657A5-21-401 - ADDENDUM 1 - SPECIFICATIONS - 94 PAGES.pdf

PDF 1 MB Posted

Attached to
Z2DA--657A5-21-401, Construct New Campus Chiller Plant, MRN
Solicitation number
36C25526R0129-0005
Issued by

About this file

This file is an Addendum 1 to the Construction Specifications for Project 657A5-21-401, a new Campus Chiller Plant facility at Marion VA Medical Center in Marion, Illinois. The specifications document provides comprehensive construction requirements organized by division and includes detailed performance standards, quality assurance procedures, and inspection protocols.

The project encompasses multiple construction disciplines including structural steel welding and bolting, concrete construction, masonry, HVAC systems, electrical installations, plumbing, fire suppression, and communications infrastructure. Key structural requirements include ordinary reinforced concrete shearwalls as the primary lateral force-resisting system, with the project assigned to Seismic Design Category D. Special inspection requirements are mandated throughout construction, including continuous monitoring of welding operations, concrete placement, and designated seismic systems such as chillers, pumps, cooling towers, and air handling units. The specifications require a Special Inspector of Record (SIOR) qualified as a registered professional engineer, with supporting special inspectors certified by organizations including ICC, ACI, AWS, NICET, PCI, and PTI depending on their discipline. Fabricators must demonstrate compliance through certifications such as AISC Certified Fabrication Plants, PCI Certified Plants, or Steel Joist Institute membership. Sample panels and full-scale mockups are required for architectural precast concrete work before production, with all work subject to government approval and inspection throughout the construction process. The project incorporates blast-resistant design requirements for critical facilities with specific performance criteria for exterior panels including peak reflected pressure and impulse resistance standards.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT # 657A5-21-401

Construct New Campus Chiller Plant

MARION VA MEDICAL CENTER

2401 W MAIN STREET

MARION, IL 62959-1165

SPECIFICATIONS

CONSTRUCTION DOCUMENTS

MAY 7, 2026

ADDENDUM 1

AUGUST 20, 2026

PREPARED BY

ADDENDUM 01

REV 1

08-20-2026

MARION VA MEDICAL CENTER

CONSTRUCT NEW CAMPUS CHILLER PLANT

PROJECT: 657A5-21-401

01-01-2026

TABLE OF CONTENTS

00 01 10 - 1

DEPARTMENT OF VETERANS AFFAIRS

VHA MASTER SPECIFICATIONS

TABLE OF CONTENTS

Section 00 01 10

SECTION NO DIVISION AND SECTION TITLES DATE

DIVISION 00 - SPECIAL SECTIONS

00 01 15 List of Drawing Sheets 05-2020

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00 General Requirements 11-2021

01 32 16.15 Project Schedules 12-2025

01 33 23 Shop Drawings, Product Data, and Samples 03-2026

01 35 26 Safety Requirements 05-2024

01 42 19 Reference Standards 11-2020

01 45 00 Quality Control 02-2021

01 45 29 Testing Laboratory Services 11-2018

01 45 35 Special Inspections 06-2021

01 57 19 Temporary Environmental Controls 01-2021

01 74 19 Construction Waste Management 04-2022

01 81 13 Sustainable Construction Requirements 10-2017

01 91 00 General Commissioning Requirements 04-2022

DIVISION 02 – EXISTING CONDITIONS

02 21 13 Site Surveys 12-2023

02 41 00 Demolition 08-2017

02 82 13.41 Asbestos Abatement for Total Demolition Project 01-2021

DIVISION 03 – CONCRETE

03 30 00 Cast-in-Place Concrete 01-2021

03 41 33 Precast Structural Pretensioned Concrete 01-2021

03 45 00 Precast Architectural Concrete 01-2021

DIVISION 04 – MASONRY

04 05 13 Masonry Mortaring 10-2017

04 05 16 Masonry Grouting 01-2021

04 20 00 Unit Masonry 08-2017

DIVISION 05 – METALS

05 12 00 Structural Steel Framing 11-2018

05 31 00 Steel Decking 01-2021

05 50 00 Metal Fabrications 08-2018

05 51 00 Metal Stairs 01-2021

08-20-2026

MARION VA MEDICAL CENTER

CONSTRUCT NEW CAMPUS CHILLER PLANT

PROJECT: 657A5-21-401

01-01-2026

TABLE OF CONTENTS

00 01 10 - 2

DIVISION 06 – WOOD, PLASTICS AND COMPOSITES

06 10 00 Rough Carpentry 10-2017

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 13 00 Sheet Waterproofing 01-2021

07 21 13 Thermal Insulation 01-2021

07 22 00 Roof and Deck Insulation 01-2021

07 27 26 Fluid-Applied Membrane Air Barrier, Vapor

Permeable

01-2021

07 42 13.02 Metal Wall Panels FFE

07 54 23 Thermoplastic Polyolefin (TPO) Roofing 11-2025

07 60 00 Flashing and Sheet Metal 01-2021

07 72 00 Roof Accessories 01-2021

07 81 00 Applied Fireproofing 07-2023

07 84 00 Firestopping 01-2021

07 92 00 Joint Sealants 04-2022

DIVISION 08 - OPENINGS

08 11 13 Hollow Metal Doors and Frames 01-2021

08 31 13 Access Doors and Frames 06-2025

08 33 00 Coiling Doors and Grilles 01-2021

08 41 13 Aluminum-Framed Entrances and Storefronts 01-2021

08 71 00 Door Hardware 03-2024

08 80 00 Glazing 01-2021

08 90 00 Louvers and Vents 01-2021

DIVISION 09 – FINISHES

09 22 16 Non-Structural Metal Framing 06-2018

09 29 00 Gypsum Board 04-2020

09 30 13 Ceramic/Porcelain Tiling 11-2025

09 51 00 Acoustical Ceilings 12-2018

09 91 00 Painting 01-2021

DIVISION 10 – SPECIALTIES

10 14 00 Signage 01-2021

10 26 00 Wall and Door Protection 01-2021

10 28 00 Toilet, Bath, and Laundry Accessories 01-2021

10 44 13 Fire Extinguisher Cabinets 08-2018

DIVISION 11 – EQUIPMENT

DIVISION 12 – FURNISHINGS

12 36 00 Countertops 12-2023

08-20-2026

MARION VA MEDICAL CENTER

CONSTRUCT NEW CAMPUS CHILLER PLANT

PROJECT: 657A5-21-401

01-01-2026

TABLE OF CONTENTS

00 01 10 - 3

DIVISION 13 - SPECIAL CONSTRUCTION

13 05 41 Seismic Restraint Requirements for Non-Structural

Components

01-2021

DIVISION 14 – CONVEYING EQUIPEMENT

DIVISION 21 - FIRE SUPPRESSION

21 08 00 Commissioning of Fire Suppression System 11-2016

21 13 13 Wet-Pipe Sprinkler Systems 06-2015

DIVISION 22 – PLUMBING

22 05 11 Common Work Results for Plumbing 01-2023

22 05 12 General Motor Requirements for Plumbing Equipment 09-2020

22 05 19 Meters and Gages for Plumbing Piping 09-2020

22 05 23 General-Duty Valves for Plumbing Piping 09-2020

22 07 11 Plumbing Insulation 09-2019

22 08 00 Commissioning of Plumbing Systems 11-2016

22 11 00 Facility Water Distribution 05-2021

22 13 00 Facility Sanitary and Vent Piping 09-2020

22 14 00 Facility Storm Drainage 09-2015

22 14 29 Sump Pumps 09-2015

22 33 00 Electric Domestic Water Heaters 09-2020

22 40 00 Plumbing Fixtures 05-2024

DIVISION 23 – HEATING, VENTILATING, AND AIR

CONDITIONING (HVAC)

