This document outlines interim life safety measures and infection control risk assessment protocols for a project to convert HVAC components in buildings 3 and 53 at a Department of Veterans Affairs medical center to building automation system control. The project involves removing two sinks from service without replacement, as well as plumbing, electrical, and HVAC work that will generate dust and require containment. Infection control procedures include barrier installation, negative pressure ventilation, containment of waste, cleaning protocols, and restrictions on construction workers. Fire safety protocols involve maintaining emergency access and exits, managing combustible loads, installing temporary fire barriers, and increasing hazard surveillance and personnel training due to impacts to compartmentalization and structural integrity.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Answer to contractor questions-657-19-114JB.pdf | ||
| 657-19-114JB - SOW 657-19-114JB w-JCI Mods 03-15-2021 RSU revised.pdf | ||
| 36C25521R0053 0003.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Title: Project/WO#
Description:
Drawing Link:
COR/Frm/PM: Phone:
Ctr Rep: Phone:
Type Construction Activities Risk Service Area
Low Risk
Medium Risk
Type B
Small scale, short duration activities that create minimal dust.
Include, but are not limited to:
☐ Installation of telephone and computer cabling.
☐ Access to chase spaces using doors or hatches (not cutting).
High Risk
Type C
Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies.
Includes, but is not limited to:
☐ Sanding or cutting of walls or ceilings.
☐ Removal of floor coverings, ceiling tiles, and casework.
☐ New wall construction.
☐ Minor duct work or electrical work above ceilings.
☐ Major cabling activities.
☐ Any activity that cannot be completed within a single
Highest Risk
Low Med High Highest Type A I I I II Type B II II II III/IV Type C II III III/IV III/IV Type D III/IV IV IV IV
Class I
Class II
Class III
Emergency Room; Kitchen or Food Preparation / Dining / Canteen;
Echocardiography; Radiology/MRI; Respiratory Therapy; Nuclear Medicine; Senior Mental Health (In Patient or Senior); Community Living Center (CLC); Clean Supply; Other
Infection Control Risk Assessment (ICRA) HVAC to BAS 657-19-114JB
Type A
Inspection and Non-Invasive Activities.
Include, but are not limited to:
☐ Removal of ceiling tiles for visual inspection limited to 1 tile per 50 square feet.
☐ Painting (but not sanding).
☐ Wall covering, electrical trim work, minor plumbing, and activities that do not generate dust or require cutting of walls or access to ceilings other than for visual inspection.
Office areas; Out Doors; Electrical or Mechanical Rooms; Social Work; Retail Store; Stage, Recreation, Theater; Stairwells;
Conference Rooms; Other
Physical and Occupational Therapy; Outpatient Clinics; Waiting Rooms; Sleep Lab; Mental Health (outpatient only); Prosthetics / Orthotics; Domiciliary; Other
Convert HVAC components in buildings 3 and 53 to BAS
Ext. 58729Richard Unger
ICRA Classification
During construction, perform following daily: Upon completion, performed the following:
11. Construct anteroom and require all personnel to pass through this room to be vacuumed using a HEPA vacuum cleaner before leaving work site OR they can wear cloth or paper coveralls that are removed each time they leave the work site.
12. All personnel entering work site are required to wear shoe covers. Shoe covers must be changed each time the worker exits the work area.
1. Clean up ceiling tile and flooring surfaces below with HEPA filtered vacuum or damp mop.
3. Provide active means to prevent dust from dispersing. Dust left on the floors, clothing and/or body is not allowed in order to prevent spreading and tracking. “Active means” are:
a. Vacuum attachments on tools with HEPA vacuum when generating dust, or
b. HEPA vacuuming immediately as the dust is generated.
c. Remove or isolate HVAC system in areas where work is being performed.
d. Water mist work surfaces to control dust while cutting.
e. Seal unused doors with duct tape.
f. Block off and seal all HVAC air vents.
g. Place +tacky mat at inside of entrance of work area and change frequently or when ineffective.
h. Wet mop and/or vacuum with +HEPA-filtered vacuum the work area before leaving the site.
Brooming is not sufficient.
4. Whenever transporting outside of construction site, wipe materials, equipment and work surfaces with EPA registered, unscented +disinfectant, which has manufacturer’s labeling as a bactericide, tuberculocide, virucide, and fungicide.
5. There shall be no standing, uncovered water during construction. This includes water in equipment drip pans and open containers within the construction areas. All accidental spills must be cleaned up and dried within 12 hours. Remove and dispose of porous materials that remain damp for more than 72 hours.
Cardiac Cath, EP Lab or Cardiology; Sterile Processing Service (SPS);
All inpatient medical or surgical units; Care Units: PACU, MICU, SICU, TCU; Spinal Cord Injury (SCI); Negative pressure isolation rooms;
Outpatient chemotherapy or Oncology areas; Operating Rooms;
Endoscopy; Dialysis; Bronchoscopy; Pharmacy; Clinical Laboratories;
Other
Type D
Major demolition and construction projects.
