This solicitation is for replacement of the electrical system within Building 1 at the Jefferson Barracks VA Medical Center in St. Louis, Missouri. The contractor will provide all labor, materials, tools, equipment, supervision, and site preparation work to replace the existing electrical system, which is beyond its useful life. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 15 is the contracting agency. The contractor must complete all work for project 657-17-182JB FCA Replace Electrical Systems in Building 1 as required.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOR OFFICE USE ONLY
MISSOURI DEPARTMENT OF NATURAL RESOURCES
AIR POLLLUTION CONTROL PROGRAM
P.O. BOX 176, JEFFERSON CITY, MO 63102-0176
ASBESTOS NOTIFICATION AMENDMENT
(Please type information)
PART A CONTRACTOR INFORMATION
1. ASBESTOS ABATEMENT CONTRACTOR NAME
2. CONTRACTOR STREET ADDRESS CITY STATE ZIP
TELEPHONE NUMBER
3. MISSOURI REGISTRATION NUMBER
REGISTRATION EXPIRATION DATE
CONTACT PERSON
PART B PROJECT INFORMATION
1. PROJECT SITE NAME
2. PROJECT SITE ADDRESS CITY STATE ZIP
TELEPHONE NUMBER
3. PROJECT I.D. NUMBER ASSIGNED BY THE MISSOURI DEPARTMENT OF NATURAL RESOURCES
PART C AMENDMENT INFORMATION (ATTACH ANOTHER SHEET IF NECESSARY)
PROJECT INFORMATION AS NOTIFIED
(Example: Start Time: 7:00 a.m.
AMENDED TO
Start Time: 7:30 a.m.)
PART D SUPPLEMENTAL INFORMATION (AS NEEDED)
PART E AUTHENTICATION
SIGNATURE OF COMPANY REPRESENTATIVE TITLE
PRINTED OR TYPED NAME
DATE
MO 780-1556 (7-96)
MISSOURI DEPARTMENT OF NATURAL RESOURCES
AIR POLLUTION CONTROL PROGRAM
ASBESTOS POST- NOTIFICATION
GENERAL INSTRUCTIONS
Persons who perform asbestos abatement projects are required to submit post-notification to the department within sixty
(60) days of the completion date indicated on the initial notification. This post-notification shall include signed and dated receipt(s) of asbestos disposal as well as final air clearance results (if applicable). These documents, along with the completed post-notification form shall be mailed to the following address*:
MISSOURI DEPARTMENT OF NATURAL RESOURCES
AIR POLLUTION CONTROL PROGRAM (ASBESTOS)
P.O. BOX 176
JEFFERSON CITY, MISSOURI 65102
*For projects under the jurisdiction of a local agency, send post notification to the appropriate office.
PART A. ASBESTOS PROJECT INFORMATION
PROJECT NAME
PROJECT ID ASSIGNED BY MDNR
ADDRESS
CITY
STATE
ZIP CODE
START DATE COMPLETION DATE
PART B. CONTRACTOR INFORMATION
NAME OF CONTRACTOR CONTRACTOR REGISTRATION NUMBER
CONTRACTOR CONTACT PERSON TELEPHONE NUMBER
PART C. WASTE DISPOSAL INFORMATION
NAME OF LANDFILL
ADDRESS
CITY STATE ZIP CODE
NOTE: INCLUDE COPIES OF ALL WASTE SHIPMENT RECORDS AND DISPOSAL RECEIPTS
PART D. AIR SAMPLING INFORMATION
NAME OF AIR SAMPLING PROFESSIONAL CERTIFICATION NUMBER
COMPANY NAME TELEPHONE NUMBER
NOTE: INCLUDE COPIES OF FINAL AIR CLEARANCE RESULTS (IF APPLICABLE)
PART E. AUTHENTICATION
I CERTIFY THAT THE INFORMATION LISTED ABOVE AND ENCLOSED IS TRUE AND ACCURATE.
SIGNATURE OF ASBESTOS ABATEMENT CONTRACTOR DATE
MO 780-1225 (8-04)
SECTION 03 30 53
(SHORT-FORM) CAST-IN-PLACE CONCRETE
PART 1 - GENERAL
1.1 SUMMARY
1.2 RELATED REQUIREMENTS
1.3 APPLICABLE PUBLICATIONS
1.4 SUBMITTALS
1.5 DELIVERY
1.6 WARRANTY
PART 2 - PRODUCTS
2.1 MATERIALS
2.2 ACCESSORIES
2.3 CONCRETE MIXES
2.4 BATCHING AND MIXING
PART 3 - EXECUTION
3.1 FORMWORK
3.2 REINFORCEMENT
3.3 PLACING CONCRETE
3.4 TOLERANCES
3.5 PROTECTION AND CURING
3.6 FORM REMOVAL
3.7 FINISHES
3.8 SURFACE TREATMENTS
SECTION 05 40 00
COLD-FORMED METAL FRAMING
PART 1 - GENERAL
1.1 DESCRIPTION:
1.2 RELATED WORK:
1.3 DESIGN REQUIREMENTS:
1.4 SUBMITTALS:
1.5 APPLICABLE PUBLICATIONS:
2.1 MATERIALS:
2.2 WALL FRAMING
2.3 FRAMING ACCESSORIES:
2.4 ANCHORS, CLIPS, AND FASTENERS:
2.5 REQUIREMENTS:
3.1 FABRICATION:
3.2 ERECTION:
3.3 TOLERANCES:
3.4 FIELD REPAIR:
SECTION 08 11 13
HOLLOW METAL DOORS AND FRAMES
PART 1 - GENERAL
1.1 SUMMARY
1.5 QUALITY ASSURANCE
1.6 DELIVERY
1.7 STORAGE AND HANDLING
1.8 WARRANTY
PART 2 - PRODUCTS
2.1 SYSTEM PERFORMANCE
2.2 MATERIALS
2.3 PRODUCTS - GENERAL
2.4 HOLLOW METAL DOORS
2.5 HOLLOW METAL FRAMES
2.6 FABRICATION
2.7 FINISHES
2.8 ACCESSORIES
3.1 PREPARATION
3.2 INSTALLATION - GENERAL
3.3 FRAME INSTALLATION
3.4 DOOR INSTALLATION
3.5 CLEANING
3.6 PROTECTION
SECTION 08 71 00
DOOR HARDWARE
PART 1 - GENERAL
1.1 DESCRIPTION
1.2 RELATED WORK
1.3 GENERAL
1.4 WARRANTY
1.5 MAINTENANCE MANUALS
1.6 SUBMITTALS
1.7 DELIVERY AND MARKING
1.8 PREINSTALLATION MEETING
1.9 INSTRUCTIONS
