAWINGS

STRUCTURAL STEEL - SEE

STRUCTURAL DRAWINGS

5" CONTINUOUS

POLYISOCYANURATE INSULATION

FULLY ADHERED TPO ROOF

MEMBRANE OVER 1/2" GYPSUM

COVERBOARD

PRE ENGINEERED STRINGERS TO

RECEIVE PAINT (P-5) - SEE FINISH

LEGEND - SEE STRUCTURAL

DRAWINGS

PRE ENGINEERED METAL GRATE STAIR

WITH INTEGRATED GUARD AND

HANDRAIL. GUARD RAIL TO RECEIVE

PAINT (P-5) - SEE FINISH LEGEND - SEE

STRUCTURAL DRAWINGS

PREFINISHED NON INSULATED

METAL PANEL WALL SYSTEM

CLOSED CELL SPRAY FOAM

INSULATION WITH INTUMESCENT

COATING - MIN 2 1/2"

FLUID APPLIED AIR AND MOISTURE

BARRIER - SEAL ALL JOINTS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Date:Revisions:No.

Au to de sk

D oc s:

//M ar io n

IL

V A

- N ew

E ne rg y

C en te r/F

FE

_M ar io n

IL

En er gy

C en te r_

AR

C

H (2

6)

.rv t

5/ 6/

:0

2:

A M

AE401

ENLARGED DETAILS

05/07/2026 SPS SPS

CONSTRUCT NEW CAMPUS

CHILLER PLANT

657A5-21-401

2401 W MAIN ST, MARION IL 62959

CONSTRUCTION

DOCUMENTS

MARION VA

HEALTH CARE

SYSTEM Approved: Owner

1 1/2" = 1'-0"1 ENLARGED SECTION DETAIL

1 1/2" = 1'-0"2 ENLARGED SECTION DETAIL

1 1/2" = 1'-0"3 ENLARGED SECTION DETAIL

1 1/2" = 1'-0"4 ENLARGED SECTION DETAIL

1 1/2" = 1'-0"5 ENLARGED SECTION DETAIL

1 1/2" = 1'-0"6 ENLARGED SECTION DETAIL

1 CONTRACT DOCUMENTS 05/07/2026

ROOFING PIPE BOOT COLLAR

WITH INTEGRAL WEATHER DRIP

6" TPO SEALING STRIP

1/2" GYPSUM COVERBOARD

TAPERED INSULATION ROOF

CRICKET

5" CONTINUOUS POLYISOCYANURATE

INSULATION (R-32)

CONTINUOUS VAPOR BARRIER

METAL ROOF DECK - SEE

STRUCTURAL DRAWINGS

STEEL FRAMING - SEE

STRUCTURAL DRAWINGS

REINFORCED TPO BASE

FLASHING

6" TPO SEALING STRIP

REINFORCED TPO BASE

6" TPO SEALING STRIP

REINFORCED TPO BASE

REINFORCED TPO BASE

6' X 6' PRE-FINISHED EQUIPMENT

ACCESS ROOF SCUTTLE

PA

N

EL

T

H

IC

KN

ES

S

VA

R

IE

S

SE

E

EL

EV 3/4" CHAMFER

3/4"

3/4

3/4" CHAMFER

PANEL THICKNESS VARIES SEE ELEV

PA

N

EL

T

H

IC

KN

ES

S

SE

E

EL

EV

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Date:Revisions:No.

Au to de sk

D oc s:

//M ar io n

IL

V A

- N ew

E ne rg y

C en te r/F

FE

_M ar io n

IL

En er gy

C en te r_

AR

C

H (2

6)

.rv t

5/ 6/

0:

:5

AM

AE431

ENLARGED DETAILS

05/07/2026 SPS KK

CONSTRUCT NEW CAMPUS

CHILLER PLANT

657A5-21-401

2401 W MAIN ST, MARION IL 62959

CONSTRUCTION

DOCUMENTS

MARION VA

HEALTH CARE

SYSTEM Approved: Owner

1 1/2" = 1'-0"1 SECTION DETAIL - ROOF HATCH

1 1/2" = 1'-0"2 PANEL CHAMFER DETAIL

1 1/2" = 1'-0"3 CORNER PANEL CHAMFER DETAIL

1 CONTRACT DOCUMENTS 05/07/2026

PER SCHEDULE

PE

R

S C

H

ED

U

LE

M

2"

PER SCHEDULE

PE

R

S C

H

ED

U

LE

1/

4"

1 3/4"

MM

PE

R

S C

H

ED

U

LE

PER SCHEDULE

PER SCHEDULE

PE

R

S C

H

ED

U

LE

2"

2" 2"

M

T

PER SCHEDULE

PE

R

S C

H

ED

U

LE

PER SCHEDULE

PE

R

S C

H

ED

U

LE

4"

2" 2"

NOTES

1.

