657-17-182JB - SPECIFICATIONS_Part6.pdf

PDF 7 MB Posted

Attached to
Z2DA--FCA - Replace Electrical Systems in 657-17-182JB, Building 1 (VA-20-00063714)
Solicitation number
36C25521R0010
Issued by

About this file

This solicitation is for replacement of the electrical system within Building 1 at the Jefferson Barracks VA Medical Center in St. Louis, Missouri. The contractor will provide all labor, materials, tools, equipment, supervision, and site preparation work to replace the existing electrical system, which is beyond its useful life. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 15 is the contracting agency. The contractor must complete all work for project 657-17-182JB FCA Replace Electrical Systems in Building 1 as required.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOR OFFICE USE ONLY

MISSOURI DEPARTMENT OF NATURAL RESOURCES

AIR POLLLUTION CONTROL PROGRAM

P.O. BOX 176, JEFFERSON CITY, MO 63102-0176

ASBESTOS NOTIFICATION AMENDMENT

(Please type information)

PART A CONTRACTOR INFORMATION

1. ASBESTOS ABATEMENT CONTRACTOR NAME

2. CONTRACTOR STREET ADDRESS CITY STATE ZIP

TELEPHONE NUMBER

3. MISSOURI REGISTRATION NUMBER

REGISTRATION EXPIRATION DATE

CONTACT PERSON

PART B PROJECT INFORMATION

1. PROJECT SITE NAME

2. PROJECT SITE ADDRESS CITY STATE ZIP

TELEPHONE NUMBER

3. PROJECT I.D. NUMBER ASSIGNED BY THE MISSOURI DEPARTMENT OF NATURAL RESOURCES

PART C AMENDMENT INFORMATION (ATTACH ANOTHER SHEET IF NECESSARY)

PROJECT INFORMATION AS NOTIFIED

(Example: Start Time: 7:00 a.m.

AMENDED TO

Start Time: 7:30 a.m.)

PART D SUPPLEMENTAL INFORMATION (AS NEEDED)

PART E AUTHENTICATION

SIGNATURE OF COMPANY REPRESENTATIVE TITLE

PRINTED OR TYPED NAME

DATE

MO 780-1556 (7-96)

MISSOURI DEPARTMENT OF NATURAL RESOURCES

AIR POLLUTION CONTROL PROGRAM

ASBESTOS POST- NOTIFICATION

GENERAL INSTRUCTIONS

Persons who perform asbestos abatement projects are required to submit post-notification to the department within sixty

(60) days of the completion date indicated on the initial notification. This post-notification shall include signed and dated receipt(s) of asbestos disposal as well as final air clearance results (if applicable). These documents, along with the completed post-notification form shall be mailed to the following address*:

MISSOURI DEPARTMENT OF NATURAL RESOURCES

AIR POLLUTION CONTROL PROGRAM (ASBESTOS)

P.O. BOX 176

JEFFERSON CITY, MISSOURI 65102

*For projects under the jurisdiction of a local agency, send post notification to the appropriate office.

PART A. ASBESTOS PROJECT INFORMATION

PROJECT NAME

PROJECT ID ASSIGNED BY MDNR

ADDRESS

CITY

STATE

ZIP CODE

START DATE COMPLETION DATE

PART B. CONTRACTOR INFORMATION

NAME OF CONTRACTOR CONTRACTOR REGISTRATION NUMBER

CONTRACTOR CONTACT PERSON TELEPHONE NUMBER

PART C. WASTE DISPOSAL INFORMATION

NAME OF LANDFILL

ADDRESS

CITY STATE ZIP CODE

NOTE: INCLUDE COPIES OF ALL WASTE SHIPMENT RECORDS AND DISPOSAL RECEIPTS

PART D. AIR SAMPLING INFORMATION

NAME OF AIR SAMPLING PROFESSIONAL CERTIFICATION NUMBER

COMPANY NAME TELEPHONE NUMBER

NOTE: INCLUDE COPIES OF FINAL AIR CLEARANCE RESULTS (IF APPLICABLE)

PART E. AUTHENTICATION

I CERTIFY THAT THE INFORMATION LISTED ABOVE AND ENCLOSED IS TRUE AND ACCURATE.

SIGNATURE OF ASBESTOS ABATEMENT CONTRACTOR DATE

MO 780-1225 (8-04)