1.10 APPLICABLE PUBLICATIONS
2.1 BUTT HINGES
2.2 DOOR CLOSING DEVICES
2.3 OVERHEAD CLOSERS
2.9 LOCKS AND LATCHES
2.13 KEYS
Locks/Keys Quantity
2.26 MISCELLANEOUS HARDWARE
3.1 HARDWARE HEIGHTS
3.2 INSTALLATION
Door Thickness Door Width Hinge Height
3.3 FINAL INSPECTION
3.4 DEMONSTRATION
3.5 HARDWARE SETS
SECTION 09 22 16
NON-STRUCTURAL METAL FRAMING
PART 1 - GENERAL
1.1 DESCRIPTION
1.2 RELATED WORK - NONE
1.3 TERMINOLOGY
1.5 DELIVERY, IDENTIFICATION, HANDLING AND STORAGE
1.6 APPLICABLE PUBLICATIONS
2.1 PROTECTIVE COATING
2.2 STEEL STUDS AND RUNNERS (TRACK)
2.3 FURRING CHANNELS
2.4 FASTENERS, CLIPS, AND OTHER METAL ACCESSORIES
3.1 INSTALLATION CRITERIA
3.2 INSTALLING STUDS
3.3 INSTALLING WALL FURRING FOR FINISH APPLIED TO ONE SIDE ONLY
3.4 INSTALLING SUPPORTS REQUIRED BY OTHER TRADES
3.5 INSTALLING SHAFT WALL SYSTEM
3.6 INSTALLING FURRED AND SUSPENDED CEILINGS OR SOFFITS
3.7 TOLERANCES
SECTION 09 29 00
GYPSUM BOARD
PART 1 - GENERAL
1.1 DESCRIPTION
1.2 RELATED WORK
1.6 ENVIRONMENTAL CONDITIONS
1.7 APPLICABLE PUBLICATIONS
2.1 GYPSUM BOARD
2.2 GYPSUM SHEATHING BOARD
2.3 ACCESSORIES
2.4 FASTENERS
2.5 FINISHING MATERIALS AND LAMINATING ADHESIVE
3.1 GYPSUM BOARD HEIGHTS
3.2 INSTALLING GYPSUM BOARD
3.3 INSTALLING GYPSUM SHEATHING
3.4 CAVITY SHAFT WALL
3.5 FINISHING OF GYPSUM BOARD
3.6 REPAIRS
3.7 UNACCESSIBLE CEILINGS
SECTION 09 91 00
PAINTING
PART 1 - GENERAL
1.1 DESCRIPTION:
1.2 RELATED WORK:
1.3 SUBMITTALS:
1.4 DELIVERY AND STORAGE:
1.5 QUALITY ASSURANCE:
1.6 REGULATORY REQUIREMENTS:
1.7 SAFETY AND HEALTH
1.8 APPLICABLE PUBLICATIONS:
2.2 PAINT PROPERTIES:
2.3 PLASTIC TAPE:
3.1 JOB CONDITIONS:
3.2 INSPECTION:
3.3 GENERAL WORKMANSHIP REQUIREMENTS:
3.4 SURFACE PREPARATION:
3.5 PAINT PREPARATION:
3.6 APPLICATION:
3.7 PRIME PAINTING:
3.8 INTERIOR FINISHES:
3.9 REFINISHING EXISTING PAINTED SURFACES:
3.10 PAINT COLOR:
3.11 MECHANICAL AND ELECTRICAL WORK FIELD PAINTING SCHEDULE:
3.12 BUILDING AND STRUCTURAL WORK FIELD PAINTING:
3.13 PROTECTION CLEAN UP, AND TOUCH-UP:
DEPARTMENT OF VETERANS AFFAIRS
VHA MASTER SPECIFICATIONS
TABLE OF CONTENTS
Section 00 01 10
DIVISION 00 - SPECIAL SECTIONS DATE
DIVISION 01 - GENERAL REQUIREMENTS
DIVISION 02 – EXISTING CONDITIONS
DIVISION 03 – CONCRETE
DIVISION 04 – MASONRY
DIVISION 05 – METALS
DIVISION 06 – WOOD, PLASTICS, AND COMPOSITES
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
DIVISION 08 - OPENINGS
DIVISION 09 – FINISHES
DIVISION 10 – SPECIALTIES
DIVISION 11 – EQUIPMENT
DIVISION 12 – FURNISHINGS
DIVISION 13 - SPECIAL CONSTRUCTION
DIVISION 14 – CONVEYING EQUIPEMENT
DIVISION 21 - FIRE SUPPRESSION
DIVISION 22 – PLUMBING
DIVISION 23 – HEATING, VENTILATING, AND AIR
CONDITIONING (HVAC)
DIVISION 25 – INTEGRATED AUTOMATION
DIVISION 26 – ELECTRICAL
DIVISION 27 – COMMUNICATIONS
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
DIVISION 31 – EARTHWORK
DIVISION 32 – EXTERIOR IMPROVEMENTS
DIVISION 33 – UTILITIES
DIVISION 34 – TRANSPORTATION
DIVISION 48 – Electrical Power Generation
SECTION 00 01 15
LIST OF DRAWING SHEETS
i
SECTION 01 00 00
GENERAL REQUIREMENTS
TABLE OF CONTENTS
..............................................................................................................Not Used
............................................................................................................Not Used
.................................................................Not Used
......................................................................................Not Used
.................................................................................................................................Not Used ii
....................................Not Used
...............................................................................Not Used
......................................................................Not Used
...............................................................................Not Used
SECTION 01 00 00
GENERAL REQUIREMENTS
1.1 SAFETY REQUIREMENTS
1.2 GENERAL INTENTION
1.3 STATEMENT OF BID ITEM(S)
1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR
1.5 CONSTRUCTION SECURITY REQUIREMENTS
1.6 OPERATIONS AND STORAGE AREAS
Phase I:
Phase II:
Phase III:
Phase IV:
1.7 ALTERATIONS
1.8 DISPOSAL AND RETENTION
1.9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND
IMPROVEMENTS
1.10 RESTORATION
1.12 PROFESSIONAL SURVEYING SERVICES
1.14 AS-BUILT DRAWINGS
1.15 USE OF ROADWAYS
1.17 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT
Temporary Installations.
