This statement of work outlines the scope of work for connecting heating, ventilation, and air conditioning systems to the building automation system at the VA St. Louis Health Care System facilities in Buildings 53 and 3. The contractor will be responsible for extending the existing Metasys facility management system, providing required engineering, hardware, project management and programming for direct digital controls, and installing electrical control wiring, controllers and network hardware. Specific work includes replacing pneumatic field devices and control valves with electronic sensors and actuators, upgrading existing controllers, installing new thermostats and sensors, and connecting fan coil units, reheat coils, air handling units and other HVAC equipment to the automation system. The contractor must complete the work within 330 calendar days at the prices submitted in their bid for the base scope and alternate bid items. The solicitation was issued by the Department of Veterans Affairs Veterans Health Administration VISN 15 for opportunity number 36C25521R0053-0003 to connect HVAC components to the BAS.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Answer to contractor questions-657-19-114JB.pdf | ||
| 657-19-114JB - ICRA ILSM signed RSU.pdf | ||
| 36C25521R0053 0003.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VA St. Louis Health Care System Statement of Work: 657-19-114JB Connect Heating, Ventilation, & Air
Conditioning to Building Automation System 6 November 2020
Revised Date: 16 March 2021 Purpose of Project:
The VA St. Louis Health Care System, Jefferson Barracks Division, needs to connect various HVAC systems the VA’s BAS system to improve healthcare, and access to healthcare, for Veteran’s.
Criteria:
All work shall be performed in accordance with solicitation/contract terms and conditions, specifications and drawings, and all applicable VA and local codes. Contractor shall furnish all supervision, tools, labor, materials, equipment, transportation and testing necessary.
Scope of Work for this project shall include the following items:
Building 53:
A) Pricing:
1. Bid Item 1, Base Bid
a. Contractor shall perform all work for 657-19-114JB Connect Heating, Ventilation, & Air Conditioning to Building Automation System at VAMC St. Louis Jefferson Barracks Division as fully described herein the contract documents.
Period of Performance is 330 Calendar Days.
b. Bid Item 1 $________________
2. Bid Item 2
a. All items listed in Bid Item 1 Base Bid with the following modifications. Remove Bldg 53 Demo of Existing Abandoned RHP, Piping, Removal and Replacement of the associated Fin Tube Control Valves, New DDC Thermostat, Power, and Networking. Qty 72 RHP & 32 associated Fin Tube Control Valves (remove Items C.2.c & C.2.d below). Period of Performance is 330 Calendar Days. (Radiant Panels (RHP’s) have been removed and replaced previously with 4-Pipe FCU’s.
NO Demolition or Valve Replacement is required. Existing Electric Action to Remain and Existing Electric Thermostats to be Upgraded to DDC)
b. Bid Item 2: $________________
3. Bid Items 3
a. All items listed in Bid Item 2 with the following modifications. Remove Bldg 53 upgrade of 12 Existing Pneumatic Duct Mounted Reheat Coil Control Valves (1/2” Threaded 3-Way Characterized Ball Valves – Qty 12) to DDC Control
(remove item C.2.a. below). Period of Performance is 330 Calendar Days. Period of Performance is 330 Calendar Days.
b. Bid Item 3: $________________ B) General Scope of Work
1. Extension of the Existing VAMC Metasys Facility Management System to support the existing Mechanical and HVAC Systems in Building 53.
2. Required Engineering, Hardware, Project Management, and programming for the DDC Control System shall be provided by contractor.
3. Electrical Control Wiring for the Panels, Controllers, Devices, and controls Network is provided by contractor.
4. Existing Pneumatic Field Devices and Piping to be removed.
a. Existing Actuators, Temperature Sensors, Pressure Sensors, to be replaced with
New Electronic/DDC Sensors and Actuators.
b. Existing Pneumatic Control Valves to be replaced. Mechanical Contractor to provide required labor, material, insulation, etc. to replace existing with New Valve.
c. See Schedule below (Att. 1) for quantity and service on attached schedule.
5. NO New Mechanical Equipment, Dampers, Fans, VFD’s are provided by contractor.
6. Demolition and mechanical labor are provided by contractor.
7. General trades labor to be included but not limited to the following:
a. General clean up.
b. Core drilling where required to run communications network.
c. Ceiling removal and reinstallation.
d. Cutting or patching existing wall sensor locations. Cover plates to be installed by contractor.