SECTION 03 30 53

(SHORT-FORM) CAST-IN-PLACE CONCRETE

PART 1 - GENERAL

1.1 SUMMARY

1.2 RELATED REQUIREMENTS

1.3 APPLICABLE PUBLICATIONS

1.4 SUBMITTALS

1.5 DELIVERY

1.6 WARRANTY

PART 2 - PRODUCTS

2.1 MATERIALS

2.2 ACCESSORIES

2.3 CONCRETE MIXES

2.4 BATCHING AND MIXING

PART 3 - EXECUTION

3.1 FORMWORK

3.2 REINFORCEMENT

3.3 PLACING CONCRETE

3.4 TOLERANCES

3.5 PROTECTION AND CURING

3.6 FORM REMOVAL

3.7 FINISHES

3.8 SURFACE TREATMENTS

SECTION 05 40 00

COLD-FORMED METAL FRAMING

PART 1 - GENERAL

1.1 DESCRIPTION:

1.2 RELATED WORK:

1.3 DESIGN REQUIREMENTS:

1.4 SUBMITTALS:

1.5 APPLICABLE PUBLICATIONS:

2.1 MATERIALS:

2.2 WALL FRAMING

2.3 FRAMING ACCESSORIES:

2.4 ANCHORS, CLIPS, AND FASTENERS:

2.5 REQUIREMENTS:

3.1 FABRICATION:

3.2 ERECTION:

3.3 TOLERANCES:

3.4 FIELD REPAIR:

SECTION 08 11 13

HOLLOW METAL DOORS AND FRAMES

PART 1 - GENERAL

1.1 SUMMARY

1.5 QUALITY ASSURANCE

1.6 DELIVERY

1.7 STORAGE AND HANDLING

1.8 WARRANTY

PART 2 - PRODUCTS

2.1 SYSTEM PERFORMANCE

2.2 MATERIALS

2.3 PRODUCTS - GENERAL

2.4 HOLLOW METAL DOORS

2.5 HOLLOW METAL FRAMES

2.6 FABRICATION

2.7 FINISHES

2.8 ACCESSORIES

3.1 PREPARATION

3.2 INSTALLATION - GENERAL

3.3 FRAME INSTALLATION

3.4 DOOR INSTALLATION

3.5 CLEANING

3.6 PROTECTION

SECTION 08 71 00

DOOR HARDWARE

PART 1 - GENERAL

1.1 DESCRIPTION

1.2 RELATED WORK

1.3 GENERAL

1.4 WARRANTY

1.5 MAINTENANCE MANUALS

1.6 SUBMITTALS

1.7 DELIVERY AND MARKING

1.8 PREINSTALLATION MEETING

1.9 INSTRUCTIONS

1.10 APPLICABLE PUBLICATIONS

2.1 BUTT HINGES

2.2 DOOR CLOSING DEVICES

2.3 OVERHEAD CLOSERS

2.9 LOCKS AND LATCHES

2.13 KEYS

Locks/Keys Quantity

2.26 MISCELLANEOUS HARDWARE

3.1 HARDWARE HEIGHTS

3.2 INSTALLATION

Door Thickness Door Width Hinge Height

3.3 FINAL INSPECTION

3.4 DEMONSTRATION

3.5 HARDWARE SETS

SECTION 09 22 16

NON-STRUCTURAL METAL FRAMING

PART 1 - GENERAL

1.1 DESCRIPTION

1.2 RELATED WORK - NONE

1.3 TERMINOLOGY

1.5 DELIVERY, IDENTIFICATION, HANDLING AND STORAGE

1.6 APPLICABLE PUBLICATIONS

2.1 PROTECTIVE COATING

2.2 STEEL STUDS AND RUNNERS (TRACK)

2.3 FURRING CHANNELS

2.4 FASTENERS, CLIPS, AND OTHER METAL ACCESSORIES

3.1 INSTALLATION CRITERIA

3.2 INSTALLING STUDS

3.3 INSTALLING WALL FURRING FOR FINISH APPLIED TO ONE SIDE ONLY

3.4 INSTALLING SUPPORTS REQUIRED BY OTHER TRADES

3.5 INSTALLING SHAFT WALL SYSTEM

3.6 INSTALLING FURRED AND SUSPENDED CEILINGS OR SOFFITS

3.7 TOLERANCES

SECTION 09 29 00

GYPSUM BOARD

PART 1 - GENERAL

1.1 DESCRIPTION

1.2 RELATED WORK

1.6 ENVIRONMENTAL CONDITIONS

1.7 APPLICABLE PUBLICATIONS

2.1 GYPSUM BOARD

2.2 GYPSUM SHEATHING BOARD

2.3 ACCESSORIES

2.4 FASTENERS

2.5 FINISHING MATERIALS AND LAMINATING ADHESIVE

3.1 GYPSUM BOARD HEIGHTS

3.2 INSTALLING GYPSUM BOARD

3.3 INSTALLING GYPSUM SHEATHING

3.4 CAVITY SHAFT WALL

3.5 FINISHING OF GYPSUM BOARD

3.6 REPAIRS

3.7 UNACCESSIBLE CEILINGS

SECTION 09 91 00

PAINTING

PART 1 - GENERAL

1.1 DESCRIPTION:

1.2 RELATED WORK:

1.3 SUBMITTALS:

1.4 DELIVERY AND STORAGE:

1.5 QUALITY ASSURANCE:

1.6 REGULATORY REQUIREMENTS:

1.7 SAFETY AND HEALTH

1.8 APPLICABLE PUBLICATIONS:

2.2 PAINT PROPERTIES:

2.3 PLASTIC TAPE:

3.1 JOB CONDITIONS:

3.2 INSPECTION:

3.3 GENERAL WORKMANSHIP REQUIREMENTS:

3.4 SURFACE PREPARATION:

3.5 PAINT PREPARATION:

3.6 APPLICATION:

3.7 PRIME PAINTING:

3.8 INTERIOR FINISHES:

3.9 REFINISHING EXISTING PAINTED SURFACES:

3.10 PAINT COLOR:

3.11 MECHANICAL AND ELECTRICAL WORK FIELD PAINTING SCHEDULE:

3.12 BUILDING AND STRUCTURAL WORK FIELD PAINTING:

3.13 PROTECTION CLEAN UP, AND TOUCH-UP:

DEPARTMENT OF VETERANS AFFAIRS

VHA MASTER SPECIFICATIONS

TABLE OF CONTENTS

Section 00 01 10

DIVISION 00 - SPECIAL SECTIONS DATE

DIVISION 01 - GENERAL REQUIREMENTS

DIVISION 02 – EXISTING CONDITIONS

DIVISION 03 – CONCRETE

DIVISION 04 – MASONRY

DIVISION 05 – METALS

DIVISION 06 – WOOD, PLASTICS, AND COMPOSITES

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

DIVISION 08 - OPENINGS

DIVISION 09 – FINISHES

DIVISION 10 – SPECIALTIES

DIVISION 11 – EQUIPMENT

DIVISION 12 – FURNISHINGS

DIVISION 13 - SPECIAL CONSTRUCTION

DIVISION 14 – CONVEYING EQUIPEMENT

DIVISION 21 - FIRE SUPPRESSION

DIVISION 22 – PLUMBING

DIVISION 23 – HEATING, VENTILATING, AND AIR

CONDITIONING (HVAC)

