638582-event.pdf
PDF 262 KB Posted
- Attached to
- DFCM Construction-Pre Qualified Roofing-Snow Roof Replacement Greenwood Student Center - 19031700
- Solicitation number
- DA19004
- Issued by
- Sevier County, Elwood Town, Utah
About this file
This is an Invitation for Bid (IFB) issued by the Utah Division of Facilities Construction and Management (DFCM) for a roof replacement project at the Greenwood Student Center at Snow College in Ephraim, Utah. The project involves removing and replacing the existing built-up roofing system and rigid roof insulation across approximately 33,576 square feet, including associated flashing systems, metal cap flashing, perimeter edge flashing, and fascia. The bid is open from 8/13/2018 to 9/11/2018, with a construction cost estimate of $410,000.00. Only pre-qualified roofing contractors who have completed Stage I of the Request for Solicitation (RFS) are permitted to bid on this project.
The bid includes removal and replacement of existing roof drains, installation of new ladders and safety guardrails, and implementation of pedestrian safety barriers and barbed wire fencing. Bidders are required to submit various documentation, including a subcontractor's list, bid bond, contractor's license number, firm's legal name and address, and point of contact information. The project will be awarded on a lump sum basis, and the bid documents include attachments such as approved drawings, specifications, an asbestos inspection report, and a mandatory meeting attendees list.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DFCM Construction-Pre Qualified Roofing-Snow Roof Replacement Greenwood Student Center - 19031700 DFCM Construction-Pre Qualified Roofing-Snow Roof Replacement Greenwood Student Center - 19031700
Open 8/13/2018 3:00 PM MDT Type Invitation for Bid
Close 9/11/2018 3:00 PM MDT Number DA19004 Currency US Dollar
Sealed Until 9/11/2018 3:00 PM MDT
Contacts
Randy Mellor rmellor@utah.gov
Commodity Codes
Commodity Code Description
99901 DFCM Division Facilities and Construction and Managment
72120 Nonresidential building construction services including commercial and office building new construction services and construction services and renovation and repair services
72152 Roofing service including maintenance and repair and installation and roofing and siding and sheet metal services and gutter and downspout service and skylight installation service
Description
INVITATION TO BID
ONLY ROOFING CONTRACTORS PRE-QUALIFIED DURING STAGE I OF THE RFS ARE
ALLOWED TO BID ON THIS PROJECT
ROOF REPLACEMENT GREENWOOD STUDENT CENTER
SNOW COLLEGE – EPHRAIM, UTAH
DFCM PROJECT NO.19031700
Project Description: The removal and replacement of existing built-up roofing system and rigid roof insulation in its entirety, associated flashing systems and metal capflashing systems. New perimeter edge flashing and fascia. New rigid roof insulation with cover board with a mechanically attached single-plymembrane roofing system approximately 33,576 square feet (Contractor to field verify total area of work). Removal and replacement of existing roof drains and new ladders and safety guardrails as indicated in the drawings are included in the project scope of work as defined by the contract documents. Pedestrian safety barriers and barb wired fencing are included in the project scope of work as defined by the contract documents.