1.18 TEMPORARY USE OF EXISTING ELEVATORS
1.20 TEMPORARY TOILETS
1.21 AVAILABILITY AND USE OF UTILITY SERVICES
1.24 INSTRUCTIONS
1.25 GOVERNMENT-FURNISHED PROPERTY
1.26 RELOCATED EQUIPMENT
1.28 CONSTRUCTION SIGN
1.29 SAFETY SIGN
1.32 HISTORIC PRESERVATION
SECTION 01 33 23
SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES
PART 1 – GENERAL
1.1 DESCRIPTION
1.2 DEFINITIONS
1.3 SUBMITTAL REGISTER
1.4 SUBMITTAL SCHEDULING
1.5 SUBMITTAL PREPARATION
1.6 SUBMITTAL FORMAT AND TRANSMISSION
1.7 SAMPLES
1.8 OPERATION AND MAINTENANCE DATA
1.9 TEST REPORTS
1.10 VA REVIEW OF SUBMITTALS AND RFIS
1.11 APPROVED SUBMITTALS
1.12 WITHHOLDING OF PAYMENT
SECTION 01 35 26
SAFETY REQUIREMENTS
TABLE OF CONTENTS
SECTION 01 35 26
Safety REQUIREMENTS
1.1 APPLICABLE PUBLICATIONS:
1.2 DEFINITIONS:
1.3 REGULATORY REQUIREMENTS:
1.4 ACCIDENT PREVENTION PLAN (APP):
SIGNATURE SHEET.
BACKGROUND INFORMATION
c STATEMENT OF SAFETY AND HEALTH POLICY
RESPONSIBILITIES AND LINES OF AUTHORITIES
e. SUBCONTRACTORS AND SUPPLIERS.
TRAINING.
g. SAFETY AND HEALTH INSPECTIONS.
h. ACCIDENT/INCIDENT INVESTIGATION & REPORTING.
i. PLANS (PROGRAMS, PROCEDURES) REQUIRED.
Accident Prevention
1.5 ACTIVITY HAZARD ANALYSES (AHAS):
1.6 PRECONSTRUCTION CONFERENCE:
1.7 “SITE SAFETY AND HEALTH OFFICER” (SSHO) AND “COMPETENT PERSON” (CP):
Superintendence by the Contractor
1.8 TRAINING:
1.9 INSPECTIONS:
1.10 ACCIDENTS, OSHA 300 LOGS, AND MAN-HOURS:
1.11 PERSONAL PROTECTIVE EQUIPMENT (PPE):
1.12 INFECTION CONTROL
Class III
1.13 TUBERCULOSIS SCREENING
1.14 FIRE SAFETY
1.15 ELECTRICAL
1.16 FALL PROTECTION
1.17 SCAFFOLDS AND OTHER WORK PLATFORMS
1.18 EXCAVATION AND TRENCHES
1.19 CRANES
1.20 CONTROL OF HAZARDOUS ENERGY (LOCKOUT/TAGOUT)
1.21 CONFINED SPACE ENTRY
1.22 WELDING AND CUTTING
1.23 LADDERS
1.24 FLOOR & WALL OPENINGS
SECTION 01 42 19
REFERENCE STANDARDS
PART 1 - GENERAL
1.1 DESCRIPTION
1.2 AVAILABILITY OF SPECIFICATIONS LISTED IN THE GSA INDEX OF FEDERAL
SPECIFICATIONS, STANDARDS AND COMMERCIAL ITEM DESCRIPTIONS FPMR PART 101-29
(FAR 52.211-1) (AUG 1998)
1.3 AVAILABILITY FOR EXAMINATION OF SPECIFICATIONS NOT LISTED IN THE GSA
INDEX OF FEDERAL SPECIFICATIONS, STANDARDS AND COMMERCIAL ITEM DESCRIPTIONS
(FAR 52.211-4) (JUN 1988)
1.4 AVAILABILITY OF SPECIFICATIONS NOT LISTED IN THE GSA INDEX OF FEDERAL
SPECIFICATIONS, STANDARDS AND COMMERCIAL ITEM DESCRIPTIONS (FAR 52.211-3)
(JUN 1988)
SECTION 01 58 16
TEMPORARY INTERIOR SIGNAGE
PART 1 GENERAL
DESCRIPTION
PART 2 PRODUCTS
2.1 TEMPORARY SIGNS
PART 3 EXECUTION
3.1 INSTALLATION
3.2 LOCATION
SECTION 01 74 19
CONSTRUCTION WASTE MANAGEMENT
PART 1 – GENERAL
1.3 QUALITY ASSURANCE
1.4 TERMINOLOGY
1.5 SUBMITTALS
1.7 RECORDS
2.1 MATERIALS
PART 3 - EXECUTION
3.1 COLLECTION
3.2 DISPOSAL
3.3 REPORT
SECTION 01 81 13
SUSTAINABLE CONSTRUCTION REQUIREMENTS
PART 1 - GENERAL
1.1 DESCRIPTION
1.3 DEFINITIONS
1.4 REFERENCE STANDARDS
1.6 QUALITY ASSURANCE
PART 2 – PRODUCTS
2.1 PERFORMANCE CRITERIA
3.1 FIELD QUALITY CONTROL
SECTION 01 91 00
GENERAL COMMISSIONING REQUIREMENTS
1.1 COMMISSIONING DESCRIPTION
1.2 CONTRACTUAL RELATIONSHIPS
1.3 RELATED WORK
1.4 SUMMARY
1.5 ACRONYMS
1.6 DEFINITIONS
Acceptance Phase Commissioning:
Accuracy:
Back Check:
Basis of Design (BOD):
Benchmarks:
Building Information Modeling (BIM):
Calibrate:
CCTV:
COBie:
Commissionability:
Commissioning Agent (CxA):
Commissioning Checklists:
Commissioning Design Review:
Commissioning Issue:
Commissioning Manager (CxM):
Commissioning Observation:
Commissioning Plan:
Commissioning Process:
Commissioning Report:
Commissioning Representative (CxR): An individual appointed by a sub-contractor to manage the commissioning process on behalf of the sub-contractor.