DIVISION 25 – INTEGRATED AUTOMATION

DIVISION 26 – ELECTRICAL

DIVISION 27 – COMMUNICATIONS

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

DIVISION 31 – EARTHWORK

DIVISION 32 – EXTERIOR IMPROVEMENTS

DIVISION 33 – UTILITIES

DIVISION 34 – TRANSPORTATION

DIVISION 48 – Electrical Power Generation

SECTION 00 01 15

LIST OF DRAWING SHEETS

i

SECTION 01 00 00

GENERAL REQUIREMENTS

TABLE OF CONTENTS

..............................................................................................................Not Used

............................................................................................................Not Used

.................................................................Not Used

......................................................................................Not Used

.................................................................................................................................Not Used ii

....................................Not Used

...............................................................................Not Used

......................................................................Not Used

...............................................................................Not Used

SECTION 01 00 00

GENERAL REQUIREMENTS

1.1 SAFETY REQUIREMENTS

1.2 GENERAL INTENTION

1.3 STATEMENT OF BID ITEM(S)

1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR

1.5 CONSTRUCTION SECURITY REQUIREMENTS

1.6 OPERATIONS AND STORAGE AREAS

Phase I:

Phase II:

Phase III:

Phase IV:

1.7 ALTERATIONS

1.8 DISPOSAL AND RETENTION

1.9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND

IMPROVEMENTS

1.10 RESTORATION

1.12 PROFESSIONAL SURVEYING SERVICES

1.14 AS-BUILT DRAWINGS

1.15 USE OF ROADWAYS

1.17 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT

Temporary Installations.

1.18 TEMPORARY USE OF EXISTING ELEVATORS

1.20 TEMPORARY TOILETS

1.21 AVAILABILITY AND USE OF UTILITY SERVICES

1.24 INSTRUCTIONS

1.25 GOVERNMENT-FURNISHED PROPERTY

1.26 RELOCATED EQUIPMENT

1.28 CONSTRUCTION SIGN

1.29 SAFETY SIGN

1.32 HISTORIC PRESERVATION

SECTION 01 33 23

SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

PART 1 – GENERAL

1.1 DESCRIPTION

1.2 DEFINITIONS

1.3 SUBMITTAL REGISTER

1.4 SUBMITTAL SCHEDULING

1.5 SUBMITTAL PREPARATION

1.6 SUBMITTAL FORMAT AND TRANSMISSION

1.7 SAMPLES

1.8 OPERATION AND MAINTENANCE DATA

1.9 TEST REPORTS

1.10 VA REVIEW OF SUBMITTALS AND RFIS

1.11 APPROVED SUBMITTALS

1.12 WITHHOLDING OF PAYMENT

SECTION 01 35 26

SAFETY REQUIREMENTS

TABLE OF CONTENTS

SECTION 01 35 26

Safety REQUIREMENTS

1.1 APPLICABLE PUBLICATIONS:

1.2 DEFINITIONS:

1.3 REGULATORY REQUIREMENTS:

1.4 ACCIDENT PREVENTION PLAN (APP):

SIGNATURE SHEET.

BACKGROUND INFORMATION

c STATEMENT OF SAFETY AND HEALTH POLICY

RESPONSIBILITIES AND LINES OF AUTHORITIES

e. SUBCONTRACTORS AND SUPPLIERS.

TRAINING.

g. SAFETY AND HEALTH INSPECTIONS.

h. ACCIDENT/INCIDENT INVESTIGATION & REPORTING.

i. PLANS (PROGRAMS, PROCEDURES) REQUIRED.

Accident Prevention

1.5 ACTIVITY HAZARD ANALYSES (AHAS):

1.6 PRECONSTRUCTION CONFERENCE:

1.7 “SITE SAFETY AND HEALTH OFFICER” (SSHO) AND “COMPETENT PERSON” (CP):

Superintendence by the Contractor

1.8 TRAINING:

1.9 INSPECTIONS:

1.10 ACCIDENTS, OSHA 300 LOGS, AND MAN-HOURS:

1.11 PERSONAL PROTECTIVE EQUIPMENT (PPE):

1.12 INFECTION CONTROL

Class III

1.13 TUBERCULOSIS SCREENING

1.14 FIRE SAFETY

1.15 ELECTRICAL

1.16 FALL PROTECTION

1.17 SCAFFOLDS AND OTHER WORK PLATFORMS

1.18 EXCAVATION AND TRENCHES

1.19 CRANES

1.20 CONTROL OF HAZARDOUS ENERGY (LOCKOUT/TAGOUT)

1.21 CONFINED SPACE ENTRY

1.22 WELDING AND CUTTING

1.23 LADDERS

1.24 FLOOR & WALL OPENINGS

SECTION 01 42 19

REFERENCE STANDARDS

PART 1 - GENERAL

1.1 DESCRIPTION

1.2 AVAILABILITY OF SPECIFICATIONS LISTED IN THE GSA INDEX OF FEDERAL

SPECIFICATIONS, STANDARDS AND COMMERCIAL ITEM DESCRIPTIONS FPMR PART 101-29

(FAR 52.211-1) (AUG 1998)

1.3 AVAILABILITY FOR EXAMINATION OF SPECIFICATIONS NOT LISTED IN THE GSA

INDEX OF FEDERAL SPECIFICATIONS, STANDARDS AND COMMERCIAL ITEM DESCRIPTIONS

(FAR 52.211-4) (JUN 1988)

1.4 AVAILABILITY OF SPECIFICATIONS NOT LISTED IN THE GSA INDEX OF FEDERAL

SPECIFICATIONS, STANDARDS AND COMMERCIAL ITEM DESCRIPTIONS (FAR 52.211-3)

(JUN 1988)