8. NO New control valves will be provided.
a. Qty 12 – ½” Threaded 3-Way Characterized Ball Valves will be replaced which serve Duct Mounted Reheat Coils.
b. Qty 41 – ½” Threaded 3-Way Characterized Ball Valves will be replaced which serve VAV Boxes.
c. NO Control Valves will be replaced under this project serving Fin-Tube or 4-Pipe Fan Coil Units.
9. Existing controls that are not operable or no longer needed (including thermostats) will be removed.
10. Existing Systems which will not be modified under this scope of work include:
a. 53-AH-1
b. 53-AH-2
c. 53-AH-3
d. 53-AH-4
e. 53-AH-5
f. 53-AH-6
g. 2nd Floor North VAV Boxes (Qty 28)
h. 53- Hot Water System
i. 53- Chilled Water System.
11. Existing Systems which are NOT Currently Controlled and will NOT be modified under this scope of work include:
a. Pneumatic Smoke Dampers (Addressed in Recent Fire Alarm Replacement Project)
b. Emergency Generator Ventilation (Addressed in Generator Replacement)
c. Hot Water Unit Heater Work (Stand Alone Electric Stat to remain)
d. Elevator Exhaust Damper Replacement work
e. Cabinet Unit Heaters (Qty 2) (Stand Alone Electric Stat to remain)
f. Duct Mounted Humidifiers (Qty 1)
C) System Specific Scope of Work:
1. Furnishing Network Hardware as required for the addition of the DDC Controls provided under this project. One NAE-55 will be provided. The VAMC to identify Network Switch Location and contractor to run Network cabling as required to Network the New NAE to the VAMC System.
2. Furnishing and installing DDC Controllers for the following:
a. Duct Mounted Reheat Coils w/ Pneumatic Thermostats (Qty 12)
i. Serving First and Second Floors Tagged RHC-1 thru RHC-12.
ii. Replace 3-Way Hot Water Control Valve
iii. Provide DDC Thermostat, Power, and Network
b. VAV Terminal Units: (Qty 41)
i. Existing pneumatic receiver Controller & Stat to be removed
ii. Existing pneumatic hot water reheat coil control valve to be replaced
iii. DDC controller, 24 VAC power, and network
iv. DDC thermostat
v. Discharge air temperature sensor
vi. Volume control damper actuator & flow DPT
c. HRP- Radiant Panel:
i. VAMC disabled all existing HRP radiant ceiling panels
• Any existing related pneumatic stats will be removed, and cover plates installed.
(Radiant Panels (RHP’s) have been removed and replaced previously with 4-Pipe FCU’s. NO Demolition or Valve Replacement is required. Existing Electric Action to Remain and Existing Electric Thermostats to be Upgraded to DDC)
d. 4-Pipe Fan Coil Units – DDC Controls to include: (Qty 72)
i. JCI to Provide new TEC DDC Networked Thermostat to Control existing
FCU Fan, Cooling Coil Control Valve, and Heating Coil Control Valve.
ii. NO Pneumatic Demo is Required
iii. NO Valve Replacement is required.
e. Fin Tube Radiation: (Qty 40 32)
i. Existing pneumatic stat to be removed
ii. Existing pneumatic hot water control valve to be replaced
iii. DDC controller, 24 VAC power, and network
iv. DDC thermostat
D) Items not included:
1. Installation of valves, wells, meters, or Taps.
2. Installation of dampers or Air Flow Measuring Stations.
3. Furnishing or installing starters, variable speed drives or disconnects for HVAC equipment
4. Furnishing or installing Smoke Detection, Fire Alarm System, Fire/Smoke Damper
Controls (by Div. 26)
5. Systems testing & balancing – The prime contractor is responsible for all TAB on this project to assure proper performance for valves that are replaced. The prime contractor shall also rebalance the hot water coils for best comfort and controllability of the new valves.
6. Demolition, premium labor, cutting, patching, or painting
7. Existing VFD Drives to Remain
8. Existing Field Devices are to Remain - Actuators, Temperature Sensors, Relays, CT's, Safeties, Pressure Sensors, control valve, etc.
