64619103_IFB_BP2_Specifications_051723.pdf
PDF 12 MB Posted
- Attached to
- Z1DA--646-24-1-5669-0001 | NRM| 646-19-103 UD Reno 6E 48 Hour Observation (VA-24-00003800)
- Solicitation number
- 36C24423R0148
About this file
This document is a specification for a construction renovation project at a Veterans Affairs medical center. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 4 is soliciting bids for the UD Reno 6E 48 Hour Observation project located at the VA medical center in Albany, New York. The solicitation number is 36C24423R0148 and bids are due by May 23, 2023. The project involves renovations to an existing 48-hour observation unit including demolition work, installation of new walls, floors, ceilings, casework, and fixtures. The specifications provide detailed requirements for materials, finishes, and construction methods. The award is to be made to the responsible bidder submitting the lowest priced, technically acceptable offer.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Specifications
University Drive Campus
VA Pittsburgh Healthcare System
4100 Allequippa St, Pittsburgh, 15213
UD Renovate 6East for 48Hr Observation
VA Contract No. VA244-17-D-0029
Station Project No. 646-19-103
Bancroft-AE Project No. 16-128
Issue for Bid
May 17th, 2023
DIVISION 00
SPECIAL SECTIONS
University Drive Campus VA Pittsburgh Healthcare System
Pittsburgh, Pennsylvania
UD Renovate 6East for 48Hr Observation
Bancroft Architects + Engineers
09-01-20
Contract No. VA24417D0029
Bancroft-AE Project No. 16-128 05/17/2023
00 01 10-1
DEPARTMENT OF VETERANS AFFAIRS
VHA MASTER SPECIFICATIONS
TABLE OF CONTENTS
Section 00 01 10
SECTION NO. DIVISION AND SECTION TITLES DATE
DIVISION 00 - SPECIAL SECTIONS
00 01 15 List of Drawing Sheets 05-20
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 General Requirements 03-20
01 33 23 Shop Drawings, Product Data, and Samples 05-17
01 35 26 Safety Requirements 07-20
01 42 19 Reference Standards 09-19
01 45 00 Quality Control 03-19
01 45 29 Testing Laboratory Services 11-18
01 45 35 Special Inspections 03-19
01 57 19 Temporary Environmental Controls 01-11
01 58 16 Temporary Interior Signage 07-15
01 74 19 Construction Waste Management 09-13
DIVISION 02 – EXISTING CONDITIONS
02 41 00 Demolition 08-17
DIVISION 03 – CONCRETE NOT USED
DIVISION 04 – MASONRY NOT USED
DIVISION 05 – METALS
05 50 00 Metal Fabrications 08-18
DIVISION 06 – WOOD, PLASTICS AND COMPOSITES
06 10 00 Rough Carpentry 10-17
06 20 00 Finish Carpentry 08-16
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 21 13 Thermal Insulation 10-17
07 60 00 Flashing and Sheet Metal 07-14
07 84 00 Firestopping 02-16
UD Renovate 6East for 48Hr Observation
Bancroft Architects + Engineers
09-01-20
Contract No. VA24417D0029
00 01 10-2
07 92 00 Joint Sealants 10-17
DIVISION 08 - OPENINGS
08 11 13 Hollow Metal Doors and Frames 08-16
08 14 00 Interior Wood Doors 02-16
08 31 13 Access Doors and Frames 02-16
08 71 00 Door Hardware 04-20
08 71 13.11 Low Energy Power Assist Door Operators 08-16
08 80 00 Glazing 10-15
DIVISION 09 – FINISHES
09 05 16 Subsurface Preparation for Floor Finishes 02-15
09 22 16 Non-Structural Metal Framing 06-18
09 29 00 Gypsum Board 04-20
09 51 00 Acoustical Ceilings 12-18
09 54 23 Linear Metal Ceilings 10-15
09 65 13 Resilient Base and Accessories 02-16
09 65 16 Resilient Sheet Flooring 05-18
09 65 19 Resilient Tile Flooring 05-18
09 67 23.20 Resinous Epoxy Base With Vinyl Chip Broadcast (RES 2) 07-14
09 68 00 Carpeting 10-15
09 91 00 Painting 01-16
DIVISION 10 – SPECIALTIES
10 21 23 Cubicle Curtain Tracks 05-15
10 25 13 Patient Bed Service Walls 01-20
10 26 00 Wall and Door Protection 10-15
10 28 00 Toilet, Bath, and Laundry Accessories 02-16
10 44 13 Fire Extinguisher Cabinets 08-18
DIVISION 11 – EQUIPMENT
11 73 00 Ceiling Mounted Patient Lift System 08-20
DIVISION 12 – FURNISHINGS
12 32 00 Manufactured Wood Casework 09-15
12 36 00 Countertops 12-18
DIVISION 13 - SPECIAL CONSTRUCTION NOT USED
DIVISION 14– CONVEYING EQUIPEMENT NOT USED
UD Renovate 6East for 48Hr Observation
Bancroft Architects + Engineers
09-01-20
Contract No. VA24417D0029
00 01 10-3
DIVISION 21- FIRE SUPPRESSION
21 13 13 Wet-Pipe Sprinkler Systems 06-15
DIVISION 22 – PLUMBING
22 05 11 Common Work Results for Plumbing 09-20
22 05 12 General Motor Requirements for Plumbing Equipment 09-20
22 05 23 General-Duty Valves for Plumbing Piping 09-20
22 07 11 Plumbing Insulation 09-19
22 11 00 Facility Water Distribution 11-19
22 13 00 Facility Sanitary and Vent Piping 09-20
22 14 00 Facility Storm Drainage 09-15
22 40 00 Plumbing Fixtures 09-15