Commissioning Specifications:
Commissioning Team:
Construction Phase Commissioning:
Contract Documents (CD):
Construction Phase Commissioning (CPC):
Coordination Drawings:
Data Logging:
Deferred System Test:
Deficiency:
Design Criteria:
Design Intent:
Design Narrative:
Design Phase Commissioning (DPC):
Environmental Systems:
Executive Summary:
Functionality:
Functional Test Procedure (FTP):
Industry Accepted Best Practice:
Installation Verification:
Integrated System Testing:
Lessons Learned Workshop:
Maintainability:
Manual Test:
Owner’s Project Requirements (OPR):
Peer Review:
Precision:
Pre-Design Phase Commissioning:
Pre-Functional Checklist (PFC):
Pre-Functional Test (PFT):
Procedure or Protocol:
Range:
Resolution:
Site Observation Visit:
Site Observation Reports (SO):
Special System Inspections:
Static Tests:
Start Up Tests:
Systems Manual:
Test Procedure:
Testing:
Testing, Adjusting, and Balancing (TAB):
Thermal Scans:
Training Plan:
Trending:
Unresolved Commissioning Issue:
Verification:
Warranty Phase Commissioning:
Warranty Visit:
Whole Building Commissioning:
1.7 SYSTEMS TO BE COMMISSIONED
Systems To Be Commissioned
System Description
Electrical
Systems To Be Commissioned
System Description
Communications
1.8 COMMISSIONING TEAM
1.9 VA'S COMMISSIONING RESPONSIBILITIES
1.10 CONTRACTOR'S COMMISSIONING RESPONSIBILITIES
1.11 COMMISSIONING AGENT’S RESPONSIBILITIES
1.12 COMMISSIONING DOCUMENTATION
1.13 SUBMITTALS
1.14 COMMISSIONING PROCESS
1.15 QUALITY ASSURANCE
1.16 COORDINATION
2.1 TEST EQUIPMENT
3.1 COMMISSIONING PROCESS ROLES AND RESPONSIBILITIES
Construction Phase
Acceptance Phase
3.2 STARTUP, INITIAL CHECKOUT, AND PRE-FUNCTIONAL CHECKLISTS
3.3 DEFICIENCIES, NONCONFORMANCE, AND APPROVAL IN CHECKLISTS AND STARTUP
3.4 PHASED COMMISSIONING
3.5 DDC SYSTEM TRENDING FOR COMMISSIONING
2-Pipe Fan Coil Unit Trending and Alarms
Point Type Trend Interval
Operationa l Trend Duration
Testing Trend Duration
Alarm Type
Alarm Range
Alarm Delay
2-Pipe Fan Coil Unit Trending and Alarms
Point Type Trend Interval
Operationa l Trend Duration
Testing Trend Duration
Alarm Type
Alarm Range
Alarm Delay
3.6 SYSTEMS FUNCTIONAL PERFORMANCE TESTING
3.7 DOCUMENTATION, NONCONFORMANCE AND APPROVAL OF TESTS
3.8 DEFERRED TESTING
3.9 OPERATION AND MAINTENANCE TRAINING REQUIREMENTS
----- END -----
SECTION 02 41 00
DEMOLITION
PART 1 - GENERAL
1.1 DESCRIPTION:
1.3 PROTECTION:
1.4 UTILITY SERVICES:
PART 2 - PRODUCTS (NOT USED)
PART 3 – EXECUTION
3.1 DEMOLITION:
3.2 CLEAN-UP:
SECTION 03 30 53
(SHORT-FORM) CAST-IN-PLACE CONCRETE
PART 1 - GENERAL
1.1 SUMMARY
1.5 DELIVERY
1.6 WARRANTY
2.2 ACCESSORIES
2.3 CONCRETE MIXES
2.4 BATCHING AND MIXING
3.1 FORMWORK
3.2 REINFORCEMENT
3.3 PLACING CONCRETE
3.4 TOLERANCES
3.5 PROTECTION AND CURING
3.6 FORM REMOVAL
3.7 FINISHES
3.8 SURFACE TREATMENTS
SECTION 05 40 00
COLD-FORMED METAL FRAMING
PART 1 - GENERAL
1.1 DESCRIPTION:
1.2 RELATED WORK:
1.3 DESIGN REQUIREMENTS:
1.4 SUBMITTALS:
1.5 APPLICABLE PUBLICATIONS:
2.2 WALL FRAMING
2.3 FRAMING ACCESSORIES:
2.4 ANCHORS, CLIPS, AND FASTENERS:
2.5 REQUIREMENTS:
3.1 FABRICATION:
3.2 ERECTION:
3.3 TOLERANCES:
3.4 FIELD REPAIR:
SECTION 08 11 13
HOLLOW METAL DOORS AND FRAMES
PART 1 - GENERAL
1.1 SUMMARY
1.6 DELIVERY
1.7 STORAGE AND HANDLING