9. System Shutdowns will be Coordinated/Scheduled with the GC/Owner
10. Contractor will reuse existing Field Device Wiring
11. Contractor will reuse networking where possible.
12. No work with Fire/Smoke Dampers
Building 3:
A) General Scope of Work:
1. Extension of the Existing VAMC Metasys Facility Management System to support the existing Mechanical and HVAC Systems in Building 3.
2. Required Engineering, Hardware, Project Management, and programming for the DDC Control System.
3. Electrical Control Wiring for the Panels, Controllers, Devices, and automated controls Network.
4. Existing Field Devices are to Remain - Actuators, Temperature Sensors, Relays, CT's, Safeties, Pressure Sensors, control valve, etc.
5. NO New Mechanical Equipment, Dampers, Fans, VFD’s are provided by contractor.
6. Demolition and mechanical labor shall be provided by contractor.
7. General trades labor to be included by the contractor for the following:
a. General clean up.
b. Core drilling where required to run communications network.
c. Ceiling removal and reinstallation.
d. Cutting or patching existing wall sensor locations. Cover plates to be installed by contractor.
8. NO new control valves will be provided.
9. Existing controls that are not operable or no longer needed (including thermostats) will be removed.
B) System Specific Scope of Work:
1. Furnishing network hardware as required for the addition of the DDC Controls provided under this project. One NAE-55 will be provided. The VAMC to identify Network Switch location and contractor to run network cabling as required to network the new NAE to the VAMC System.
2. Furnishing and installing DDC controllers for the following:
a. AHU-1 DDC controller upgrade and programming to include: (existing controller to be replaced to support the following field devices)
i. Start/Stop
ii. Status
iii. OA-Damper Control
iv. HW Circulation Pump Start/Stop
v. HW Circulation Pump Status
vi. Hot Water Valve Command
vii. Chilled Water Valve Command
viii. Filter Differential Pressure Sensor
ix. Supply Air Temperature Sensor
x. Freeze Stat
xi. Chilled Water Supply Pressure
xii. Chilled Water Return Pressure
xiii. Hot Water Supply Pressure
xiv. Hot Water Return Pressure
b. AHU-2, 3, 4, & 5 DDC CONTROLLER UPGRADE AND PROGRAMMING TO INCLUDE:
(EXISTING CONTROLLER TO BE REPLACED TO SUPPORT THE FOLLOWING FIELD
DEVICES) (QTY 4)
i. Start/Stop
ii. Status
iii. OA-Damper Control
iv. HW Circulation Pump Start/Stop
v. HW Circulation Pump Status
vi. Hot Water Valve Command
vii. Chilled Water Valve Command
viii. Filter Differential Pressure Sensor
ix. Supply Air Temperature Sensor
x. Freeze Stat
c. Hot Water System - DDC CONTROLLER UPGRADE AND PROGRAMMING TO INCLUDE:
(EXISTING CONTROLLER TO BE REPLACED TO SUPPORT THE FOLLOWING FIELD
DEVICES)
i. Shared panel with chilled water system
ii. Relocate panel to avoid further heat and water damage.
iii. Hot Water Supply Pressure
iv. Hot Water Return Pressure
v. Hot Water Distribution Pump Start/Stop (Qty 2)
vi. Hot Water Distribution Pump Status (Qty 2)
vii. Steam HX-A 1/3 Control Valve – contractor to Replace Valve Actuator with
Spring Returned Close Action
viii. Steam HX-A 1/3 Control Valve – contractor to Replace Valve Actuator with
Spring Returned Close Action
ix. Steam HX-B 2/3 Control Valve – contractor to Replace Valve Actuator with
Spring Returned Close Action
x. Steam HX-B 2/3 Control Valve – contractor to Replace Valve Actuator with
Spring Returned Close Action
xi. Condensate Pump Start/Stop & Status (Qty 2)
d. Chilled Water System - DDC CONTROLLER UPGRADE AND PROGRAMMING TO
INCLUDE:(EXISTING CONTROLLER TO BE REPLACED TO SUPPORT THE FOLLOWING
FIELD DEVICES)
i. Shared Panel with Chilled Water System
ii. Owner has requested Relocation outside of Mechanical Room due to Water and Heat Damage Potential
iii. Chilled Water Supply Temperature
iv. Chilled Water Return Temperature
v. Primary Chilled Water Pump
vi. Chilled Water Distribution Pump VFD Control (Qty 2)
vii. Chiller Enable/Disable
viii. Chiller Status
ix. Chiller Alarm
x. Chilled Water Setpoint Adjust
e. Fan Coil Units – DDC Controller Upgrade and Programming to include: (Qty 66)
i. TEC DDC Networked Thermostats (In Patient Rooms the DDC Thermostat will be mounted up in the Unit and a Tamper Proof Sensor will be located in the space)
ii. Existing FCU to be Controlled by New TEC: This includes:
a. Chilled Water Coil Control Valve
b. Hot Water Coil Control Valve
c. Fan Control
C) Items not included:
1. Installation of valves, wells, meters, or Taps.
2. Installation of dampers or Air Flow Measuring Stations.
3. Furnishing or installing starters, variable speed drives or disconnects for HVAC equipment
4. Furnishing or installing Smoke Detection, Fire Alarm System, Fire/Smoke Damper Controls
(by Div. 26)
5. Systems testing & balancing
6. Demolition, premium labor, cutting, patching, or painting
7. Existing VFD Drives to Remain
8. Existing Field Devices are to Remain - Actuators, Temperature Sensors, Relays, CT's, Safeties, Pressure Sensors, control valve, etc.
9. System Shutdowns will be Coordinated/Scheduled with the GC/Owner
10. Contractor will reuse existing Field Device Wiring
11. Contractor will reuse networking where possible.
12. No work with Fire/Smoke Dampers
Attachment 1: Building 53 HVAC Components
General Location Served ID TAG
Valve GPM Note
First Floor Center/South RHC 1 1 Pneumatic Stat & Valve Replaced w/ DDC First Floor Center/South RHC 2 1.5 Pneumatic Stat & Valve Replaced w/ DDC First Floor Center/South RHC 3 0.5 Pneumatic Stat & Valve Replaced w/ DDC First Floor North RHC 4 ? Pneumatic Stat & Valve Replaced w/ DDC First Floor North RHC 5 1.5 Pneumatic Stat & Valve Replaced w/ DDC First Floor North RHC 6 1.5 Pneumatic Stat & Valve Replaced w/ DDC Second Floor Center/South RHC 7 1.5 Pneumatic Stat & Valve Replaced w/ DDC Second Floor Center/South RHC 8 0.5 Pneumatic Stat & Valve Replaced w/ DDC Second Floor Center/South RHC 9 2.5 Pneumatic Stat & Valve Replaced w/ DDC Second Floor Center/South RHC 10 1.5 Pneumatic Stat & Valve Replaced w/ DDC Second Floor Center/South RHC 11 0.5 Pneumatic Stat & Valve Replaced w/ DDC Second Floor Center/South RHC 12 1 Pneumatic Stat & Valve Replaced w/ DDC Tot 12 Ground Floor Center/South VAV 1 1.5
Pneumatic Stat/Controller & Valve Replaced w/ DDC
Ground Floor Center/South VAV 2 1.5
Pneumatic Stat/Controller & Valve Replaced w/ DDC
Ground Floor Center/South VAV 3 2.5
Pneumatic Stat/Controller & Valve Replaced w/ DDC
Ground Floor Center/South VAV 4 1.5
Pneumatic Stat/Controller & Valve Replaced w/ DDC
Ground Floor Center/South VAV 5 2
Pneumatic Stat/Controller & Valve Replaced w/ DDC
Ground Floor Center/South VAV 6 1.5
Pneumatic Stat/Controller & Valve Replaced w/ DDC
Ground Floor Center/South VAV 7 0.5
Pneumatic Stat/Controller & Valve Replaced w/ DDC
Ground Floor Center/South VAV 8 1
Pneumatic Stat/Controller & Valve Replaced w/ DDC
Ground Floor Center/South VAV 9 No VLV
Pneumatic Stat/Controller & Valve Replaced w/ DDC
Ground Floor Center/South VAV 10 3.5
Pneumatic Stat/Controller & Valve Replaced w/ DDC
Ground Floor Center/South VAV 11 0.5
Pneumatic Stat/Controller & Valve Replaced w/ DDC
Ground Floor Center/South VAV 12 3.5
Pneumatic Stat/Controller & Valve Replaced w/ DDC
Ground Floor Center/South VAV 13 1.5
Pneumatic Stat/Controller & Valve Replaced w/ DDC
Ground Floor Center/South VAV 14 2
Pneumatic Stat/Controller & Valve Replaced w/ DDC
Ground Floor Center/South VAV 61 No VLV
Pneumatic Stat/Controller & Valve Replaced w/ DDC
Ground Floor Center/South VAV 62 No VLV
Pneumatic Stat/Controller & Valve Replaced w/ DDC