DIVISION 23 – HEATING, VENTILATING, AND AIR
CONDITIONING (HVAC)
23 05 11 Common Work Results for HVAC 02-20
23 05 93 Testing, Adjusting, and Balancing for HVAC 02-20
23 07 11 HVAC and Boiler Plant Insulation 02-20
23 09 23 Direct-Digital Control System for HVAC 09-11
23 21 13 Hydronic Piping 02-20 23 31 00 HVAC Ducts and Casings 02-20
23 34 00 HVAC Fans 02-20
23 36 00 Air Terminal Units 02-20
23 37 00 Air Outlets and Inlets 02-20
23 74 13 Packaged, Outdoor, Central-Station Air-Handling Units 03-20
DIVISION 25 – INTEGRATED AUTOMATION (NOT USED)
DIVISION 26 – ELECTRICAL
26 05 11 Requirements for Electrical Installations 01-16
26 05 19 Low-Voltage Electrical Power Conductors and Cables 01-17
26 05 26 Grounding and Bonding for Electrical Systems 01-17
26 05 33 Raceway and Boxes for Electrical Systems 01-18
26 09 23 Lighting Controls 01-18
26 22 00 Low-Voltage Transformers 01-18
26 24 16 Panelboards 01-18
26 27 26 Wiring Devices 01-18
26 29 11 Motor Controllers 01-18
26 29 21 Enclosed Switches and Circuit Breakers 01-17
26 43 13 Surge Protective Devices 01-17
26 51 00 Interior Lighting 01-18
UD Renovate 6East for 48Hr Observation
Bancroft Architects + Engineers
09-01-20
Contract No. VA24417D0029
00 01 10-4
DIVISION 27 – COMMUNICATIONS
27 05 11 Requirements for Communications Installations 09-19
27 05 26 Grounding and Bonding for Communications Systems 06-15
27 05 33 Raceways and Boxes for Communications Systems 10-18
27 10 00 Control, Communication and Signal Wiring 06-15
27 15 00 Communications Structured Cabling 01-16
27 51 16 Public Address and Mass Notification Systems 10-18
27 52 23 Nurse Call and Code Blue Systems 10-18
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
28 05 00 Common Work Results for Electronic Safety and Security 04-18
28 05 13 Conductors and Cables for Electronic Safety and
Security
10-18
28 05 26 Grounding and Bonding for Electronic Safety and
Security
09-11
28 05 28.33 Conduits and Backboxes for Electronic Safety and
Security
09-11
28 13 00 Physical Access Control System 10-11
28 23 00 Video Surveillance 09-11
28 26 00 Electronic Personal Protection System 09-11
28 31 00 Fire Detection and Alarm 10-11
DIVISION 31 – EARTHWORK NOT USED
DIVISION 32 – EXTERIOR IMPROVEMENTS NOT USED
DIVISION 33 – UTILITIES NOT USED
DIVISION 34 – TRANSPORTATION NOT USED
DIVISION 48 – Electrical Power Generation NOT USED
APPENDIX A
Schedule of Special Inspections
University Campus Drive Campus VA Pittsburgh Healthcare System
UD Renovate 6East for 48HR Observation
Bancroft Architects + Engineers
05-01-20
Contract No. VA244-17-D-0029
Station Project No. 646-19-103
Bancroft-AE Project No. 16-128 05/17/2023
00 01 15 - 1
SECTION 00 01 15
LIST OF DRAWING SHEETS
The drawings listed below accompanying this specification form a part of the contract.
Drawing No. Title
GENERAL
G001 GENERAL - COVER SHEET
G002 GENERAL - SHEET INDEX
GI001 GENERAL - CONTRACTOR AND BASIS-OF-DESIGN
PROTOCOL NOTES
GI002 GENERAL - PROTECTION PROTOCOL, SCOPE OF WORK
AND MISC. NOTES
GI003 GENERAL - DEMOLITION NOTES
GI004 GENERAL - ABBREVIATIONS, SYMBOLS LEGEND, AND
STANDARD MOUNTING HEIGHTS
GI101 GENERAL - CODE AND BUILDING INFORMATION
GI201 GENERAL - BUILDING ORIENTATION MAP, SIXTH FLOOR
GI202 GENERAL - BUILDING ORIENTATION MAP, ROOF
GI301 GENERAL - LIFE SAFETY PLAN, SIXTH FLOOR
GI401 GENERAL - INFECTION CONTROL PLAN, SIXTH FLOOR
GI402 GENERAL - INFECTION CONTROL PLAN, SIXTH FLOOR
GI403A GENERAL - ICRA GUIDELINES
GI403B GENERAL – ICRA GUIDELINES
GI404 GENERAL - ICRA DRAWING CLASS IV
GC101 GENERAL – CONSTRUCTION SEQUENCE OF WORK
GC102 GENERAL – CONSTRUCTION STAGING PLAN
ARCHITECTURAL
AD106 ARCHITECTURAL -DEMOLITION PLAN, SIXTH FLOOR
ACD106 ARCHITECTURAL - CEILING DEMOLITION PLAN, SIXTH
FLOOR
A106 ARCHITECTURAL - FLOOR PLAN, SIXTH FLOOR
A106A ARCHITECTURAL – PARTIAL FLOOR PLAN, SIXTH FLOOR
A106B ARCHITECTURAL – PARTIAL FLOOR PLAN, SIXTH FLOOR
A106C ARCHITECTURAL – PARTIAL FLOOR PLAN, SIXTH FLOOR
UD Renovate 6East for 48HR Observation
Bancroft Architects + Engineers
05-01-20
Contract No. VA244-17-D-0029
Station Project No. 646-19-103
Bancroft-AE Project No. 16-128 05/17/2023
00 01 15 - 2
AC106A ARCHITECTURAL – PARTIAL CEILING PLAN, SIXTH
FLOOR
AC106B ARCHITECTURAL – PARTIAL CEILING PLAN, SIXTH
FLOOR
AC106C ARCHITECTURAL – PARTIAL CEILING PLAN, SIXTH
FLOOR
A201 ARCHITECTURAL - EXTERIOR BUILDING ELEVATIONS
A202 ARCHITECTURAL - EXTERIOR BUILDING ELEVATIONS
A204 ARCHITECTURAL - EXTERIOR BUILDING ELEVATIONS
A401 ARCHITECTURAL – ENLARGED PLANS AND INTERIOR
ELEVATIONS
A402 ARCHITECTURAL – ENLARGED PLANS AND INTERIOR
ELEVATIONS
A403 ARCHITECTURAL – ENLARGED PLANS AND INTERIOR
ELEVATIONS