1.8 WARRANTY
PART 2 - PRODUCTS
2.1 SYSTEM PERFORMANCE
2.2 MATERIALS
2.3 PRODUCTS - GENERAL
2.4 HOLLOW METAL DOORS
2.5 HOLLOW METAL FRAMES
2.6 FABRICATION
2.7 FINISHES
2.8 ACCESSORIES
3.3 FRAME INSTALLATION
3.4 DOOR INSTALLATION
3.5 CLEANING
3.6 PROTECTION
SECTION 08 71 00
DOOR HARDWARE
PART 1 - GENERAL
1.1 DESCRIPTION
1.3 GENERAL
1.4 WARRANTY
1.5 MAINTENANCE MANUALS
1.7 DELIVERY AND MARKING
1.8 PREINSTALLATION MEETING
1.9 INSTRUCTIONS
2.1 BUTT HINGES
2.2 DOOR CLOSING DEVICES
2.3 OVERHEAD CLOSERS
2.9 LOCKS AND LATCHES
2.13 KEYS
Locks/Keys Quantity
2.26 MISCELLANEOUS HARDWARE
3.1 HARDWARE HEIGHTS
3.2 INSTALLATION
Door Thickness Door Width Hinge Height
3.3 FINAL INSPECTION
3.4 DEMONSTRATION
3.5 HARDWARE SETS
SECTION 09 22 16
NON-STRUCTURAL METAL FRAMING
PART 1 - GENERAL
1.1 DESCRIPTION
1.2 RELATED WORK - NONE
2.1 PROTECTIVE COATING
2.2 STEEL STUDS AND RUNNERS (TRACK)
2.3 FURRING CHANNELS
2.4 FASTENERS, CLIPS, AND OTHER METAL ACCESSORIES
3.1 INSTALLATION CRITERIA
3.2 INSTALLING STUDS
3.3 INSTALLING WALL FURRING FOR FINISH APPLIED TO ONE SIDE ONLY
3.4 INSTALLING SUPPORTS REQUIRED BY OTHER TRADES
3.5 INSTALLING SHAFT WALL SYSTEM
3.6 INSTALLING FURRED AND SUSPENDED CEILINGS OR SOFFITS
3.7 TOLERANCES
SECTION 09 29 00
GYPSUM BOARD
PART 1 - GENERAL
1.1 DESCRIPTION
1.2 RELATED WORK
1.6 ENVIRONMENTAL CONDITIONS
2.1 GYPSUM BOARD
2.2 GYPSUM SHEATHING BOARD
2.3 ACCESSORIES
2.4 FASTENERS
2.5 FINISHING MATERIALS AND LAMINATING ADHESIVE
3.1 GYPSUM BOARD HEIGHTS
3.2 INSTALLING GYPSUM BOARD
3.3 INSTALLING GYPSUM SHEATHING
3.4 CAVITY SHAFT WALL
3.5 FINISHING OF GYPSUM BOARD
3.6 REPAIRS
3.7 UNACCESSIBLE CEILINGS
SECTION 09 91 00
PAINTING
1.1 DESCRIPTION:
1.3 SUBMITTALS:
1.4 DELIVERY AND STORAGE:
1.5 QUALITY ASSURANCE:
1.6 REGULATORY REQUIREMENTS:
1.7 SAFETY AND HEALTH
1.8 APPLICABLE PUBLICATIONS:
2.2 PAINT PROPERTIES:
2.3 PLASTIC TAPE:
3.1 JOB CONDITIONS:
3.2 INSPECTION:
3.3 GENERAL WORKMANSHIP REQUIREMENTS:
3.4 SURFACE PREPARATION:
3.5 PAINT PREPARATION:
3.6 APPLICATION:
3.7 PRIME PAINTING:
3.8 INTERIOR FINISHES:
3.9 REFINISHING EXISTING PAINTED SURFACES:
3.10 PAINT COLOR:
3.11 MECHANICAL AND ELECTRICAL WORK FIELD PAINTING SCHEDULE:
3.12 BUILDING AND STRUCTURAL WORK FIELD PAINTING:
3.13 PROTECTION CLEAN UP, AND TOUCH-UP:
SECTION 21 13 13
WET-PIPE SPRINKLER SYSTEMS
PART 1 - GENERAL
1.1 DESCRIPTION
1.3 DESIGN CRITERIA
2.1 PIPING & FITTINGS
2.2 VALVES
2.3 SPRINKLERS
2.4 SPRINKLER SYSTEM SIGNAGE
2.5 SWITCHES:
2.6 GAUGES
2.7 PIPE HANGERS, SUPPORTS AND RESTRAINT OF SYSTEM PIPING
2.8 WALL, FLOOR AND CEILING PLATES
2.9 VALVE TAGS
3.2 INSPECTION AND TEST
SECTION 23 05 11
COMMON WORK RESULTS FOR HVAC
1.6 DELIVERY, STORAGE AND HANDLING
1.7 AS-BUILT DOCUMENTATION
1.8 JOB CONDITIONS – WORK IN EXISTING BUILDING
2.1 FACTORY-ASSEMBLED PRODUCTS
2.2 COMPATIBILITY OF RELATED EQUIPMENT
2.3 DRIVE GUARDS
2.4 LIFTING ATTACHMENTS
2.5 ELECTRIC MOTORS
2.6 EQUIPMENT AND MATERIALS IDENTIFICATION
2.7 FIRESTOPPING
2.8 GALVANIZED REPAIR COMPOUND
2.9 HVAC PIPE AND EQUIPMENT SUPPORTS AND RESTRAINTS
2.10 PIPE PENETRATIONS
2.11 DUCT PENETRATIONS
2.12 SPECIAL TOOLS AND LUBRICANTS
2.13 WALL, FLOOR AND CEILING PLATES
2.14 ASBESTOS
PART 3 - EXECUTION
3.1 GENERAL
3.2 ARRANGEMENT AND INSTALLATION OF EQUIPMENT AND PIPING