Ground Floor Center/South VAV 63 1.5
Pneumatic Stat/Controller & Valve Replaced w/ DDC
Ground Floor Center/South VAV 64 1.5
Pneumatic Stat/Controller & Valve Replaced w/ DDC
Ground Floor Center/South VAV 65 1.5
Pneumatic Stat/Controller & Valve Replaced w/ DDC
Ground Floor Center/South VAV 66 1.5
Pneumatic Stat/Controller & Valve Replaced w/ DDC
Ground Floor North VAV 15 1.5 Pneumatic Stat/Controller & Valve Replaced w/ DDC
Ground Floor North VAV 16 1 Pneumatic Stat/Controller & Valve Replaced w/ DDC
Ground Floor North VAV 17 0.5 Pneumatic Stat/Controller & Valve Replaced w/ DDC
Ground Floor North VAV 18 1.5 Pneumatic Stat/Controller & Valve Replaced w/ DDC
Ground Floor North VAV 19 2.5 Pneumatic Stat/Controller & Valve Replaced w/ DDC
Ground Floor North VAV 20 2 Pneumatic Stat/Controller & Valve Replaced w/ DDC
Ground Floor North VAV 21 1.5 Pneumatic Stat/Controller & Valve Replaced w/ DDC
Ground Floor North VAV 22 0.5 Pneumatic Stat/Controller & Valve Replaced w/ DDC
Tot 28
First Floor Center/South VAV 23 No VLV
Replaced w/ DDC
First Floor Center/South VAV 24 1.5
Replaced w/ DDC
First Floor Center/South VAV 25 1 Pneumatic Stat/Controller & Valve Replaced w/ DDC
First Floor Center/South VAV 26 3.5 Pneumatic Stat/Controller & Valve Replaced w/ DDC
First Floor Center/South VAV 27 No VLV Pneumatic Stat/Controller & Valve Replaced w/ DDC
First Floor Center/South VAV 28 No VLV Pneumatic Stat/Controller & Valve Replaced w/ DDC
First Floor Center/South VAV 29 No VLV Pneumatic Stat/Controller & Valve Replaced w/ DDC
First Floor Center/South VAV 30 6 Pneumatic Stat/Controller & Valve Replaced w/ DDC
First Floor Center/South VAV 31 1 Pneumatic Stat/Controller & Valve Replaced w/ DDC
First Floor Center/South VAV 32 No VLV Pneumatic Stat/Controller & Valve Replaced w/ DDC
First Floor Center/South VAV 67 1 Pneumatic Stat/Controller & Vlv & FTR Vlv Replaced w/ DDC
First Floor North VAV 33 1 Pneumatic Stat/Controller & Valve Replaced w/ DDC
First Floor North VAV 34 1 Pneumatic Stat/Controller & Valve Replaced w/ DDC
First Floor North VAV 35 1 Pneumatic Stat/Controller & Valve Replaced w/ DDC
Tot 13 Second Floor Center/South VAV 36 2 New DDC 2008 - No Work Required Second Floor Center/South VAV 37 2 New DDC 2008 - No Work Required Second Floor Center/South VAV 38 1 New DDC 2008 - No Work Required Second Floor Center/South VAV 39 1.5 New DDC 2008 - No Work Required Second Floor Center/South VAV 40 1.5 New DDC 2008 - No Work Required Second Floor Center/South VAV 41 2 New DDC 2008 - No Work Required Second Floor Center/South VAV 42 1.5 New DDC 2008 - No Work Required Second Floor Center/South VAV 43 1.5 New DDC 2008 - No Work Required Second Floor Center/South VAV 44 1 New DDC 2008 - No Work Required Second Floor Center/South VAV 45 0.5 New DDC 2008 - No Work Required