A404 ARCHITECTURAL – ENLARGED PLANS AND INTERIOR
ELEVATIONS
A405 ARCHITECTURAL – ENLARGED PLANS AND INTERIOR
ELEVATIONS
A406 ARCHITECTURAL – ENLARGED PLANS AND INTERIOR
ELEVATIONS
A407 ARCHITECTURAL – ENLARGED PLANS AND INTERIOR
ELEVATIONS
A408 ARCHITECTURAL – ENLARGED PLANS AND INTERIOR
ELEVATIONS
A409 ARCHITECTURAL – ENLARGED PLANS AND INTERIOR
ELEVATIONS
A410 ARCHITECTURAL – ENLARGED PLANS AND INTERIOR
ELEVATIONS
A501 ARCHITECTURAL - TYPICAL WALL TYPES
A502 ARCHITECTURAL - TYPICAL DETAILS
A503 ARCHITECTURAL – MILLWORK DETAILS
A504 ARCHITECTURAL - TYPICAL MILLWORK DETAILS
A521 ARCHITECTURAL - TYPICAL CEILING DETAILS
A601 ARCHITECTURAL - DOOR SCHEDULE & FRAME TYPES
A602 ARCHITECTURAL - DOOR AND WINDOW DETAILS
INTERIORS
I106 FLOOR FINISH PLAN
I601 ROOM FINISH SCHEDULE
UD Renovate 6East for 48HR Observation
Bancroft Architects + Engineers
05-01-20
Contract No. VA244-17-D-0029
Station Project No. 646-19-103
Bancroft-AE Project No. 16-128 05/17/2023
00 01 15 - 3
I602 ROOM FINISH LEGEND
IG601 SIGNAGE PLAN
IG602 SIGNAGE TYPES
IG603 SIGNAGE SCHEDULE & MOUNTING HEIGHTS
Q106 EQUIPMENT PLAN
Q601 EQUIPMENT SCHEDULE
Q602 EQUIPMENT SCHEDULE
FIRE PROTECTION
FP001 FIRE PROTECTION - GENERAL NOTES, SYMBOLS AND
ABBREVIATIONS
FD106 FIRE PROTECTION - DEMOLITION PLAN - SIXTH FLOOR
FP106 FIRE PROTECTION - SPRINKLER PLAN - SIXTH FLOOR
FP501 FIRE PROTECTION - DETAILS
PLUMBING
P001 PLUMBING - GENERAL NOTES, SYMBOLS AND
ABBREVIATIONS
PD105 PLUMBING - DEMOLITION PLAN, FIFTH FLOOR
PD106 PLUMBING - DEMOLITION PLAN, SIXTH FLOOR
PS105 PLUMBING - SANITARY PLAN - FIFTH FLOOR
PW106 PLUMBING - DEMOSTIC WATER PLAN - SIXTH FLOOR
P501 PLUMBING DETAILS
P502 PLUMBING DETAILS
P601 PLUMBING - SANITARY AND VENT RISER DIAGRAM -
SIXTH FLOOR
P602 PLUMBING - SANITARY AND VENT RISER DIAGRAM -
SIXTH FLOOR
P603 PLUMBING - DOMESTIC WATER RISER DIAGRAM - SIXTH
FLOOR
P700 PLUMBING SCHEDULES
MEDICAL GAS
MG001 MEDICAL GAS - GENERAL NOTES, SYMBOLS AND
ABBREVIATIONS
MG106 MEDICAL GAS - PIPING PLAN - SIXTH FLOOR
MG501 MEDICAL GAS DETAILS
UD Renovate 6East for 48HR Observation
Bancroft Architects + Engineers
05-01-20
Contract No. VA244-17-D-0029
Station Project No. 646-19-103
00 01 15 - 4
MECHANICAL
M001 MECHANICAL - GENERAL NOTES, SYMBOLS AND
ABBREVIATIONS
MHD105 MECHANICAL - PARTIAL ROOF VENTILATION
DEMOLITION PLAN, FIFTH FLOOR
MHD106 MECHANICAL - VENTILATION DEMOLITION PLAN, SIXTH
FLOOR
MPD106 MECHANICAL - PIPING DEMOLITION PLAN, SIXTH
FLOOR
MH105 MECHANICAL - PARTIAL ROOF VENTILATION PLAN,
FIFTH FLOOR
MH106 MECHANICAL – VENTILATION OVERALL VIEW – 6TH
FLOOR
MH106A MECHANICAL – PARTIAL VENTILATION PLAN - SIXTH
FLOOR
MH106B MECHANICAL – PARTIAL VENTILATION PLAN – SIXTH
FLOOR
M106B MECHANICAL – PARTIAL VENTILATION PLAN, SIXTH
FLOOR
MP105 MECHANICAL - PARTIAL ROOF PIPING PLAN, FIFTH
FLOOR
MP106 MECHANICAL - PIPING PLAN - SIXTH FLOOR
M501 MECHANICAL DETAILS
M502 MECHANICAL DETAILS
M503 MECHANICAL DETAILS
M601 MECHANICAL EQUIPMENT SCHEDULES
M701 TEMPERATURE CONTROLS
M702 TEMPERATURE CONTROLS
UD Renovate 6East for 48HR Observation
Bancroft Architects + Engineers
05-01-20
Contract No. VA244-17-D-0029
Station Project No. 646-19-103
Bancroft-AE Project No. 16-128 05/17/2023
00 01 15 - 5
ELECTRICAL
E001 ELECTRICAL - GENERAL NOTES, AND TABLES
E002 ELECTRICAL - SYMBOLS AND ABBREVIATIONS
EPD105 ELECTRICAL - PARTIAL POWER DEMOLITION ROOF PLAN
- FIFTH FLOOR
EPD106 ELECTRICAL - POWER AND COMMUNICATION DEMOLITION
PLAN, SIXTH FLOOR
ELD106 ELECTRICAL -LIGHTING DEMOLITION PLAN, SIXTH
FLOOR
EP100 ELECTRICAL - PARITAL POWER PLAN - BASEMENT
EP105 ELECTRICAL - PARITAL POWER ROOF PLAN - FIFTH
FLOOR
EP106 ELECTRICAL - PARITAL POWER PLAN - SIXTH FLOOR
EPM106 ELECTRICAL - PARTIAL POWER MECHANICAL PLAN -
SIXTH FLOOR
EL106 ELECTRICAL - PARTIAL LIGHTING PLAN - SIXTH
FLOOR
ET106 ELECTRICAL - PARTIAL COMM & TECH PLAN - SIXTH
FLOOR
EF106 ELECTRICAL - PARTIAL FIRE ALARM AND SECURITY
PLAN - SIXTH FLOOR
E501 ELECTRICAL ONE LINE DIAGRAM
E601 ELECTRICAL - PANEL AND LIGHTING FIXTURE
SCHEDULES
E601 ELECTRICAL SCHEDULES
E602 ELECTRICAL PANEL SCHEDULES
E701 ELECTRICAL DETAILS
E702 ELECTRICAL DETAILS
E703 ELECTRICAL DETAILS
E704 ELECTRICAL DETAILS
E705 ELECTRICAL DETAILS
E706 ELECTRICAL DETAILS
- - - E N D - - -
DIVISION 01
GENERAL REQUIREMENTS
UD Renovate 6East for 48HR Observation
Bancroft Architects + Engineers
03-01-20
Contract No. VA244-17-D-0029
Station Project No. 646-19-103
Bancroft-AE Project No. 16-128 05/17/2023
01 00 00 - 1
SECTION 01 00 00
GENERAL REQUIREMENTS
TABLE OF CONTENTS
1.1 SAFETY REQUIREMENTS
1.2 GENERAL INTENTION
1.3 STATEMENT OF BID ITEM(S)
1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR
