This hazardous building materials inspection report documents the results of an asbestos and lead-based paint inspection conducted at the VA Medical Center in Omaha, Nebraska. The inspection identified assumed asbestos-containing materials including various sizes of thermal system insulation, fittings, gaskets, and a silver-colored thermal system insulation flue system throughout Building 2. No asbestos was detected in sampled caulk or gaskets. Regarding lead-based paint, a black factory paint on a steam trap tag in Building 1 tested positive for lead. The report provides notification, removal, and regulatory compliance recommendations for the assumed and confirmed hazardous materials.
The related federal contract opportunity notice announces a future solicitation for project number 636-19-301 to correct mechanical deficiencies at the same Omaha VA Medical Center. The project scope involves installing three new boilers inside Building 2 to replace existing boilers while maintaining steam production capabilities. The solicitation will be a 100% SDVOSB set-aside with an anticipated posting date of August 23, 2021. The contract duration is estimated at 425 days with a magnitude between $5-10 million. The solicitation will require capability statements, certifications, and registrations from SDVOSB respondents.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HAZARDOUS BUILDING MATERIALS
INSPECTION REPORT
Correct Mechanical Deficiencies VA Medical Center Omaha, Nebraska
VA Project No: 636-19-301
August 27, 2020
Prepared for:
Veterans Affairs Medical Center c/o CLH Architects
Elkhorn, Nebraska
Prepared by:
AMI Environmental
8802 South 135th Street, Suite 100
Omaha, Nebraska 68138
AMIE # 19-00285
TABLE OF CONTENTS
1. SURVEY OVERVIEW
1.1. Purpose and Scope
1.1.1. Inspection Area
1.1.2. Limitations
1.2. Regulatory Reference
2. BUILDING INFORMATION
2.1. General Construction
2.2. Pre-Existing Information
3. INSPECTION METHODOLOGIES
3.1. Asbestos Inspection
3.1.1. Key Definitions
3.1.2. Homogenous Material Numbering Convention
3.1.3. Bulk Sampling
3.2. Lead-Based Paint Inspection
3.2.1. Key Definitions
3.2.2. Homogenous Paint Applications Numbering Convention
3.2.3. Paint Chip Sampling
4. SUMMARY OF INSPECTION FINDINGS
4.1. Asbestos Inspection Findings
4.2. Lead Paint Inspection Findings
5. RISKS AND HAZARDS
5.1. Asbestos
5.2. Lead-Based Paint
6. RECOMMENDATIONS
6.1. General Recommendations
6.1.1. Asbestos
6.1.2. Lead-Based Paint
6.2. Hazardous Conditions Recommendations
6.3. Point Count Analysis / TEM Chatfield Analysis Recommendations
7. REGULATORY REQUIREMENTS
7.1. Asbestos-Containing Materials
7.1.1. Notification Requirements
7.1.2. Asbestos Removal Requirements
7.1.3. OSHA Regulation of <1 Percent Asbestos
7.1.4. Asbestos Removal Regulations
7.2. Lead-Based Paint
7.2.1. Disposal Requirements
7.2.2. Construction Requirements
APPENDIX A: Tables
APPENDIX B: Photo Logs
APPENDIX C: Schematics
APPENDIX D: Analytical Results
APPENDIX E: Inspectors Credentials
HAZARDOUS MATERIALS INSPECTION REPORT
Correct Mechanical Deficiencies
Veterans Affairs Medical Center
Omaha, Nebraska
1. SURVEY OVERVIEW
On February 24, 25, and 26, 2020, Building 1, Steam Traps located in various mechanical rooms at the
Veterans Affairs Medical Center, Omaha, Nebraska, were inspected for asbestos-containing material
(ACM) and lead-based paint (LBP) by a representative of AMI Environmental (AMIE). On May 18 and
August 14, 2020, Building 2 (Steam Plant) Boilers 1, 2 and 3 and associated piping, equipment, pumps, exterior windows, and connecting pipes were inspected and sampled for asbestos-containing material
(ACM) and lead-based paint (LBP) by a representative of AMI Environmental (AMIE). The hazardous building materials inspection was conducted in preparation for replacement or upgrading of materials.
The project is hereinafter referred to as The Project. The inspection was initiated at the request of Mr.
Gary Gebhard, Architect, from CLH Architects, on behalf of the VA Medical Center.
The inspection was performed by Mr. William Crowe, in accordance with regulatory requirements and generally accepted industry methods. Copies of applicable requisite training certificates for Mr. Crowe are provided in Appendix E.
1.1. Purpose and Scope
The purpose and scope of the inspection was to identify and sample suspect ACMs, LBPs or other lead containing building materials present in the project area that may be impacted by The Project.
1.1.1. Inspection Area
The hazardous building materials inspection of the limited project area included 3 boilers, associated piping and pumps, glycol pipe connections, exterior windows in boiler room, and stair/platform in boiler room located in Building 2, and steam traps located in Building 1. The above described areas are hereinafter referred to collectively as the Inspection Area.
1.1.2. Limitations
Nondestructive sampling protocols prevented inspection and sampling of materials inside walls and other inaccessible areas of the building. Steam traps are located throughout Building 1, including patient rooms and other areas inaccessible for inspection. Examples of suspect materials not sampled, include those which may exist inside finished interior walls, pipe chases, rigid ceilings and in inaccessible rooms.
Gaskets/packings are present in pipe valves, pumps, boilers and equipment within the Inspection area. Gaskets/packings are concealed and unable to be sampled. Gaskets/packings are assumed as
ACM unless sampled, analyzed, and found as non-ACM.
It is recommended that prior to or during construction that any new materials discovered in the demolition process be tested or abated as ACM.
Sampling of these materials may not be necessary if, in the case of suspect ACM, the materials are assumed to be ACM or if they are determined by a licensed asbestos inspector to be homogenous to other materials that were sampled.
Hazardous Building Materials Inspection Report AMI Project No. 19-00285
Omaha VA Med Center August 27, 2020
4101 Woolworth, Omaha, Nebraska Page of 10
1.2. Regulatory Reference
The asbestos inspection was conducted in accordance with USEPA National Emission Standard for
Hazardous Air Pollutants (NESHAP) regulations (ref.: 40 CFR, Part 61), following criteria established for identifying asbestos-containing building materials that may be impacted by planned renovation activities; applicable protocols established by the Asbestos Hazard Emergency Response Act
(AHERA) (ref.: 40 CFR 763). There is also no licensing requirement for lead paint sampling in non-
HUD facilities.
The State of Nebraska licenses asbestos inspectors to perform asbestos inspections in the State of
Nebraska.
2. BUILDING INFORMATION
2.1. General Construction
This Correct Mechanical Deficiencies project involves the replacement of boilers, valves, piping and other equipment in Buildings 1 and 2.
2.2. Pre-Existing Information
Information on previous surveys or sampling for lead-based paint or asbestos, within the Building’s 1 and 2 Inspection Area, was not provided. Some pipes in the Boiler room were marked “A” and are reported to be asbestos containing by boiler plant personnel. These materials are assumed ACM and were not sampled.
3. INSPECTION METHODOLOGIES
3.1. Asbestos Inspection
The inspection and sampling were conducted in accordance with the USEPA National Emission
Standard for Hazardous Air Pollutants (NESHAP) regulations (ref.: 40 CFR, Part 61), following criteria established for identifying asbestos-containing. building materials that may be impacted by planned renovation. Additional aspects of the inspection methodology are discussed below.
3.1.1. Key Definitions
3.1.1.1. Homogenous Material
Homogenous materials are unique applications of building materials uniform in color and texture. The homogeneity of a material can be further defined by area(s) of application. Bulk sampling is conducted to determine the asbestos content of a homogenous material.