Includes, but is not limited to:
☐ Activities that require consecutive work shifts.
☐ Requires heavy demolition or removal of a complete cabling system.
☐ New construction.
Risk Group Const Type
2. Wet mop and/or vacuum with HEPA-filtered vacuum before leaving work area and wipe work surfaces with disinfectant.
3. Contain construction waste before transport in tightly covered containers. Tape may be used to ensure a tight cover.
4. Remove isolation of HVAC system in areas when work and area cleanup has been completed.
6. Complete all critical barriers, i.e., sheetrock, plywood, plastic, to seal area from non-work area or implement control cube method before construction begins.
7. Maintain Negative Pressure Ventilation (NPV) at 0.01” Water Column (WC) within the work site utilizing NPV machine.
8. NPV monitoring devices should be visible from outside the worksite and readings shall be documented daily or more often as needed. Keep tracking monitoring device and tracking log at outside of entrance at the site.
9. Contain construction waste before transport in tightly covered containers. Tape covering, unless using form-fitting solid lid.
5. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.
6. Do not remove barriers from work area until completed project is thoroughly and inspected by COR, Safety and Infection Control.
10. Seal holes, pipes, conduits, and punctures. All above
Class IV
1. Execute work by methods to minimize dust dispersal from minor flooring or surface disruptions.
2. For visual inspection only, dampen ceiling tile with water spray before removing. Replace a ceiling tile immediately after inspection; do not leave unattended.
Project Title: Project/WO #
Physical and Occupational Therapy
Office areas inpatient medical
Out Doors
Outpatient Oncology areas
Outpatient Clinics
NO
Hard Walls
NO
YES
NO
YES
NO
Does this work remove any of the following from service?
-isolation/negative airflow rooms?
-hand hygiene sinks?
-clean or soiled utility rooms ?
Consult with Infection Prevention staff for mitigating action
Removing two sinks from service, they will not be replaced.
All work will be coordinated with users surrounding space.
Does the work need to be performed during patient-care hours?
Barrier Types:
Note: Renovation/construction area
- shall be isolated from the occupied areas during const. and shall be negative with respect to surrounding areas.
Will be coordinated through shutdown calendar.
Will be coordinated through shutdown calendar.
Will be coordinated through shutdown calendar.
Plumbing:
Potable Water:
Electrical:
Adjacent Area(s) are a Higher Risk than Work Area; Consider Additional Protective Measures
Identify containment measures:
Any work above 85 decibles will be coordinated for after hours.
Will be coordinated through shutdown calendar.
ICRA - Operations Steps HVAC to BAS 657-19-114JB
- boundary shared with public or patient care areas must have hard walls.
Highest Risk
Low Risk
Noise:
HVAC:
Medium Risk
Low Risk
Is the work area in or adjacent to an isolation room?
Identify containment issues with the project team: traffic flow, housekeeping, and debris removal (if not on dwg).
Also, Insert any EXCEPTIONS or ADDITIONS to above items here.
- using hard walls must use door with door closer and lock; otherwise, plastic walls may use zipper door.
Is there a risk of compromising structural integrity (e.g., wall, ceiling, etc.) due to potential of water damage?
Identify the areas surrounding the project area, assessing potential impact.
Unit Below Unit Above
East West North South
Risk Group:
Risk Group:
Risk Group:
Risk Group:
Risk Group:
Risk Group: Medium Risk
Identify impact issues (probable disruptions/outages, and describe their corresponding corrective actions).
Highest Risk
IP Signature Not Required for Class I or
Class II
X Infection Prevention Representative
X PM/COR/Shop Representative
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Sprinkler shoutdowns will be coordinated with safety staff and smoke detection will be installed.
Required Actions: If designated smoking areas are impacted or closed due to construction, temporary areas may need to be established.
Specific Actions (confirm with Safety Dept):
G. COMBUSTIBLE LOAD LEVELS: Does the project involve the storage of flammable or combustible materials?
Does the project have the potential for creating flammable or combustible debris?
Required Actions: Surveillance of construction sites will need to be increased to prevent the accumulation of excess flammable or combustible debris. The fire load of the construction area must be kept to a minimum.
Specific Actions (confirm with Safety Dept):
Project will be cleaned daily and minimal construction debri will be left on site.
A. EXITS: Does the project/repair have the potential of affecting an exit or other means of egress?
Will the affected exit be used by other than the contractor’s/maintenance personnel?
B. EMERGENCY ACCESS: Does the project/repair have the potential of obstructing access for fire department vehicles, fire fighters, suppression connections, hydrants, or fire lanes?
Required Actions: An alternate exit must be designated and training is required for those persons affected. Safety office will conduct/coordinate training. Means of exiting construction/repair areas must be inspected and documented by contractor/shop designee on a daily basis to prevent blockages due to debris.
