657A5-21-401 - ADDENDUM 1 - SPECIFICATIONS - 94 PAGES.pdf
PDF 1 MB Posted
- Solicitation number
- 36C25526R0129-0005
About this file
This file is an Addendum 1 to the Construction Specifications for Project 657A5-21-401, a new Campus Chiller Plant facility at Marion VA Medical Center in Marion, Illinois. The specifications document provides comprehensive construction requirements organized by division and includes detailed performance standards, quality assurance procedures, and inspection protocols.
The project encompasses multiple construction disciplines including structural steel welding and bolting, concrete construction, masonry, HVAC systems, electrical installations, plumbing, fire suppression, and communications infrastructure. Key structural requirements include ordinary reinforced concrete shearwalls as the primary lateral force-resisting system, with the project assigned to Seismic Design Category D. Special inspection requirements are mandated throughout construction, including continuous monitoring of welding operations, concrete placement, and designated seismic systems such as chillers, pumps, cooling towers, and air handling units. The specifications require a Special Inspector of Record (SIOR) qualified as a registered professional engineer, with supporting special inspectors certified by organizations including ICC, ACI, AWS, NICET, PCI, and PTI depending on their discipline. Fabricators must demonstrate compliance through certifications such as AISC Certified Fabrication Plants, PCI Certified Plants, or Steel Joist Institute membership. Sample panels and full-scale mockups are required for architectural precast concrete work before production, with all work subject to government approval and inspection throughout the construction process. The project incorporates blast-resistant design requirements for critical facilities with specific performance criteria for exterior panels including peak reflected pressure and impulse resistance standards.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT # 657A5-21-401
Construct New Campus Chiller Plant
MARION VA MEDICAL CENTER
2401 W MAIN STREET
MARION, IL 62959-1165
SPECIFICATIONS
CONSTRUCTION DOCUMENTS
MAY 7, 2026
ADDENDUM 1
AUGUST 20, 2026
PREPARED BY
ADDENDUM 01
REV 1
08-20-2026
MARION VA MEDICAL CENTER
CONSTRUCT NEW CAMPUS CHILLER PLANT
PROJECT: 657A5-21-401
01-01-2026
TABLE OF CONTENTS
00 01 10 - 1
DEPARTMENT OF VETERANS AFFAIRS
VHA MASTER SPECIFICATIONS
TABLE OF CONTENTS
Section 00 01 10
SECTION NO DIVISION AND SECTION TITLES DATE
DIVISION 00 - SPECIAL SECTIONS
00 01 15 List of Drawing Sheets 05-2020
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 General Requirements 11-2021
01 32 16.15 Project Schedules 12-2025
01 33 23 Shop Drawings, Product Data, and Samples 03-2026
01 35 26 Safety Requirements 05-2024
01 42 19 Reference Standards 11-2020
01 45 00 Quality Control 02-2021
01 45 29 Testing Laboratory Services 11-2018
01 45 35 Special Inspections 06-2021
01 57 19 Temporary Environmental Controls 01-2021
01 74 19 Construction Waste Management 04-2022
01 81 13 Sustainable Construction Requirements 10-2017
01 91 00 General Commissioning Requirements 04-2022
DIVISION 02 – EXISTING CONDITIONS
02 21 13 Site Surveys 12-2023
02 41 00 Demolition 08-2017
02 82 13.41 Asbestos Abatement for Total Demolition Project 01-2021
DIVISION 03 – CONCRETE
03 30 00 Cast-in-Place Concrete 01-2021
03 41 33 Precast Structural Pretensioned Concrete 01-2021
03 45 00 Precast Architectural Concrete 01-2021
DIVISION 04 – MASONRY
04 05 13 Masonry Mortaring 10-2017
04 05 16 Masonry Grouting 01-2021
04 20 00 Unit Masonry 08-2017
DIVISION 05 – METALS
05 12 00 Structural Steel Framing 11-2018
05 31 00 Steel Decking 01-2021
05 50 00 Metal Fabrications 08-2018
05 51 00 Metal Stairs 01-2021
08-20-2026
MARION VA MEDICAL CENTER
CONSTRUCT NEW CAMPUS CHILLER PLANT
PROJECT: 657A5-21-401
01-01-2026
TABLE OF CONTENTS
00 01 10 - 2
DIVISION 06 – WOOD, PLASTICS AND COMPOSITES
06 10 00 Rough Carpentry 10-2017
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 13 00 Sheet Waterproofing 01-2021
07 21 13 Thermal Insulation 01-2021
07 22 00 Roof and Deck Insulation 01-2021
07 27 26 Fluid-Applied Membrane Air Barrier, Vapor
Permeable
01-2021
07 42 13.02 Metal Wall Panels FFE
07 54 23 Thermoplastic Polyolefin (TPO) Roofing 11-2025
07 60 00 Flashing and Sheet Metal 01-2021
07 72 00 Roof Accessories 01-2021
07 81 00 Applied Fireproofing 07-2023
07 84 00 Firestopping 01-2021
07 92 00 Joint Sealants 04-2022
DIVISION 08 - OPENINGS
08 11 13 Hollow Metal Doors and Frames 01-2021
08 31 13 Access Doors and Frames 06-2025
08 33 00 Coiling Doors and Grilles 01-2021
08 41 13 Aluminum-Framed Entrances and Storefronts 01-2021
08 71 00 Door Hardware 03-2024
08 80 00 Glazing 01-2021
08 90 00 Louvers and Vents 01-2021
DIVISION 09 – FINISHES
09 22 16 Non-Structural Metal Framing 06-2018
09 29 00 Gypsum Board 04-2020
09 30 13 Ceramic/Porcelain Tiling 11-2025
09 51 00 Acoustical Ceilings 12-2018
09 91 00 Painting 01-2021
DIVISION 10 – SPECIALTIES
10 14 00 Signage 01-2021
10 26 00 Wall and Door Protection 01-2021
10 28 00 Toilet, Bath, and Laundry Accessories 01-2021
10 44 13 Fire Extinguisher Cabinets 08-2018
DIVISION 11 – EQUIPMENT
DIVISION 12 – FURNISHINGS
12 36 00 Countertops 12-2023
08-20-2026
MARION VA MEDICAL CENTER
CONSTRUCT NEW CAMPUS CHILLER PLANT
PROJECT: 657A5-21-401
01-01-2026
TABLE OF CONTENTS
00 01 10 - 3
DIVISION 13 - SPECIAL CONSTRUCTION
13 05 41 Seismic Restraint Requirements for Non-Structural
Components
01-2021
DIVISION 14 – CONVEYING EQUIPEMENT
DIVISION 21 - FIRE SUPPRESSION
21 08 00 Commissioning of Fire Suppression System 11-2016
21 13 13 Wet-Pipe Sprinkler Systems 06-2015
DIVISION 22 – PLUMBING
22 05 11 Common Work Results for Plumbing 01-2023
22 05 12 General Motor Requirements for Plumbing Equipment 09-2020
22 05 19 Meters and Gages for Plumbing Piping 09-2020
22 05 23 General-Duty Valves for Plumbing Piping 09-2020