23 05 11 Common Work Results for HVAC 03-2023

23 05 12 General Motor Requirements for HVAC 03-2023

23 05 41 Noise and Vibration Control for HVAC Piping and

Equipment

03-2023

23 05 93 Testing, Adjusting, and Balancing for HVAC 03-2023

23 07 11 HVAC Insulation 02-2020

23 08 00 Commissioning of HVAC Systems 03-2023

23 09 23 Direct-Digital Control System for HVAC 03-2023

23 21 13 Hydronic Piping 06-2025

23 21 23 Hydronic Pumps 03-2023

23 23 00 Refrigerant Piping 03-2024

23 25 00 HVAC Water Treatment 03-2023

23 31 00 HVAC Ducts and Casings 03-2023

23 34 00 HVAC Fans 03-2023

23 36 00 Air Terminal Units 03-2023

23 37 00 Air Outlets and Inlets 03-2023

23 40 00 HVAC Air Cleaning Devices 03-2023

23 64 00 Packaged Water Chillers 03-2024

08-20-2026

MARION VA MEDICAL CENTER

CONSTRUCT NEW CAMPUS CHILLER PLANT

PROJECT: 657A5-21-401

01-01-2026

TABLE OF CONTENTS

00 01 10 - 4

SECTION NO DIVISION AND SECTION TITLES DATE

23 65 00 Cooling Towers 03-2023

23 73 00 Indoor Central-Station Air-Handling Units 03-2023

23 82 00 Convection Heating and Cooling Units 03-2023

23 82 16 Air Coils 03-2024

DIVISION 25 – INTEGRATED AUTOMATION

DIVISION 26 – ELECTRICAL

26 05 11 Requirements for Electrical Installations 11-2022

26 05 13 Medium-Voltage Cables 06-2025

26 05 19 Low-Voltage Electrical Power Conductors and Cables 11-2022

26 05 26 Grounding and Bonding for Electrical Systems 11-2022

26 05 33 Raceway and Boxes for Electrical Systems 11-2022

26 05 41 Underground Electrical Construction 01-2026

26 05 73 Overcurrent Protective Device Coordination Study 11-2022

26 08 00 Commissioning of Electrical Systems 11-2022

26 09 23 Lighting Controls 11-2022

26 11 16 Secondary Unit Substations 11-2022

26 13 16 Medium-Voltage Fusible Interrupter Switches 11-2022

26 22 00 Low-Voltage Transformers 11-2022

26 23 00 Low-Voltage Switchgear 11-2022

26 24 16 Panelboards 11-2022

26 27 26 Wiring Devices 11-2022

26 29 11 Motor Controllers 11-2022

26 29 21 Enclosed Switches and Circuit Breakers 11-2022

26 36 23 Automatic Transfer Switches 11-2022

26 41 00 Facility Lightning Protection 11-2022

26 43 13 Surge Protective Devices 11-2022

26 51 00 Interior Lighting 03-2024

26 56 00 Exterior Lighting 11-2022

DIVISION 27 – COMMUNICATIONS

27 05 11 Requirements for Communications Installations 09-2019

27 05 26i Grounding and Bonding for Communications Systems 12-2022

27 05 33i Conduits and Backboxes for Communications Systems 12-2022

27 05 36i Cable Trays For Communications Systems 12-2022

27 05 53i Identification for Communication Systems 06-2015

27 08 00 Commissioning of Communications Systems 11-2016

27 10 00i Structured Cabling 12-2022

27 11 00 Telecommunications Room Fittings 06-2015

27 11 16i Communications Cabinets, Racks, Frames, and

Enclosures

01-2016

27 11 19i Communications Termination Blocks And Patch Panels

27 11 26i Communications Rack Mounted Power Protection And

Power Strips

08-20-2026

MARION VA MEDICAL CENTER

CONSTRUCT NEW CAMPUS CHILLER PLANT

PROJECT: 657A5-21-401

01-01-2026

TABLE OF CONTENTS

00 01 10 - 5

SECTION NO DIVISION AND SECTION TITLES DATE

27 13 13-13i Communications Copper Cable Splicing And

Terminations

27 13 23-13i Communications Optical Fiber Splicing And

Terminations

27 13 23i Communications Optical Fiber Backbone Cabling

27 15 00 Communications Structured Cabling 01-2016

27 15 13i Communications Copper Horizontal Cabling 12-22

27 16 19i Communications Patch Cords, Station Cords, and

Power Strips

12-22

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

28 05 00 Common Work Results for Electronic Safety and

Security

04-2018

28 05 13 Conductors and Cables for Electronic Safety and

Security

10-2018

28 05 26 Grounding and Bonding for Electronic Safety and

Security

09-2011

28 05 28.33 Conduits and Backboxes for Electronic Safety and

Security

09-2011

28 08 00 Commissioning of Electronic Safety and Security

Systems

11-2016

28 08 00.01 DVA/USACE Projects Commissioning of Electronic

Safety and Security Systems

08-2019

28 13 00 Physical Access Control System 10-2011

28 23 00 Video Surveillance 09-2011

28 31 00 Fire Detection and Alarm 10-2011

DIVISION 31 – EARTHWORK

31 20 00 Earthwork 08-2023

31 23 19 Dewatering 10-2012

31 23 23.33 Flowable Fill 10-2012

31 63 26 Drilled Caissons 10-2012

DIVISION 32 – EXTERIOR IMPROVEMENTS

32 05 23 Cement and Concrete for Exterior Improvements 08-2016

32 12 16 Asphalt Paving 09-2015

32 17 23 Pavement Markings 08-2016

32 90 00 Planting 08-2016

DIVISION 33 – UTILITIES

33 10 00 Water Utilities 03-2017

33 30 00 Sanitary Sewer Utilities 06-2013

33 40 00 Storm Sewer Utilities 12-2017

08-20-2026

MARION VA MEDICAL CENTER

CONSTRUCT NEW CAMPUS CHILLER PLANT

PROJECT: 657A5-21-401

01-01-2026

TABLE OF CONTENTS

00 01 10 - 6

DIVISION 34 – TRANSPORTATION

34 75 13.13 Active Vehicle Barriers 08-2016

DIVISION 48 – Electrical Power Generation

08-20-2026

MARION VA MEDICAL CENTER

CONSTRUCT NEW CAMPUS CHILLER PLANT

PROJECT: 657A5-21-401

06-01-21

SPECIAL INSPECTIONS

01 45 35 - 1

SECTION 01 45 35

PART 1 - GENERAL

1.1 DESCRIPTION

A. This guide specification will be applicable to both new buildings and existing building rehabilitations/renovations. In addition to the