3.3 TEMPORARY PIPING AND EQUIPMENT
3.4 RIGGING
3.5 PIPE AND EQUIPMENT SUPPORTS
3.6 MECHANICAL DEMOLITION
3.7 CLEANING AND PAINTING
3.8 IDENTIFICATION SIGNS
3.9 MOTOR AND DRIVES
3.10 LUBRICATION
3.11 STARTUP, TEMPORARY OPERATION AND TESTING
3.12 OPERATING AND PERFORMANCE TESTS
3.13 DEMONSTRATION AND TRAINING
SECTION 23 05 93
TESTING, ADJUSTING, AND BALANCING FOR HVAC
PART 1 - GENERAL
1.1 DESCRIPTION
1.5 APPLICABLE PUBLICATIONS
2.1 PLUGS
2.2 INSULATION REPAIR MATERIAL
3.2 DESIGN REVIEW REPORT
3.3 SYSTEMS INSPECTION REPORT
3.4 DUCT AIR LEAKAGE TEST REPORT
3.5 SYSTEM READINESS REPORT
3.6 TAB REPORTS
3.7 TAB PROCEDURES
3.9 MARKING OF SETTINGS
3.10 IDENTIFICATION OF TEST PORTS
SECTION 23 07 11
HVAC INSULATION
4.3.3.1
Standard Method of Test of Surface Burning Characteristics of Building Materials
4.3.3.1.1
(See 4.2.4.2.)
4.3.3.1.2
Standard Methods of Tests of Fire Endurance of Building Construction and Materials
1.5 STORAGE AND HANDLING OF MATERIAL
2.1 MINERAL FIBER OR FIBER GLASS
2.2 MINERAL WOOL OR REFRACTORY FIBER
2.3 RIGID CELLULAR PHENOLIC FOAM
2.4 CELLULAR GLASS CLOSED-CELL
2.5 FLEXIBLE ELASTOMERIC CELLULAR THERMAL
2.6 CALCIUM SILICATE
Insulation Characteristics
ITEMS TYPE I TYPE II
2.7 INSULATION FACINGS AND JACKETS
2.8 PIPE COVERING PROTECTION SADDLES
Nominal Pipe Size and Accessories Material (Insert Blocks)
2.9 ADHESIVE, MASTIC, CEMENT
2.10 MECHANICAL FASTENERS
2.11 REINFORCEMENT AND FINISHES
2.12 FLAME AND SMOKE
3.1 GENERAL REQUIREMENTS
3.2 INSULATION INSTALLATION
3.8 PIPE INSULATION SCHEDULE
Insulation Thickness Millimeters (Inches)
SECTION 23 09 23
DIRECT-DIGITAL CONTROL SYSTEM FOR HVAC
Work/Item/System Furnish Install Low Voltage Wiring
Line Power
Item/Task Section 23 09 23 contactor
Control system integrator
VA
1.3 DEFINITION
1.4 QUALITY ASSURANCE
1.5 PERFORMANCE
Measured Variable Reported Accuracy
Controlled Variable Control Accuracy Range of Medium
1.6 WARRANTY
1.7 SUBMITTALS
1.8 INSTRUCTIONS
1.9 PROJECT CONDITIONS (ENVIRONMENTAL CONDITIONS OF OPERATION)
2.2 CONTROLS SYSTEM ARCHITECTURE
2.3 COMMUNICATION
2.4 NETWORK AND DEVICE NAMING CONVENTION
2.5 BACNET DEVICES
2.6 CONTROLLERS
2.7 SENSORS (AIR, WATER AND STEAM)
2.8 CONTROL CABLES
2.9 THERMOSTATS
2.10 FINAL CONTROL ELEMENTS AND OPERATORS
2.11 AIR FLOW CONTROL
3.2 SYSTEM VALIDATION AND DEMONSTRATION
SECTION 23 21 13
HYDRONIC PIPING
PART 1 - GENERAL
1.1 DESCRIPTION
1.6 AS-BUILT DOCUMENTATION
1.7 SPARE PARTS
2.1 PIPE AND EQUIPMENT SUPPORTS, PIPE SLEEVES, AND WALL AND CEILING PLATES
2.2 PIPE AND TUBING
2.3 FITTINGS FOR STEEL PIPE
2.4 FITTINGS FOR COPPER TUBING
2.5 DIELECTRIC FITTINGS
2.6 SCREWED JOINTS
2.7 VALVES
2.8 EXPANSION JOINTS
2.9 FIRESTOPPING MATERIAL
3.2 PIPE JOINTS
3.3 LEAK TESTING ABOVEGROUND PIPING
3.4 FLUSHING AND CLEANING PIPING SYSTEMS
3.5 STARTUP AND TESTING
3.6 DEMONSTRATION AND TRAINING
SECTION 23 31 00
HVAC DUCTS AND CASINGS
PART 1 - GENERAL
1.1 DESCRIPTION
1.2 RELATED WORK
2.1 DUCT MATERIALS AND SEALANTS
2.2 DUCT CONSTRUCTION AND INSTALLATION
2.3 DUCT ACCESS DOORS, PANELS AND SECTIONS
2.4 FIRE DAMPERS
2.5 SMOKE DAMPERS
2.6 COMBINATION FIRE AND SMOKE DAMPERS
2.7 INSTRUMENT TEST FITTINGS
2.8 ELECTROSTATIC SHIELDING
3.2 DUCT LEAKAGE TESTS AND REPAIR
3.4 TESTING, ADJUSTING AND BALANCING (TAB)
3.5 OPERATING AND PERFORMANCE TESTS