22 07 11 Plumbing Insulation 09-2019
22 08 00 Commissioning of Plumbing Systems 11-2016
22 11 00 Facility Water Distribution 05-2021
22 13 00 Facility Sanitary and Vent Piping 09-2020
22 14 00 Facility Storm Drainage 09-2015
22 14 29 Sump Pumps 09-2015
22 33 00 Electric Domestic Water Heaters 09-2020
22 40 00 Plumbing Fixtures 05-2024
DIVISION 23 – HEATING, VENTILATING, AND AIR
CONDITIONING (HVAC)
23 05 11 Common Work Results for HVAC 03-2023
23 05 12 General Motor Requirements for HVAC 03-2023
23 05 41 Noise and Vibration Control for HVAC Piping and
Equipment
03-2023
23 05 93 Testing, Adjusting, and Balancing for HVAC 03-2023
23 07 11 HVAC Insulation 02-2020
23 08 00 Commissioning of HVAC Systems 03-2023
23 09 23 Direct-Digital Control System for HVAC 03-2023
23 21 13 Hydronic Piping 06-2025
23 21 23 Hydronic Pumps 03-2023
23 23 00 Refrigerant Piping 03-2024
23 25 00 HVAC Water Treatment 03-2023
23 31 00 HVAC Ducts and Casings 03-2023
23 34 00 HVAC Fans 03-2023
23 36 00 Air Terminal Units 03-2023
23 37 00 Air Outlets and Inlets 03-2023
23 40 00 HVAC Air Cleaning Devices 03-2023
23 64 00 Packaged Water Chillers 03-2024
08-20-2026
MARION VA MEDICAL CENTER
CONSTRUCT NEW CAMPUS CHILLER PLANT
PROJECT: 657A5-21-401
01-01-2026
TABLE OF CONTENTS
00 01 10 - 4
SECTION NO DIVISION AND SECTION TITLES DATE
23 65 00 Cooling Towers 03-2023
23 73 00 Indoor Central-Station Air-Handling Units 03-2023
23 82 00 Convection Heating and Cooling Units 03-2023
23 82 16 Air Coils 03-2024
DIVISION 25 – INTEGRATED AUTOMATION
DIVISION 26 – ELECTRICAL
26 05 11 Requirements for Electrical Installations 11-2022
26 05 13 Medium-Voltage Cables 06-2025
26 05 19 Low-Voltage Electrical Power Conductors and Cables 11-2022
26 05 26 Grounding and Bonding for Electrical Systems 11-2022
26 05 33 Raceway and Boxes for Electrical Systems 11-2022
26 05 41 Underground Electrical Construction 01-2026
26 05 73 Overcurrent Protective Device Coordination Study 11-2022
26 08 00 Commissioning of Electrical Systems 11-2022
26 09 23 Lighting Controls 11-2022
26 11 16 Secondary Unit Substations 11-2022
26 13 16 Medium-Voltage Fusible Interrupter Switches 11-2022
26 22 00 Low-Voltage Transformers 11-2022
26 23 00 Low-Voltage Switchgear 11-2022
26 24 16 Panelboards 11-2022
26 27 26 Wiring Devices 11-2022
26 29 11 Motor Controllers 11-2022
26 29 21 Enclosed Switches and Circuit Breakers 11-2022
26 36 23 Automatic Transfer Switches 11-2022
26 41 00 Facility Lightning Protection 11-2022
26 43 13 Surge Protective Devices 11-2022
26 51 00 Interior Lighting 03-2024
26 56 00 Exterior Lighting 11-2022
DIVISION 27 – COMMUNICATIONS
27 05 11 Requirements for Communications Installations 09-2019
27 05 26i Grounding and Bonding for Communications Systems 12-2022
27 05 33i Conduits and Backboxes for Communications Systems 12-2022
27 05 36i Cable Trays For Communications Systems 12-2022
27 05 53i Identification for Communication Systems 06-2015
27 08 00 Commissioning of Communications Systems 11-2016
27 10 00i Structured Cabling 12-2022
27 11 00 Telecommunications Room Fittings 06-2015
27 11 16i Communications Cabinets, Racks, Frames, and
Enclosures
01-2016
27 11 19i Communications Termination Blocks And Patch Panels
27 11 26i Communications Rack Mounted Power Protection And
Power Strips
08-20-2026
MARION VA MEDICAL CENTER
CONSTRUCT NEW CAMPUS CHILLER PLANT
PROJECT: 657A5-21-401
01-01-2026
TABLE OF CONTENTS
00 01 10 - 5
SECTION NO DIVISION AND SECTION TITLES DATE
27 13 13-13i Communications Copper Cable Splicing And
Terminations
27 13 23-13i Communications Optical Fiber Splicing And
Terminations
27 13 23i Communications Optical Fiber Backbone Cabling
27 15 00 Communications Structured Cabling 01-2016
27 15 13i Communications Copper Horizontal Cabling 12-22
27 16 19i Communications Patch Cords, Station Cords, and
Power Strips
12-22
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
28 05 00 Common Work Results for Electronic Safety and
Security
04-2018
28 05 13 Conductors and Cables for Electronic Safety and
Security
10-2018
28 05 26 Grounding and Bonding for Electronic Safety and
Security
09-2011
28 05 28.33 Conduits and Backboxes for Electronic Safety and
Security
09-2011
28 08 00 Commissioning of Electronic Safety and Security
Systems
11-2016
28 08 00.01 DVA/USACE Projects Commissioning of Electronic
Safety and Security Systems
08-2019
28 13 00 Physical Access Control System 10-2011
28 23 00 Video Surveillance 09-2011
28 31 00 Fire Detection and Alarm 10-2011
DIVISION 31 – EARTHWORK
31 20 00 Earthwork 08-2023
31 23 19 Dewatering 10-2012
31 23 23.33 Flowable Fill 10-2012
31 63 26 Drilled Caissons 10-2012
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 05 23 Cement and Concrete for Exterior Improvements 08-2016
32 12 16 Asphalt Paving 09-2015
32 17 23 Pavement Markings 08-2016
32 90 00 Planting 08-2016
DIVISION 33 – UTILITIES
33 10 00 Water Utilities 03-2017
33 30 00 Sanitary Sewer Utilities 06-2013
33 40 00 Storm Sewer Utilities 12-2017
08-20-2026
MARION VA MEDICAL CENTER
CONSTRUCT NEW CAMPUS CHILLER PLANT
PROJECT: 657A5-21-401
01-01-2026
TABLE OF CONTENTS
00 01 10 - 6
DIVISION 34 – TRANSPORTATION
34 75 13.13 Active Vehicle Barriers 08-2016
DIVISION 48 – Electrical Power Generation
08-20-2026
MARION VA MEDICAL CENTER
CONSTRUCT NEW CAMPUS CHILLER PLANT
PROJECT: 657A5-21-401
06-01-21
SPECIAL INSPECTIONS
01 45 35 - 1
SECTION 01 45 35
PART 1 - GENERAL
1.1 DESCRIPTION
A. This guide specification will be applicable to both new buildings and existing building rehabilitations/renovations. In addition to the
Special Inspection and testing specified requirements, a registered design professional must perform structural observations during construction. All observed deficiencies will be immediately reported to the Contracting Officer. The registered design professional performing these observations will be a representative of the Designer of Record
(DOR) for the building being constructed.