Second Floor Center/South VAV 46 0.5 New DDC 2008 - No Work Required Second Floor Center/South VAV 47 1.5 New DDC 2008 - No Work Required Second Floor Center/South VAV 60 1 New DDC 2008 - No Work Required Second Floor North VAV 48 1.5 New DDC 2008 - No Work Required Second Floor North VAV 49 1.5 New DDC 2008 - No Work Required Second Floor North VAV 50 0.5 New DDC 2008 - No Work Required Second Floor North VAV 51 1 New DDC 2008 - No Work Required Second Floor North VAV 52 2.5 New DDC 2008 - No Work Required Second Floor North VAV 53 2.5 New DDC 2008 - No Work Required Second Floor North VAV 54 3.5 New DDC 2008 - No Work Required Second Floor North VAV 55 3.5 New DDC 2008 - No Work Required Second Floor North VAV 56 1.5 New DDC 2008 - No Work Required Second Floor North VAV 57 1.5 New DDC 2008 - No Work Required Second Floor North VAV 58 3.5 New DDC 2008 - No Work Required Second Floor North VAV 59 3.5 New DDC 2008 - No Work Required
First Floor North HRP 1N99 2.3 Ower Disabled/Abandoned - Remove as required. New DDC for associated FTR
First Floor North HRP 1N96 2.3 Ower Disabled/Abandoned - Remove as required.
First Floor North HRP 1N95 1.5 Ower Disabled/Abandoned - Remove as required. New DDC for associated FTR
First Floor North HRP 1N100 3 Ower Disabled/Abandoned - Remove as required.
First Floor North HRP 1N92 0.8 Ower Disabled/Abandoned - Remove as required.
First Floor North HRP 1N90 0.8 Ower Disabled/Abandoned - Remove as required.
First Floor North HRP 1N82 1.5 Ower Disabled/Abandoned - Remove as required.
First Floor North HRP 1N86 0.8 Ower Disabled/Abandoned - Remove as required.
First Floor North HRP 1N83 1.5 Ower Disabled/Abandoned - Remove as required.
First Floor North HRP 1N85 1.5 Ower Disabled/Abandoned - Remove as required. New DDC for associated FTR
First Floor North HRP 1N106 1.5 Ower Disabled/Abandoned - Remove as required. New DDC for associated FTR
First Floor North HRP 1N113 1.5 Ower Disabled/Abandoned - Remove as required. New DDC for associated FTR
First Floor North HRP 1N107 1.5 required.
First Floor North HRP 1N112 1.5 required.
First Floor North HRP 1N109 2.3 Ower Disabled/Abandoned - Remove as required. New DDC for associated FTR
First Floor North HRP 1N110 2.3 Ower Disabled/Abandoned - Remove as required. New DDC for associated FTR
First Floor North HRP 1N79 0.8 Ower Disabled/Abandoned - Remove as required.
First Floor North HRP 1N77 1.5 Ower Disabled/Abandoned - Remove as required.
First Floor North HRP 1S01 1.5 Ower Disabled/Abandoned - Remove as required.
First Floor North HRP 1S13 2.3 Ower Disabled/Abandoned - Remove as required. New DDC for associated FTR
First Floor North HRP 1S16 2.3 Ower Disabled/Abandoned - Remove as required.
First Floor North HRP 1S65 1.5 Ower Disabled/Abandoned - Remove as required.
First Floor North HRP 1S63 0.8 Ower Disabled/Abandoned - Remove as required.
First Floor North HRP 1S24 1.5 Ower Disabled/Abandoned - Remove as required. New DDC for associated FTR
First Floor North HRP 1S31 1.5 Ower Disabled/Abandoned - Remove as required. New DDC for associated FTR
First Floor North HRP 1S25 1.5 Ower Disabled/Abandoned - Remove as required.
First Floor North HRP 1S30 1.5 Ower Disabled/Abandoned - Remove as required.
First Floor North HRP 1S27 2.3 Ower Disabled/Abandoned - Remove as required. New DDC for associated FTR
First Floor North HRP 1S28 2.3 Ower Disabled/Abandoned - Remove as required. New DDC for associated FTR
First Floor North HRP 1S58 1.5 Ower Disabled/Abandoned - Remove as required.