1.5 CONSTRUCTION SECURITY REQUIREMENTS
1.6 OPERATIONS AND STORAGE AREAS
1.7 ALTERATIONS
1.8 DISPOSAL AND RETENTION
1.9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT,
UTILITIES, AND IMPROVEMENTS
1.10 RESTORATION
1.11 PHYSICAL DATA
1.12 PROFESSIONAL SURVEYING SERVICES
1.13 LAYOUT OF WORK
1.14 AS-BUILT DRAWINGS
1.15 WARRANTY MANAGEMENT
1.16 USE OF ROADWAYS
1.17 CONTRACTING OFFICER’S REPRESENTATIVE FIELD OFFICE
1.18 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT
1.19 TEMPORARY USE OF EXISTING ELEVATORS
1.20 TEMPORARY USE OF NEW ELEVATORS
Station Project No. 646-19-103
Bancroft-AE Project No. 16-128 05/17/2023
01 00 00 - 2
1.21 TEMPORARY TOILETS
1.22 AVAILABILITY AND USE OF UTILITY SERVICES
1.23 NEW TELEPHONE EQUIPMENT
1.24 TESTS
1.25 INSTRUCTIONS
1.26 GOVERNMENT-FURNISHED PROPERTY
1.27 RELOCATED // EQUIPMENT // ITEMS //
1.28 STORAGE SPACE FOR DEPARTMENT OF VETERANS AFFAIRS EQUIPMENT
1.29 CONSTRUCTION SIGN
1.30 SAFETY SIGN
1.31 PHOTOGRAPHIC DOCUMENTATION
1.32 FINAL ELEVATION Digital Images
1.33 HISTORIC PRESERVATION
1.34 VA TRIRIGA CPMS
Station Project No. 646-19-103
Bancroft-AE Project No. 16-128 05/17/2023
01 00 00 -1
SECTION 01 00 00
GENERAL REQUIREMENTS
1.1 SAFETY REQUIREMENTS
Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.
1.2 GENERAL INTENTION
A. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for the construction bid document for the project “UD Renovate 6 East for 48HR Observation” and the 5th floor roof enclosure as required by drawings and specifications.
B. Visits to the site by Bidders may be made only by appointment with the
Medical Center Engineering Officer.
C. Offices of Bancroft Architects + Engineers, located in Elk Grove
Village, Illinois, as Architect-Engineers, will render certain technical services during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the Government without affirmations by Contracting Officer or his duly authorized representative.
D. Before placement and installation of work subject to tests by testing laboratory retained by Department of Veterans Affairs, the Contractor shall notify the Contracting Officer Representative (COR) in sufficient time to enable testing laboratory personnel to be present at the site in time for proper taking and testing of specimens and field inspection. Such prior notice shall be not less than three work days unless otherwise designated by the COR.
Station Project No. 646-19-103
Bancroft-AE Project No. 16-128 05/17/2023
01 00 00 -2
E. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.
1.3 STATEMENT OF BID ITEM(S)
A. ITEM I,(BASE BID): All work shown or specified within the drawings and specifications. The project renovates Sixth floor East for 48-hour
Observation in Building 1 of the Veterans Affairs Pittsburgh Healthcare
System. This project also includes constructing a shed over the HVAC units on top of the 5th floor. General Construction work includes general construction, alterations, necessary removal of existing structures and construction, and certain other items as graphically illustrated on the contract drawings, narratively described in the contract specifications, and officially amended/modified by the VA
Medical Center.
ITEM II, Electrical Work: Work includes all labor, material, equipment and supervision to perform the required electrical construction work on this project as graphically illustrated on the contract drawings, narratively described in the contract specifications, and officially amended/modified by the VA Medical Center.
ITEM III, Mechanical Work: Work includes all labor, material, equipment and supervision to perform the required Mechanical construction work as graphically illustrated on the contract drawings, narratively described in the contract specifications, and officially amended/modified by the
VA Medical Center.
Station Project No. 646-19-103
Bancroft-AE Project No. 16-128 05/17/2023
01 00 00 -3
//Mechanical Work:// _______:// Work includes all labor, material, equipment and supervision to perform the required Mechanical construction work on this project including….., , //______//.
BID ITEM I (Base Bid) $________________________________________________
BID ITEM 2
DEDUCT: Contractor shall perform all work as described in BID ITEM #1 (BASE
BID) and delete all costs for equipment, materials, labor, supervision, and quality control associated with the installation of.
If selected, the construction time allocated for completion of the work associated with DEDUCT BID ITEM #2, as described above is XXX calendar days from notice to proceed by the VA. Award is subject to the availability of funds.