B. Structural observations are required for the following project conditions per IBC Chapter 17:
1. Seismic Design Category D, E or F; and assigned to Risk Cat III, IV or V.
2. Seismic Design Category D, E or F; and with a height greater than
22860 mm 75 ft.
3. Seismic Design Category E, assigned to Risk Category I or II and the building is greater than two stories above grade plane.
4. Nominal design wind speed in excess of 49 m/sec 110 mph; and assigned to Risk Cat III, IV or V.
5. Nominal design wind speed in excess of 49 m/sec 110 mph; and with a height greater than 23 m 75 ft.
1.2 APPLICABLE PUBLICATIONS
A. The publication listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
B. American Society of Civil Engineers (ASCE)
1. ASCE 7 - (2010; Errata 2011; Supp 2 2013) Minimum Design Loads for
Buildings and Other Structures
C. International Code Council (ICC)
2. ICC IBC - (2015) International Building Code
08-20-2026
MARION VA MEDICAL CENTER
CONSTRUCT NEW CAMPUS CHILLER PLANT
01 45 35 - 2
1.3 GENERAL REQUIREMENTS
A. Perform Special Inspections in accordance with the Statement of Special
Inspections, Schedule of Special Inspections and Chapter 17 of ICC IBC.
The Statement of Special Inspections and Schedule of Special Inspections are included as an attachment to this specification. Special Inspections are to be performed by an independent third party and are intended to ensure that the work of the prime contractor is in accordance with the
Contract Documents and applicable building codes. Special inspections do not take the place of the three phases of control inspections performed by the Contractor's QC Manager or any testing and inspections required by other sections of the specifications.
B. Structural observations will be performed by the Government. The contractor must provide notification to the Contracting Officer 14 days prior to the following points of construction that structural observations need to occur:
1.4 DEFINITIONS
A. Continuous Special Inspections – The constant monitoring of specific tasks by a special inspector. These inspections must be carried out continuously over the duration of the particular tasks.
B. Periodic Special Inspections – Special Inspections by the special inspector who is intermittently present where the work to be inspected has been or is being performed. Specific time interval on a specific
Special Inspection should be indicated on the Schedule of Special
Inspections.
C. Perform – Perform these Special Inspections tasks for each welded joint or member.
D. Observe – Observe these Special Inspections items on a random daily basis. Operations need not be delayed pending these inspections.
E. Special Inspector (SI) – A qualified person retained by the contractor and approved by the Contracting Officer as having the competence necessary to inspect a particular type of construction requiring
Special Inspections. The SI must be an independent third party hired directly by the Prime Contractor.
F. Associate Special Inspector (ASI) – A qualified person who assists the
SI in performing Special Inspections but must perform inspection under
08-20-2026
MARION VA MEDICAL CENTER
CONSTRUCT NEW CAMPUS CHILLER PLANT
01 45 35 - 3 the direct supervision of the SI and cannot perform inspections without the SI on site.
G. Third Party – A third party inspector must not be company employee of the Contractor or any Sub-Contractor performing the work to be inspected.
H. Special Inspector of Record (SIOR) – SIOR must be an independent third party hired directly by the Prime Contractor and is required for the following project conditions:
1. Seismic Design Category D, E, or F; and assigned to Risk Category
III, IV, or V.
2. Seismic Design Category D, E, or F; and with a height greater than
22860mm 75 ft.
3. Seismic Design Category E, assigned to Risk Category I or II and the building is greater than two (2) stories above grade plane.
4. Nominal design wind speed in excess o f49 m/sec 100 mph; and assigned to Risk Category III, IV, or V.
5. Nominal design wind speed in excess of 49 mm/sec 100mph; and with a height greater than 23m 75ft.
6. In addition to these conditions, the DOR is encouraged to consider using an SIOR on large magnitude or critical projects where this additional level of quality control is affordable.
I. Contracting Officer – The Government official having overall authority for administrative contracting actions. Certain contracting actions may be delegated to the Contracting Officer's Representative (COR).
J. Contractor’s Quality Control (QC) Manager – An individual retained by the prime contractor and qualified in accordance with the Section 01 45
00.00 10 QUALITY CONTROL having the overall responsibility for the contractor's QC organization.
K. Designer of Record (DOR) – A registered design professional is contracted by the Government as an A/E responsible for the overall design and review of submittal documents prepared by others. The DOR is registered or licensed to practice their respective design profession as defined by the statutory requirements of the professional registration laws in state in which the design professional works. The
08-20-2026
MARION VA MEDICAL CENTER
CONSTRUCT NEW CAMPUS CHILLER PLANT
01 45 35 - 4
DOR is also referred to as the Engineer of Record (EOR) in design code documents.
L. Statement of Special Inspections (SSI) – A document developed by the
DOR identifying the material, systems, components and work required to have Special Inspections and covering the following:
1. List of the Architectural Designated Seismic Systems – these components are in or attached to a Risk Category IV or V structure and are needed for continued operation of the facility or their failure could impair the continued operation of the facility.
2. List of the Mechanical Designated Seismic Systems
a. For Seismic Design Category C or Risk V, list the following:
1) Heating, ventilation, and air-conditioning (HVAC) ductwork containing hazardous materials and anchorage of such ductwork
2) Piping systems and mechanical units containing flammable, combustible, or highly toxic materials.
b. For Seismic Design Category D, E, or F or Risk Category V list mechanical system that meet one of the following:
1) Life safety component required to function after an earthquake
2) Component that contains hazardous content,
3) All components in an essential facility needed for continued operation after an earthquake.
3. List of the Electrical Designated Systems
a. For Seismic Design Category C or Risk V, list the anchorage of electrical equipment used for emergency or standby power systems.
b. For Seismic Design Category D, E or F list electrical system that meet one of the following:
1) Life safety component required to function after an earthquake
2) Component that contains hazardous content,
3) All components in an essential facility needed for continued operation after an earthquake.