SECTION 01 58 16

TEMPORARY INTERIOR SIGNAGE

PART 1 GENERAL

DESCRIPTION

PART 2 PRODUCTS

2.1 TEMPORARY SIGNS

PART 3 EXECUTION

3.1 INSTALLATION

3.2 LOCATION

SECTION 01 74 19

CONSTRUCTION WASTE MANAGEMENT

PART 1 – GENERAL

1.3 QUALITY ASSURANCE

1.4 TERMINOLOGY

1.5 SUBMITTALS

1.7 RECORDS

2.1 MATERIALS

PART 3 - EXECUTION

3.1 COLLECTION

3.2 DISPOSAL

3.3 REPORT

SECTION 01 81 13

SUSTAINABLE CONSTRUCTION REQUIREMENTS

PART 1 - GENERAL

1.1 DESCRIPTION

1.3 DEFINITIONS

1.4 REFERENCE STANDARDS

1.6 QUALITY ASSURANCE

PART 2 – PRODUCTS

2.1 PERFORMANCE CRITERIA

3.1 FIELD QUALITY CONTROL

SECTION 01 91 00

GENERAL COMMISSIONING REQUIREMENTS

1.1 COMMISSIONING DESCRIPTION

1.2 CONTRACTUAL RELATIONSHIPS

1.3 RELATED WORK

1.4 SUMMARY

1.5 ACRONYMS

1.6 DEFINITIONS

Acceptance Phase Commissioning:

Accuracy:

Back Check:

Basis of Design (BOD):

Benchmarks:

Building Information Modeling (BIM):

Calibrate:

CCTV:

COBie:

Commissionability:

Commissioning Agent (CxA):

Commissioning Checklists:

Commissioning Design Review:

Commissioning Issue:

Commissioning Manager (CxM):

Commissioning Observation:

Commissioning Plan:

Commissioning Process:

Commissioning Report:

Commissioning Representative (CxR): An individual appointed by a sub-contractor to manage the commissioning process on behalf of the sub-contractor.

Commissioning Specifications:

Commissioning Team:

Construction Phase Commissioning:

Contract Documents (CD):

Construction Phase Commissioning (CPC):

Coordination Drawings:

Data Logging:

Deferred System Test:

Deficiency:

Design Criteria:

Design Intent:

Design Narrative:

Design Phase Commissioning (DPC):

Environmental Systems:

Executive Summary:

Functionality:

Functional Test Procedure (FTP):

Industry Accepted Best Practice:

Installation Verification:

Integrated System Testing:

Lessons Learned Workshop:

Maintainability:

Manual Test:

Owner’s Project Requirements (OPR):

Peer Review:

Precision:

Pre-Design Phase Commissioning:

Pre-Functional Checklist (PFC):

Pre-Functional Test (PFT):

Procedure or Protocol:

Range:

Resolution:

Site Observation Visit:

Site Observation Reports (SO):

Special System Inspections:

Static Tests:

Start Up Tests:

Systems Manual:

Test Procedure:

Testing:

Testing, Adjusting, and Balancing (TAB):

Thermal Scans:

Training Plan:

Trending:

Unresolved Commissioning Issue:

Verification:

Warranty Phase Commissioning:

Warranty Visit:

Whole Building Commissioning:

1.7 SYSTEMS TO BE COMMISSIONED

Systems To Be Commissioned

System Description

Electrical

Systems To Be Commissioned

System Description

Communications

1.8 COMMISSIONING TEAM

1.9 VA'S COMMISSIONING RESPONSIBILITIES

1.10 CONTRACTOR'S COMMISSIONING RESPONSIBILITIES

1.11 COMMISSIONING AGENT’S RESPONSIBILITIES

1.12 COMMISSIONING DOCUMENTATION

1.13 SUBMITTALS

1.14 COMMISSIONING PROCESS

1.15 QUALITY ASSURANCE

1.16 COORDINATION

2.1 TEST EQUIPMENT

3.1 COMMISSIONING PROCESS ROLES AND RESPONSIBILITIES

Construction Phase

Acceptance Phase

3.2 STARTUP, INITIAL CHECKOUT, AND PRE-FUNCTIONAL CHECKLISTS

3.3 DEFICIENCIES, NONCONFORMANCE, AND APPROVAL IN CHECKLISTS AND STARTUP

3.4 PHASED COMMISSIONING

3.5 DDC SYSTEM TRENDING FOR COMMISSIONING

2-Pipe Fan Coil Unit Trending and Alarms

Point Type Trend Interval

Operationa l Trend Duration

Testing Trend Duration

Alarm Type

Alarm Range

Alarm Delay

2-Pipe Fan Coil Unit Trending and Alarms

Point Type Trend Interval

Operationa l Trend Duration

Testing Trend Duration

Alarm Type

Alarm Range

Alarm Delay

3.6 SYSTEMS FUNCTIONAL PERFORMANCE TESTING

3.7 DOCUMENTATION, NONCONFORMANCE AND APPROVAL OF TESTS

3.8 DEFERRED TESTING

3.9 OPERATION AND MAINTENANCE TRAINING REQUIREMENTS

----- END -----

SECTION 02 41 00

DEMOLITION

PART 1 - GENERAL

1.1 DESCRIPTION:

1.3 PROTECTION:

1.4 UTILITY SERVICES:

PART 2 - PRODUCTS (NOT USED)