3.1.1.2. Asbestos-Containing Material (ACM)
The Environmental Protection Agency (EPA) and the Occupational Safety and Health
Administration (OSHA) define ACMs as any material that contains greater than one percent asbestos, as determined by visual area estimation (microscopic analysis). The
State of Nebraska follows the EPA standard. Some materials contain one percent or less asbestos. While these materials are not ACMs by definition, they are still regulated by
OSHA, for worker exposure.
3.1.1.3. Friable/Non-Friable ACM
Friable ACMs are materials that contain more than one percent asbestos and, when dry, can be crumbled, pulverized, or reduced to powder by hand pressure, thereby releasing fibers into the air more readily. In contrast, non-friable ACMs are ACMs that, when dry, cannot be crumbled, pulverized, or reduced to powder by hand pressure. Non-friable ACMs are grouped into two categories: Category I and Category
II.
3.1.1.4. Regulated Asbestos-Containing Materials (RACM)
Regulated Asbestos-Containing Materials (RACM) include friable ACMs and non-friable ACMs that, depending on their category, have become friable, have been subjected to specific forms of impact damage, have a high probability of becoming friable, and/or may become friable during removal.
3.1.2. Homogenous Material Numbering Convention
All suspect asbestos materials are assigned a unique homogeneous material number. AHERA identifies three basic material types: Surfacing Materials (SM), which include spray and trowel applied materials, such as fireproofing, ceiling texture, plaster, etc.; Thermal System Insulation
(TSI), which includes insulating materials applied to mechanical and plumbing components for temperature preservation and condensation prevention purposes; and Miscellaneous
Materials (MM), which includes all other materials, such as floor coverings and mastics, roofing materials, asbestos cement products, and many others. When a homogenous material has multiple layers, individual layers are identified and analyzed separately by laboratory analysis.
3.1.3. Bulk Sampling
Bulk sampling must be performed to determine whether suspect building material contains asbestos. Asbestos bulk sampling for the inspection was conducted in accordance with protocols established by the Asbestos Hazard Emergency Response Act (AHERA) (ref.: 40
CFR 763). Friability of the suspect asbestos-containing materials was determined by touching and/or sampling of the material.
3.1.3.1. Bulk Sample Numbering Convention
Bulk samples are given a sequence number when collected.
3.1.3.2. Polarized Light Microscopy Analysis (PLM)
Bulk samples collected during the inspection were submitted to an EPA accredited laboratory, EMSL Analytical, Inc. (EMSL), located at 200 Route 130 North, Cinnaminson, New Jersey. EMSL was instructed to perform Polarized Light
Microscopy (PLM) analysis, utilizing dispersion staining techniques (ref: EPA
Method 600/M4-82-020). PLM analysis is the least expensive and most commonly used visual estimate method. While PLM analysis is acceptable to EPA, OSHA, and most states for determining asbestos content, some states now require more sophisticated methods when analyzing certain types of materials.
A total of 31 asbestos bulk samples were collected and submitted for laboratory analysis. PLM Analysis was performed on the 31 samples collected. Some materials were marked as asbestos containing and are assumed as ACM. Concealed materials are assumed as ACM. Table 1 lists all samples collected and analyzed in the current survey in addition to assumed ACM materials.
Some samples and/or heterogeneous applications may not have been analyzed by the lab if a positive result was obtained from a sample that is among a group of samples representing a suspect material. This process, known as stop on first positive, is followed because if a single sample is found to be positive, that material is determined to be ACM, thus making it unnecessary to analyze any additional samples in the sampling group.
Please refer to the Table 1– Asbestos Material Sampling Table in Appendix A for a complete listing of all materials sampled. The laboratory analytical reports may be found in Appendix D for the current inspection.
3.1.3.3. Quantification Method Analysis
EPA regulations allow materials determined to contain less than 10 percent asbestos utilizing a visual estimate quantification method, such as PLM analysis, to be treated as non-asbestos containing if the material is re-analyzed using one of two quantification methods and determined to contain one percent or less of asbestos. The two acceptable quantification methods are point count analysis and TEM Chatfield analysis.
Quantification methods are more time-consuming and more expensive analytical procedures that are occasionally used to more accurately determine the amount of asbestos in certain samples. Because of their higher cost and the acceptable accuracy of the less expensive visual estimation method, laboratories do not typically perform quantification analyses unless specifically requested.
The quantification method known as point count analysis is used for most ACM types, except floor tile. The organic matrix composition of floor tile precludes the use of point count analysis to more accurately determine asbestos amounts within a sample.
Therefore, TEM Chatfield analysis—which effectively removes all organic materials, leaving only asbestos behind—is necessary to provide a more precise percentage of asbestos content in floor tile.
Please refer to section 6.0 Recommendations, for recommendations concerning supplemental analysis.
3.2. Lead-Based Paint Inspection
The LBP inspection included visual identification of homogenous paint applications and paint chip sampling of the paint(s). While the U. S. Department of Housing and Urban Development (HUD) promulgates guidelines for LBP inspections in child occupied facilities, there are no formal guidelines for non-HUD regulated inspections. Thus, the LBP inspection was conducted in accordance with generally accepted industry standards and practices. Additional aspects of the inspection methodology are discussed below.
3.2.1. Key Definitions
3.2.1.1. Homogenous Paint Applications
Homogenous paint applications are significant paint applications that are visually distinct by their color and uniformity. Significant paint applications do not include incidental occurrences of paint such as isolated occurrences of accent trim, artistic paints, etc. While visual inspection alone cannot generally identify sub-layers of paint, these applications are often identified in the analytical analysis.
3.2.1.2. Lead-Based Paint (LBP)
Pursuant to Federal Register, Vol. 61, No. 169, LBP is defined as paint or other surface coatings equal to or greater than 0.5 percent lead by weight or equal to or greater than 1 mg/cm2.
3.2.2. Homogenous Paint Applications Numbering Convention
Homogenous paints and coatings are assigned a unique homogeneous material number (HM#).
The HM# is referenced throughout the report to uniquely identify each paint application.
3.2.3. Lead-based Paint and Lead Containing Materials Sampling
Sampling of suspected lead-based paint or other suspected lead containing materials was conducted using paint chip sampling for the paint applications identified. A total of 39 lead-based paint chip samples were collected to determine the lead content of painted surfaces.
4. SUMMARY OF INSPECTION FINDINGS
Key findings of the hazardous building materials inspection are summarized below. Please refer to the
Appendices for complete details of the inspection findings and supporting documentation.
4.1. Asbestos Inspection Findings
Below is a summary of the findings of the asbestos inspection:
• ACM Black caulk on interior of boiler room windows (500 LF)
• ACM Gray caulk on interior of boiler room windows (400 LF)
• ACM Red jacketed TSI of various sizes (280 LF)
• ACM Red jacketed TSI Fittings of various sizes (25 Ea.)
• ACM Yellow jacketed TSI of various sizes (265 LF)
• ACM Yellow jacketed TSI Fittings of various sizes (25 Ea.)
• ACM Green jacketed TSI of various sizes (545 LF)
• ACM Green jacketed TSI Fittings (35 Ea.)
• ACM White jacketed TSI of various sizes (50 LF)
• ACM White jacketed TSI Fittings (5 Ea.)
• ACM Silver Flue Systems (1500 SF)
• ACM Gaskets/Packings (500 Ea.)
Please refer to Table 1 – Asbestos Sampling Table in Appendix A for a complete listing of all asbestos sampling.