4. List of elements that are part of the progressive collapse resistance system.
08-20-2026
MARION VA MEDICAL CENTER
CONSTRUCT NEW CAMPUS CHILLER PLANT
01 45 35 - 5
a. Provide a description of the following as they apply:
1) Elements of the tie force system consisting of internal longitudinal and transverse, vertical, and peripheral tie.
2) Elements of the alternate path system.
3) Elements having enhanced local resistance. The Statement of
Special Inspections and the Schedule of Special Inspections will be included as an attachment to this specification
a) Schedule of Special Inspections – A schedule which lists each of the required Special Inspections, the extent to which each Special Inspections is to be performed, and the required frequency for each in accordance with ICC
IBC Chapter 17. Template found here:
Schedule of SI Template.docx
Statement of SI Template.xlsx
b) Designated Seismic System – Those nonstructural components that require design in accordance with ASCE 7
Chapter 13 and for which the component importance factor, Ip, is greater than 1.0. This designation applies to systems that are required to be operational following the
Design Earthquake for RC I - IV structures and following the MCER for RC V structures. All systems in RC V facilities designated as MC-1 in accordance with UFC 3-
310-04 are considered part of the Designated Seismic
Systems. Designated Seismic Systems will be identified by
Owner and will have an Importance Factor Ip = 1.5.
M. Submittals: Government approval is required for all submittals. CQC
Special Inspection reports shall be submitted under this Specification section and follow the Special Inspection naming convention. Submit the following:
1. SD-01 Preconstruction Submittals;
2. SIOR Letter of Acceptance;
3. Special Inspections Project Manual;
4. Special Inspections Agency's Written Practices
5. NDT Procedures and Equipment’ Calibration Records;
08-20-2026
MARION VA MEDICAL CENTER
CONSTRUCT NEW CAMPUS CHILLER PLANT
01 45 35 - 6
6. SD-06 Test Reports;
7. Special Inspections
8. Daily Reports;
9. Special Inspections; Biweekly Reports;
10. SD-07 Certificates;
11. Fabrication Plant
12. Steel Truss Plant;
13. Wood Truss Plant;
14. AC472 Accreditation;
15. Steel Joist Institute Membership;
16. Precast Concrete Institute (PCI) Certified Plant;
17. Certificate of Compliance;
18. Special Inspector of Record Qualifications;
19. Special Inspector Qualifications;
20. Qualification Records for NDT technicians;
21. SD-11 Closeout Submittals;
22. Interim Final Report of Special Inspections;
23. Comprehensive Final Report of Special Inspections;
N. Special Inspector Qualifications: Submit qualifications for each SI, ASI, and the SIOR from the following certifying associations:
Associated Air Balance Council (AABC); American Concrete Institute
(ACI); Association of the Wall and Ceiling Industry (AWCI); American
Welding Society (AWS); Factory Mutual (FM); International Code Council
(ICC); Nondestructive Testing (NDT); National Institute for
Certification in Engineering Technologies (NICET); Precast/Prestressed
Concrete Institute (PCI); Post-Tensioning Institute (PTI); Underwriters
Laboratories (UL). Qualifications should be in accordance with the following minimums; PM or COR can restrict qualifications to the higher standards shown if multiple options are shown for a role based on complexity of project.
QUALIFICATIONS
08-20-2026
MARION VA MEDICAL CENTER
CONSTRUCT NEW CAMPUS CHILLER PLANT
01 45 35 - 7
Area Special Inspector Associated Special
Inspector
SIOR
Steel
Construction and High
Strength
Bolting
ICC Structural Steel and Bolting Special
Inspector certificate with on year of related experience, or Registered
Professional Engineer with related experience.
Engineer-In-Training with one year of related experience.
Welding
Structural
Steel (For highly complex steel use only
AWS Certified
Welding
Inspectors)
ICC Welding Special
Inspector certificate with one year of related experience or
AWS Certified Welding
Inspector
AWS Certified
Associate Welding
Inspector
Nondestructive
Testing of
Welds
NDT Level II
Certificate
NDT Level II
Certificate plus one year of related experience
Cold Formed
Steel Framing
ICC Structural Steel and Bolting Special
Inspector certificate with on year of related experience, or ICC Commercial
Building Inspector with one year of experience; or
Registered
Professional Engineer with related experience.
Engineer-In-Training
08-20-2026
MARION VA MEDICAL CENTER
CONSTRUCT NEW CAMPUS CHILLER PLANT
01 45 35 - 8
Area Special Inspector Associated Special
Inspector
SIOR
Concrete
Construction
ICC Reinforced
Concrete Special
Inspector Certificate with one year of related experience, or ACI Concrete
Construction Special
Inspector, or NICET
Concrete Technician
Level III Certificate in Construction
Materials Testing, or, Registered
Professional Engineer with related experience
ACI Concrete
Construction Special
Inspector in
Training, or
Engineer-In-Training related experience
Prestressed
Concrete
Construction
ICC Pre-stressed
Special Inspector
Certificate with one year of related experience, or PCI
Quality Control
Technician/ Inspector
Level II Certificate with one year of related experience, or Registered
Professional Engineer with related experience.