Special Inspection and testing specified requirements, a registered design professional must perform structural observations during construction. All observed deficiencies will be immediately reported to the Contracting Officer. The registered design professional performing these observations will be a representative of the Designer of Record

(DOR) for the building being constructed.

B. Structural observations are required for the following project conditions per IBC Chapter 17:

1. Seismic Design Category D, E or F; and assigned to Risk Cat III, IV or V.

2. Seismic Design Category D, E or F; and with a height greater than

22860 mm 75 ft.

3. Seismic Design Category E, assigned to Risk Category I or II and the building is greater than two stories above grade plane.

4. Nominal design wind speed in excess of 49 m/sec 110 mph; and assigned to Risk Cat III, IV or V.

5. Nominal design wind speed in excess of 49 m/sec 110 mph; and with a height greater than 23 m 75 ft.

1.2 APPLICABLE PUBLICATIONS

A. The publication listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

B. American Society of Civil Engineers (ASCE)

1. ASCE 7 - (2010; Errata 2011; Supp 2 2013) Minimum Design Loads for

Buildings and Other Structures

C. International Code Council (ICC)

2. ICC IBC - (2015) International Building Code

08-20-2026

MARION VA MEDICAL CENTER

CONSTRUCT NEW CAMPUS CHILLER PLANT

01 45 35 - 2

1.3 GENERAL REQUIREMENTS

A. Perform Special Inspections in accordance with the Statement of Special

Inspections, Schedule of Special Inspections and Chapter 17 of ICC IBC.

The Statement of Special Inspections and Schedule of Special Inspections are included as an attachment to this specification. Special Inspections are to be performed by an independent third party and are intended to ensure that the work of the prime contractor is in accordance with the

Contract Documents and applicable building codes. Special inspections do not take the place of the three phases of control inspections performed by the Contractor's QC Manager or any testing and inspections required by other sections of the specifications.

B. Structural observations will be performed by the Government. The contractor must provide notification to the Contracting Officer 14 days prior to the following points of construction that structural observations need to occur:

1.4 DEFINITIONS

A. Continuous Special Inspections – The constant monitoring of specific tasks by a special inspector. These inspections must be carried out continuously over the duration of the particular tasks.

B. Periodic Special Inspections – Special Inspections by the special inspector who is intermittently present where the work to be inspected has been or is being performed. Specific time interval on a specific

Special Inspection should be indicated on the Schedule of Special

Inspections.

C. Perform – Perform these Special Inspections tasks for each welded joint or member.

D. Observe – Observe these Special Inspections items on a random daily basis. Operations need not be delayed pending these inspections.

E. Special Inspector (SI) – A qualified person retained by the contractor and approved by the Contracting Officer as having the competence necessary to inspect a particular type of construction requiring

Special Inspections. The SI must be an independent third party hired directly by the Prime Contractor.

F. Associate Special Inspector (ASI) – A qualified person who assists the

SI in performing Special Inspections but must perform inspection under

08-20-2026

MARION VA MEDICAL CENTER

CONSTRUCT NEW CAMPUS CHILLER PLANT

01 45 35 - 3 the direct supervision of the SI and cannot perform inspections without the SI on site.

G. Third Party – A third party inspector must not be company employee of the Contractor or any Sub-Contractor performing the work to be inspected.

H. Special Inspector of Record (SIOR) – SIOR must be an independent third party hired directly by the Prime Contractor and is required for the following project conditions:

1. Seismic Design Category D, E, or F; and assigned to Risk Category

III, IV, or V.

2. Seismic Design Category D, E, or F; and with a height greater than

22860mm 75 ft.

3. Seismic Design Category E, assigned to Risk Category I or II and the building is greater than two (2) stories above grade plane.

4. Nominal design wind speed in excess o f49 m/sec 100 mph; and assigned to Risk Category III, IV, or V.

5. Nominal design wind speed in excess of 49 mm/sec 100mph; and with a height greater than 23m 75ft.

6. In addition to these conditions, the DOR is encouraged to consider using an SIOR on large magnitude or critical projects where this additional level of quality control is affordable.

I. Contracting Officer – The Government official having overall authority for administrative contracting actions. Certain contracting actions may be delegated to the Contracting Officer's Representative (COR).

J. Contractor’s Quality Control (QC) Manager – An individual retained by the prime contractor and qualified in accordance with the Section 01 45

00.00 10 QUALITY CONTROL having the overall responsibility for the contractor's QC organization.

K. Designer of Record (DOR) – A registered design professional is contracted by the Government as an A/E responsible for the overall design and review of submittal documents prepared by others. The DOR is registered or licensed to practice their respective design profession as defined by the statutory requirements of the professional registration laws in state in which the design professional works. The

08-20-2026

MARION VA MEDICAL CENTER

CONSTRUCT NEW CAMPUS CHILLER PLANT

01 45 35 - 4

DOR is also referred to as the Engineer of Record (EOR) in design code documents.

L. Statement of Special Inspections (SSI) – A document developed by the

DOR identifying the material, systems, components and work required to have Special Inspections and covering the following:

1. List of the Architectural Designated Seismic Systems – these components are in or attached to a Risk Category IV or V structure and are needed for continued operation of the facility or their failure could impair the continued operation of the facility.

2. List of the Mechanical Designated Seismic Systems

a. For Seismic Design Category C or Risk V, list the following:

1) Heating, ventilation, and air-conditioning (HVAC) ductwork containing hazardous materials and anchorage of such ductwork

2) Piping systems and mechanical units containing flammable, combustible, or highly toxic materials.

b. For Seismic Design Category D, E, or F or Risk Category V list mechanical system that meet one of the following:

1) Life safety component required to function after an earthquake

2) Component that contains hazardous content,

3) All components in an essential facility needed for continued operation after an earthquake.

3. List of the Electrical Designated Systems

a. For Seismic Design Category C or Risk V, list the anchorage of electrical equipment used for emergency or standby power systems.

b. For Seismic Design Category D, E or F list electrical system that meet one of the following:

1) Life safety component required to function after an earthquake

2) Component that contains hazardous content,

3) All components in an essential facility needed for continued operation after an earthquake.