4.2. Lead Paint Inspection Findings
Below is a summary of the findings of the lead-based paint inspection:
• LBP, gray, is present is present on Boiler 1 (2000 SF)
• LBP, orange, is present on pipes in Building 2, Boiler Room. (200 LF)
• LBP, blue, is present is present on Boilers 1 and 2 (800 SF)
• LBP, gray, is present is present on End Edge Strip Boilers 1 and 2 (50 LF)
• LBP, gray, is present is present on Seam Strips Boilers 1 and 2 (120 LF)
• LBP, yellow, is present on pipes in Building 2, Basement (below Boiler Room). (500 LF)
• LBP, green, is present on pipes in Building 2, Basement (below Boiler Room). (50 LF)
• LBP, black, is present on valves in Building 2, Basement (below Boiler 3). (5 EA)
Please refer to Table 2 – Lead Paint Sampling Table in Appendix A for a complete listing of all lead-based paint sampling.
5. RISKS AND HAZARDS
5.1. Asbestos
To be a significant health concern, asbestos fibers must be inhaled. When asbestos fibers are inhaled, they become lodged in the lung tissue or alveoli. Here they clog and scar the tissues, causing the walls of the alveoli to lose their elasticity and useful function in respiration. Asbestosis (scarring of the lung), lung cancer, and Mesothelioma (cancer of the lining of the chest or lining of the abdominal wall) are diseases associated with asbestos exposure. Risks and hazards increase with increased exposure. ACM condition, proximity to building occupants, building use, and other factors can influence the potential for asbestos fibers to become airborne, and therefore increase exposure risks.
5.2. Lead-Based Paint
Inhalation and ingestion are the major routes of lead exposure. Once in the body, lead is distributed via the bloodstream to red blood cells, soft-tissue and bone. The kidneys and gastrointestinal (GI) tract eliminate lead in the body very slowly, while minute amounts are lost through perspiration.
Lead in the body can cause serious damage to the central and peripheral nervous system, the cardiovascular system, and the kidneys. Exposure to high concentrations of lead can cause retardation, convulsions, coma, and sometimes death. Children are especially vulnerable and susceptible to lead poisoning. Even low levels of exposure persisting during childhood are known to slow a child’s normal development and cause learning and behavioral problems. Exposure to lead can result from deteriorating surfaces and activities mechanically impacting lead surfaces. Preventing exposure requires proper work practices, monitoring, disposal and personal protective equipment during demolition, alteration and friction producing activities.
6. RECOMMENDATIONS
The purpose of this section is to interpret survey findings and provide preliminary recommendations that may be relevant and appropriate at this time. Because this document is a presentation of investigative findings, recommendations related to future construction activities are inherently general in nature. More specific determinations concerning hazardous building materials to be impacted by construction should be made during the abatement project design process.
6.1. General Recommendations
6.1.1. Asbestos
State and/or federal regulations require that ACMs be removed prior to demolition or renovation activities that will impact the ACMs. Depending on the specific renovation work to be performed, certain ACMs may not require removal if they will not be disturbed and do not pose a risk to building occupants or construction trade workers. However, to ensure worker safety and to eliminate future asbestos-related maintenance and management costs and risks, AMIE recommends removal of all identified ACMs in the areas to be renovated. While partial abatement may be technically possible, it is often impractical and not cost-effective.
ACMs not impacted by renovation or demolition activities should be inspected annually and maintained in good condition. ACMs deemed to be in less than good condition (damaged or significantly damaged) should be repaired or removed and replaced. Such repairs should be performed by qualified persons and in accordance with regulatory guidelines.
6.1.2. Lead-Based Paint and Lead Containing Materials
Facility owners are ultimately liable for their lead-containing hazardous waste from cradle to grave. EPA regulations provide two ways to determine whether a waste stream, such as demolition debris containing LBP, must be classified as hazardous waste. Waste generators can either test the waste using an approved testing method (Toxicity Characteristic Leaching
Procedure [TCLP]), or they can apply knowledge of the hazardous characteristic of the waste.
Based on the initial lead paint testing results, AMIE recommends TCLP testing be conducted on the existing building materials, painted and unpainted, prior to the start of renovation or demolition activity. In addition, trade contractors who work in the facility should also be notified of the presence of lead so that they can appropriately monitor and protect their workers against lead exposure.
Any lead-based painted building components not removed during renovation should be considered for inclusion in a facility management plan that maintains potential exposure below
OSHA action levels and ensures the material will be handled properly and in accordance with applicable regulations.
6.2. Hazardous Conditions Recommendations
No hazardous conditions, from hazardous materials, were observed in the building during the inspection.
6.3. Point Count Analysis / TEM Chatfield Analysis Recommendations
AMIE does not recommend Point Count or TEM Chatfield analysis of any of the ACMs identified.
7. REGULATORY REQUIREMENTS
7.1. Asbestos-Containing Materials
The removal and disposal of ACMs is regulated at the federal, state, and, sometimes, local level. While some states have developed their own regulatory standards for the various asbestos disciplines, many states have adopted the federal standards but have established licensing requirements and enforcement authority at the state level.
7.1.1. Notification Requirements
EPA’s NESHAP regulation, 40 CFR, Subpart M, 61.145, Standard for Demolition and
Renovation, stipulates that an owner of a facility submit proper notification with either the
EPA’s regional office and/or the state and local regulatory agency of intention to demolish or renovate. Notifications must be received by the appropriate regulatory agencies 10 working days prior to commencement of asbestos stripping or removal, or other site work. If the demolition or renovation date changes, or the scope of work is increased, another notification is required.
7.1.2. Asbestos Removal Requirements
Asbestos removal must be performed by a licensed abatement contractor. The contractor should follow all work practices, worker protection, and disposal requirements set forth in the contract specifications and by the Occupational Safety and Health Administration (OSHA) and the EPA. Key federal regulations concerning asbestos include 29 CFR 1910.1001, 29 CFR
1926.1101, 40 CFR Part 61, Subpart M, and 40 CFR 763.
7.1.3. OSHA Regulation of ≤ 1 Percent Asbestos
While EPA and many states do not regulate materials containing one percent or less asbestos, OSHA regulates materials containing any amount of asbestos. (Ref. OSHA Construction
Industry Standard, 29 CFR 1926.1101(a)(3))
7.1.4. State of Nebraska Asbestos Removal Regulations
Asbestos Containing Building Material (ACBM) should only be removed by licensed and accredited contractors in the State of Nebraska.
7.2. Lead Waste
7.2.1. Disposal Requirements
The Resource Conservation and Recovery Act (RCRA) classifies lead-containing waste streams as hazardous materials if TCLP levels exceed five parts per million. If TCLP leachable lead levels exceed that threshold, EPA regulations (40 CFR 261) require the waste stream to be handled and disposed of as a hazardous waste. Waste streams containing less the five parts per million of leachable lead are classified as non-hazardous waste and can be disposed of in a construction and demolition landfill.
7.2.2. Construction Requirements
OSHA’s 29 CFR 1926.62 regulates worker exposure to lead during construction activities that include demolition or salvage of structures where lead or materials containing lead are present, as well as removal or encapsulation of lead-containing materials. The standard establishes maximum limits of exposure to lead, including a permissible exposure limit and action level, and should be adhered to during construction and demolition activities.
APPENDIX A
Tables
Table 1 – Asbestos Materials Sampling Table
Table 2 – Lead Paint Sampling Table www.amienvironmental.com
8802 South 135th Street, Suite 100 • Omaha, NE 68138
800.828.8487 • 402.397.5001 • 402.397.3313 (fax http://www.amienvironmental.com/
Table 1 – Asbestos Material Sampling Table
Homogeneous
Area Sample No.