PCI Quality Control
Technician/ Inspector
Level I Certificate with one year of related experience, or Engineer-In-
Training with one year of related experience
Post-Tensioned
Concrete
Construction
PTI Level 2 Unbonded
PT Inspector
Certificate, or
Registered
Professional Engineer with related experience
PTI Level 1 Unbonded
PT Inspector
Certificate with one year of related experience, or
Engineer-In-Training
08-20-2026
MARION VA MEDICAL CENTER
CONSTRUCT NEW CAMPUS CHILLER PLANT
01 45 35 - 9
Area Special Inspector Associated Special
Inspector
SIOR
Masonry
Construction
ICC Structural
Masonry Special
Inspector Certificate with one year of related experience, or Registered
Professional Engineer with related experience
Engineer-In-Training
Wood ICC Commercial
Building Inspector
Certificate with one year of related experience, or ICC
Residential Building
Inspector with on year of experience, or Registered
Professional Engineer with related experience
Engineer-In-Training
Verification of Site Soil
Condition, Fill
Placement, and
Load-Bearing
Requirements
ICC Soils Special
Inspector Certificate with one year of related experience, or NICET Soils
Technician Level II
Certificate in
Construction Material
Testing, or NICET
Geotechnical
Engineering
Technician Level II
Construction or
Generalist
Certificate, or
Geologist-In-Training with one year of related experience, or Registered
Professional Engineer with related experience
NICET Soils
Technician Level I
Certificate in
Construction Material
Testing with one year of related experience, or NICET
Geotechnical
Engineering
Technician Level I
Construction, or
Generalist
Certificate with one year of related experience, or
Engineer-In-Training
08-20-2026
MARION VA MEDICAL CENTER
CONSTRUCT NEW CAMPUS CHILLER PLANT
01 45 35 - 10
Area Special Inspector Associated Special
Inspector
SIOR
Deep
Foundations
NICET Soils
Technician Level II
Certificate in
Construction Material
Testing, or NICET
Geotechnical
Engineering
Technician Level II
Construction or
Generalist
Certificate, or
Geologist-In-Training with one year of related experience, or Registered
Professional Engineer with related experience
NICET Soils
Technician Level I
Certificate in
Construction Material
Testing with one year of related experience, or NICET
Geotechnical
Engineering
Technician Level I
Construction or
Generalist
Certificate with one year of related experience, or
Engineer-In-Training
Sprayed Fire
Resistant
Manual
ICC Spray-applied
Fireproofing Special
Inspector
Certificate, or ICC
Fire Inspector I
Certificate with one year of related experience, or
Registered
Professional Engineer with related experience
Engineer-In-Training
Mastic and
Intumescent
Fire Resistant
Coatings
ICC Spray-applied
Fireproofing Special
Inspector
Certificate, or ICC
Fire Inspector I
Certificate with one year of related experience, or
Registered
Professional Engineer with related experience
Engineer-In-Training
08-20-2026
MARION VA MEDICAL CENTER
CONSTRUCT NEW CAMPUS CHILLER PLANT
01 45 35 - 11
Area Special Inspector Associated Special
Inspector
SIOR
Exterior
Insulation and
Finish Systems
(EIFS)
AWCI EIFS Inspector
Certificate, or
Exterior Design
Institute
Certificate, or
Registered
Professional Engineer with related experience
Engineer-In-Training
Fire-Resistant
Penetrations and Joints
Passed the UL
Firestop Exam with one year of related experience, or Passed the FM Firestop Exam with one year of related experience, or Registered
Professional Engineer with related experience
Engineer-In-Training
Smoke Control AABC Technician
Certification with one year of related experience, or
Registered
Professional Engineer with related experience
Engineer-In-Training
SIOR Registered
Professional
Engineer
PART 2 - PRODUCTS
2.1 FABRICATORS SPECIAL INSPECTION
A. Special Inspections of fabricator's work performed in the fabricator's shop is required to be inspected in accordance with the Statement of
Special Inspections and the Schedule of Special Inspections unless the fabricator is certified by the approved agency to perform such work without Special Inspections. Submit the applicable certification(s) from the following list to the Contracting Officer for information to
08-20-2026
MARION VA MEDICAL CENTER
CONSTRUCT NEW CAMPUS CHILLER PLANT
01 45 35 - 12 allow work performed in the fabricator's shop to not be subjected to
Special Inspections.
B. The following certifications meet the requirements for fabricator approval in accordance with paragraph 1704.2.5.2 of IBC:
1. American Institute of Steel Construction (AISC) Certified
Fabrication Plant, Category STD.
2. Truss Plate Institute (TPI) steel truss plate quality assurance program certification.
3. Truss Plate Institute (TPI) wood truss plate quality assurance program certification.
4. International Accreditation Service, AC472 Accreditation Steel Joist
Institute Membership
5. Precast Concrete Institute (PCI) Certified Plant, Group C
C. At the completion of fabrication, submit a certificate of compliance, to be included with the comprehensive final report of Special
Inspections, stating that the materials supplied and work performed by the fabricator are in accordance the construction documents.
PART 3 - EXECUTION
3.1 RESPONSIBILIES MATRIX
Inspector Responsibility Condition
SIOR a. Supervise all Special Inspectors required by the contract documents and the IBC.
b. Submit a SIOR Letter of Acceptance to the
Contracting Officer attesting to acceptance of the duties of SIOR, signed and sealed by the
SIOR.
c. Verify the qualifications of all of the Special
Inspectors.
d. Verify the qualifications of fabricators.
Applicable when SIOR is required
SIOR e. Submit Special Inspections agency's written practices for the monitoring and control of the agency's operations to include the following:
1. The agency's procedures for the selection and administration of inspection personnel, describing the training, experience and
Applicable when SIOR is required and when the structural design is required to follow
08-20-2026
MARION VA MEDICAL CENTER
CONSTRUCT NEW CAMPUS CHILLER PLANT
01 45 35 - 13
Inspector Responsibility Condition examination requirements for qualifications and certification of inspection personnel.
2. The agency's inspection procedures, including general inspection, material controls, and visual welding inspection.
f. Submit qualification records for nondestructive testing (NDT) technicians designated for the project. Submit NDT procedures and equipment calibration records for NDT to be performed and equipment to be used for the project.
AISC341 for seismic design of steel structures
SIOR g. Prepare a Special Inspections Project Manual, which will cover the following:
1. Roles and responsibilities of the following individuals during Special Inspections: SIOR, SI, General Contractor, Subcontractors, QC
Manager, and DOR.
2. Organizational chart and/or communication plan, indicating lines of communication
3. Contractor's internal plan for scheduling inspections. Address items such as timeliness of inspection requests, who to contact for inspection requests, and availability of alternate inspectors. Contractor's internal plan for scheduling inspections. Address items such as timeliness of inspection requests, who to contact for inspection requests, and availability of alternate inspectors.
4. Indicate the government reporting procedures.
5. Propose forms or templates to be used by SI and SIOR to document inspections.
6. Indicate procedures for tracking nonconforming work and verification that corrective work is complete.
7. Indicate how the SIOR and/or SI will participate in weekly QC meetings.
8. Indicate how Special Inspections of shop fabricated items will be handled when the fabricator's shop is not certified per paragraph FABRICATOR SPECIAL INSPECTIONS.
9. Include a section in the manual that covers each specific item requiring Special
Inspections that is indicated on the Schedule of Special Inspections. Provide names and qualifications of each special inspector who
Applicable when SIOR is required
08-20-2026
MARION VA MEDICAL CENTER
CONSTRUCT NEW CAMPUS CHILLER PLANT
01 45 35 - 14
Inspector Responsibility Condition will be performing the Special Inspections for each specific item. Provide detail on how the Special Inspections are to be carried out for each item so that the expectations are clear for the General Contractor and the
Subcontractor performing the work. Make a copy of the Special Inspections Project
Manual available on the job site during construction. Submit a copy of the Special
Inspections Project Manual for approval.
h. Attend coordination and mutual understanding meeting where the information in the Special
Inspections Project Manual will be reviewed to verify that all parties have a clear understanding of the Special Inspections provisions and the individual duties and responsibilities of each party.
i. Maintain a 3- ring binder for the Special
Inspector's daily and biweekly reports and the
Special Inspections Project Manual. This file must be located in a conspicuous place in the project trailer/office to allow review by the
Contracting Officer and the DOR.
j. Submit a copy of the Special Inspector's daily reports to the QC Manager.
k. Discrepancies that are observed during Special
Inspections must be reported to the QC Manager for correction. If discrepancies are not corrected before the special inspector leaves the site the observed discrepancies must be documented in the daily report.
l. Submit a biweekly Special Inspections report until all work requiring Special Inspections is complete. A report is required for each biweekly period in which Special Inspections activity occurs, and must include the following:
1. A brief summary of the work performed during the reporting time frame.
2. Changes and/or discrepancies with the drawings, specifications, and mechanical or electrical component certification if they require seismic systems, that were observed during the reporting period.