4. List of elements that are part of the progressive collapse resistance system.

08-20-2026

MARION VA MEDICAL CENTER

CONSTRUCT NEW CAMPUS CHILLER PLANT

01 45 35 - 5

a. Provide a description of the following as they apply:

1) Elements of the tie force system consisting of internal longitudinal and transverse, vertical, and peripheral tie.

2) Elements of the alternate path system.

3) Elements having enhanced local resistance. The Statement of

Special Inspections and the Schedule of Special Inspections will be included as an attachment to this specification

a) Schedule of Special Inspections – A schedule which lists each of the required Special Inspections, the extent to which each Special Inspections is to be performed, and the required frequency for each in accordance with ICC

IBC Chapter 17. Template found here:

Schedule of SI Template.docx

Statement of SI Template.xlsx

b) Designated Seismic System – Those nonstructural components that require design in accordance with ASCE 7

Chapter 13 and for which the component importance factor, Ip, is greater than 1.0. This designation applies to systems that are required to be operational following the

Design Earthquake for RC I - IV structures and following the MCER for RC V structures. All systems in RC V facilities designated as MC-1 in accordance with UFC 3-

310-04 are considered part of the Designated Seismic

Systems. Designated Seismic Systems will be identified by

Owner and will have an Importance Factor Ip = 1.5.

M. Submittals: Government approval is required for all submittals. CQC

Special Inspection reports shall be submitted under this Specification section and follow the Special Inspection naming convention. Submit the following:

1. SD-01 Preconstruction Submittals;

2. SIOR Letter of Acceptance;

3. Special Inspections Project Manual;

4. Special Inspections Agency's Written Practices

5. NDT Procedures and Equipment’ Calibration Records;

08-20-2026

MARION VA MEDICAL CENTER

CONSTRUCT NEW CAMPUS CHILLER PLANT

01 45 35 - 6

6. SD-06 Test Reports;

7. Special Inspections

8. Daily Reports;

9. Special Inspections; Biweekly Reports;

10. SD-07 Certificates;

11. Fabrication Plant

12. Steel Truss Plant;

13. Wood Truss Plant;

14. AC472 Accreditation;

15. Steel Joist Institute Membership;

16. Precast Concrete Institute (PCI) Certified Plant;

17. Certificate of Compliance;

18. Special Inspector of Record Qualifications;

19. Special Inspector Qualifications;

20. Qualification Records for NDT technicians;

21. SD-11 Closeout Submittals;

22. Interim Final Report of Special Inspections;

23. Comprehensive Final Report of Special Inspections;

N. Special Inspector Qualifications: Submit qualifications for each SI, ASI, and the SIOR from the following certifying associations:

Associated Air Balance Council (AABC); American Concrete Institute

(ACI); Association of the Wall and Ceiling Industry (AWCI); American

Welding Society (AWS); Factory Mutual (FM); International Code Council

(ICC); Nondestructive Testing (NDT); National Institute for

Certification in Engineering Technologies (NICET); Precast/Prestressed

Concrete Institute (PCI); Post-Tensioning Institute (PTI); Underwriters

Laboratories (UL). Qualifications should be in accordance with the following minimums; PM or COR can restrict qualifications to the higher standards shown if multiple options are shown for a role based on complexity of project.

QUALIFICATIONS

08-20-2026

MARION VA MEDICAL CENTER

CONSTRUCT NEW CAMPUS CHILLER PLANT

01 45 35 - 7

Area Special Inspector Associated Special

Inspector

SIOR

Steel

Construction and High

Strength

Bolting

ICC Structural Steel and Bolting Special

Inspector certificate with on year of related experience, or Registered

Professional Engineer with related experience.

Engineer-In-Training with one year of related experience.

Welding

Structural

Steel (For highly complex steel use only

AWS Certified

Welding

Inspectors)

ICC Welding Special

Inspector certificate with one year of related experience or

AWS Certified Welding

Inspector

AWS Certified

Associate Welding

Inspector

Nondestructive

Testing of

Welds

NDT Level II

Certificate

NDT Level II

Certificate plus one year of related experience

Cold Formed

Steel Framing

ICC Structural Steel and Bolting Special

Inspector certificate with on year of related experience, or ICC Commercial

Building Inspector with one year of experience; or

Registered

Professional Engineer with related experience.

Engineer-In-Training

08-20-2026

MARION VA MEDICAL CENTER

CONSTRUCT NEW CAMPUS CHILLER PLANT

01 45 35 - 8

Area Special Inspector Associated Special

Inspector

SIOR

Concrete

Construction

ICC Reinforced

Concrete Special

Inspector Certificate with one year of related experience, or ACI Concrete

Construction Special

Inspector, or NICET

Concrete Technician

Level III Certificate in Construction

Materials Testing, or, Registered

Professional Engineer with related experience

ACI Concrete

Construction Special

Inspector in

Training, or

Engineer-In-Training related experience

Prestressed

Concrete

Construction

ICC Pre-stressed

Special Inspector

Certificate with one year of related experience, or PCI

Quality Control

Technician/ Inspector

Level II Certificate with one year of related experience, or Registered

Professional Engineer with related experience.