SECTION 23 82 00
CONVECTION HEATING AND COOLING UNITS
PART 1 - GENERAL
1.1 DESCRIPTION
1.2 RELATED WORK
1.3 QUALITY ASSURANCE
1.6 GUARANTY
2.1 ROOM FAN-COIL UNITS
3.2 OPERATIONAL TEST
3.3 STARTUP AND TESTING
3.4 DEMONSTRATION AND TRAINING
SECTION 26 05 11
REQUIREMENTS FOR ELECTRICAL INSTALLATIONS
PART 1 - GENERAL
1.1 DESCRIPTION
1.2 MINIMUM REQUIREMENTS
1.3 TEST STANDARDS
1.4 QUALIFICATIONS (PRODUCTS AND SERVICES)
1.6 MANUFACTURED PRODUCTS
1.7 VARIATIONS FROM CONTRACT REQUIREMENTS
1.8 MATERIALS AND EQUIPMENT PROTECTION
1.9 WORK PERFORMANCE
1.10 EQUIPMENT INSTALLATION AND REQUIREMENTS
1.11 EQUIPMENT IDENTIFICATION
1.12 SUBMITTALS
1.13 SINGULAR NUMBER
1.14 POLYCHLORINATED BIPHENYL (PCB) EQUIPMENT
1.15 ACCEPTANCE CHECKS AND TESTS
1.16 WARRANTY
1.17 INSTRUCTION
PART 3 - EXECUTION (NOT USED)
SECTION 26 05 19
LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES
PART 1 - GENERAL
1.1 DESCRIPTION
1.2 RELATED WORK
2.1 CONDUCTORS AND CABLES
2.2 SPLICES
2.3 CONNECTORS AND TERMINATIONS
2.4 CONTROL WIRING
2.5 WIRE LUBRICATING COMPOUND
3.2 SPLICE AND TERMINATION INSTALLATION
3.3 CONDUCTOR IDENTIFICATION
3.4 FEEDER CONDUCTOR IDENTIFICATION
3.5 EXISTING CONDUCTORS
3.6 CONTROL WIRING INSTALLATION
3.7 CONTROL WIRING IDENTIFICATION
3.8 ACCEPTANCE CHECKS AND TESTS
SECTION 26 05 26
GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS
PART 1 - GENERAL
1.1 DESCRIPTION
1.2 RELATED WORK
2.1 GROUNDING AND BONDING CONDUCTORS
2.2 GROUND RODS
2.3 CONCRETE ENCASED ELECTRODE
2.4 GROUND CONNECTIONS
2.5 EQUIPMENT RACK AND CABINET GROUND BARS
2.6 GROUND TERMINAL BLOCKS
2.7 GROUNDING BUS BAR
3.2 INACCESSIBLE GROUNDING CONNECTIONS
3.3 MEDIUM-VOLTAGE EQUIPMENT AND CIRCUITS
3.4 SECONDARY VOLTAGE EQUIPMENT AND CIRCUITS
3.5 RACEWAY
3.6 CORROSION INHIBITORS
3.7 CONDUCTIVE PIPING
3.8 LIGHTNING PROTECTION SYSTEM
3.9 MAIN ELECTRICAL ROOM GROUNDING
3.10 GROUND RESISTANCE
3.11 GROUND ROD INSTALLATION
3.12 ACCEPTANCE CHECKS AND TESTS
SECTION 26 05 33
RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS
PART 1 - GENERAL
1.1 DESCRIPTION
1.2 RELATED WORK
2.1 MATERIAL
3.1 PENETRATIONS
3.2 INSTALLATION, GENERAL
3.3 CONCEALED WORK INSTALLATION
3.4 EXPOSED WORK INSTALLATION
3.5 DIRECT BURIAL INSTALLATION
3.6 HAZARDOUS LOCATIONS
3.7 WET OR DAMP LOCATIONS
3.8 MOTORS AND VIBRATING EQUIPMENT
3.9 EXPANSION JOINTS
3.10 CONDUIT SUPPORTS
3.11 BOX INSTALLATION
SECTION 26 05 41
UNDERGROUND ELECTRICAL CONSTRUCTION
PART 1 - GENERAL
1.1 DESCRIPTION
1.2 RELATED WORK
2.1 PULLBOXES
2.2 DUCTS
2.3 GROUNDING
2.4 WARNING TAPE
2.5 PULL ROPE FOR SPARE DUCTS
PART 3 - EXECUTION
3.1 MANHOLE AND PULLBOX INSTALLATION
3.2 TRENCHING
3.3 DUCT INSTALLATION
3.4 ACCEPTANCE CHECKS AND TESTS
SECTION 26 05 73
OVERCURRENT PROTECTIVE DEVICE COORDINATION STUDY
PART 1 - GENERAL
1.1 DESCRIPTION
1.2 RELATED WORK
1.6 STUDY REQUIREMENTS
1.7 ANALYSIS
1.8 ADJUSTMENTS, SETTINGS, AND MODIFICATIONS
PART 3 - EXECUTION (NOT USED)
SPECSECTION 26 08 00
COMMISSIONING OF ELECTRICAL SYSTEMS
PART 1 - GENERAL
1.1 DESCRIPTION
1.2 RELATED WORK
1.3 SUMMARY
1.4 DEFINITIONS
1.5 COMMISSIONED SYSTEMS
PART 3 - EXECUTION
3.1 CONSTRUCTION INSPECTIONS
3.2 PRE-FUNCTIONAL CHECKLISTS
3.3 CONTRACTORS TESTS
3.4 SYSTEMS FUNCTIONAL PERFORMANCE TESTING
3.5 TRAINING OF VA PERSONNEL