Photo
No.
Description Color Material Location Asbestos Content
Estimated
Quantity Comments
BC-1
2/24/20
Residual TSI on Drip
Leg Gray
Building 1 - B024
Below Grade Mech. Room
None Detected
BC-1
5/18/20
Interior caulk on
Exterior Windows Black
Building 2 Boiler Room 6% Chrysotile 500 LF
BC-2
5/18/20
Interior caulk on
Exterior Windows Black
Building 2 Boiler Room 5% Chrysotile Included in above
BC-3
5/18/20
Interior caulk on
Exterior Windows Brown
Building 2 Boiler Room None Detected
BC-4
5/18/20
Interior caulk on
Exterior Windows
Building 2 Boiler Room None Detected
BC-5
5/18/20
Interior caulk on
Exterior Windows Gray
Building 2 Boiler Room 6% Chrysotile 400 LF
BC-6
5/18/20
Interior caulk on
Exterior Windows Gray
Building 2 Boiler Room 3% Chrysotile Included in above
BC-7, 8,9
5/18/20
Pipe Thermal System
Insulation – 20” Red
Building 2 Boiler Room Assumed ACM 180 LF Marked “A”
BC-10,11,12
5/18/20
Pipe Thermal System
Insulation – 24” Red
Building 2 Boiler Room Assumed ACM 60 LF Marked “A”
BC-13,14,15
5/18/20
Pipe Thermal System
Insulation – 4” Red
Building 2 Boiler Room Assumed ACM 10 LF Marked “A”
BC-16,17
5/18/20
Pipe Thermal System
Insulation – 8” Red
Building 2 Boiler Room Assumed ACM 30 LF Marked “A”
BC-18, 19
5/18/20
Pipe Thermal System
Insulation – Fittings Red
Building 2 Boiler Room Assumed ACM 25 Each Marked “A”
BC-20
5/18/20
Debris Gray
Building 2 Boiler Room
Under Glycol Lines
BC-21
5/18/20
Debris Gray
Building 2 Boiler Room
Under Glycol Lines
BC-22
5/18/20
Caulk Gray Exterior Windows
BC-23
5/18/20
Caulk Gray
Exterior Windows None Detected
BC-24
5/18/20
Caulk
Exterior Windows None Detected
Table 1. Asbestos Material Sampling Results Asbestos Containing Materials (ACM) = >1% Asbestos
Homogeneous
Area
Sample No. Photo
No.
Description Color Material Location Asbestos Content Estimated
Quantity
Comments
BC-25
5/18/20
12 Caulk Brown Exterior Windows
No Sample 13 Thermal System
Insulation – 4”
Yellow Building 2 Boiler Room Assumed ACM
220 LF
Marked “A”
No Sample 14 Thermal System
Insulation – 6”
Yellow Building 2 Below Boiler
Room
Assumed ACM 20 LF Marked “A”
No Sample 15 Thermal System
Insulation – 8”
Yellow Building 2 Below Boiler
Room
Assumed ACM 25 LF Marked “A”
No Sample 16 Thermal System
Insulation Fittings
Yellow Building 2 Boiler Room Assumed ACM 25 Each Marked “A”
No Sample 17 Thermal System
Insulation – 8”
Green Building 2 Boiler Room Assumed ACM 450 LF Marked “A”
No Sample 18 Thermal System
Insulation – 6”
Green Building 2 Boiler Room Assumed ACM 30 LF Marked “A”
No Sample 19 Thermal System
Insulation - 3”
Green Building 2 Boiler Room Assumed ACM 30 LF Marked “A”
No Sample 20 Thermal System
Insulation Fittings
Green Building 2 Boiler Room Assumed ACM 35 Each Marked “A”
No Sample 21 Thermal System
Insulation – 8”
White Building 2 Boiler Room Assumed ACM 50 LF Marked “A”
No Sample 21 Thermal System
Insulation – Fittings
White Building 2 Boiler Room Assumed ACM 5 LF Marked “A”
No Sample 22 Thermal System
Insulation-Flue
System
Silver Building 2 Boiler Room Assumed ACM
1500 SF 2 Each
13 No Sample None Gaskets/Packings N/A
Building 1 and 2
Concealed inside valves, boiler and equipment
Assumed ACM 500 Each
Estimate only.
Only Defective
Steam Traps to be replaced
BC-1
23 Caulk Gray Building 2 Boiler Room
OH Door Boiler 3
None Detected
30 LF
14 BC-2
23 Caulk Gray
Building 2 Boiler Room
OH Door Boiler 3
None Detected
30 LF
15 BC-3 24 Gasket White Boiler 3 Ends None Detected 60 LF
15 BC-4 24 Gasket White Boiler 3 Ends None Detected 60 LF
16 BC-5
25 End Caulk White
Caulk on Fiberglass Pipe
Boiler 3
None Detected
20 SF
16 BC-6 25 End Caulk White Caulk on Fiberglass Pipe None Detected 20 SF
Table 2 – Lead Sampling Table
Sample
No.
Photo
No.
Substrate Description Location Color Lead Content Condition
Estimated
Quantity
B1 1 Metal Factory Paint on Steam Trap
Tag 46
Building 1 - B024
Below Grade Mech.
Room
Black <0.014% Fair
B4 2 Metal Paint on Steam Trap
Tag 35
Building 1 - B024
Below Grade Mech.
Room
Black <0.015% Fair
B5 3 Metal Paint on Steam Trap
Building 1 - B024
Below Grade Mech.