B. ALTERNATE NO.1: ____________________________________________
C. ALTERNATE NO. 2:____________________________________________
1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR
A. Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at Contractor's expense.
1.5 CONSTRUCTION SECURITY REQUIREMENTS
A. Security Plan:
1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.
Station Project No. 646-19-103
Bancroft-AE Project No. 16-128 05/17/2023
01 00 00 -4
2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.
B. Security Procedures:
1. General Contractor’s employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site.
2. Before starting work the General Contractor shall give one week’s notice to the Contracting Officer so that security arrangements can be provided for the employees. This notice is separate from any notices required for utility shutdown described later in this section.
3. No photography of VA premises is allowed without written permission of the Contracting Officer.
4. VA reserves the right to close down or shut down the project site and order General Contractor’s employees off the premises in the event of a national emergency. The General Contractor may return to the site only with the written approval of the Contracting Officer.
D. Key Control:
1. The General Contractor shall provide duplicate keys and lock combinations to the Contracting officers representative (COR) for the purpose of security inspections of every area of project including tool boxes and parked machines and take any emergency action.
2. The General Contractor shall turn over all permanent lock cylinders to the VA locksmith for permanent installation. See Section 08 71
00, DOOR HARDWARE and coordinate.
E. Document Control:
Station Project No. 646-19-103
Bancroft-AE Project No. 16-128 05/17/2023
01 00 00 -5
1. Before starting any work, the General Contractor/Sub Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of
“sensitive information”.
2. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.
3. Certain documents, sketches, videos or photographs and drawings may be marked “Law Enforcement Sensitive” or “Sensitive Unclassified”.
Secure such information in separate containers and limit the access to only those who will need it for the project. Return the information to the Contracting Officer upon request.
4. These security documents shall not be removed or transmitted from the project site without the written approval of Contracting
Officer.
5. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the VA.
6. Notify Contracting Officer and Site Security Officer immediately when there is a loss or compromise of “sensitive information”.
7. All electronic information shall be stored in specified location following VA standards and procedures using an Engineering Document
Management Software (EDMS).
a. Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through the
EDMS system.
b. “Sensitive information” including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed.
Station Project No. 646-19-103
Bancroft-AE Project No. 16-128 05/17/2023
01 00 00 -6
F. Motor Vehicle Restrictions
1. Vehicle authorization request shall be required for any vehicle entering the site and such request shall be submitted 24 hours before the date and time of access. Access shall be restricted to picking up and dropping off materials and supplies.
2. A limited number of (2 to 5) permits shall be issued for General
Contractor and its employees for parking in designated areas only.
1.6 OPERATIONS AND STORAGE AREAS
A. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer. The Contractor shall hold and save the
Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.
B. Temporary buildings (e.g., storage sheds, shops, offices) and utilities may be erected by the Contractor only with the approval of the
Contracting Officer and shall be built with labor and materials furnished by the Contractor without expense to the Government. The temporary buildings and utilities shall remain the property of the
Contractor and shall be removed by the Contractor at its expense upon completion of the work. With the written consent of the Contracting
Officer, the buildings and utilities may be abandoned and need not be removed.
C. The Contractor shall, under regulations prescribed by the Contracting
Officer, use only established roadways, or use temporary roadways constructed by the Contractor when and as authorized by the Contracting
Officer. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the Contractor shall protect them from damage. The
Station Project No. 646-19-103
Bancroft-AE Project No. 16-128 05/17/2023
01 00 00 -7
Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.
(FAR 52.236-10)
D. Working space and space available for storing materials shall be as determined by the COR .
E. Workers are subject to rules of Medical Center applicable to their conduct.
F. Execute work so as to interfere as little as possible with normal functioning of Medical Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others. Use of equipment and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied, during construction, jointly by patients or medical personnel, and Contractor's personnel, except as permitted by COR where required by limited working space.
1. Do not store materials and equipment in other than assigned areas.
2. Schedule delivery of materials and equipment to immediate construction working areas within buildings in use by Department of
Veterans Affairs in quantities sufficient for not more than two work days. Provide unobstructed access to Medical Center areas required to remain in operation.
3. Where access by Medical Center personnel to vacated portions of buildings is not required, storage of Contractor's materials and equipment will be permitted subject to fire and safety requirements.
G. Phasing:
Station Project No. 646-19-103
Bancroft-AE Project No. 16-128 05/17/2023
01 00 00 -8
The Medical Center must maintain its operation 24 hours a day 7 days a week. Therefore, any interruption in service must be scheduled and coordinated with the COR to ensure that no lapses in operation occur.
It is the CONTRACTOR'S responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the interim life safety measure to be used during the work, and a schedule defining the duration of the work with milestone subtasks.
To ensure such executions, Contractor shall furnish the COR with a schedule of approximate dates on which the Contractor intends to accomplish work in each specific area of site, building or portion thereof. In addition, Contractor shall notify the COR two weeks in advance of the proposed date of starting work in each specific area of site, building or portion thereof. Arrange such dates to insure accomplishment of this work in successive phases mutually agreeable to the Medical Center Director, COR, and Contractor, as follows:
Phase I: TBD by the Contractor utilizing suggested phasing information contained in the contract documents and with the approval of the COR.
Phase II: TBD by the Contractor utilizing suggested phasing information contained in the contract documents and with the approval of the COR.
H. Building No.(1) will be occupied during performance of work; but immediate areas of alterations will be vacated.
Contractor shall take all measures and provide all material necessary for protecting existing equipment and property in affected areas of construction against dust and debris, so that equipment and affected areas to be used in the Medical Centers operations will not be hindered. Contractor shall permit access to Department of
Station Project No. 646-19-103
Bancroft-AE Project No. 16-128 05/17/2023
01 00 00 -9
Veterans Affairs personnel and patients through other construction areas which serve as routes of access to such affected areas and equipment. These routes whether access or egress shall be isolated from the construction area by temporary partitions and have walking surfaces, lighting etc to facilitate patient and staff access.
Coordinate alteration work in areas occupied by Department of
Veterans Affairs so that Medical Center operations will continue during the construction period.
I. When a building and/or construction site is turned over to Contractor, Contractor shall accept entire responsibility including upkeep and maintenance therefore:
1. Contractor shall maintain a minimum temperature of 4 degrees C (40 degrees F) at all times, except as otherwise specified.