Four foot corridor passage will be required throughout construction.
Specific Actions (confirm with Safety Dept):
Specific Actions (confirm with Safety Dept):Required Actions: An alternate means of access must be designated and the St.
Louis City (JC)/St. Louis County (JB) Fire Department and VA Police must be notified by the Safety Office of the alternative.
C. FIRE PROTECTION: Does the project/repair have the potential of impairing existing fire alarm, detection, or suppression systems?
Required Actions: If the fire load of a particular area is significantly increased over normal due to construction, additional firefighting equipment (such as fire extinguishers) will be required. If any of this additional firefighting equipment is of a different type than that already available in the affected area, training in the use of this equipment for staff or contractor personnel is required.
Specific Actions (confirm with Safety Dept):
F. SMOKING POLICY: Will variance to existing medical center smoking policy be permitted?
E. ADDITIONAL FIRE FIGHTING EQUIPMENT AND TRAINING: Does the area affected by the project warrant placement of additional fire protection equipment?
Will additional firefighting training be required by affected personal?
Required Actions: If construction/repair involves major breaches in fire or smoke barriers, the contractor must erect temporary walls around the construction area to have fire and smoke ratings equal, or better, to the barrier rating that has been compromised.
Specific Actions (confirm with Safety Dept):
Hard barriers will be sealed to the deck.
Required Actions: If a fire protection or alarm system is to be rendered non-operational for more than 4 hours out of a 24-hour period, either a substitute system or a fire watch must be initiated. If neither of these methods can be implemented, the area must be closed down and evacuated. All of these measures must be coordinated with the Safety Office, VA Police, and the affected staff.
Specific Actions (confirm with Safety Dept):
Interim Life Safety Measures (ILSM) Convert HVAC components in Building 3 and 53 to BAS 657-19-114JB
D. TEMPORARY PARTITIONS: Will construction involve the use of temporary fire or smoke partitions or barriers?
Will temporary fire protection systems be required as part this project/repair?
H. FIRE DRILLS: Does the project warrant additional fire drills within the affected areas?
Required Actions: If the life safety features of a particular area are adversely impacted by construction, then the frequency of fire drills must be increased to two per shift per quarter for healthcare/lodger occupancies. Adverse impacts would include blocked fire exits, impaired fire alarm or sprinkler systems, or major compromises in fire or smoke barriers or compartments.
Specific Actions (confirm with Safety Dept):
Yes / No
Yes / No
Yes / No
Yes / No
K. ADDITIONAL PERSONNEL TRAINING: Does the project have the potential of affecting structural features of the fire safety systems?
L. FACILITY-WIDE TRAINING: Does the project present life safety code deficiencies or construction hazards which warrant facility-wide education of personnel concerning the interim life safety measures?
Does the project present occupational health deficiencies which warrant facility-wide education of personnel concerning those procedures?
Required Actions: Training must be provided facility wide to educate staff, patients and visitors to any life safety system that is impaired throughout the entire building. In addition, the St. Louis City (JC)/St. Louis County (JB) Fire Department and VA Police will be notified.
Specific Actions (confirm with Safety Dept):
Interim Life Safety Measures (ILSM) (con't) HVAC to BAS 657-19-114JB
Required Actions: Any construction activities that adversely affect occupational health issues must be reviewed to minimize the effects. If negative pressurization is required for “special ventilation”, then include a daily reporting of the pressure measurement as part of the the daily ILSM log.
Specific Actions (confirm with Safety Dept):
ICRA precautions will be followed for any required ventilation throughout project.
J. OCCUPATIONAL HEALTH ISSUES: Do construction workers need to be restricted to dedicated corridors, elevators, or exits?
Will the construction activities be hazardous to immune-compromised patients?
Will any disruptions of the water/plumbing system affect the purity of potable water?
Is special ventilation required for the area during construction?
I. HAZARD SURVEILLANCE: Does the project present additional hazards, such as excavations, construction storage or field offices, crane work, high voltage, confined spaces, scaffolding, etc., which warrant increased hazard surveillance?
Required Actions: If yes, then a Qualified Person as defined by OSHA must perform the work and additional project surveillance is warranted to identify potential life safety issues.
Specific Actions (confirm with Safety Dept):
Safety Representative Signature Not Required:
Class I or II & no Exit/Emergency Access Issues
Does the project have the potential for negatively affecting infection control procedures?
Does the project have the potential of affecting compartmentalization features of the fire safety systems?
Required Actions: Affected personnel must be notified when fire safety systems or infection control procedures are compromised and trained in temporary changes in procedures to compensate for the impaired systems. Examples are the need for alternate fire exits, alarm or sprinkler systems or to evacuate behind secondary fire barriers or compartments due to fire or smoke partition compromises.
Specific Actions (confirm with Safety Dept):
X Safety Dept Representative
ICRA, ILSM