PCI Quality Control

Technician/ Inspector

Level I Certificate with one year of related experience, or Engineer-In-

Training with one year of related experience

Post-Tensioned

Concrete

Construction

PTI Level 2 Unbonded

PT Inspector

Certificate, or

Registered

Professional Engineer with related experience

PTI Level 1 Unbonded

PT Inspector

Certificate with one year of related experience, or

Engineer-In-Training

08-20-2026

MARION VA MEDICAL CENTER

CONSTRUCT NEW CAMPUS CHILLER PLANT

01 45 35 - 9

Area Special Inspector Associated Special

Inspector

SIOR

Masonry

Construction

ICC Structural

Masonry Special

Inspector Certificate with one year of related experience, or Registered

Professional Engineer with related experience

Engineer-In-Training

Wood ICC Commercial

Building Inspector

Certificate with one year of related experience, or ICC

Residential Building

Inspector with on year of experience, or Registered

Professional Engineer with related experience

Engineer-In-Training

Verification of Site Soil

Condition, Fill

Placement, and

Load-Bearing

Requirements

ICC Soils Special

Inspector Certificate with one year of related experience, or NICET Soils

Technician Level II

Certificate in

Construction Material

Testing, or NICET

Geotechnical

Engineering

Technician Level II

Construction or

Generalist

Certificate, or

Geologist-In-Training with one year of related experience, or Registered

Professional Engineer with related experience

NICET Soils

Technician Level I

Certificate in

Construction Material

Testing with one year of related experience, or NICET

Geotechnical

Engineering

Technician Level I

Construction, or

Generalist

Certificate with one year of related experience, or

Engineer-In-Training

08-20-2026

MARION VA MEDICAL CENTER

CONSTRUCT NEW CAMPUS CHILLER PLANT

01 45 35 - 10

Area Special Inspector Associated Special

Inspector

SIOR

Deep

Foundations

NICET Soils

Technician Level II

Certificate in

Construction Material

Testing, or NICET

Geotechnical

Engineering

Technician Level II

Construction or

Generalist

Certificate, or

Geologist-In-Training with one year of related experience, or Registered

Professional Engineer with related experience

NICET Soils

Technician Level I

Certificate in

Construction Material

Testing with one year of related experience, or NICET

Geotechnical

Engineering

Technician Level I

Construction or

Generalist

Certificate with one year of related experience, or

Engineer-In-Training

Sprayed Fire

Resistant

Manual

ICC Spray-applied

Fireproofing Special

Inspector

Certificate, or ICC

Fire Inspector I

Certificate with one year of related experience, or

Registered

Professional Engineer with related experience

Engineer-In-Training

Mastic and

Intumescent

Fire Resistant

Coatings

ICC Spray-applied

Fireproofing Special

Inspector

Certificate, or ICC

Fire Inspector I

Certificate with one year of related experience, or

Registered

Professional Engineer with related experience

Engineer-In-Training

08-20-2026

MARION VA MEDICAL CENTER

CONSTRUCT NEW CAMPUS CHILLER PLANT

01 45 35 - 11

Area Special Inspector Associated Special

Inspector

SIOR

Exterior

Insulation and

Finish Systems

(EIFS)

AWCI EIFS Inspector

Certificate, or

Exterior Design

Institute

Certificate, or

Registered

Professional Engineer with related experience

Engineer-In-Training

Fire-Resistant

Penetrations and Joints

Passed the UL

Firestop Exam with one year of related experience, or Passed the FM Firestop Exam with one year of related experience, or Registered

Professional Engineer with related experience

Engineer-In-Training

Smoke Control AABC Technician

Certification with one year of related experience, or

Registered

Professional Engineer with related experience

Engineer-In-Training

SIOR Registered

Professional

Engineer

PART 2 - PRODUCTS

2.1 FABRICATORS SPECIAL INSPECTION

A. Special Inspections of fabricator's work performed in the fabricator's shop is required to be inspected in accordance with the Statement of

Special Inspections and the Schedule of Special Inspections unless the fabricator is certified by the approved agency to perform such work without Special Inspections. Submit the applicable certification(s) from the following list to the Contracting Officer for information to

08-20-2026

MARION VA MEDICAL CENTER

CONSTRUCT NEW CAMPUS CHILLER PLANT

01 45 35 - 12 allow work performed in the fabricator's shop to not be subjected to

Special Inspections.

B. The following certifications meet the requirements for fabricator approval in accordance with paragraph 1704.2.5.2 of IBC:

1. American Institute of Steel Construction (AISC) Certified

Fabrication Plant, Category STD.

2. Truss Plate Institute (TPI) steel truss plate quality assurance program certification.

3. Truss Plate Institute (TPI) wood truss plate quality assurance program certification.

4. International Accreditation Service, AC472 Accreditation Steel Joist

Institute Membership

5. Precast Concrete Institute (PCI) Certified Plant, Group C

C. At the completion of fabrication, submit a certificate of compliance, to be included with the comprehensive final report of Special

Inspections, stating that the materials supplied and work performed by the fabricator are in accordance the construction documents.

PART 3 - EXECUTION

3.1 RESPONSIBILIES MATRIX

Inspector Responsibility Condition

SIOR a. Supervise all Special Inspectors required by the contract documents and the IBC.

b. Submit a SIOR Letter of Acceptance to the

Contracting Officer attesting to acceptance of the duties of SIOR, signed and sealed by the

SIOR.

c. Verify the qualifications of all of the Special

Inspectors.

d. Verify the qualifications of fabricators.

Applicable when SIOR is required

SIOR e. Submit Special Inspections agency's written practices for the monitoring and control of the agency's operations to include the following:

1. The agency's procedures for the selection and administration of inspection personnel, describing the training, experience and

Applicable when SIOR is required and when the structural design is required to follow

08-20-2026

MARION VA MEDICAL CENTER

CONSTRUCT NEW CAMPUS CHILLER PLANT

01 45 35 - 13

Inspector Responsibility Condition examination requirements for qualifications and certification of inspection personnel.

2. The agency's inspection procedures, including general inspection, material controls, and visual welding inspection.

f. Submit qualification records for nondestructive testing (NDT) technicians designated for the project. Submit NDT procedures and equipment calibration records for NDT to be performed and equipment to be used for the project.

AISC341 for seismic design of steel structures

SIOR g. Prepare a Special Inspections Project Manual, which will cover the following:

1. Roles and responsibilities of the following individuals during Special Inspections: SIOR, SI, General Contractor, Subcontractors, QC

Manager, and DOR.

2. Organizational chart and/or communication plan, indicating lines of communication

3. Contractor's internal plan for scheduling inspections. Address items such as timeliness of inspection requests, who to contact for inspection requests, and availability of alternate inspectors. Contractor's internal plan for scheduling inspections. Address items such as timeliness of inspection requests, who to contact for inspection requests, and availability of alternate inspectors.

4. Indicate the government reporting procedures.

5. Propose forms or templates to be used by SI and SIOR to document inspections.

6. Indicate procedures for tracking nonconforming work and verification that corrective work is complete.

7. Indicate how the SIOR and/or SI will participate in weekly QC meetings.

8. Indicate how Special Inspections of shop fabricated items will be handled when the fabricator's shop is not certified per paragraph FABRICATOR SPECIAL INSPECTIONS.

9. Include a section in the manual that covers each specific item requiring Special

Inspections that is indicated on the Schedule of Special Inspections. Provide names and qualifications of each special inspector who

Applicable when SIOR is required

08-20-2026

MARION VA MEDICAL CENTER

CONSTRUCT NEW CAMPUS CHILLER PLANT

01 45 35 - 14

Inspector Responsibility Condition will be performing the Special Inspections for each specific item. Provide detail on how the Special Inspections are to be carried out for each item so that the expectations are clear for the General Contractor and the

Subcontractor performing the work. Make a copy of the Special Inspections Project

Manual available on the job site during construction. Submit a copy of the Special

Inspections Project Manual for approval.

h. Attend coordination and mutual understanding meeting where the information in the Special

Inspections Project Manual will be reviewed to verify that all parties have a clear understanding of the Special Inspections provisions and the individual duties and responsibilities of each party.

i. Maintain a 3- ring binder for the Special

Inspector's daily and biweekly reports and the

Special Inspections Project Manual. This file must be located in a conspicuous place in the project trailer/office to allow review by the

Contracting Officer and the DOR.

j. Submit a copy of the Special Inspector's daily reports to the QC Manager.

k. Discrepancies that are observed during Special

Inspections must be reported to the QC Manager for correction. If discrepancies are not corrected before the special inspector leaves the site the observed discrepancies must be documented in the daily report.

l. Submit a biweekly Special Inspections report until all work requiring Special Inspections is complete. A report is required for each biweekly period in which Special Inspections activity occurs, and must include the following:

1. A brief summary of the work performed during the reporting time frame.

2. Changes and/or discrepancies with the drawings, specifications, and mechanical or electrical component certification if they require seismic systems, that were observed during the reporting period.