2. Contractor shall maintain in operating condition existing fire protection and alarm equipment. In connection with fire alarm equipment, Contractor shall make arrangements for pre-inspection of site with Fire Department or Company (Department of Veterans Affairs or municipal) whichever will be required to respond to an alarm from
Contractor's employee or watchman.
J. Utilities Services: Maintain existing utility services for Medical
Center at all times. Provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uninterrupted services.
Where necessary to cut existing water, steam, gases, sewer or air pipes, or conduits, wires, cables, etc. of utility services or of fire protection systems and communications systems (including telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR.
1. No utility service such as water, gas, steam, sewers or electricity, or fire protection systems and communications systems may be interrupted without prior approval of COR . Electrical work shall be
Station Project No. 646-19-103
Bancroft-AE Project No. 16-128 05/17/2023
01 00 00 -10 accomplished with all affected circuits or equipment de-energized.
When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without a detailed work plan, the Medical Center Director’s prior knowledge and written approval. Refer to specification Sections 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS, 27 05 11 REQUIREMENTS FOR
COMMUNICATIONS INSTALLATIONS and 28 05 00, COMMON WORK RESULTS FOR
ELECTRONIC SAFETY AND SECURITY for additional requirements.
2. Contractor shall submit a request to interrupt any such services to
COR, in writing, 7 days in advance of proposed interruption. Request shall state reason, date, exact time of, and approximate duration of such interruption.
3. Contractor will be advised (in writing) of approval of request, or of which other date and/or time such interruption will cause least inconvenience to operations of Medical Center. Interruption time approved by Medical Center may occur at other than Contractor's normal working hours.
4. Major interruptions of any system must be requested, in writing, at least 15 calendar days prior to the desired time and shall be performed as directed by the COR.
5. In case of a contract construction emergency, service will be interrupted on approval of COR. Such approval will be confirmed in writing as soon as practical.
6. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the Contractor.
K. Abandoned Lines: All service lines such as wires, cables, conduits, ducts, pipes and the like, and their hangers or supports, which are to be abandoned but are not required to be entirely removed, shall be
Station Project No. 646-19-103
Bancroft-AE Project No. 16-128 05/17/2023
01 00 00 -11 sealed, capped or plugged at the main, branch or panel they originate from. The lines shall not be capped in finished areas, but shall be removed and sealed, capped or plugged in ceilings, within furred spaces, in unfinished areas, or within walls or partitions; so that they are completely behind the finished surfaces.
L. To minimize interference of construction activities with flow of
Medical Center traffic, comply with the following:
1. Keep roads, walks and entrances to grounds, to parking and to occupied areas of buildings clear of construction materials, debris and standing construction equipment and vehicles.
2. Method and scheduling of required cutting, altering and removal of existing roads, walks and entrances must be approved by the COR.
M. Coordinate the work for this contract with other construction operations as directed by COR. This includes the scheduling of traffic and the use of roadways, as specified in Article, USE OF ROADWAYS.
1.7 ALTERATIONS
A. Survey: Before any work is started for all phases, the Contractor shall make a thorough survey with the COR, of areas of buildings in which alterations occur and areas which are anticipated routes of access, and furnish a report, signed by all three, to the Contracting Officer. This report shall list by rooms and spaces:
1. Existing condition and types of resilient flooring, doors, windows, walls and other surfaces not required to be altered throughout affected areas of building.
2. Existence and conditions of items such as plumbing fixtures and accessories, electrical fixtures, equipment, venetian blinds, Station Project No. 646-19-103
Bancroft-AE Project No. 16-128 05/17/2023
01 00 00 -12 shades, etc., required by drawings to be either reused or relocated, or both.
3. Shall note any discrepancies between drawings and existing conditions at site.
4. Shall designate areas for working space, materials storage and routes of access to areas within buildings where alterations occur and which have been agreed upon by Contractor and COR.
B. Any items required by drawings to be either reused or relocated or both, found during this survey to be nonexistent, or in opinion of COR and/or Supply Representative, to be in such condition that their use is impossible or impractical, shall be furnished and/or replaced by
Contractor with new items in accordance with specifications which will be furnished by Government. Provided the contract work is changed by reason of this subparagraph B, the contract will be modified accordingly, under provisions of clause entitled "DIFFERING SITE
CONDITIONS" (FAR 52.236-2) and "CHANGES" (FAR 52.243-4).
C. Re-Survey: Thirty days before expected partial or final inspection date for any phase, the Contractor and COR together shall make a thorough re-survey of the areas of buildings involved. They shall furnish a report on conditions then existing, of resilient flooring, doors, windows, walls and other surfaces as compared with conditions of same as noted in first condition survey report:
1. Re-survey report shall also list any damage caused by Contractor to such flooring and other surfaces, despite protection measures; and, will form basis for determining extent of repair work required of
Contractor to restore damage caused by Contractor's workers in executing work of this contract.
D. Protection: Provide the following protective measures:
1. Wherever existing roof surfaces are disturbed they shall be protected against water infiltration. In case of leaks, they shall
Station Project No. 646-19-103
Bancroft-AE Project No. 16-128 05/17/2023
01 00 00 -13 be repaired immediately upon discovery. The contractor is required to provide a “dry-in” plan to the COR for approval prior to commencing any work. The contractor may not disturb or remove any portion of the roof that cannot be “dried-in” in the same day as it was disturbed.
2. Temporary protection against damage for portions of existing structures and grounds where work is to be done, materials handled and equipment moved and/or relocated.
3. Protection of interior of existing structures at all times, from damage, dust and weather inclemency. Wherever work is performed, floor surfaces that are to remain in place shall be adequately protected prior to starting work, and this protection shall be maintained intact until all work in the area is completed.
4. Wherever any work is performed where dust, fumes or particulate debris could enter any portion of the HVAC system/duct work, the contractor is required to coordinate with the COR to eliminate any possible disturbance to the Medical Center occupants. This protection shall be maintained intact until all work in the area is completed.”