3. Discrepancies which were resolved or corrected.
08-20-2026
MARION VA MEDICAL CENTER
CONSTRUCT NEW CAMPUS CHILLER PLANT
01 45 35 - 15
Inspector Responsibility Condition
4. A list of nonconforming items requiring resolution.
5. All applicable test results including nondestructive testing reports.
QC Manager a. If there is no SIOR, QC Manager must Supervise all Special Inspectors required by the contract documents and the IBC; Verify the qualifications of all of the Special Inspectors; Verify the qualifications of fabricators; Maintain a 3-ring binder for the Special Inspector's daily and biweekly reports. This file must be located in a conspicuous place in the project trailer/office to allow review by the
Contracting Officer and the DOR.
Applicable when SIOR is not required
QC Manager b. Maintain a rework items list that includes discrepancies noted on the Special Inspectors daily report.
n/a
Special
Inspectors
a. Inspect all elements of the project for which the special inspector is qualified to inspect and are identified in the Schedule of Special
Inspections.
b. Attend preparatory phase meetings related to the
Definable Feature of Work (DFOW) for which the special inspector is qualified to inspect.
n/a
Special
Inspectors
c. Submit Special Inspections agency's written practices for the monitoring and control of the agency's operations to include the following:
1. The agency's procedures for the selection and administration of inspection personnel, describing the training, experience and examination requirements for qualifications and certification of inspection personnel.
2. The agency's inspection procedures, including general inspection, material controls, and visual welding inspection.
d. Submit qualification records for nondestructive testing (NDT) technicians designated for the project.
e. Submit NDT procedures and equipment calibration records for NDT to be performed and equipment to be used for the project.]
Applicable when SIOR is
NOT required and when the structural design is required to follow AISC
341 for seismic design of steel structures
08-20-2026
MARION VA MEDICAL CENTER
CONSTRUCT NEW CAMPUS CHILLER PLANT
01 45 35 - 16
Inspector Responsibility Condition
Special
Inspectors
f. Submit a copy of the daily reports to the QC
Manager.
g. Discrepancies that are observed during Special
Inspections must be reported to the QC Manager for correction. If discrepancies are not corrected before the special inspector leaves the site the observed discrepancies must be documented in the daily report.
h. Submit a biweekly Special Inspection Report until all inspections are complete. A report is required for each biweekly period in which
Special Inspections activity occurs, and must include the following:
1. A brief summary of the work performed during the reporting time frame
2. Changes and/or discrepancies with the drawings, specifications, and mechanical or electrical component certification if they require seismic systems that were observed during the reporting period.
3. Discrepancies which were resolved or corrected.
4. A list of nonconforming items requiring resolution.
5. All applicable test result including nondestructive testing reports.
j. At the completion of the project submit a comprehensive final report of Special
Inspections that documents the Special
Inspections completed for the project and corrections of all discrepancies noted in the daily reports. The comprehensive final report of
Special Inspections must be signed, dated and indicate the certification of the special inspector qualifying them to conduct the inspection.
Applicable when SIOR is not required
Special
Inspectors
k. Submit daily reports to the SIOR Applicable when SIOR is required
3.2 DEFECTIVE WORK
Check work as it progresses, but failure to detect any defective work or materials must in no way prevent later rejection if defective work
08-20-2026
MARION VA MEDICAL CENTER
CONSTRUCT NEW CAMPUS CHILLER PLANT
01 45 35 - 17 or materials are discovered, nor obligate the Government to accept such work.
-- End –-
Project:
Location:
Project #:
Date:
D
IV
No
Project:
Location:
Project #:
Date:
Project Risk Category:
Project Design Wind Speed (mph):
Number of Stories:
Structure Height Above Grade (ft):
Hazardous Occupancy or attached to such? Group H Occupancies (2015 IBC, Section 415)
Construct New Campus Chiller Plant
Marion, Illinois
657A5-21-401
8/19/2026
STATEMENT OF SPECIAL INSPECTIONS
Project Seismic Design Category:
Professional Registration Number:
Consulting Firm Name (if any):
SIOR Office AND Mobile Phone Number:
Special Inspector of Record (SIOR)
A Special Inspector of Record (SIOR) IS required (per UFGS 01 45 35, Section 1.3.8)
SIOR Name (Registered Professional):
Ordinary Reinforced Concrete Shearwalls See drawings
Lateral Force Resisting System (LFRS)
2015 IBC 1704.3.2 and 1704.3.3
Following is a listing of critical main wind/seismic force resisting systems for this structure. Carefully inspect these elements as part of the roles and responsiblities of the
Special Inspector (reference the Schedule of Special Inspections for inspection checklists).
Vertical LFRS Elements Notes
Horizontal LFRS Elements Notes
Ordinary Reinforced Masonry Shear Walls See drawings
Out of Plane Wall Connections See drawings
Concrete over metal deck 2nd floor and roof
Metal Roof Deck & Related Fastening System See Roof Plan
(2015 IBC 1705.13.3.4) (ASCE 7-10, 13.2.2, C13.2.2) (UFC 3-310-04, 2-11.2 & 2-13.2.2)
DESIGNATED SEISMIC SYSTEMS DO APPLY TO THIS PROJECT, due to the Seismic Design Category being D
Statement of Special Inspections Page 1 of 2
Construct New Campus Chiller Plant
Marion, Illinois
657A5-21-401
8/19/2026
Designated Seismic Systems (DSS)
EllenO'Brien Text Box
ADDENDUM 01
08-20-2026
1.
2.
3.
4.
5.
1.
2.
3.
4.
5.
6.
1.
2.
3.
4.
5.
6.
ELECTRICAL Designated Seismic Systems (DSS) Requiring a Certificate of Compliance
All electrical panels, distribution, feeders and substations
Final Walk Down Inspection and Report
If additional space is required, append an additional sheet listing the remaining DSS
OTHER Designated Seismic Systems (DSS) Requiring a Certificate of Compliance
Chillers
Pumps (chilled water - primary and secondary, condenser water)
Cooling Towers
If additional space is required, append an additional sheet listing the remaining DSS
Air handling units, VAVs, and exhast fans
1. Record observations of Final Walk Down Inspection
2. Document that Inspections were performed in accordance with the Schedule of Special Inspections
3. Document that all Designated Seismic Systems are installed according to construction/manufacturer document requirements, and that Compliance
Certificates have been collected (UFC 03 301 01, 2-13.2.2.1).