2.

COORDINATE AUTO OPERATORS AND ACCESS CONTROL WITH ELECTRICAL AND TECHNOLOGY DRAWINGS.

ALL HOLLOW METAL DOORS AND DOOR FRAMES TO MATCH WITH ADJACENT WALL COLOR UNLESS OTHERWISE NOTED.

NOTES

1. PAINT EXPOSED STRUCTURAL MEMBERS AND METAL DECK P-1 IN ROOMS WITH NO CEILING.

NOTES

1.

2.

3.

ALL PRODUCTS LISTED IN THE FINISH LEGEND ARE BASIS OF DESIGN ONLY UNLESS NOTED OTHERWISE.

PROVIDE TRANSITION STRIPS AT TRANSITIONS FOR ALL DISSIMILAR FLOORING MATERIALS, TYPICAL. SEE DIVISION 9 SPECIFICATIONS.

REFER TO SPECIFICATIONS FOR PAINT SHEEN.

T T T

14' - 0"

4'

8"

EQ. EQ. EQ.

PER SCHEDULE

PE

R

S C

H

ED

U

LE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Date:Revisions:No.

Au to de sk

D oc s:

//M ar io n

IL

V A

- N ew

E ne rg y

C en te r/F

FE

_M ar io n

IL

En er gy

C en te r_

AR

C

H (2

6)

.rv t

5/ 6/

:0

2:

A M

AE601

SCHEDULES

05/07/2026 SPS SPS

CONSTRUCT NEW CAMPUS

CHILLER PLANT

657A5-21-401

2401 W MAIN ST, MARION IL 62959

CONSTRUCTION

DOCUMENTS

MARION VA

HEALTH CARE

SYSTEM Approved: Owner

1/2" = 1'-0"

GLAZING ELEVATION

1/4" = 1'-0"

DOOR AND FRAME ELEVATIONS

DOOR SCHEDULE

DOOR #

HARDWARE

SET

ACCESS

CONTROL

PANEL

WIDTH HEIGHT THICKNESS

FRAME

HEAD JAMB SILL FIRE RATING NOTESDOOR TYPE

DOOR

MATERIAL TYPE MATERIAL

01-FIRST FLOOR

100 HW-E5 - OHC STEEL 14' - 0" 14' - 0" 0" - STEEL - INSULATED OVERHEAD COILING DOOR WITH INTEGRAL COILING SECURITY SCREEN

100A SH-3E YES F HM 3' - 0" 7' - 0" 1 3/4" B HM -

100B SH-3E YES F HM 3' - 0" 7' - 0" 1 3/4" B HM -

101 HW-3 - G HM 3' - 0" 7' - 0" 1 3/4" A HM -

102 SH-3 YES F HM 3' - 0" 7' - 0" 1 3/4" A HM -

103 HW-5 - F HM 3' - 0" 7' - 0" 1 3/4" A HM -

104 HW-2 - F HM 3' - 0" 7' - 0" 1 3/4" A HM -

105 HW-12 - F HM 3' - 0" 7' - 0" 1 3/4" A HM 90 MINUTE

105A SH-3E1 YES FF HM 6' - 4" 7' - 0" 1 3/4" B HM -

106 HW-6 - F HM 4' - 0" 7' - 0" 1 3/4" A HM 90 MINUTE

106A HW-E9 - FF HM 6' - 4" 7' - 0" 1 3/4" B HM

03-ROOF

106H 6' - 0" 1' - 4"