First Floor North HRP 1S54 0.8 Ower Disabled/Abandoned - Remove as required.
First Floor North HRP 1S55 1.5 Ower Disabled/Abandoned - Remove as required. New DDC for associated FTR
First Floor North HRP 1S57 1.5 Ower Disabled/Abandoned - Remove as required.
First Floor North HRP 1S51 0.8 Ower Disabled/Abandoned - Remove as required.
First Floor North HRP 1S50 1 Ower Disabled/Abandoned - Remove as required.
First Floor North HRP 1S41 3 required. New DDC for associated FTR
First Floor North HRP 1S46 1.5 required. New DDC for associated FTR
First Floor North HRP 1S42 2.3 Ower Disabled/Abandoned - Remove as required. New DDC for associated FTR
First Floor North HRP 1S45 2.3 required.
Second Floor North HRP 2N87 1.5 Removed '08 - No Work Required Second Floor North HRP 2N104 1.5 Removed '08 - No Work Required Second Floor North HRP 2N86 2.3 Removed '08 - No Work Required Second Floor North HRP 2N106 2.3 Removed '08 - No Work Required Second Floor South HRP 2S85 1.5 Removed '08 - No Work Required Second Floor South HRP 2S01 1.5 Removed '08 - No Work Required Second Floor South HRP 2S03 1.5 Removed '08 - No Work Required Second Floor South HRP 2S83 3 Removed '08 - No Work Required Second Floor South HRP 2S82 1.5 Removed '08 - No Work Required Second Floor South HRP 2S80 1.5 Removed '08 - No Work Required
Second Floor South HRP 2S77 2.3 Ower Disabled/Abandoned - Remove as required. New DDC for associated FTR
Second Floor South HRP 2S25 3.8 Ower Disabled/Abandoned - Remove as required. New DDC for associated FTR
Second Floor South HRP 2S76 2.3 Ower Disabled/Abandoned - Remove as required. New DDC for associated FTR
Second Floor South HRP 2S28 2.3 Ower Disabled/Abandoned - Remove as required. New DDC for associated FTR
Second Floor South HRP 2S73 2.3 Ower Disabled/Abandoned - Remove as required. New DDC for associated FTR
Second Floor South HRP 2S72 3.8 Ower Disabled/Abandoned - Remove as required. New DDC for associated FTR
Second Floor South HRP 2S68 2.3 Ower Disabled/Abandoned - Remove as required. New DDC for associated FTR
Second Floor South HRP 2S66 1.5 Ower Disabled/Abandoned - Remove as required. New DDC for associated FTR
Second Floor South HRP 2S41 2.3 Ower Disabled/Abandoned - Remove as required. New DDC for associated FTR
Second Floor South HRP 2S40 2.3 Ower Disabled/Abandoned - Remove as required. New DDC for associated FTR
Second Floor South HRP 2S43 1.5 Ower Disabled/Abandoned - Remove as required.
Second Floor South HRP 2S38 1.5 Ower Disabled/Abandoned - Remove as required.
Second Floor South HRP 2S44 1.5 Ower Disabled/Abandoned - Remove as required. New DDC for associated FTR
Second Floor South HRP 2S37 1.5
Second Floor South HRP 2S65 1.5 required.
Second Floor South HRP 2S70 0.8 Ower Disabled/Abandoned - Remove as required.
Second Floor South HRP 2S64 0.6 Ower Disabled/Abandoned - Remove as required.
Second Floor South HRP 2S61 1.5 Ower Disabled/Abandoned - Remove as required.
Second Floor South HRP 2S62 1.5 Ower Disabled/Abandoned - Remove as required.
Second Floor South HRP 2S63 0.8 Ower Disabled/Abandoned - Remove as required.
Second Floor South HRP 2S53 3.8 Ower Disabled/Abandoned - Remove as required. New DDC for associated FTR
Second Floor South HRP 2S58 1.5 Ower Disabled/Abandoned - Remove as required. New DDC for associated FTR
Second Floor South HRP 2S54 3 Ower Disabled/Abandoned - Remove as required. New DDC for associated FTR
Second Floor South HRP 2S57 3