Room
White 0.025% Fair
B7 4 Metal Paint on Steam Trap
Tag 69
Building 1 – Chiller
Room (across B024)
Orange/
Green
<0.080% Fair
B8 5 Metal Paint on Steam Trap
Tag 71
Building 1 – Chiller
Room (across B024)
White 0.0088% Fair
B9 6 Metal Paint on Steam Trap
Tag 88
Building 1
Mech Rm. B830
Green <0.016% Fair
B10 7 Metal Paint on Steam Trap
Tag 91
Building 1
Mech Rm. 716
Light Green <0.013% Fair
L1 8 Metal Paint on Boiler Building 2 Boiler 1 Gray 0.69% Poor 2000 SF
L2 9 Metal Paint on Boiler Building 2 Boiler 2 Gray 0.021% Poor
L3 10 Metal Paint on Pipes Building 2 Boiler Room Orange 5.1% Poor 200 LF
L4 11 Metal Paint on Boilers Building 2
Boilers 1 and 2
Blue 1.30% Poor 800 SF
L5 12 Metal Paint on Pipes Building 2 Boiler Room Green 0.082% Poor
L6 13 Metal Paint on Pipes Building 2 Boiler Room Yellow 0.28% Poor
L7 14 Metal Paint on Pipes 1” Building 2 Boiler Room Gray 0.24% Poor
L8 15 Metal Stairs/Platform Building 2 Boiler Room Gray 0.44% Poor
L9 16 Metal Boiler End Edge Strip
Boilers 1 and 2
Building 2 Boiler Room
Boilers 1 and 2
Gray 8.2% Poor
50 LF
L10 17 Metal Boiler End Dome
Boilers 1 and 2
Building 2 Boiler Room
Boilers 1 and 2
Gray 0.26% Poor
L11 18 Metal Pipe and Joints Building 2 Boiler Room Silver 0.10% Poor
L12 19 Metal Boiler Seams Building 2 Boiler Room
Boilers 1 and 2
Gray 5.0% Poor 120 LF
Table 2. Lead-Based Paint Content
Lead-Based Paint = ≥ 0.05% by weight or ≥1 mg/cm2
L13 20 Metal Pipes 1” and 2” Building 2 Sub Grade
Below Boiler Room
Yellow 2.3% Poor 120 LF
L14 21 Metal Building 2 Boiler Room – Painted Pipe Building 2 Sub Grade
Below Boiler Room
Green 0.93% Poor 50 LF
L15 22 Metal Below Grade Pump Area Fittings Building 2 Sub Grade
Below Boiler Room
Black 0.12% Poor
L16 23 Metal Painted water line above pumps Building 2 Sub Grade
Below Boiler Room
Green 0.2518% Fair
L17 24 Metal White Paint overspray on Glycol Pipes Building 2 Sub Grade
Below Boiler Room
White 0.0592% Poor
L1 25 Metal Painted Frame Building 2 Boiler 3 Green <0.014% Fair 300 SF
L2 26 Metal Painted Valves and Control Boxes Building 2 Boiler Room
Boiler 3
Blue <0.026% 100 SF
L3 27 Metal Painted Boiler Sides, Top, Bottom Building 2 Boiler 3 Green <0.011% Fair 1200 SF
L4 28 Metal Painted Boiler 3 Ends Building 2 Boiler 3 Black <0.014% Fair 200 SF
L5 29 Metal Orange/Yellow Painted 1”/2” Gas Pipes Building 2 Boiler Room
Boiler 3
Yellow/Orange <0.023% Fair 100 LF
L6 30 Metal Orange/Yellow Painted 4” Gas Pipes Building 2 Boiler Room
Boiler 3
Yellow/Orange <0.021% Fair 20 LF
L7 31 Metal Yellow Painted Fuel Lines Building 2 Subgrade
Below Boiler 3
Yellow <0.012% Fair 400 LF
L8 32 Metal Painted Frame Controls Building 2 Subgrade
Below Boiler 3
Light Blue 0.11% Fair I EA
L9 33 Metal Valves Building 2 Subgrade
Below Boiler 3
Black
Red Under
0.056% Fair 5 EA
L10 34 Metal Valves Building 2 Subgrade
Below Boiler 3
Black 2.5% Fair 5 EA
L11 35 Metal Painted 3” Pipe Building 2 Subgrade
Below Boiler 3
Blue 0.025% Fair 4 LF
L12 36 Metal OH Door/Frame Building 2 Boiler Room
Boiler 3
Gray <0.021% Good 400 SF
L13 37 Metal Handrail in front of OH Door Building 2 Boiler 3 Gray <0.016% Fair 1 EA
L14 38 Metal Floor Building 2 Boiler 3 Gray 0.054% Fair 1800 SF
L15 39 Metal Handrails Above Boiler 3 Building 2 Above
Boiler 3
Gray 0.032% Fair 500 LF
APPENDIX B
Photo Logs
Asbestos Photo Log
Lead-Based Paint Photo Log www.amienvironmental.com
8802 South 135th Street, Suite 100 • Omaha, NE 68138
800.828.8487 • 402.397.5001 • 402.397.3313 (fax) http://www.amienvironmental.com/
Asbestos Photo Log
PHOTO 1
Residual TSI on Drip Leg
Non-ACM
PHOTO 2
Caulk on interior side of windows
Building 2 Boiler Room 6% Chrysotile
PHOTO 3
Building 2 Boiler Room Non-ACM
PHOTO 4
Building 2 Boiler Room 6% Chrysotile
PHOTO 5
Red Jacketed TSI on Pipe
Assumed ACM
PHOTO 6
PHOTO 7
PHOTO 8
PHOTO 9
Red Jacketed TSI Fittings
PHOTO 10
Debris on Floor under Glycol Pipes
PHOTO 11
Gray Window Caulk – Exterior
PHOTO 12
Brown Window Caulk – Exterior
PHOTO 13
Yellow Jacketed TSI on Pipe
PHOTO 14
PHOTO 15
PHOTO 16
Yellow Jacketed TSI Fittings
PHOTO 17
Green Jacketed TSI on Pipe
PHOTO 18
PHOTO 19
PHOTO 20
Green Jacketed TSI Fittings
PHOTO 21
White Jacketed TSI Fittings
PHOTO 22
Silver Painted Flue
PHOTO 23
Gray Caulk on OH Door
PHOTO 24
White Gasket on Boiler 3 Ends
PHOTO 25
White Caulk on ends of Fiberglass TSI Pipe
Building 2 Boiler Room Non-ACM
Lead-Based Paint Photo Log
PHOTO 1
Building 1 – B024 Below Grade Mechanical Room
<0.5% lead
PHOTO 2
Building 1 – B024 Below Grade Mechanical Room
PHOTO 3
Building 1 B024 – Below Grade Mechanical Room
PHOTO 4
Building 1 Chiller Room Across from Mechanical
Room B024 <0.5% lead
PHOTO 5
Building 1 Chiller Room Across from Mechanical
Room B024 <0.5% lead
PHOTO 6
Building 1 – Mechanical Room 830
PHOTO 7
Building 1- Mechanical Room 716
PHOTO 8
Building 2 Boiler Room – Gray Paint (Boiler 1)
>0.5% Lead
PHOTO 9
Building 2 Boiler Room – Gray Paint (Boiler 2)
<0.5% Lead
PHOTO 10
Building 2 Boiler Room Orange Painted Pipe
>0.5% lead
PHOTO 11
Building 2 Boiler Room Blue Paint on Boilers 1&2
PHOTO 12
Building 2 Boiler Room Green Painted Pipes
PHOTO 13
Building 2 Boiler Room - Yellow Pipes
PHOTO 14
Building 2 Boiler Room 1” Gray Pipes
PHOTO 15
Building 2 Boiler Room Stairs/Platform
PHOTO 16
Building 2 Boiler Room Edge strip paint 1&2
PHOTO 17
Building 2 Boiler Room – Boiler End Dome
PHOTO 18
Building 2 Boiler Room – Silver Pipes
PHOTO 19
Building 2 Boiler Room – Painted Seams
PHOTO 20
Building 2 Sub grade below boiler Room
Yellow Painted Pipes
PHOTO 21
Building 2 Sub grade below boiler Room
Green Painted Pipes
PHOTO 22
Building 2 Boiler Room – Black Pipe Fittings
Building 2 Boiler Room – Green Overhead Water
Pipe
PHOTO 24
Bldg. 2 Sub Grade below boiler
White Overpray Paint on Glycol Line
<0,5% Lead
Building 2 – Boiler Room Boiler 3
Green Painted Frame Under Boiler 3 <0.5% Lead
PHOTO 26
Building 2 – Boiler Room Boiler 3
Blue Painted Frame/Controls <0.5% Lead
PHOTO 27
Building 2 – Green Painted Boiler 3
PHOTO 28
Building 2 – Black Painted Boiler 3 Ends
PHOTO 29
Building 2 Boiler Room 3 Orange/Yellow 1”/2”
Gas Lines <0.5% lead
PHOTO 30
Building 2 Boiler Room 3 Orange/Yellow 1”/2”
Gas Lines <0.5% lead
PHOTO 31
Building 2 Boiler 3-Yellow Fuel Line
PHOTO 32
Building 2 Subgrade Below Boiler 3-Blue Control box/valves
PHOTO 33
Building 2 Subgrade to Boiler Room 3-Black/Red under painted valves
PHOTO 34
Building 2 Subgrade to Boiler Room 3-Black painted valves >0.5% Lead
PHOTO 35
Building 2 Subgrade to Boiler Room 3-Blue painted <0.5% Lead
PHOTO 36
Building 2 Boiler 3-Gray OH Door/Frame
PHOTO 37
Handrail in front of OH Door
PHOTO 38
Building 2-Gray Painted Boiler Room Floor
PHOTO 39
Building 2 Boiler Room-Handrail above Boiler 3
APPENDIX C
Schematics
Asbestos Material Locations
Lead-based Paint Material Locations
GENERAL NOTES:
1. THESE DRAWINGS ARE DIAGRAMMATIC AND FOR GENERAL IDENTIFICATION OF ASBESTOS-CONTAINING MATERIALS (ACM) AND
LEAD-BASED PAINT (LBP) SUBJECT TO REMOVAL OR DISTURBANCE. THEIR ACCURACY IS NOT GUARANTEED. LOCATIONS AND QUANTITIES
SHOWN OF ACM AND LBP TO BE REMOVED ARE REPRESENTATIVE BASED ON RECENT AND PREEXISTING SITE SURVEY INFORMATION. THE
ABATEMENT CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFYING ALL MATERIAL LOCATIONS AND REMOVAL QUANTITIES, AND
EXISTING SITE CONDITIONS.