SECTION 26 23 00
LOW-VOLTAGE SWITCHGEAR
PART 1 - GENERAL
1.1 DESCRIPTION
1.2 RELATED WORK
1.4 FACTORY TESTS
2.1 GENERAL
2.2 HOUSING
2.3 BUSES
2.4 LOW-VOLTAGE POWER CIRCUIT BREAKERS
2.5 METERING
2.6 OTHER EQUIPMENT
2.10 CONTROL WIRING
2.11 NAMEPLATES AND MIMIC BUS
3.2 ACCEPTANCE CHECKS AND TESTS
3.3 FOLLOW-UP VERIFICATION
3.4 TEMPORARY HEATING
3.5 WARNING SIGN
3.6 ONE LINE DIAGRAM AND SEQUENCE OF OPERATION
3.7 AS-LEFT TRIP UNIT SETTINGS
3.8 INSTRUCTION
SECTION 26 24 13
DISTRIBUTION SWITCHBOARDS
PART 1 - GENERAL
1.1 DESCRIPTION
1.2 RELATED WORK
2.1 GENERAL
2.2 BASIC ARRANGEMENT
2.3 HOUSING
2.4 BUSES
2.5 MAIN CIRCUIT BREAKERS
2.6 FEEDER CIRCUIT BREAKERS
2.9 CONTROL WIRING
2.10 NAMEPLATES AND MIMIC BUS
3.4 WARNING SIGN
3.5 ONE LINE DIAGRAM AND SEQUENCE OF OPERATION
3.6 AS-LEFT TRIP UNIT SETTINGS
3.7 INSTRUCTION
SECTION 26 24 16
PANELBOARDS
PART 1 - GENERAL
1.1 DESCRIPTION
1.2 RELATED WORK
2.1 GENERAL REQUIREMENTS
2.2 ENCLOSURES AND TRIMS
2.3 MOLDED CASE CIRCUIT BREAKERS
2.4 SURGE PROTECTIVE DEVICES
SECTION 26 27 26
WIRING DEVICES
PART 1 - GENERAL
1.1 DESCRIPTION
1.2 RELATED WORK
2.1 RECEPTACLES
2.2 TOGGLE SWITCHES
2.3 WALL PLATES
2.5 SURFACE MULTIPLE-OUTLET ASSEMBLIES
SECTION 26 32 13
ENGINE GENERATORS
PART 1 - GENERAL
1.1 DESCRIPTION
1.2 RELATED WORK
r
1.6 STORAGE AND HANDLING
1.7 JOB CONDITIONS
1.8 APPLICABLE PUBLICATIONS
2.2 ENGINE
2.3 GOVERNOR
2.4 LUBRICATION OIL SYSTEM
2.5 FUEL SYSTEM
2.6 COOLING SYSTEM
2.7 AIR INTAKE AND EXHAUST SYSTEMS
2.8 ENGINE STARTING SYSTEM
2.9 LUBRICATING OIL HEATER
2.10 JACKET COOLANT HEATER
2.11 GENERATOR
2.12 GENERATOR OVERCURRENT AND FAULT PROTECTION
2.13 CONTROLS
2.14 REMOTE MANUAL STOP STATION
2.15 REMOTE ANNUNCIATOR PANEL
2.16 SOUND-ATTENUATED ENCLOSURE
2.17 SPARE PARTS
3.4 INSTRUCTIONS AND FINAL INSPECTIONS
SECTION 26 36 23
AUTOMATIC TRANSFER SWITCHES
PART 1 - GENERAL
1.1 DESCRIPTION
2.2 SEQUENCE OF OPERATION
2.3 BYPASS-ISOLATION SWITCH
2.4 REMOTE ANNUNCIATOR SYSTEM
3.3 FIELD SETTINGS VERIFICATION
3.4 FOLLOW-UP VERIFICATION
3.5 INSTRUCTION
SECTION 26 41 00
FACILITY LIGHTNING PROTECTION
PART 1 - GENERAL
1.1 DESCRIPTION
1.2 RELATED WORK
SECTION 27 05 11
REQUIREMENTS FOR COMMUNICATIONS INSTALLATIONS
PART 1 - GENERAL
1.2 REFERENCES
1.4 SINGULAR NUMBER
1.5 RELATED WORK
1.6 ADMINISTRATIVE REQUIREMENTS
1.7 SUBMITTALS
1.8 CLOSEOUT SUBMITTALS
1.9 MAINTENANCE MATERIAL SUBMITTALS
1.10 QUALITY ASSURANCE
1.11 DELIVERY, STORAGE, AND HANDLING
1.12 FIELD CONDITIONS
1.13 WARRANTY
2.1 PERFORMANCE AND DESIGN CRITERIA
2.2 WIRE LUBRICATING COMPOUND
2.3 FIREPROOFING TAPE
2.4 ACCESS PANELS
3.3 EQUIPMENT INSTALLATION
3.4 EQUIPMENT IDENTIFICATION
3.5 CUTTING AND PATCHING
3.6 FIELD QUALITY CONTROL
3.7 CLEANING
3.8 TRAINING
3.9 PROTECTION
SECTION 27 05 26
GROUNDING AND BONDING FOR COMMUNICATIONS SYSTEMS
PART 1 - GENERAL
1.1 DESCRIPTION
1.2 RELATED WORK
1.3 SUBMITTALS
2.1 COMPONENTS
3.1 EQUIPMENT INSTALLATION AND REQUIREMENTS
3.2 FIELD QUALITY CONTROL
SECTION 33 08 00
COMMISSIONING OF SITE UTILITY SYSTEMS
PART 1 - GENERAL
1.1 DESCRIPTION
1.2 RELATED WORK
1.3 SUMMARY
1.4 DEFINITIONS
1.5 COMMISSIONED SYSTEMS
PART 3 - EXECUTION
3.1 CONSTRUCTION INSPECTIONS
3.2 PRE-FUNCTIONAL CHECKLISTS
3.3 CONTRACTORS TESTS
3.4 SYSTEMS FUNCTIONAL PERFORMANCE TESTING
3.5 TRAINING OF VA PERSONNEL