1.8 DISPOSAL AND RETENTION
A. Materials and equipment accruing from work removed and from demolition of buildings or structures, or parts thereof, shall be disposed of as follows:
1. Reserved items which are to remain property of the Government are noted on drawings or in specifications as items to be stored. Items that remain property of the Government shall be removed or dislodged from present locations in such a manner as to prevent damage which would be detrimental to re-installation and reuse. Store such items where directed by COR.
Station Project No. 646-19-103
Bancroft-AE Project No. 16-128 05/17/2023
01 00 00 -14
2. Items not reserved shall become property of the Contractor and be removed by Contractor from Medical Center.
3. Items of portable equipment and furnishings located in rooms and spaces in which work is to be done under this contract shall remain the property of the Government. When rooms and spaces are vacated by the Department of Veterans Affairs during the alteration period, such items which are NOT required by drawings and specifications to be either relocated or reused will be removed by the Government in advance of work to avoid interfering with Contractor's operation.
1.9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND
IMPROVEMENTS (NOT USED)
1.10 RESTORATION
A. Remove, cut, alter, replace, patch and repair existing work as necessary to install new work. Except as otherwise shown or specified, do not cut, alter or remove any structural work, and do not disturb any ducts, plumbing, steam, gas, or electric work without approval of the
COR. Existing work to be altered or extended and that is found to be defective in any way, shall be reported to the COR before it is disturbed. Materials and workmanship used in restoring work, shall conform in type and quality to that of original existing construction, except as otherwise shown or specified.
B. Upon completion of contract, deliver work complete and undamaged.
Existing work (walls, ceilings, partitions, floors, mechanical and electrical work, lawns, paving, roads, walks, etc.) disturbed or removed as a result of performing required new work, shall be patched, repaired, reinstalled, or replaced with new work, and refinished and left in as good condition as existed before commencing work.
C. At Contractor's own expense, Contractor shall immediately restore to service and repair any damage caused by Contractor's workers to existing piping and conduits, wires, cables, etc., of utility services
Station Project No. 646-19-103
Bancroft-AE Project No. 16-128 05/17/2023
01 00 00 -15 or of fire protection systems and communications systems (including telephone) which are not scheduled for discontinuance or abandonment.
D. Expense of repairs to such utilities and systems not shown on drawings or locations of which are unknown will be covered by adjustment to contract time and price in accordance with clause entitled "CHANGES"
(FAR 52.243-4) and "DIFFERING SITE CONDITIONS" (FAR 52.236-2).
1.11 PHYSICAL DATA (NOT USED)
1.12 PROFESSIONAL SURVEYING SERVICES (NOT USED)
1.13 LAYOUT OF WORK (NOT USED)
1.14 AS-BUILT DRAWINGS
A. The contractor shall maintain two full size sets of as-built drawings which will be kept current during construction of the project, to include all contract changes, modifications and clarifications.
B. All variations shall be shown in the same general detail as used in the contract drawings. To ensure compliance, as-built drawings shall be made available for the COR review, as often as requested.
C. Contractor shall deliver two approved completed sets of as-built drawings in the electronic version (scanned PDF) to the COR within 15 calendar days after each completed phase and after the acceptance of the project by the COR.
D. Paragraphs A, B, & C shall also apply to all shop drawings.
1.15 WARRANTY MANAGEMENT
A. Warranty Management Plan: Develop a warranty management plan which contains information relevant to FAR 52.246-21 Warranty of Construction in at least 30 days before the planned pre-warranty conference, submit one set of the warranty management plan. Include within the warranty management plan all required actions and documents to assure that the
Government receives all warranties to which it is entitled. The plan
Station Project No. 646-19-103
Bancroft-AE Project No. 16-128 05/17/2023
01 00 00 -16 must be in narrative form and contain sufficient detail to render it suitable for use by future maintenance and repair personnel, whether tradesman, or of engineering background, not necessarily familiar with this contract. The term “status” as indicated below must include due date and whether item has been submitted or was approved. Warranty information made available during the construction phase must be submitted to the Contracting Officer for approval prior to each monthly invoice for payment. Assemble approved information in a binder and turn over to the Government upon acceptance of the work. The construction warranty period will begin on the date of the project acceptance and continue for the product warranty period. A joint 4 month and 9 month warranty inspection will be conducted, measured from time of acceptance, by the Contactor and the Contracting Officer. Include in the warranty management plan, but not limited to, the following:
1. Roles and responsibilities of all personnel associated with the warranty process, including points of contact and telephone numbers within the company of the Contractor, subcontractors, manufacturers or suppliers involved.
2. Furnish with each warranty the name, address and telephone number of each of the guarantor’s representatives nearest project location.
3. Listing and status of delivery of all Certificates of Warranty for extended warranty items, to include roofs, HVAC balancing, pumps, motors, transformers and for all commissioned systems such as fire protection and alarm systems, sprinkler systems and lightning protection systems, etc.
4. A list for each warranted equipment item, feature of construction or system indicating:
a. Name of item.
b. Model and serial numbers.
c. Location where installed.
Station Project No. 646-19-103
Bancroft-AE Project No. 16-128 05/17/2023
01 00 00 -17
d. Name and phone numbers of manufacturers and suppliers.
e. Name and phone numbers of manufacturers or suppliers.
f. Names, addresses and phone numbers of sources of spare parts.
g. Warranties and terms of warranty. Include one-year overall warranty of construction, including the starting date of warranty of construction. Items which have extended warranties must be indicated with separate warranty expiration dates.
h. Starting point and duration of warranty period.
i. Summary of maintenance procedures required to continue the warranty in force.
j. Cross-reference to specific pertinent Operation and Maintenance manuals.
k. Organizations, names and phone numbers of persons to call for warranty service.
l. Typical response time and repair time expected for various warranted equipment.
5. The plans for attendance at the 4 and 9-month post construction warranty inspections conducted by the government.
6. Procedure and status of tagging of all equipment covered by extended warranties.
7. Copies of instructions to be posted near selected pieces of equipment where operation is critical for warranty and/or safety reasons.
B. Performance Bond: The Performance Bond must remain effective throughout the construction period.
1. In the event the Contractor fails to commence and diligently pursue any construction warranty work required, the Contracting Officer
Station Project No. 646-19-103
Bancroft-AE Project No. 16-128 05/17/2023
01 00 00 -18 will have the work performed by others, and after completion of the work, will charge the remaining construction warranty funds of expenses incurred by the Government while performing the work, including, but not limited to administrative expenses.