2. ASBESTOS REMOVAL IS BEING PERFORMED PURSUANT TO RENOVATION OF THE PROJECT AREAS. REMOVE AND DISPOSE OF ALL
ACM IN ACCORDANCE WITH APPLICABLE REGULATIONS, PROJECT SPECIFICATIONS, AND THE APPROVED ASBESTOS HAZARD ABATEMENT
PLAN (AHAP). IF SUSPECT ACMS ARE ENCOUNTERED DURING CONSTRUCTION AND DEMOLITION THAT ARE NOT IDENTIFIED ON THE
ASBESTOS ABATEMENT DRAWINGS, STOP WORK AND CONTACT THE PROJECT MANAGER AND VPIH.
3. ALL WORK IS TO BE PERFORMED IN ACCORDANCE WITH ALL APPLICABLE FEDERAL, STATE, AND LOCAL REGULATIONS; PROJECT
SPECIFICATIONS, THE APPROVED WORK PLAN, AND ACCEPTED INDUSTRY PRACTICE. WHEN REQUIREMENTS OVERLAP OR CONFLICT, THE
MOST STRINGENT REQUIREMENT SHALL APPLY. ALL WORK SHALL BE SUBJECT TO INSPECTION BY THE OWNER, THE OWNER'S
CONSULTANTS, AND REGULATORY PERSONNEL.
4. DEMOLITION OF NON-ACM BUILDING MATERIALS MAY BE REQUIRED TO ACCESS REGULATED MATERIALS, INCLUDING, BUT NOT
LIMITED TO, CABINETS, RAISED FLOORING, GYPSUM WALLBOARD, EXPANDED METAL OR WOOD LATH AND PLASTER WALLS AND CEILINGS, WALL FRAMING, CARPET, CERAMIC AND VINYL FLOOR COVERINGS, WOOD, ETC. THE ABATEMENT CONTRACTOR SHALL BE RESPONSIBLE
FOR DEMOLITION OF NON-ACM MATERIALS AS NEEDED TO ACCESS REGULATED MATERIALS FOR ABATEMENT, AND FOR COORDINATING
THE LIMITS OF DEMOLITION AND ABATEMENT WITH THE GENERAL CONTRACTOR.
5. ALL COSTS ASSOCIATED WITH EXPLORATORY DEMOLITION AND DEMOLITION OF NON-ACM MATERIALS NEEDED TO ACCOMPLISH
ABATEMENT SHALL BE INCLUDED IN THE ABATEMENT CONTRACTOR'S LUMP SUM PRICE FOR THE PROJECT. NO ADDITIONAL
COMPENSATION SHALL BE CONSIDERED FOR THIS WORK.
ASBESTOS NOTES:
1. THE PROJECT AREA WAS RECENTLY SURVEYED FOR ACM. REFER TO THE HAZARDOUS BUILDING MATERIALS INSPECTION REPORT
BY AMI ENVIRONMENTAL, DATED AUGUST 27, 2020 FOR MORE INFORMATION ABOUT ACMS IDENTIFIED IN THE PROJECT AREA.
2. CONCEALED ACM PIPE INSULATION (TSI) MAY EXIST WITHIN WALLS, PIPE CHASES AND ABOVE RIGID CEILINGS. COORDINATE ACCESS
WITH DEMOLITION DRAWINGS AND THE GENERAL CONTRACTOR. SOME EXPLORATORY DEMOLITION MAY BE REQUIRED TO DETERMINE IF
CONCEALED ACM IS PRESENT.
3. GASKETS AND PACKINGS ARE CONCEALED IN VALVES, EQUIPMENT, STEAM TRAPS, BOILERS AND FLUES AND ARE INACCESSIBLE
FOR SAMPLING. GASKETS AND PACKINGS ARE ASSUMED AS ACM UNLESS SAMPLED, ANALYZED, AND DETERMINED TO BE NON-ASBESTOS.
4. ESTABLISH REGULATED AREAS (RA) AND NEGATIVE PRESSURE ENCLOSURES (NPE) AND PERFORM REMOVAL IN ACCORDANCE WITH
APPLICABLE SPECIFICATION SECTIONS: SEC 02 82 13-13, GLOVEBAG ASBESTOS ABATEMENT; SEC 02 82 11, TRADITIONAL ASBESTOS
ABATEMENT; SEC 02 82 13-19, FINALIZE LIMITS OF REGULATED AREAS, LOCATIONS OF NEGATIVE AIR MACHINES (NAM), PERSONAL
DECONTAMINATION FACILITIES (PDF), AND WASTE DECONTAMINATION FACILITIES (WDF) BASED ON SITE CONDITIONS, BEST PRACTICES
AND PHASING REQUIREMENTS.
5. ASSUME 50% EFFICIENCY WHEN CALCULATING NAM REQUIREMENTS FOR ACHIEVING FOUR (4) AIR CHANGES PER HOUR AND
PROVIDED GREATER THAN -0.02” WCG PRESSURE. CONFIGURE AND PLACE NAMS AS NEEDED TO MAXIMIZE AIR MOVEMENT AND PREVENT
DEAD AIR SPACE. COORDINATE NEGATIVE AIR DISCHARGE LOCATIONS WITH GENERAL CONTRACTOR, OWNER'S REPRESENTATIVE, AND
VPIH, IF NEEDED.
ASBESTOS ABATEMENT PHASING:
1. THE ABATEMENT CONTRACTOR SHALL WORK CLOSELY WITH THE GENERAL CONTRACTOR, CONTRACTING OFFICER, OWNER OR
OWNER'S REPRESENTATIVE, AND/OR THE VPIH TO COORDINATE REMOVAL OF ACM IN ACCORDANCE WITH PROJECT SCHEDULING, SEQUENCING, AND PHASING REQUIREMENTS. SOME AFTER HOURS AND WEEK-END WORK MAY BE REQUIRED. PHASING IS SUBJECT TO
CHANGE TO ACCOMMODATE SITE CONDITIONS AND FACILITY OPERATIONS.
LEAD-BASED PAINT AND PAINT CONTAINING LEAD:
1. LEAD-BASED PAINT (LBP) ARE PAINTS THAT CONTAIN LEAD ≥1.0 mg/m² or ≥0.5 PERCENT BY WEIGHT. PAINT CONTAINING LEAD (PCL) IS
PAINT WITH A DETECTABLE LEVEL OF LEAD. LBP AND PCL ARE KNOWN TO EXIST ON MATERIALS, COMPONENTS, AND SURFACES THAT
MAY BE DISTURBED, PENETRATED, REFINISHED, OR DEMOLISHED. PERFORM DEMOLITION OF MATERIALS AND COMPONENTS WITH LBP
AND/OR PCL IN ACCORDANCE WITH APPLICABLE REGULATIONS AND THE APPROVED WORK PLAN.