Construction Cost Estimate: $410,000.00
Required to View Event
Prerequisites Required to Enter Bid
18 September 201818 September 2018 mailto:rmellor@utah.gov mailto:rmellor@utah.gov mailto:rmellor@utah.gov
1. Subcontractor's List Due
2. Liquidated Damages
3. Completion Date
4. Mandatory Pre-bid Meeting
5. Pricing
6. Bid Bond
Buyer Attachments
1. Bid Bond
2. Instructions & Subcontractors List Form
3. Solicitation
4. Project Schedule
5. Approved Drawings
6. Approved Specifications
7. Asbestos Inspection Report
8. Mandatory Meeting Attendees
9. DFCM Addendum 1
Questions Required Questions
1.1. # of DFCM Addendums
1.3. Contractor's License #
1.4. Firms legal name and address
1.5. Contractor Point of Contact-name, phone number and email.
18 September 201818 September 2018 https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/638582-413303269Bid%20Bond.pdf?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1600361556&Signature=%2BYY6hbDarVWc69yh0NTPSqqZzh0%3D https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/638582-413303269Bid%20Bond.pdf?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1600361556&Signature=%2BYY6hbDarVWc69yh0NTPSqqZzh0%3D https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/638582-635438782Subcontractor%20List%20Form.pdf?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1600361556&Signature=OZnlF%2FWwhrAdAIitrGFq%2FbP3kiM%3D https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/638582-635438782Subcontractor%20List%20Form.pdf?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1600361556&Signature=OZnlF%2FWwhrAdAIitrGFq%2FbP3kiM%3D https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/638582-692024457Solicitation-19031700.pdf?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1600361556&Signature=DCamEuis33eMpUz1wDfdhYEK0%2Fg%3D https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/638582-692024457Solicitation-19031700.pdf?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1600361556&Signature=DCamEuis33eMpUz1wDfdhYEK0%2Fg%3D https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/638582-692024471Project%20Schedule.pdf?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1600361556&Signature=Ioia47sFgfUSReTs26z%2FrkF1DHo%3D https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/638582-692024471Project%20Schedule.pdf?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1600361556&Signature=Ioia47sFgfUSReTs26z%2FrkF1DHo%3D https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/638582-691844089Approved%20Drawings.pdf?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1600361556&Signature=FM%2BYKamrdTz4OSUbrWvi92lzH%2Fo%3D https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/638582-691844089Approved%20Drawings.pdf?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1600361556&Signature=FM%2BYKamrdTz4OSUbrWvi92lzH%2Fo%3D https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/638582-691845659Approved%20Specifications.pdf?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1600361556&Signature=Pfga2gmb8cC1ObRls%2B910kq4kW8%3D https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/638582-691845659Approved%20Specifications.pdf?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1600361556&Signature=Pfga2gmb8cC1ObRls%2B910kq4kW8%3D https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/638582-691845336Asbestos%20Inspection%20Report.pdf?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1600361556&Signature=SO4dMuWiKlV5qKMl8%2FLD51fjYa8%3D https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/638582-691845336Asbestos%20Inspection%20Report.pdf?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1600361556&Signature=SO4dMuWiKlV5qKMl8%2FLD51fjYa8%3D https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/638582-697331475Mandatory%20Meeting%20Attendees.pdf?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1600361556&Signature=6CBCe3uoUt%2BEt9MmTNCJlLa%2B2ps%3D https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/638582-697331475Mandatory%20Meeting%20Attendees.pdf?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1600361556&Signature=6CBCe3uoUt%2BEt9MmTNCJlLa%2B2ps%3D https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/638582-700909434DFCM%20Addendum%201.pdf?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1600361556&Signature=6KjubhLLu8SemcHu9VhIbfku5FM%3D https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/638582-700909434DFCM%20Addendum%201.pdf?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1600361556&Signature=6KjubhLLu8SemcHu9VhIbfku5FM%3D
Product Line Items Product Line Items
There are no Items added to this event.
Service Line Items Service Line Items
# Item Name, Commodity Code, Description Allow Alternates Qty. UOM Requested Service Delivery
S1 Base Bid 1 LS - Lump Sum
The removal and replacement of existing built-up roofing system and rigid roof insulation in its entirety, associated flashing systems and metal capflashing systems. New perimeter edge flashing and fascia. New rigid roof insulation with cover board with a mechanically attached single-plymembrane roofing system approximately 33,576 square feet (Contractor to field verify total area of work). Removal and replacement of existing roof drains and new ladders and safety guardrails as indicated in the drawings are included in the project scope of work as defined by the contract documents. Pedestrian safety barriers and barb wired fencing are included in the project scope of work as defined by the contract documents.
18 September 201818 September 2018
File details come from the government source that posted it. Updated .