301 HW-E4 - F HM 3' - 0" 7' - 0" 1 3/4" B HM -

ROOM FINISH SCHEDULE

ROOM

NUMBER NAME AREA

WALL FINISH

BASE FINISH FLOOR FINISH CEILING FINISH NOTESNORTH EAST SOUTH WEST

01-FIRST FLOOR

100 CHILLER PLANT 4843 SF P-1 P-1 P-1 P-1 - EPF-1 EXPOSED

101 CONTROL ROOM 191 SF P-1 P-1 P-1 P-1 RB-1 EPF-1 ACT-1

102 TR 100 SF P-1 P-1 P-1 P-1 RB-1 EPF-1 ACT-1 REFER TO WALL TYPES FOR PLYWOOD WALL TREATMENT

103 H.A.C. 74 SF P-1 P-1 P-1 P-1 RB-1 ESD-1 ACT-1

104 TOILET 73 SF CT-1 P-1 CT-1 CT-2 PTWB-1 PCT-1 ACT-1

105 ELECTRICAL ROOM 578 SF P-1 P-1 P-1 P-1 - EPF-1 EXPOSED

106 ELECTRICAL ROOM 832 SF P-1 P-1 P-1 P-1 - EPF-1 EXPOSED

02-MEZZANINE

200 MEZZANINE 2049 SF P-1 P-1 P-1 P-1 - SC-1 EXPOSED

FINISH LEGEND

MARK DESCRIPTION BASIS OF DESIGN SIZE STYLE / COLOR - BASIS OF DESIGN FLAME/SMOKE COMMENTS

BASE FINISH

PTWB - 1 PORCELAIN TILE DALTILE 6X12 - BULLNOSE INDOTERRA - TRAIL IN44 - MATTE -

RB-1 RUBBER BASE JOHNSONITE 4" TRADITIONAL VINYL 1/8" CLASS B

CASEWORK FINISH

SS-1 SOLID SURFACE WILSONART CLASS A

CEILING FINISHES

ACT-1 ACCOUSTIC CEILING TILE ARMSTRONG 24X24 CALLA 2824 - SQUARE TEGULAR 9/16" / WHITE CLASS A

FLOOR FINISHES

EPF-1 EPOXY PAINT SHERWIN WILLIAMS -- SW 7673 PEWTER CAST - DYNAMIC COEFFICIENT OF FRICTION (DCOF) OF 0.42 OR GREATER

ESD-1 ELECTROSTATIC DISSIPATIVE

EPOXY FLOORING

SHERWIN WILLIAMS -- SW 7023 REQUISITE GRAY -

PCT-1 PORCELAIN TILE DALTILE 12X24 INDOTERRA - TRAIL IN44 - MATTE -

SC-1 SEALED CONCRETE - -- - - DYNAMIC COEFFICIENT OF FRICTION (DCOF) OF 0.42 OR GREATER

WALL FINISHES

CT-1 CERAMIC TILE DALTILE 4X12 MYTHOLOGY - TITAN MY96 - GLOSSY -

CT-2 CERAMIC TILE DALTILE 2X4 MYTHOLOGY - HARMONIA MY92 - GLOSSY -

P-1 WALL PAINT SHERWIN WILLIAMS - SW 7004 SNOWBOUND HIGH GLOSS SHEEN FOR ALL AREAS NOT IN TEMPERATURE CONTROLLED AREAS

P-2 WALL PAINT SHERWIN WILLIAMS -- SW 7619 LABRADORITE

P-3 WALL PAINT SHERWIN WILLIAMS -- SW 7605 GALE FORCE

DOOR LEGEND

FG FF

BA C

M STAINLESS STEEL MOP PLATE MOUNTED ON PUSH SIDE OF DOOR

GLAZING LEGEND

T TEMPERED SAFETY GLAZING

T TEMPERED SAFETY GLAZING

OHC

1 CONTRACT DOCUMENTS 05/07/2026

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Date:Revisions:No.

Au to de sk

D oc s:

//M ar io n

IL

V A

- N ew

E ne rg y

C en te r/F

FE

_M ar io n

IL

En er gy

C en te r_

AR

C

H (2

6)

.rv t

5/ 6/

:0

2:

A M

AE701

3D VIEWS

05/07/2026 SS SS

CONSTRUCT NEW CAMPUS

CHILLER PLANT

657A5-21-401

2401 W MAIN ST, MARION IL 62959

CONSTRUCTION

DOCUMENTS

MARION VA

HEALTH CARE

SYSTEM Approved: Owner

1 CONTRACT DOCUMENTS 05/07/2026

06.08_SF601 - FRAMING TYPICAL DETAILS
06.09_SF701 - FRAMING SCHEDULES
07.00_AD101 -B49 - B49 - DEMOLITION FLOOR PLAN AND ELEVATION
07.02_AE101 - FLOOR PLANS
07.02_AE102 - ROOF PLAN
07.03_AE141 - FIRST FLOOR REFLECTED CEILING PLAN
07.04_AE201 - EXTERIOR ELEVATIONS
07.04_AE202 - EXTERIOR WALL PANEL DETAILS
07.06_AE301 - BUILDING SECTIONS
07.07_AE310 - WALL SECTIONS
07.08_AE311 - WALL SECTIONS
07.09_AE321 - ENLARGED PLANS, SECTIONS, AND ELEVATIONS

File details come from the government source that posted it. Updated .