3. Discrepancies which were resolved or corrected.

08-20-2026

MARION VA MEDICAL CENTER

CONSTRUCT NEW CAMPUS CHILLER PLANT

01 45 35 - 15

Inspector Responsibility Condition

4. A list of nonconforming items requiring resolution.

5. All applicable test results including nondestructive testing reports.

QC Manager a. If there is no SIOR, QC Manager must Supervise all Special Inspectors required by the contract documents and the IBC; Verify the qualifications of all of the Special Inspectors; Verify the qualifications of fabricators; Maintain a 3-ring binder for the Special Inspector's daily and biweekly reports. This file must be located in a conspicuous place in the project trailer/office to allow review by the

Contracting Officer and the DOR.

Applicable when SIOR is not required

QC Manager b. Maintain a rework items list that includes discrepancies noted on the Special Inspectors daily report.

n/a

Special

Inspectors

a. Inspect all elements of the project for which the special inspector is qualified to inspect and are identified in the Schedule of Special

Inspections.

b. Attend preparatory phase meetings related to the

Definable Feature of Work (DFOW) for which the special inspector is qualified to inspect.

n/a

Special

Inspectors

c. Submit Special Inspections agency's written practices for the monitoring and control of the agency's operations to include the following:

1. The agency's procedures for the selection and administration of inspection personnel, describing the training, experience and examination requirements for qualifications and certification of inspection personnel.

2. The agency's inspection procedures, including general inspection, material controls, and visual welding inspection.

d. Submit qualification records for nondestructive testing (NDT) technicians designated for the project.

e. Submit NDT procedures and equipment calibration records for NDT to be performed and equipment to be used for the project.]

Applicable when SIOR is

NOT required and when the structural design is required to follow AISC

341 for seismic design of steel structures

08-20-2026

MARION VA MEDICAL CENTER

CONSTRUCT NEW CAMPUS CHILLER PLANT

01 45 35 - 16

Inspector Responsibility Condition

Special

Inspectors

f. Submit a copy of the daily reports to the QC

Manager.

g. Discrepancies that are observed during Special

Inspections must be reported to the QC Manager for correction. If discrepancies are not corrected before the special inspector leaves the site the observed discrepancies must be documented in the daily report.

h. Submit a biweekly Special Inspection Report until all inspections are complete. A report is required for each biweekly period in which

Special Inspections activity occurs, and must include the following:

1. A brief summary of the work performed during the reporting time frame

2. Changes and/or discrepancies with the drawings, specifications, and mechanical or electrical component certification if they require seismic systems that were observed during the reporting period.

3. Discrepancies which were resolved or corrected.

4. A list of nonconforming items requiring resolution.

5. All applicable test result including nondestructive testing reports.

j. At the completion of the project submit a comprehensive final report of Special

Inspections that documents the Special

Inspections completed for the project and corrections of all discrepancies noted in the daily reports. The comprehensive final report of

Special Inspections must be signed, dated and indicate the certification of the special inspector qualifying them to conduct the inspection.

Applicable when SIOR is not required

Special

Inspectors

k. Submit daily reports to the SIOR Applicable when SIOR is required

3.2 DEFECTIVE WORK

Check work as it progresses, but failure to detect any defective work or materials must in no way prevent later rejection if defective work

08-20-2026

MARION VA MEDICAL CENTER

CONSTRUCT NEW CAMPUS CHILLER PLANT

01 45 35 - 17 or materials are discovered, nor obligate the Government to accept such work.

-- End –-

Project:

Location:

Project #:

Date:

D

IV

No

Project:

Location:

Project #:

Date:

Project Risk Category:

Project Design Wind Speed (mph):

Number of Stories:

Structure Height Above Grade (ft):

Hazardous Occupancy or attached to such? Group H Occupancies (2015 IBC, Section 415)

Construct New Campus Chiller Plant

Marion, Illinois

657A5-21-401

8/19/2026

STATEMENT OF SPECIAL INSPECTIONS

Project Seismic Design Category:

Professional Registration Number:

Consulting Firm Name (if any):

SIOR Office AND Mobile Phone Number:

Special Inspector of Record (SIOR)

A Special Inspector of Record (SIOR) IS required (per UFGS 01 45 35, Section 1.3.8)

SIOR Name (Registered Professional):

Ordinary Reinforced Concrete Shearwalls See drawings

Lateral Force Resisting System (LFRS)

2015 IBC 1704.3.2 and 1704.3.3

Following is a listing of critical main wind/seismic force resisting systems for this structure. Carefully inspect these elements as part of the roles and responsiblities of the

Special Inspector (reference the Schedule of Special Inspections for inspection checklists).

Vertical LFRS Elements Notes

Horizontal LFRS Elements Notes

Ordinary Reinforced Masonry Shear Walls See drawings

Out of Plane Wall Connections See drawings

Concrete over metal deck 2nd floor and roof

Metal Roof Deck & Related Fastening System See Roof Plan

(2015 IBC 1705.13.3.4) (ASCE 7-10, 13.2.2, C13.2.2) (UFC 3-310-04, 2-11.2 & 2-13.2.2)

DESIGNATED SEISMIC SYSTEMS DO APPLY TO THIS PROJECT, due to the Seismic Design Category being D

Statement of Special Inspections Page 1 of 2

Construct New Campus Chiller Plant

Marion, Illinois

657A5-21-401

8/19/2026

Designated Seismic Systems (DSS)

EllenO'Brien Text Box

ADDENDUM 01

08-20-2026

1.

2.

3.

4.

5.

1.

2.

3.

4.

5.

6.

1.

2.

3.

4.

5.

6.

ELECTRICAL Designated Seismic Systems (DSS) Requiring a Certificate of Compliance

All electrical panels, distribution, feeders and substations

Final Walk Down Inspection and Report

If additional space is required, append an additional sheet listing the remaining DSS

OTHER Designated Seismic Systems (DSS) Requiring a Certificate of Compliance

Chillers

Pumps (chilled water - primary and secondary, condenser water)

Cooling Towers

If additional space is required, append an additional sheet listing the remaining DSS

Air handling units, VAVs, and exhast fans

1. Record observations of Final Walk Down Inspection

2. Document that Inspections were performed in accordance with the Schedule of Special Inspections

3. Document that all Designated Seismic Systems are installed according to construction/manufacturer document requirements, and that Compliance

Certificates have been collected (UFC 03 301 01, 2-13.2.2.1).