PART 3 – EXECUTION

3.1 DEMOLITION:

3.2 CLEAN-UP:

SECTION 03 30 53

(SHORT-FORM) CAST-IN-PLACE CONCRETE

PART 1 - GENERAL

1.1 SUMMARY

1.5 DELIVERY

1.6 WARRANTY

2.2 ACCESSORIES

2.3 CONCRETE MIXES

2.4 BATCHING AND MIXING

3.1 FORMWORK

3.2 REINFORCEMENT

3.3 PLACING CONCRETE

3.4 TOLERANCES

3.5 PROTECTION AND CURING

3.6 FORM REMOVAL

3.7 FINISHES

3.8 SURFACE TREATMENTS

SECTION 05 40 00

COLD-FORMED METAL FRAMING

PART 1 - GENERAL

1.1 DESCRIPTION:

1.2 RELATED WORK:

1.3 DESIGN REQUIREMENTS:

1.4 SUBMITTALS:

1.5 APPLICABLE PUBLICATIONS:

2.2 WALL FRAMING

2.3 FRAMING ACCESSORIES:

2.4 ANCHORS, CLIPS, AND FASTENERS:

2.5 REQUIREMENTS:

3.1 FABRICATION:

3.2 ERECTION:

3.3 TOLERANCES:

3.4 FIELD REPAIR:

SECTION 08 11 13

HOLLOW METAL DOORS AND FRAMES

PART 1 - GENERAL

1.1 SUMMARY

1.6 DELIVERY

1.7 STORAGE AND HANDLING

1.8 WARRANTY

PART 2 - PRODUCTS

2.1 SYSTEM PERFORMANCE

2.2 MATERIALS

2.3 PRODUCTS - GENERAL

2.4 HOLLOW METAL DOORS

2.5 HOLLOW METAL FRAMES

2.6 FABRICATION

2.7 FINISHES

2.8 ACCESSORIES

3.3 FRAME INSTALLATION

3.4 DOOR INSTALLATION

3.5 CLEANING

3.6 PROTECTION

SECTION 08 71 00

DOOR HARDWARE

PART 1 - GENERAL

1.1 DESCRIPTION

1.3 GENERAL

1.4 WARRANTY

1.5 MAINTENANCE MANUALS

1.7 DELIVERY AND MARKING

1.8 PREINSTALLATION MEETING

1.9 INSTRUCTIONS

2.1 BUTT HINGES

2.2 DOOR CLOSING DEVICES

2.3 OVERHEAD CLOSERS

2.9 LOCKS AND LATCHES

2.13 KEYS

Locks/Keys Quantity

2.26 MISCELLANEOUS HARDWARE

3.1 HARDWARE HEIGHTS

3.2 INSTALLATION

Door Thickness Door Width Hinge Height

3.3 FINAL INSPECTION

3.4 DEMONSTRATION

3.5 HARDWARE SETS

SECTION 09 22 16

NON-STRUCTURAL METAL FRAMING

PART 1 - GENERAL

1.1 DESCRIPTION

1.2 RELATED WORK - NONE

2.1 PROTECTIVE COATING

2.2 STEEL STUDS AND RUNNERS (TRACK)

2.3 FURRING CHANNELS

2.4 FASTENERS, CLIPS, AND OTHER METAL ACCESSORIES

3.1 INSTALLATION CRITERIA

3.2 INSTALLING STUDS

3.3 INSTALLING WALL FURRING FOR FINISH APPLIED TO ONE SIDE ONLY

3.4 INSTALLING SUPPORTS REQUIRED BY OTHER TRADES

3.5 INSTALLING SHAFT WALL SYSTEM

3.6 INSTALLING FURRED AND SUSPENDED CEILINGS OR SOFFITS

3.7 TOLERANCES

SECTION 09 29 00

GYPSUM BOARD

PART 1 - GENERAL

1.1 DESCRIPTION

1.2 RELATED WORK

1.6 ENVIRONMENTAL CONDITIONS

2.1 GYPSUM BOARD

2.2 GYPSUM SHEATHING BOARD

2.3 ACCESSORIES

2.4 FASTENERS

2.5 FINISHING MATERIALS AND LAMINATING ADHESIVE

3.1 GYPSUM BOARD HEIGHTS

3.2 INSTALLING GYPSUM BOARD

3.3 INSTALLING GYPSUM SHEATHING

3.4 CAVITY SHAFT WALL

3.5 FINISHING OF GYPSUM BOARD

3.6 REPAIRS

3.7 UNACCESSIBLE CEILINGS

SECTION 09 91 00

PAINTING

1.1 DESCRIPTION:

1.3 SUBMITTALS:

1.4 DELIVERY AND STORAGE:

1.5 QUALITY ASSURANCE:

1.6 REGULATORY REQUIREMENTS:

1.7 SAFETY AND HEALTH

1.8 APPLICABLE PUBLICATIONS:

2.2 PAINT PROPERTIES:

2.3 PLASTIC TAPE:

3.1 JOB CONDITIONS:

3.2 INSPECTION:

3.3 GENERAL WORKMANSHIP REQUIREMENTS:

3.4 SURFACE PREPARATION:

3.5 PAINT PREPARATION:

3.6 APPLICATION:

3.7 PRIME PAINTING:

3.8 INTERIOR FINISHES:

3.9 REFINISHING EXISTING PAINTED SURFACES:

3.10 PAINT COLOR:

3.11 MECHANICAL AND ELECTRICAL WORK FIELD PAINTING SCHEDULE:

3.12 BUILDING AND STRUCTURAL WORK FIELD PAINTING:

3.13 PROTECTION CLEAN UP, AND TOUCH-UP:

SECTION 21 13 13

WET-PIPE SPRINKLER SYSTEMS

PART 1 - GENERAL

1.1 DESCRIPTION

1.3 DESIGN CRITERIA

2.1 PIPING & FITTINGS

2.2 VALVES

2.3 SPRINKLERS

2.4 SPRINKLER SYSTEM SIGNAGE

2.5 SWITCHES:

2.6 GAUGES

2.7 PIPE HANGERS, SUPPORTS AND RESTRAINT OF SYSTEM PIPING

2.8 WALL, FLOOR AND CEILING PLATES

2.9 VALVE TAGS

3.2 INSPECTION AND TEST

SECTION 23 05 11

COMMON WORK RESULTS FOR HVAC

1.6 DELIVERY, STORAGE AND HANDLING

1.7 AS-BUILT DOCUMENTATION

1.8 JOB CONDITIONS – WORK IN EXISTING BUILDING

2.1 FACTORY-ASSEMBLED PRODUCTS

2.2 COMPATIBILITY OF RELATED EQUIPMENT

2.3 DRIVE GUARDS

2.4 LIFTING ATTACHMENTS

2.5 ELECTRIC MOTORS

2.6 EQUIPMENT AND MATERIALS IDENTIFICATION

2.7 FIRESTOPPING

2.8 GALVANIZED REPAIR COMPOUND

2.9 HVAC PIPE AND EQUIPMENT SUPPORTS AND RESTRAINTS

2.10 PIPE PENETRATIONS

2.11 DUCT PENETRATIONS

2.12 SPECIAL TOOLS AND LUBRICANTS

2.13 WALL, FLOOR AND CEILING PLATES

2.14 ASBESTOS

PART 3 - EXECUTION

3.1 GENERAL

3.2 ARRANGEMENT AND INSTALLATION OF EQUIPMENT AND PIPING

3.3 TEMPORARY PIPING AND EQUIPMENT

3.4 RIGGING

3.5 PIPE AND EQUIPMENT SUPPORTS

3.6 MECHANICAL DEMOLITION

3.7 CLEANING AND PAINTING

3.8 IDENTIFICATION SIGNS

3.9 MOTOR AND DRIVES

3.10 LUBRICATION

3.11 STARTUP, TEMPORARY OPERATION AND TESTING

3.12 OPERATING AND PERFORMANCE TESTS

3.13 DEMONSTRATION AND TRAINING

SECTION 23 05 93

TESTING, ADJUSTING, AND BALANCING FOR HVAC

PART 1 - GENERAL

1.1 DESCRIPTION

1.5 APPLICABLE PUBLICATIONS

2.1 PLUGS

2.2 INSULATION REPAIR MATERIAL

3.2 DESIGN REVIEW REPORT

3.3 SYSTEMS INSPECTION REPORT

3.4 DUCT AIR LEAKAGE TEST REPORT

3.5 SYSTEM READINESS REPORT

3.6 TAB REPORTS

3.7 TAB PROCEDURES

3.9 MARKING OF SETTINGS

3.10 IDENTIFICATION OF TEST PORTS

SECTION 23 07 11

HVAC INSULATION

4.3.3.1

Standard Method of Test of Surface Burning Characteristics of Building Materials

4.3.3.1.1

(See 4.2.4.2.)

4.3.3.1.2

Standard Methods of Tests of Fire Endurance of Building Construction and Materials

1.5 STORAGE AND HANDLING OF MATERIAL

2.1 MINERAL FIBER OR FIBER GLASS

2.2 MINERAL WOOL OR REFRACTORY FIBER

2.3 RIGID CELLULAR PHENOLIC FOAM

2.4 CELLULAR GLASS CLOSED-CELL

2.5 FLEXIBLE ELASTOMERIC CELLULAR THERMAL

2.6 CALCIUM SILICATE

Insulation Characteristics

ITEMS TYPE I TYPE II

2.7 INSULATION FACINGS AND JACKETS

2.8 PIPE COVERING PROTECTION SADDLES

Nominal Pipe Size and Accessories Material (Insert Blocks)

2.9 ADHESIVE, MASTIC, CEMENT

2.10 MECHANICAL FASTENERS

2.11 REINFORCEMENT AND FINISHES

2.12 FLAME AND SMOKE

3.1 GENERAL REQUIREMENTS

3.2 INSULATION INSTALLATION

3.8 PIPE INSULATION SCHEDULE

Insulation Thickness Millimeters (Inches)