Statement of Special Inspections Page 2 of 2
(UFC 3 301 01 SECTION 2-2.4.3)
Designated Seismic Systems shall receive a final walk-down inspection by the Registered Design Professional in Responsible Charge
Final Walk Down Report, Prepared by the Registered Design Professional in Responsible Charge, Must Include:
MECHANICAL/PLUMBING Designated Seismic Systems (DSS) Requiring a Certificate of Compliance
EllenO'Brien Text Box
ADDENDUM 01
SCHEDULE OF SPECIAL INSPECTIONS (01 45 35) REVISED FOR IBC 2015 ON 9/30/16
DESIGNER NOTES (to be deleted after reviewing):
1. This schedule contains minimum requirements. Do not delete applicable inspection tasks unless notes in blue indicate it is acceptable to do so.
2. Blue text = designers notes. The designer must review and edit all blue text in this schedule prior to inserting this schedule into the special inspections spec (UFGS 01 45 35).
3. Check section boxes with ANY inspection tasks applicable to your project. You may choose to delete unchecked sections or leave them in the scheduled unchecked.
4. Individual rows/tasks that that are not applicable to the project may be left in the section, as the inspector can determine whether they occur/apply (e.g. metal trusses in the light gauge framing section for example).
5. Design discipline sections are color coded for easier reference by designers. This schedule does NOT need to be printed in color.
6. When finished editing, delete this note box and save this schedule as a PDF and insert into the project specifications (special inspections section).
SCHEDULE OF SPECIAL INSPECTIONS
Reference 01 45 35 for all requirements not noted as part of this schedule.
INSPECTION DEFINITIONS:
PERFORM: Perform these tasks for each weld, fastener or bolted connection, and noted verification.
OBSERVE: Observe these items randomly during the course of each work day to insure that applicable requirements are being met. Operations need not be delayed pending these inspections at contractor’s risk.
DOCUMENT: Document, with a report, that the work has been performed in accordance with the contract documents. This is in addition to any other reports required in the Special Inspections guide specification.
CONTINUOUS: Constant monitoring of identified tasks by a special inspector over the duration of performance of said tasks.
SCHEDULE OF SPECIAL INSPECTIONS (01 45 35) REVISED FOR IBC 2015 ON 9/30/16
A. STRUCTURAL - STEEL – WELDING SECTION
THIS SECTION APPLICABLE IF BOX IS CHECKED: ☒
STEEL INSPECTION PRIOR TO WELDING – VERIFY THE FOLLOWING ARE IN COMPLIANCE
IBC 1705.2.1, AISC 360-10: Table C-N5.4-1
TASK INSPECTION TYPE1 DESCRIPTION
1. Verify that the welding procedures specification
(WPS) is available
PERFORM
2. Verify manufacturer certifications for welding consumables are available
PERFORM
3. Verify material identification PERFORM Type and grade.
4. Welder Identification
System
PERFORM The fabricator or erector, as applicable, shall maintain a system by which a welder who has welded a joint or member can be identified. Stamps, if used, shall be the low-stress type.
5. Fit-up of groove welds
(including joint geometry)
OBSERVE Joint preparation
Dimensions (alignment, root opening, root face, bevel)
Cleanliness (condition of steel surfaces)
Tacking (tack weld quality and location)
Backing type and fit (if applicable)
6. Configuration and finish of access holes
OBSERVE
7. Fit-up of fillet welds OBSERVE Dimensions (alignment, gaps at root)
Cleanliness (condition of steel surfaces)
Tacking (tack weld quality and location)
STEEL INSPECTION DURING WELDING – VERIFY THE FOLLOWING ARE IN COMPLIANCE
IBC 1705.2.1, AISC 360-10: Table C-N5.4-2
TASK INSPECTION TYPE DESCRIPTION
8. Use of qualified welders PERFORM Welding by welders, welding operators, and tack welders who are qualified in conformance with requirements.
9. Control and handling of welding consumables
OBSERVE Packaging
Electrode atmospheric exposure control
10. No welding over cracked tack welds
OBSERVE
11. Environmental conditions OBSERVE Wind speed within limits
Precipitation and temperature
12. Welding Procedures
Specification followed
OBSERVE Settings on welding equipment
Travel speed
Selected welding materials
Shielding gas type/flow rate
Preheat applied
Interpass temperature maintained (min./max.)
Proper position (F, V, H, OH)
1 PERFORM: Perform these tasks for each weld, fastener or bolted connection, and required verification.
OBSERVE: Observe these items on a random sampling basis daily to insure that applicable requirements are met. Operations need not be delayed pending these inspections at contractor’s risk.
SCHEDULE OF SPECIAL INSPECTIONS (01 45 35) REVISED FOR IBC 2015 ON 9/30/16
Intermix of filler metals avoided
13. Welding techniques OBSERVE Interpass and final cleaning
Each pass within profile limitations
Each pass meets quality requirements
SCHEDULE OF SPECIAL INSPECTIONS (01 45 35) REVISED FOR IBC 2015 ON 9/30/16
A. STRUCTURAL - STEEL – WELDING SECTION (CONTINUED)
STEEL INSPECTION AFTER WELDING – VERIFY THE FOLLOWING ARE IN COMPLIANCE
IBC 2015 1705.2.1, AISC 360-10: Table C-N5.4-3
TASK INSPECTION TYPE 1 DESCRIPTION
14. Welds cleaned OBSERVE
15. Size, length, and location of all welds
PERFORM Size, length, and location of all welds conform to the requirements of the detail drawings.
16. Welds meet visual acceptance criteria
PERFORM AND
DOCUMENT
Crack prohibition
Weld/base-metal fusion
Crater cross section
Weld profiles
Weld size
Undercut
Porosity
17. Arc strikes PERFORM
18. k-area PERFORM When welding of doubler plates, continuity plates or stiffeners has been performed in the k-area, visually inspect the web k-area for cracks.
19. Backing removed, weld tabs removed and finished, and fillet welds added where required
PERFORM
20. Repair activities PERFORM AND
DOCUMENT
21. Document acceptance or rejection of welded joint or member
PERFORM
END SECTION
1 PERFORM: Perform these tasks for each weld, fastener or bolted connection, and required verification.
DOCUMENT: Document in a report that the work has been performed as required. This is in addition to all other required reports.