Statement of Special Inspections Page 2 of 2

(UFC 3 301 01 SECTION 2-2.4.3)

Designated Seismic Systems shall receive a final walk-down inspection by the Registered Design Professional in Responsible Charge

Final Walk Down Report, Prepared by the Registered Design Professional in Responsible Charge, Must Include:

MECHANICAL/PLUMBING Designated Seismic Systems (DSS) Requiring a Certificate of Compliance

EllenO'Brien Text Box

ADDENDUM 01

SCHEDULE OF SPECIAL INSPECTIONS (01 45 35) REVISED FOR IBC 2015 ON 9/30/16

DESIGNER NOTES (to be deleted after reviewing):

1. This schedule contains minimum requirements. Do not delete applicable inspection tasks unless notes in blue indicate it is acceptable to do so.

2. Blue text = designers notes. The designer must review and edit all blue text in this schedule prior to inserting this schedule into the special inspections spec (UFGS 01 45 35).

3. Check section boxes with ANY inspection tasks applicable to your project. You may choose to delete unchecked sections or leave them in the scheduled unchecked.

4. Individual rows/tasks that that are not applicable to the project may be left in the section, as the inspector can determine whether they occur/apply (e.g. metal trusses in the light gauge framing section for example).

5. Design discipline sections are color coded for easier reference by designers. This schedule does NOT need to be printed in color.

6. When finished editing, delete this note box and save this schedule as a PDF and insert into the project specifications (special inspections section).

SCHEDULE OF SPECIAL INSPECTIONS

Reference 01 45 35 for all requirements not noted as part of this schedule.

INSPECTION DEFINITIONS:

PERFORM: Perform these tasks for each weld, fastener or bolted connection, and noted verification.

OBSERVE: Observe these items randomly during the course of each work day to insure that applicable requirements are being met. Operations need not be delayed pending these inspections at contractor’s risk.

DOCUMENT: Document, with a report, that the work has been performed in accordance with the contract documents. This is in addition to any other reports required in the Special Inspections guide specification.

CONTINUOUS: Constant monitoring of identified tasks by a special inspector over the duration of performance of said tasks.

SCHEDULE OF SPECIAL INSPECTIONS (01 45 35) REVISED FOR IBC 2015 ON 9/30/16

A. STRUCTURAL - STEEL – WELDING SECTION

THIS SECTION APPLICABLE IF BOX IS CHECKED: ☒

STEEL INSPECTION PRIOR TO WELDING – VERIFY THE FOLLOWING ARE IN COMPLIANCE

IBC 1705.2.1, AISC 360-10: Table C-N5.4-1

TASK INSPECTION TYPE1 DESCRIPTION

1. Verify that the welding procedures specification

(WPS) is available

PERFORM

2. Verify manufacturer certifications for welding consumables are available

PERFORM

3. Verify material identification PERFORM Type and grade.

4. Welder Identification

System

PERFORM The fabricator or erector, as applicable, shall maintain a system by which a welder who has welded a joint or member can be identified. Stamps, if used, shall be the low-stress type.

5. Fit-up of groove welds

(including joint geometry)

OBSERVE Joint preparation

Dimensions (alignment, root opening, root face, bevel)

Cleanliness (condition of steel surfaces)

Tacking (tack weld quality and location)

Backing type and fit (if applicable)

6. Configuration and finish of access holes

OBSERVE

7. Fit-up of fillet welds OBSERVE Dimensions (alignment, gaps at root)

Cleanliness (condition of steel surfaces)

Tacking (tack weld quality and location)

STEEL INSPECTION DURING WELDING – VERIFY THE FOLLOWING ARE IN COMPLIANCE

IBC 1705.2.1, AISC 360-10: Table C-N5.4-2

TASK INSPECTION TYPE DESCRIPTION

8. Use of qualified welders PERFORM Welding by welders, welding operators, and tack welders who are qualified in conformance with requirements.

9. Control and handling of welding consumables

OBSERVE Packaging

Electrode atmospheric exposure control

10. No welding over cracked tack welds

OBSERVE

11. Environmental conditions OBSERVE Wind speed within limits

Precipitation and temperature

12. Welding Procedures

Specification followed

OBSERVE Settings on welding equipment

Travel speed

Selected welding materials

Shielding gas type/flow rate

Preheat applied

Interpass temperature maintained (min./max.)

Proper position (F, V, H, OH)

1 PERFORM: Perform these tasks for each weld, fastener or bolted connection, and required verification.

OBSERVE: Observe these items on a random sampling basis daily to insure that applicable requirements are met. Operations need not be delayed pending these inspections at contractor’s risk.

SCHEDULE OF SPECIAL INSPECTIONS (01 45 35) REVISED FOR IBC 2015 ON 9/30/16

Intermix of filler metals avoided

13. Welding techniques OBSERVE Interpass and final cleaning

Each pass within profile limitations

Each pass meets quality requirements

SCHEDULE OF SPECIAL INSPECTIONS (01 45 35) REVISED FOR IBC 2015 ON 9/30/16

A. STRUCTURAL - STEEL – WELDING SECTION (CONTINUED)

STEEL INSPECTION AFTER WELDING – VERIFY THE FOLLOWING ARE IN COMPLIANCE

IBC 2015 1705.2.1, AISC 360-10: Table C-N5.4-3

TASK INSPECTION TYPE 1 DESCRIPTION

14. Welds cleaned OBSERVE

15. Size, length, and location of all welds

PERFORM Size, length, and location of all welds conform to the requirements of the detail drawings.

16. Welds meet visual acceptance criteria

PERFORM AND

DOCUMENT

Crack prohibition

Weld/base-metal fusion

Crater cross section

Weld profiles

Weld size

Undercut

Porosity

17. Arc strikes PERFORM

18. k-area PERFORM When welding of doubler plates, continuity plates or stiffeners has been performed in the k-area, visually inspect the web k-area for cracks.

19. Backing removed, weld tabs removed and finished, and fillet welds added where required

PERFORM

20. Repair activities PERFORM AND

DOCUMENT

21. Document acceptance or rejection of welded joint or member

PERFORM

END SECTION

1 PERFORM: Perform these tasks for each weld, fastener or bolted connection, and required verification.

DOCUMENT: Document in a report that the work has been performed as required. This is in addition to all other required reports.