2. FLAKING AND PEELING LBP AND/OR PCL ON SURFACES TO REMAIN SHALL BE REMOVED AND STABILIZED USING METHODS IN
ACCORDANCE WITH SECTION 02 83 33.13, LEAD-BASED PAINT REMOVAL AND DISPOSAL.
3. REFER TO THE HAZARDOUS BUILDING MATERIALS INSPECTION REPORT BY AMI ENVIRONMENTAL, DATED AUGUST 27, 2020, FOR
INFORMATION CONCERNING THE PRESENCE OF LBP AND PCL IN THE PROJECT AREAS.
SUMMARY OF ASBESTOS CONTAINING MATERIALS
DESCRIPTION LOCATION
EST. QTY.
HATCHING
INTERIOR & EXTERIOR CAULK - COLOR; GRAY &
BLACK
BLDG 2 BOILER RM
WINDOWS
900 LF
PIPING THERMAL SYSTEMS INSULATION - COLOR;
YELLOW & RED
BLDG 2 BOILER RM
1110 FT²
PIPING THERMAL SYSTEMS FITTINGS - COLOR;
YELLOW, GREEN & RED
BLDG 2 BOILER RM 85 EACH
THERMAL SYSTEMS FLUE - COLOR; SILVER
BLDG 2 BOILER RM 1500 SF
GASKETS / PACKING
BLDG 1 & 2
CONCELED INSIDE
BOILER &
EQUIPMENT
500 EACH
DEFECTIVE TRAPS BUILDING 1 AS NEEDED
SUMMARY OF LEAD-BASED PAINT MATERIALS
DESCRIPTION CONDITION EST. QTY.
HATCHING OR
KEYNOTE
BUILDING 2 - PAINT ON EXTERIOR OF
BOILER 1 (GRAY)
POOR
2000 SQ FT
BUILDING 2 - PAINT ON PIPES OF
BOILER ROOM (ORANGE)
POOR 200 LF
BUILDING 2 - PAINT ON EXTERIOR OF
BOILERS 1 AND 2 (BLUE)
POOR 800 SQ FT
BUILDING 2 - END EDGE STRIP OF
BOILERS 1 AND 2 (GRAY)
POOR 50 LF
BUILDING 2 - SEAM STRIP OF BOILERS 1
AND 2 (GRAY)
POOR 120 LF
BUILDING 2 - PAINT ON PIPES (YELLOW)
SUBGRADE OF BOILER RM
POOR 500 LF
BUILDING 2 - PAINT ON PIPES (GREEN)
SUBGRADE OF BOILER RM
POOR 50 LF
BUILDING 2 - VALVE UNDER BOILER 3
PAINTED BLACK
POOR 5 EACH
65% SUBMITTAL
VAMC OMAHA - CORRECT
MECHANICAL DEFICIENCIES
OMAHA, NE
636-19-301
8-27-2020
A
S e r v i c e
D i s a b l d
V t e ra n
O w n m a l
B u s i n e s s
SDVOSB
CVE
3705 North 200th Street
Elkhorn, Nebraska 68022
(402) 291-6941
CLH PROJECT
NO: 18-013
WHC MET
HA-100
BUILDING 2 HAZARDOUS
MATERIALS SUMMARY
AutoCAD SHX Text
NONE
AutoCAD SHX Text
NONE
AutoCAD SHX Text Drawing Title
AutoCAD SHX Text Approved: Project Director
AutoCAD SHX Text Project Title
AutoCAD SHX Text Date
AutoCAD SHX Text Location
AutoCAD SHX Text Checked
AutoCAD SHX Text Building Number
AutoCAD SHX Text Project Number
AutoCAD SHX Text Drawing Number
AutoCAD SHX Text Drawn
AutoCAD SHX Text Dwg. of
AutoCAD SHX Text Revisions:
AutoCAD SHX Text Date
AutoCAD SHX Text
CONSULTANTS:
AutoCAD SHX Text
ARCHITECT/ENGINEERS:
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text
VA FORM 08-6231
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Office of Construction and Facilities Management
AutoCAD SHX Text
AMI ENVIRONMENTAL
AutoCAD SHX Text
8802 SOUTH 135TH STREET, SUITE 100
AutoCAD SHX Text
OMAHA, NEBRASKA, 68138
AutoCAD SHX Text
PH: (402) 397-3313
ASBESTOS NOTES:
1. THE PROJECT AREA WAS RECENTLY SURVEYED FOR ACM. REFER TO THE HAZARDOUS BUILDING MATERIALS INSPECTION REPORT
BY AMI ENVIRONMENTAL, DATED AUGUST 27, 2020 FOR MORE INFORMATION ABOUT ACMS IDENTIFIED IN THE PROJECT AREA.
2. CONCEALED ACM PIPE INSULATION (TSI) MAY EXIST WITHIN WALLS, PIPE CHASES AND ABOVE RIGID CEILINGS. COORDINATE ACCESS
WITH DEMOLITION DRAWINGS AND THE GENERAL CONTRACTOR. SOME EXPLORATORY DEMOLITION MAY BE REQUIRED TO DETERMINE IF
CONCEALED ACM IS PRESENT.
3. GASKETS AND PACKINGS ARE CONCEALED IN VALVES, EQUIPMENT, STEAM TRAPS, BOILERS AND FLUES AND ARE INACCESSIBLE
FOR SAMPLING. GASKETS AND PACKINGS ARE ASSUMED AS ACM UNLESS SAMPLED, ANALYZED, AND DETERMINED TO BE NON-ASBESTOS.
4. ESTABLISH REGULATED AREAS (RA) AND NEGATIVE PRESSURE ENCLOSURES (NPE) AND PERFORM REMOVAL IN ACCORDANCE WITH
APPLICABLE SPECIFICATION SECTIONS: SEC 02 82 13-13, GLOVEBAG ASBESTOS ABATEMENT; SEC 02 82 11, TRADITIONAL ASBESTOS
ABATEMENT; SEC 02 82 13-19, FINALIZE LIMITS OF REGULATED AREAS, LOCATIONS OF NEGATIVE AIR MACHINES (NAM), PERSONAL
DECONTAMINATION FACILITIES (PDF), AND WASTE DECONTAMINATION FACILITIES (WDF) BASED ON SITE CONDITIONS, BEST PRACTICES
AND PHASING REQUIREMENTS.
5. ASSUME 50% EFFICIENCY WHEN CALCULATING NAM REQUIREMENTS FOR ACHIEVING FOUR (4) AIR CHANGES PER HOUR AND
PROVIDED GREATER THAN -0.02” WCG PRESSURE. CONFIGURE AND PLACE NAMS AS NEEDED TO MAXIMIZE AIR MOVEMENT AND PREVENT
DEAD AIR SPACE. COORDINATE NEGATIVE AIR DISCHARGE LOCATIONS WITH GENERAL CONTRACTOR, OWNER'S REPRESENTATIVE, AND
VPIH, IF NEEDED.