SCHEDULE OF SPECIAL INSPECTIONS (01 45 35) REVISED FOR IBC 2015 ON 9/30/16
B. STRUCTURAL - STEEL – BOLTING SECTION
STEEL INSPECTION TASKS PRIOR TO BOLTING – VERIFY THE FOLLOWING ARE IN COMPLIANCE
IBC 1705.2.1, AISC 360-10: Table C-N5.6-1
TASK INSPECTION TYPE 1 DESCRIPTION
1. Manufacture’s certifications available for fastener materials
PERFORM
2. Fasteners marked in accordance with
ASTM requirements
OBSERVE
3. Proper fasteners selected for joint detail
(grade, type, bolt length if threads are to be excluded from shear plane)
OBSERVE
4. Proper bolting procedure selected for joint detail
OBSERVE
5. Connecting elements, including appropriate faying surface condition and hole preparation, if specified, meet applicable requirements
OBSERVE
6. Proper storage provided for bolts, nuts, washers, and other fastener components
OBSERVE
STEEL INSPECTION TASKS DURING BOLTING – VERIFY THE FOLLOWING ARE IN COMPLIANCE
IBC 1705.2.1, AISC 360-10: Table C-N5.6-2
TASK INSPECTION TYPE 1 DESCRIPTION
7. Fastener assemblies of suitable condition, placed in all holes and washers (if required) are positioned as required
OBSERVE
8. Joint brought to the snug-tight condition prior to pretensioning operation
OBSERVE
9. Fastener component not turned by the wrench prevented from rotating
OBSERVE
10. Bolts are pretensioned in accordance with
RCSC Specification, progressing systematically from the most rigid point toward the free edges
OBSERVE
STEEL INSPECTION TASKS AFTER BOLTING – VERIFY THE FOLLOWING ARE IN COMPLIANCE
IBC 1705.2.1, AISC 360-10: Table C-N5.6-3
TASK INSPECTION TYPE 1 DESCRIPTION
11. Document acceptance or rejection of all bolted connections
1 PERFORM: Perform these tasks for each weld, fastener or bolted connection, and required verification.
OBSERVE: Observe these items on a random sampling basis daily to insure that applicable requirements are met. Operations need
DOCUMENT: Document in a report that the work has been performed as required. This is in addition to all other required reports.
SCHEDULE OF SPECIAL INSPECTIONS (01 45 35) REVISED FOR IBC 2015 ON 9/30/16
C. STRUCTURAL - STEEL - NON DESTRUCTIVE TESTING SECTION
NONDESTRUCTIVE TESTING OF WELDED JOINTS – VERIFY THE FOLLOWING ARE IN COMPLIANCE
IBC 1705.2.1, AISC 360-10: Section N5.5
TASK INSPECTION TYPE 1 DESCRIPTION
1. Use of qualified nondestructive testing personnel
PERFORM Visual weld inspection and nondestructive testing (NDT) shall be conducted by personnel qualified in accordance with AWS
D1.8 clause 7.2
2. CJP groove welds OBSERVE [NOTE: DOR must delete this row if section D (SEISMIC
PROVISIONS SECTION) is checked]
Dye penetrant testing (DT) and ultrasonic testing (UT) shall be performed on 20% of CJP groove welds for materials greater than 5/16” (8mm) thick. Testing rate must be increased to 100% if greater than 5% of welds tested have unacceptable defects.
3. Welded joints subject to fatigue
OBSERVE Dye penetrant testing (DT) and Ultrasonic testing (UT) shall be performed on 100% of welded joints identified on contract drawings as being subject to fatigue.
4. Weld tab removal sites OBSERVE At the end of welds where weld tabs have been removed, magnetic particle testing shall be performed on the same beam-to-column joints receiving UT
1 PERFORM: Perform these tasks for each weld, fastener or bolted connection, and required verification.
OBSERVE: Observe these items on a random sampling basis daily to insure that applicable requirements are met. Operations need
SCHEDULE OF SPECIAL INSPECTIONS (01 45 35) REVISED FOR IBC 2015 ON 9/30/16
D. STRUCTURAL - STEEL – AISC 341 REQUIREMENTS (SEISMIC PROVISIONS) SECTION
NONDESTRUCTIVE TESTING OF WELDED JOINTS – VERIFY THE FOLLOWING ARE IN COMPLIANCE
IBC 1705.2.1, AISC 341-10: Section J6.2
TASK INSPECTION TYPE 1 DESCRIPTION
[NOTE: DOR may uncheck this section for projects NOT designed in accordance with AISC 341 (Seismic
Provisions) or for projects designed according to AISC 341, but using an R value equal to 3]
5. CJP groove welds OBSERVE Dye penetrant testing (DT) and ultrasonic testing (UT) shall be performed on 100% of CJP groove welds for materials greater than
5/16” thick (8mm).
6. Beam cope and access hole.
OBSERVE At welded splices and connections, thermally cut surfaces of beam copes and access holes shall be tested using magnetic particle testing
(MT) or dye penetrant testing (DT), when the flange thickness exceeds 1 1/2 in. for rolled shapes, or when the web thickness exceeds 1 1/2 in. for built-up shapes.
7. K-area NDT (AISC
341)
PERFORM Where welding of doubler plates, continuity plates or stiffeners has been performed in the k-area, the web shall be tested for cracks using magnetic particle testing (MT). The MT inspection area shall include the k-area base metal within 3-inches of the weld. The MT shall be performed no sooner than 48 hours following completion of the welding.
8. Placement of reinforcing or contouring fillet welds
1 PERFORM: Perform these tasks for each weld, fastener or bolted connection, and required verification.
OBSERVE: Observe these items on a random sampling basis daily to insure that applicable requirements are met. Operations need
DOCUMENT: Document in a report that the work has been performed as required. This is in addition to all other required reports.
SCHEDULE OF SPECIAL INSPECTIONS (01 45 35) REVISED FOR IBC 2015 ON 9/30/16
E. STRUCTURAL - STEEL - COMPOSITE CONSTRUCTION 1
COMPOSITE CONSTRUCTION PRIOR TO PLACING CONCRETE – VERIFY THE FOLLOWING ARE IN COMPLIANCE
IBC 1705.2.1, AISC 360-10: Table N6.1, AISC 341-10: Table J9-1
TASK INSPECTION TYPE 2 DESCRIPTION
1. Placement and installation of steel headed stud anchors
PERFORM
2. Material identification of reinforcing steel (Type/Grade)
OBSERVE
3. Determination of carbon equivalent for reinforcing steel other than ASTM A706
OBSERVE
4. Proper reinforcing steel size, spacing, clearances, support, and orientation
OBSERVE
5. Reinforcing steel has been tied and supported as required
OBSERVE
F. STRUCTURAL - STEEL - OTHER INSPECTIONS
OTHER STEEL INSPECTIONS – VERIFY THE FOLLOWING ARE IN COMPLIANCE
IBC 1705.2.1, AISC…