SECTION 23 09 23

DIRECT-DIGITAL CONTROL SYSTEM FOR HVAC

Work/Item/System Furnish Install Low Voltage Wiring

Line Power

Item/Task Section 23 09 23 contactor

Control system integrator

VA

1.3 DEFINITION

1.4 QUALITY ASSURANCE

1.5 PERFORMANCE

Measured Variable Reported Accuracy

Controlled Variable Control Accuracy Range of Medium

1.6 WARRANTY

1.7 SUBMITTALS

1.8 INSTRUCTIONS

1.9 PROJECT CONDITIONS (ENVIRONMENTAL CONDITIONS OF OPERATION)

2.2 CONTROLS SYSTEM ARCHITECTURE

2.3 COMMUNICATION

2.4 NETWORK AND DEVICE NAMING CONVENTION

2.5 BACNET DEVICES

2.6 CONTROLLERS

2.7 SENSORS (AIR, WATER AND STEAM)

2.8 CONTROL CABLES

2.9 THERMOSTATS

2.10 FINAL CONTROL ELEMENTS AND OPERATORS

2.11 AIR FLOW CONTROL

3.2 SYSTEM VALIDATION AND DEMONSTRATION

SECTION 23 21 13

HYDRONIC PIPING

PART 1 - GENERAL

1.1 DESCRIPTION

1.6 AS-BUILT DOCUMENTATION

1.7 SPARE PARTS

2.1 PIPE AND EQUIPMENT SUPPORTS, PIPE SLEEVES, AND WALL AND CEILING PLATES

2.2 PIPE AND TUBING

2.3 FITTINGS FOR STEEL PIPE

2.4 FITTINGS FOR COPPER TUBING

2.5 DIELECTRIC FITTINGS

2.6 SCREWED JOINTS

2.7 VALVES

2.8 EXPANSION JOINTS

2.9 FIRESTOPPING MATERIAL

3.2 PIPE JOINTS

3.3 LEAK TESTING ABOVEGROUND PIPING

3.4 FLUSHING AND CLEANING PIPING SYSTEMS

3.5 STARTUP AND TESTING

3.6 DEMONSTRATION AND TRAINING

SECTION 23 31 00

HVAC DUCTS AND CASINGS

PART 1 - GENERAL

1.1 DESCRIPTION

1.2 RELATED WORK

2.1 DUCT MATERIALS AND SEALANTS

2.2 DUCT CONSTRUCTION AND INSTALLATION

2.3 DUCT ACCESS DOORS, PANELS AND SECTIONS

2.4 FIRE DAMPERS

2.5 SMOKE DAMPERS

2.6 COMBINATION FIRE AND SMOKE DAMPERS

2.7 INSTRUMENT TEST FITTINGS

2.8 ELECTROSTATIC SHIELDING

3.2 DUCT LEAKAGE TESTS AND REPAIR

3.4 TESTING, ADJUSTING AND BALANCING (TAB)

3.5 OPERATING AND PERFORMANCE TESTS

SECTION 23 82 00

CONVECTION HEATING AND COOLING UNITS

PART 1 - GENERAL

1.1 DESCRIPTION

1.2 RELATED WORK

1.3 QUALITY ASSURANCE

1.6 GUARANTY

2.1 ROOM FAN-COIL UNITS

3.2 OPERATIONAL TEST

3.3 STARTUP AND TESTING

3.4 DEMONSTRATION AND TRAINING

SECTION 26 05 11

REQUIREMENTS FOR ELECTRICAL INSTALLATIONS

PART 1 - GENERAL

1.1 DESCRIPTION

1.2 MINIMUM REQUIREMENTS

1.3 TEST STANDARDS

1.4 QUALIFICATIONS (PRODUCTS AND SERVICES)

1.6 MANUFACTURED PRODUCTS

1.7 VARIATIONS FROM CONTRACT REQUIREMENTS

1.8 MATERIALS AND EQUIPMENT PROTECTION

1.9 WORK PERFORMANCE

1.10 EQUIPMENT INSTALLATION AND REQUIREMENTS

1.11 EQUIPMENT IDENTIFICATION

1.12 SUBMITTALS

1.13 SINGULAR NUMBER

1.14 POLYCHLORINATED BIPHENYL (PCB) EQUIPMENT

1.15 ACCEPTANCE CHECKS AND TESTS

1.16 WARRANTY

1.17 INSTRUCTION

PART 3 - EXECUTION (NOT USED)

SECTION 26 05 19

LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES

PART 1 - GENERAL

1.1 DESCRIPTION

1.2 RELATED WORK

2.1 CONDUCTORS AND CABLES

2.2 SPLICES

2.3 CONNECTORS AND TERMINATIONS

2.4 CONTROL WIRING

2.5 WIRE LUBRICATING COMPOUND

3.2 SPLICE AND TERMINATION INSTALLATION

3.3 CONDUCTOR IDENTIFICATION

3.4 FEEDER CONDUCTOR IDENTIFICATION

3.5 EXISTING CONDUCTORS

3.6 CONTROL WIRING INSTALLATION

3.7 CONTROL WIRING IDENTIFICATION

3.8 ACCEPTANCE CHECKS AND TESTS

SECTION 26 05 26

GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS

PART 1 - GENERAL

1.1 DESCRIPTION

1.2 RELATED WORK

2.1 GROUNDING AND BONDING CONDUCTORS

2.2 GROUND RODS

2.3 CONCRETE ENCASED ELECTRODE

2.4 GROUND CONNECTIONS

2.5 EQUIPMENT RACK AND CABINET GROUND BARS

2.6 GROUND TERMINAL BLOCKS

2.7 GROUNDING BUS BAR

3.2 INACCESSIBLE GROUNDING CONNECTIONS

3.3 MEDIUM-VOLTAGE EQUIPMENT AND CIRCUITS

3.4 SECONDARY VOLTAGE EQUIPMENT AND CIRCUITS

3.5 RACEWAY

3.6 CORROSION INHIBITORS

3.7 CONDUCTIVE PIPING

3.8 LIGHTNING PROTECTION SYSTEM

3.9 MAIN ELECTRICAL ROOM GROUNDING

3.10 GROUND RESISTANCE

3.11 GROUND ROD INSTALLATION

3.12 ACCEPTANCE CHECKS AND TESTS

SECTION 26 05 33

RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS

PART 1 - GENERAL

1.1 DESCRIPTION

1.2 RELATED WORK

2.1 MATERIAL

3.1 PENETRATIONS

3.2 INSTALLATION, GENERAL

3.3 CONCEALED WORK INSTALLATION

3.4 EXPOSED WORK INSTALLATION

3.5 DIRECT BURIAL INSTALLATION

3.6 HAZARDOUS LOCATIONS

3.7 WET OR DAMP LOCATIONS

3.8 MOTORS AND VIBRATING EQUIPMENT

3.9 EXPANSION JOINTS

3.10 CONDUIT SUPPORTS

3.11 BOX INSTALLATION

SECTION 26 05 41

UNDERGROUND ELECTRICAL CONSTRUCTION

PART 1 - GENERAL

1.1 DESCRIPTION

1.2 RELATED WORK

2.1 PULLBOXES

2.2 DUCTS

2.3 GROUNDING

2.4 WARNING TAPE

2.5 PULL ROPE FOR SPARE DUCTS

PART 3 - EXECUTION

3.1 MANHOLE AND PULLBOX INSTALLATION

3.2 TRENCHING

3.3 DUCT INSTALLATION

3.4 ACCEPTANCE CHECKS AND TESTS

SECTION 26 05 73

OVERCURRENT PROTECTIVE DEVICE COORDINATION STUDY

PART 1 - GENERAL

1.1 DESCRIPTION

1.2 RELATED WORK

1.6 STUDY REQUIREMENTS

1.7 ANALYSIS

1.8 ADJUSTMENTS, SETTINGS, AND MODIFICATIONS

PART 3 - EXECUTION (NOT USED)

SPECSECTION 26 08 00

COMMISSIONING OF ELECTRICAL SYSTEMS

PART 1 - GENERAL

1.1 DESCRIPTION

1.2 RELATED WORK

1.3 SUMMARY

1.4 DEFINITIONS

1.5 COMMISSIONED SYSTEMS

PART 3 - EXECUTION

3.1 CONSTRUCTION INSPECTIONS

3.2 PRE-FUNCTIONAL CHECKLISTS

3.3 CONTRACTORS TESTS

3.4 SYSTEMS FUNCTIONAL PERFORMANCE TESTING

3.5 TRAINING OF VA PERSONNEL

SECTION 26 23 00

LOW-VOLTAGE SWITCHGEAR

PART 1 - GENERAL

1.1 DESCRIPTION

1.2 RELATED WORK

1.4 FACTORY TESTS

2.1 GENERAL

2.2 HOUSING

2.3 BUSES

2.4 LOW-VOLTAGE POWER CIRCUIT BREAKERS

2.5 METERING

2.6 OTHER EQUIPMENT

2.10 CONTROL WIRING

2.11 NAMEPLATES AND MIMIC BUS

3.2 ACCEPTANCE CHECKS AND TESTS

3.3 FOLLOW-UP VERIFICATION

3.4 TEMPORARY HEATING

3.5 WARNING SIGN

3.6 ONE LINE DIAGRAM AND SEQUENCE OF OPERATION

3.7 AS-LEFT TRIP UNIT SETTINGS

3.8 INSTRUCTION

SECTION 26 24 13

DISTRIBUTION SWITCHBOARDS

PART 1 - GENERAL

1.1 DESCRIPTION

1.2 RELATED WORK

2.1 GENERAL

2.2 BASIC ARRANGEMENT

2.3 HOUSING

2.4 BUSES

2.5 MAIN CIRCUIT BREAKERS

2.6 FEEDER CIRCUIT BREAKERS

2.9 CONTROL WIRING

2.10 NAMEPLATES AND MIMIC BUS

3.4 WARNING SIGN

3.5 ONE LINE DIAGRAM AND SEQUENCE OF OPERATION

3.6 AS-LEFT TRIP UNIT SETTINGS

3.7 INSTRUCTION

SECTION 26 24 16

PANELBOARDS

PART 1 - GENERAL

1.1 DESCRIPTION

1.2 RELATED WORK

2.1 GENERAL REQUIREMENTS

2.2 ENCLOSURES AND TRIMS

2.3 MOLDED CASE CIRCUIT BREAKERS

2.4 SURGE PROTECTIVE DEVICES

SECTION 26 27 26

WIRING DEVICES

PART 1 - GENERAL

1.1 DESCRIPTION

1.2 RELATED WORK

2.1 RECEPTACLES

2.2 TOGGLE SWITCHES

2.3 WALL PLATES

2.5 SURFACE MULTIPLE-OUTLET ASSEMBLIES

SECTION 26 32 13

ENGINE GENERATORS

PART 1 - GENERAL

1.1 DESCRIPTION

1.2 RELATED WORK

r

1.6 STORAGE AND HANDLING

1.7 JOB CONDITIONS

1.8 APPLICABLE PUBLICATIONS

2.2 ENGINE

2.3 GOVERNOR

2.4 LUBRICATION OIL SYSTEM

2.5 FUEL SYSTEM

2.6 COOLING SYSTEM

2.7 AIR INTAKE AND EXHAUST SYSTEMS

2.8 ENGINE STARTING SYSTEM

2.9 LUBRICATING OIL HEATER

2.10 JACKET COOLANT HEATER

2.11 GENERATOR

2.12 GENERATOR OVERCURRENT AND FAULT PROTECTION

2.13 CONTROLS

2.14 REMOTE MANUAL STOP STATION

2.15 REMOTE ANNUNCIATOR PANEL

2.16 SOUND-ATTENUATED ENCLOSURE

2.17 SPARE PARTS

3.4 INSTRUCTIONS AND FINAL INSPECTIONS

SECTION 26 36 23

AUTOMATIC TRANSFER SWITCHES

PART 1 - GENERAL

1.1 DESCRIPTION

2.2 SEQUENCE OF OPERATION

2.3 BYPASS-ISOLATION SWITCH

2.4 REMOTE ANNUNCIATOR SYSTEM

3.3 FIELD SETTINGS VERIFICATION

3.4 FOLLOW-UP VERIFICATION

3.5 INSTRUCTION

SECTION 26 41 00

FACILITY LIGHTNING PROTECTION

PART 1 - GENERAL

1.1 DESCRIPTION

1.2 RELATED WORK

SECTION 27 05 11

REQUIREMENTS FOR COMMUNICATIONS INSTALLATIONS

PART 1 - GENERAL

1.2 REFERENCES

1.4 SINGULAR NUMBER

1.5 RELATED WORK

1.6 ADMINISTRATIVE REQUIREMENTS

1.7 SUBMITTALS

1.8 CLOSEOUT SUBMITTALS

1.9 MAINTENANCE MATERIAL SUBMITTALS

1.10 QUALITY ASSURANCE

1.11 DELIVERY, STORAGE, AND HANDLING

1.12 FIELD CONDITIONS

1.13 WARRANTY

2.1 PERFORMANCE AND DESIGN CRITERIA

2.2 WIRE LUBRICATING COMPOUND

2.3 FIREPROOFING TAPE

2.4 ACCESS PANELS

3.3 EQUIPMENT INSTALLATION

3.4 EQUIPMENT IDENTIFICATION

3.5 CUTTING AND PATCHING

3.6 FIELD QUALITY CONTROL

3.7 CLEANING

3.8 TRAINING

3.9 PROTECTION

SECTION 27 05 26

GROUNDING AND BONDING FOR COMMUNICATIONS SYSTEMS

PART 1 - GENERAL

1.1 DESCRIPTION

1.2 RELATED WORK

1.3 SUBMITTALS

2.1 COMPONENTS

3.1 EQUIPMENT INSTALLATION AND REQUIREMENTS

3.2 FIELD QUALITY CONTROL

SECTION 33 08 00

COMMISSIONING OF SITE UTILITY SYSTEMS

PART 1 - GENERAL

1.1 DESCRIPTION

1.2 RELATED WORK

1.3 SUMMARY

1.4 DEFINITIONS

1.5 COMMISSIONED SYSTEMS

PART 3 - EXECUTION

3.1 CONSTRUCTION INSPECTIONS

3.2 PRE-FUNCTIONAL CHECKLISTS

3.3 CONTRACTORS TESTS

3.4 SYSTEMS FUNCTIONAL PERFORMANCE TESTING

3.5 TRAINING OF VA PERSONNEL