2. In the event sufficient funds are not available to cover the construction warranty work performed by the Government at the contractor’s expenses, the Contracting Officer will have the right to recoup expenses from the bonding company.
3. Following oral or written notification of required construction warranty repair work, the Contractor shall respond in a timely manner. Written verification will follow oral instructions. Failure to respond will be cause for the Contracting Officer to proceed against the Contractor.
C. Pre-Warranty Conference: Prior to contract completion, and at a time designated by the Contracting Officer, the Contractor shall meet with the Contracting Officer to develop a mutual understanding with respect to the requirements of this section. Communication procedures for
Contractor notification of construction warranty defects, priorities with respect to the type of defect, reasonable time required for
Contractor response, and other details deemed necessary by the
Contracting Officer for the execution of the construction warranty will be established/ reviewed at this meeting. In connection with these requirements and at the time of the Contractor’s quality control completion inspection, furnish the name, telephone number and address of a licensed and bonded company which is authorized to initiate and pursue construction warranty work action on behalf of the Contractor.
This point of contract will be located within the local service area of the warranted construction, be continuously available and be responsive to Government inquiry on warranty work action and status. This requirement does not relieve the Contractor of any of its responsibilities in conjunction with other portions of this provision.
D. Contractor’s Response to Construction Warranty Service Requirements:
Station Project No. 646-19-103
Bancroft-AE Project No. 16-128 05/17/2023
01 00 00 -19
Following oral or written notification by the Contracting Officer, the
Contractor shall respond to construction warranty service requirements in accordance with the “Construction Warranty Service Priority List” and the three categories of priorities listed below. Submit a report on any warranty item that has been repaired during the warranty period.
Include within the report the cause of the problem, date reported, corrective action taken, and when the repair was completed. If the
Contractor does not perform the construction warranty within the timeframe specified, the Government will perform the work and back charge the construction warranty payment item established.
1. First Priority Code 1. Perform onsite inspection to evaluate situation, and determine course of action within 4 hours, initiate work within 6 hours and work continuously to completion or relief.
2. Second Priority Code 2. Perform onsite inspection to evaluate situation, and determine course of action within 8 hours, initiate work within 24 hours and work continuously to completion or relief.
3. Third Priority Code 3. All other work to be initiated within 3 work days and work continuously to completion or relief.
4. The “Construction Warranty Service Priority List” is as follows:
Code 1-Life Safety Systems
a. Fire suppression systems.
b. Fire alarm system(s).
Code 1-Air Conditioning Systems
a. Air conditioning leak in part of the building, if causing damage.
b. Air conditioning system not cooling properly.
Code 1 Doors
Station Project No. 646-19-103
Bancroft-AE Project No. 16-128 05/17/2023
01 00 00 -20
a. Overhead doors not operational, causing a security, fire or safety problem.
b. Interior, exterior personnel doors or hardware, not functioning properly, causing security, fire or safety problem.
Code 3-Doors
a. Overhead doors not operational.
b. Interior/exterior personnel doors or hardware not functioning properly.
Code 1-Electrical
a. Power failure (entire area or any building operational after 1600 hours).
b. Security lights.
c. Smoke detectors.
Code 2-Electrical
a. Power failure (no power to a room or part of building).
b. Receptacles and lights not operational (in a room or part of building).
Code 3-Electrical
a. Exterior lights not operational.
Code 1-Gas
a. Leaks and pipeline breaks.
Code 1-Heat
a. Power failure affecting heat.
Code 1-Plumbing
Station Project No. 646-19-103
Bancroft-AE Project No. 16-128 05/17/2023
01 00 00 -21
a. Hot water heater failure.
b. Leaking water supply pipes.
Code 2-Plumbing
a. Flush valves not operating properly
b. Fixture drain, supply line or any water pipe leaking.
c. Toilet leaking at base.
Code 3- Plumbing
a. Leaky faucets.
Code 3-Interior
a. Floors damaged.
b. Paint chipping or peeling.
c. Casework damaged.
Code 1-Roof Leaks
a. Damage to property is occurring.
Code 2-Water (Exterior)
a. No water to facility.
Code 2-Water (Hot)
a. No hot water in portion of building listed.
Code 3
a. All work not listed above.
Station Project No. 646-19-103
Bancroft-AE Project No. 16-128 05/17/2023
01 00 00 -22
E. Warranty Tags: At the time of installation, tag each warranted item with a durable, oil and water-resistant tag approved by the Contracting
Officer. Attach each tag with a copper wire and spray with a silicone waterproof coating. Also submit two record copies of the warranty tags showing the layout and design. The date of acceptance and the QC signature must remain blank until the project is accepted for beneficial occupancy. Show the following information on the tag.
1.16 USE OF ROADWAYS
A. For hauling, use only established public roads and roads on Medical
Center property and, when authorized by the COR, such temporary roads which are necessary in the performance of contract work. Temporary roads shall be constructed and restoration performed by the Contractor at Contractor's expense. When necessary to cross curbing, sidewalks, or
Station Project No. 646-19-103
Bancroft-AE Project No. 16-128 05/17/2023
01 00 00 -23 similar construction, they must be protected by well-constructed bridges.
B. When new permanent roads are to be a part of this contract, Contractor may construct them immediately for use to facilitate building operations. These roads may be used by all who have business thereon within zone of building operations.
C. When certain buildings (or parts of certain buildings) are required to be completed in advance of general date of completion, all roads leading thereto must be completed and available for use at time set for completion of such buildings or parts thereof.
1.17 RESIDENT ENGINEER'S FIELD OFFICE (NOT USED)
1.18 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT
A. Use of new installed mechanical and electrical equipment to provide heat, ventilation, plumbing, light and power will be permitted subject to written approval and compliance with the following provisions:
1. Permission to use each unit or system must be given by COR in writing. If the equipment is not installed and maintained in accordance with the written agreement and following provisions, the
COR will withdraw permission for use of the equipment.
2. Electrical installations used by the equipment shall be completed in accordance with the drawings and specifications to…