SCHEDULE OF SPECIAL INSPECTIONS (01 45 35) REVISED FOR IBC 2015 ON 9/30/16

B. STRUCTURAL - STEEL – BOLTING SECTION

STEEL INSPECTION TASKS PRIOR TO BOLTING – VERIFY THE FOLLOWING ARE IN COMPLIANCE

IBC 1705.2.1, AISC 360-10: Table C-N5.6-1

TASK INSPECTION TYPE 1 DESCRIPTION

1. Manufacture’s certifications available for fastener materials

PERFORM

2. Fasteners marked in accordance with

ASTM requirements

OBSERVE

3. Proper fasteners selected for joint detail

(grade, type, bolt length if threads are to be excluded from shear plane)

OBSERVE

4. Proper bolting procedure selected for joint detail

OBSERVE

5. Connecting elements, including appropriate faying surface condition and hole preparation, if specified, meet applicable requirements

OBSERVE

6. Proper storage provided for bolts, nuts, washers, and other fastener components

OBSERVE

STEEL INSPECTION TASKS DURING BOLTING – VERIFY THE FOLLOWING ARE IN COMPLIANCE

IBC 1705.2.1, AISC 360-10: Table C-N5.6-2

TASK INSPECTION TYPE 1 DESCRIPTION

7. Fastener assemblies of suitable condition, placed in all holes and washers (if required) are positioned as required

OBSERVE

8. Joint brought to the snug-tight condition prior to pretensioning operation

OBSERVE

9. Fastener component not turned by the wrench prevented from rotating

OBSERVE

10. Bolts are pretensioned in accordance with

RCSC Specification, progressing systematically from the most rigid point toward the free edges

OBSERVE

STEEL INSPECTION TASKS AFTER BOLTING – VERIFY THE FOLLOWING ARE IN COMPLIANCE

IBC 1705.2.1, AISC 360-10: Table C-N5.6-3

TASK INSPECTION TYPE 1 DESCRIPTION

11. Document acceptance or rejection of all bolted connections

1 PERFORM: Perform these tasks for each weld, fastener or bolted connection, and required verification.

OBSERVE: Observe these items on a random sampling basis daily to insure that applicable requirements are met. Operations need

DOCUMENT: Document in a report that the work has been performed as required. This is in addition to all other required reports.

SCHEDULE OF SPECIAL INSPECTIONS (01 45 35) REVISED FOR IBC 2015 ON 9/30/16

C. STRUCTURAL - STEEL - NON DESTRUCTIVE TESTING SECTION

NONDESTRUCTIVE TESTING OF WELDED JOINTS – VERIFY THE FOLLOWING ARE IN COMPLIANCE

IBC 1705.2.1, AISC 360-10: Section N5.5

TASK INSPECTION TYPE 1 DESCRIPTION

1. Use of qualified nondestructive testing personnel

PERFORM Visual weld inspection and nondestructive testing (NDT) shall be conducted by personnel qualified in accordance with AWS

D1.8 clause 7.2

2. CJP groove welds OBSERVE [NOTE: DOR must delete this row if section D (SEISMIC

PROVISIONS SECTION) is checked]

Dye penetrant testing (DT) and ultrasonic testing (UT) shall be performed on 20% of CJP groove welds for materials greater than 5/16” (8mm) thick. Testing rate must be increased to 100% if greater than 5% of welds tested have unacceptable defects.

3. Welded joints subject to fatigue

OBSERVE Dye penetrant testing (DT) and Ultrasonic testing (UT) shall be performed on 100% of welded joints identified on contract drawings as being subject to fatigue.

4. Weld tab removal sites OBSERVE At the end of welds where weld tabs have been removed, magnetic particle testing shall be performed on the same beam-to-column joints receiving UT

1 PERFORM: Perform these tasks for each weld, fastener or bolted connection, and required verification.

OBSERVE: Observe these items on a random sampling basis daily to insure that applicable requirements are met. Operations need

SCHEDULE OF SPECIAL INSPECTIONS (01 45 35) REVISED FOR IBC 2015 ON 9/30/16

D. STRUCTURAL - STEEL – AISC 341 REQUIREMENTS (SEISMIC PROVISIONS) SECTION

NONDESTRUCTIVE TESTING OF WELDED JOINTS – VERIFY THE FOLLOWING ARE IN COMPLIANCE

IBC 1705.2.1, AISC 341-10: Section J6.2

TASK INSPECTION TYPE 1 DESCRIPTION

[NOTE: DOR may uncheck this section for projects NOT designed in accordance with AISC 341 (Seismic

Provisions) or for projects designed according to AISC 341, but using an R value equal to 3]

5. CJP groove welds OBSERVE Dye penetrant testing (DT) and ultrasonic testing (UT) shall be performed on 100% of CJP groove welds for materials greater than

5/16” thick (8mm).

6. Beam cope and access hole.

OBSERVE At welded splices and connections, thermally cut surfaces of beam copes and access holes shall be tested using magnetic particle testing

(MT) or dye penetrant testing (DT), when the flange thickness exceeds 1 1/2 in. for rolled shapes, or when the web thickness exceeds 1 1/2 in. for built-up shapes.

7. K-area NDT (AISC

341)

PERFORM Where welding of doubler plates, continuity plates or stiffeners has been performed in the k-area, the web shall be tested for cracks using magnetic particle testing (MT). The MT inspection area shall include the k-area base metal within 3-inches of the weld. The MT shall be performed no sooner than 48 hours following completion of the welding.

8. Placement of reinforcing or contouring fillet welds

1 PERFORM: Perform these tasks for each weld, fastener or bolted connection, and required verification.

OBSERVE: Observe these items on a random sampling basis daily to insure that applicable requirements are met. Operations need

DOCUMENT: Document in a report that the work has been performed as required. This is in addition to all other required reports.

SCHEDULE OF SPECIAL INSPECTIONS (01 45 35) REVISED FOR IBC 2015 ON 9/30/16

E. STRUCTURAL - STEEL - COMPOSITE CONSTRUCTION 1

COMPOSITE CONSTRUCTION PRIOR TO PLACING CONCRETE – VERIFY THE FOLLOWING ARE IN COMPLIANCE

IBC 1705.2.1, AISC 360-10: Table N6.1, AISC 341-10: Table J9-1

TASK INSPECTION TYPE 2 DESCRIPTION

1. Placement and installation of steel headed stud anchors

PERFORM

2. Material identification of reinforcing steel (Type/Grade)

OBSERVE

3. Determination of carbon equivalent for reinforcing steel other than ASTM A706

OBSERVE

4. Proper reinforcing steel size, spacing, clearances, support, and orientation

OBSERVE

5. Reinforcing steel has been tied and supported as required

OBSERVE

F. STRUCTURAL - STEEL - OTHER INSPECTIONS

OTHER STEEL INSPECTIONS – VERIFY THE FOLLOWING ARE IN COMPLIANCE

IBC 1705.2.1, AISC…

This is the start of the file's text. The full file is on GovTribe.