SUMMARY OF ASBESTOS CONTAINING MATERIALS
DESCRIPTION LOCATION EST. QTY. HATCHING
INTERIOR & EXTERIOR CAULK - COLOR; GRAY &
BLACK
BLDG 2 BOILER RM
WINDOWS
900 LF
PIPING THERMAL SYSTEMS INSULATION - COLOR;
YELLOW & RED
BLDG 2 BOILER RM 1110 FT²
PIPING THERMAL SYSTEMS FITTINGS - COLOR;
YELLOW, GREEN & RED
BLDG 2 BOILER RM 85 EACH
THERMAL SYSTEMS FLUE - COLOR; SILVER
BLDG 2 BOILER RM 1500 SF
GASKETS / PACKING
BLDG 1 & 2
CONCELED INSIDE
BOILER &
EQUIPMENT
500 EACH
DEFECTIVE TRAPS BUILDING 1 AS NEEDED
65% SUBMITTAL
VAMC OMAHA - CORRECT
MECHANICAL DEFICIENCIES
OMAHA, NE
636-19-301 r v i c e
D i s a b l t e ra n
O w n a s i n e s s
SDVOSB
CVE
3705 North 200th Street
Elkhorn, Nebraska 68022
(402) 291-6941
CLH PROJECT
NO: 18-013
WHC MET
HA-101
BUILDING 2 HAZARDOUS
MATERIALS ASBESTOS
BASEMENT PLAN
AutoCAD SHX Text B03
AutoCAD SHX Text B07
AutoCAD SHX Text B04
AutoCAD SHX Text B02
AutoCAD SHX Text U
AutoCAD SHX Text U
AutoCAD SHX Text
BOILER #1 ABOVE
AutoCAD SHX Text
BOILER #2 ABOVE
AutoCAD SHX Text
BOILER #3 ABOVE
AutoCAD SHX Text
%%UBASEMENT PLAN
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
SCALE: 1/4" = 1'-0"
AutoCAD SHX Text
NONE
AutoCAD SHX Text
NONE
AutoCAD SHX Text Drawing Title
AutoCAD SHX Text Approved: Project Director
AutoCAD SHX Text Project Title
AutoCAD SHX Text Date
AutoCAD SHX Text Location
AutoCAD SHX Text Checked
AutoCAD SHX Text Building Number
AutoCAD SHX Text Project Number
AutoCAD SHX Text Drawing Number
AutoCAD SHX Text Drawn
AutoCAD SHX Text Dwg. of
AutoCAD SHX Text Revisions:
AutoCAD SHX Text Date
AutoCAD SHX Text
CONSULTANTS:
AutoCAD SHX Text
ARCHITECT/ENGINEERS:
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text
VA FORM 08-6231
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Office of Construction and Facilities Management
AutoCAD SHX Text
AMI ENVIRONMENTAL
AutoCAD SHX Text
8802 SOUTH 135TH STREET, SUITE 100
AutoCAD SHX Text
OMAHA, NEBRASKA, 68138
ASBESTOS NOTES:
1. THE PROJECT AREA WAS RECENTLY SURVEYED FOR ACM. REFER TO THE HAZARDOUS BUILDING MATERIALS INSPECTION REPORT
BY AMI ENVIRONMENTAL, DATED AUGUST 27, 2020 FOR MORE INFORMATION ABOUT ACMS IDENTIFIED IN THE PROJECT AREA.
2. CONCEALED ACM PIPE INSULATION (TSI) MAY EXIST WITHIN WALLS, PIPE CHASES AND ABOVE RIGID CEILINGS. COORDINATE ACCESS
WITH DEMOLITION DRAWINGS AND THE GENERAL CONTRACTOR. SOME EXPLORATORY DEMOLITION MAY BE REQUIRED TO DETERMINE IF
CONCEALED ACM IS PRESENT.
3. GASKETS AND PACKINGS ARE CONCEALED IN VALVES, EQUIPMENT, STEAM TRAPS, BOILERS AND FLUES AND ARE INACCESSIBLE
FOR SAMPLING. GASKETS AND PACKINGS ARE ASSUMED AS ACM UNLESS SAMPLED, ANALYZED, AND DETERMINED TO BE NON-ASBESTOS.
4. ESTABLISH REGULATED AREAS (RA) AND NEGATIVE PRESSURE ENCLOSURES (NPE) AND PERFORM REMOVAL IN ACCORDANCE WITH
APPLICABLE SPECIFICATION SECTIONS: SEC 02 82 13-13, GLOVEBAG ASBESTOS ABATEMENT; SEC 02 82 11, TRADITIONAL ASBESTOS
ABATEMENT; SEC 02 82 13-19, FINALIZE LIMITS OF REGULATED AREAS, LOCATIONS OF NEGATIVE AIR MACHINES (NAM), PERSONAL
DECONTAMINATION FACILITIES (PDF), AND WASTE DECONTAMINATION FACILITIES (WDF) BASED ON SITE CONDITIONS, BEST PRACTICES
AND PHASING REQUIREMENTS.
5. ASSUME 50% EFFICIENCY WHEN CALCULATING NAM REQUIREMENTS FOR ACHIEVING FOUR (4) AIR CHANGES PER HOUR AND
PROVIDED GREATER THAN -0.02” WCG PRESSURE. CONFIGURE AND PLACE NAMS AS NEEDED TO MAXIMIZE AIR MOVEMENT AND PREVENT
DEAD AIR SPACE. COORDINATE NEGATIVE AIR DISCHARGE LOCATIONS WITH GENERAL CONTRACTOR, OWNER'S REPRESENTATIVE, AND
VPIH, IF NEEDED.
SUMMARY OF ASBESTOS CONTAINING MATERIALS
DESCRIPTION LOCATION EST. QTY. HATCHING
INTERIOR & EXTERIOR CAULK - COLOR; GRAY &
BLACK
BLDG 2 BOILER RM
WINDOWS
900 LF
PIPING THERMAL SYSTEMS INSULATION - COLOR;
YELLOW & RED
BLDG 2 BOILER RM 1110 FT²
PIPING THERMAL SYSTEMS FITTINGS - COLOR;
YELLOW, GREEN & RED
BLDG 2 BOILER RM 85 EACH
THERMAL SYSTEMS FLUE - COLOR; SILVER
BLDG 2 BOILER RM 1500 SF
GASKETS / PACKING
BLDG 1 & 2
CONCELED INSIDE
BOILER &
EQUIPMENT
500 EACH
DEFECTIVE TRAPS BUILDING 1 AS NEEDED
65% SUBMITTAL
VAMC OMAHA - CORRECT
MECHANICAL DEFICIENCIES
OMAHA, NE
636-19-301 r v i c e
D i s a b l t e ra n
O w n a s i n e s s
SDVOSB
CVE
3705 North 200th Street
Elkhorn, Nebraska 68022
(402) 291-6941
CLH PROJECT
NO: 18-013
WHC MET
HA-102
BUILDING 2 HAZARDOUS
MATERIALS ASBESTOS FIRST
FLOOR PLAN
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text U
AutoCAD SHX Text
BOILER # 1
AutoCAD SHX Text
BOILER # 2
AutoCAD SHX Text
BOILER # 3
AutoCAD SHX Text
%%UFIRST FLOOR PLAN
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
SCALE: 1/4" = 1'-0"
AutoCAD SHX Text
NONE
AutoCAD SHX Text
NONE
AutoCAD SHX Text Drawing Title
AutoCAD SHX Text Approved: Project Director
AutoCAD SHX Text Project Title
AutoCAD SHX Text Date
AutoCAD SHX Text Location
AutoCAD SHX Text Checked
AutoCAD SHX Text Building Number
AutoCAD SHX Text Project Number
AutoCAD SHX Text Drawing Number
AutoCAD SHX Text Drawn
AutoCAD SHX Text Dwg. of
AutoCAD SHX Text Revisions:
AutoCAD SHX Text Date
AutoCAD SHX Text
CONSULTANTS:
AutoCAD SHX Text
ARCHITECT/ENGINEERS:
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text three inches = one foot
Aut…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .