The document is a Limited Asbestos Containing Materials Inspection report prepared by Quad Three Group, Inc. for the Scranton Office of Economic and Community Development, focusing on a property located at 630 Clay Avenue in Scranton, Pennsylvania. The inspection was conducted on January 19, 2022, and updated on June 13, 2025, in preparation for a planned demolition. The survey involved collecting and analyzing 53 material samples to identify asbestos-containing materials (ACM) within the multiple-family residence comprising six apartments across three floors and a basement. The City of Scranton has issued an Invitation to Bid for the demolition project, with sealed bids to be received online via the city's e-Procurement Portal until 10:00 am on Monday, July 28, 2025.

The inspection identified two primary asbestos-containing materials: 9x9 floor tiles located in the rear entrance way (approximately 150 sq ft) and pipe/fitting/duct insulation in the basement (approximately 180 linear feet). The estimated total cost for asbestos material removal is $6,300, with an additional $1,500 for mobilization and demobilization, bringing the grand total to $7,800. The report also noted the presence of miscellaneous paint cans and fluorescent lighting units that should be properly handled and disposed of prior to demolition. Interested bidders must register on the city's e-Procurement Portal and follow the project to receive addenda notifications and submit bid documents electronically.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LIMITED ASBESTOS CONTAINING MATERIALS INSPECTION

Throughout:

630 CLAY AVENUE

SCRANTON, PA 18510

Prepared for:

SCRANTON OFFICE OF ECOMONIC AND COMMUNITY DEVELOPMENT

340 NORTH WASHINGTON AVENUE (MUNICIPAL BUILDING),

SCRANTON, PA 18503

Attention:

Mr. Andrew Connors

Prepared by:

QUAD THREE GROUP, INC.

37 NORTH WASHINGTON STREET

WILKES-BARRE, PENNSYLVANIA 18701

PH. (570) 829 - 4200

FAX (570) 829 - 0302

PROJECT # 13030.04.34

UPDATED JUNE 2025

TABLE OF CONTENTS

I. EXECUTIVE SUMMARY………………………………………….…..1.

II. INTRODUCTION…………………………………………………..…..1.

III. SURVEY AREA AND DISCUSSION………………………..………2.

IV. MATERIALS SAMPLING AND ANALYTICAL…………………….2.

V. INSPECTION FINDINGS AND RECOMMENDATIONS…………..3.

VI. ASBESTOS CONTAINING MATERIALS ABATEMENT………....4.

COST

VII. ADDITIONAL HAZARDOUS MATERIALS

RECCOMENDATIONS………………………………………………..4.

VIII. INSPECTION DISCLAIMER…………………………………….……5.

APPENDICES

APPENDIX A ASBESTOS ANALYSIS RESULTS

APPENDIX B FLOOR PLANS

APPENDIX C PHOTOS

APPENDIX D CERTIFICATIONS

LIMITED ASBESTOS CONTAINING MATERIALS INSPECTION

Prepared for:

Scranton Office of Economic and Community Development 340 North Washington Avenue (Municipal Building), Scranton, PA 18503

I. EXECUTIVE SUMMARY

An Asbestos Materials Inspection was conducted on January 19th, 2022 and updated on June 13th 2025 within the planned demolition site located at 630 Clay Avenue, Scranton, Pennsylvania. The purpose of the inspection was to determine what asbestos containing materials exist within the structure. Mr. William Sterling (PA Asbestos Inspector #057069) of Quad Three Group, Inc. conducted the inspection in conjunction with demolition scheduled at the structure.

As part of this asbestos inspection, the quantities and conditions of asbestos containing materials were identified. A total of fifty three (53) layers of material samples were collected and analyzed.

Asbestos containing materials (ACM) have been identified within the structure and include: 9 x 9 floor tile and Pipe / Fitting / Duct Insulation.

Materials that were non-suspect or were sampled and through analysis found to not contain asbestos include: wall / ceiling plaster, wall / ceiling texture, drywall ceiling, linoleum flooring, sheet flooring, and ceiling tile. Descriptions of all the material samples collected can be found in Appendix A.

The conclusions presented in this report are the result of the coalition, compilation and analysis of samples and other information obtained during the inspection. The results presented in this report represent the conditions present at the time of the inspection. Quad Three Group has no control over conditions or events that occurred following the date of inspection.

II. INTRODUCTION

On January 19 th, 2022, and updated on June 13th, 2025 a limited asbestos inspection was performed within 630 Clay Avenue, Scranton, Pennsylvania. The purpose of the inspection was to visually locate, identify and quantify asbestos containing materials (ACM) as they exist within the structure scheduled for demolition. The survey/inspection process included:

A. Inspecting the area to identify representative “suspected” asbestos-containing materials, types and sampling sites.

B. Collecting representative samples from any suspect material in order to identify all Asbestos Containing Materials (ACM). Examples of these materials include Pipe insulation, plaster, sheet-rock, floor tiles, linoleum, etc.

1.

C. Sampling was performed by experienced, licensed personnel utilizing semi -destructive sampling techniques in an attempt to locate asbestos containing materials.

D. Laboratory analysis of the materials sampled was performed at an accredited laboratory using the EPA recommended method of polarized light microscopy (PLM) for friable samples.

III. SURVEY AREA DISCUSSION

The multiple family residence consisted of six apartments comprising three floors and a basement at 630 Clay Avenue. The building primarily consists of wood floors, wood paneling, plaster walls / ceilings, and drywall ceilings. Major structural components include concrete, brick, stone, block, and wood. Access was limited at the time of the June 2025 inspection updated because of deteriorating structural conditions within the structure.

IV. MATERIALS SAMPLING AND ANALYTICAL METHODOLOGY

The building inspection was conducted by an inspector, qualified by experience, education and training in the recognition of suspect asbestos-containing materials (ACM). An initial walk through was conducted to identify suspect asbestos containing materials and to group them into homogeneous sampling areas.

Following the walkthrough, the number of samples required to determine the presence of ACM in the study areas was determined. Sample collection was performed with the intent to identify and locate asbestos containing materials and to group them into homogeneous material categories. This grouping allowed the inspectors to identify like materials within the structure to avoid over sampling or mischaracterization of an asbestos containing material.

The majority of ACM was located utilizing non-destructive techniques. Some areas of ACM may still exist in areas that could not be accessed until complete interior demolition is completed, although it is unlikely.

Representative samples of each “suspect asbestos containing material” were collected utilizing approved federal and state methods. When samples were collected, the locations were noted. Measurements were taken to determine the approximate quantity of suspect material. The condition of the material was also documented at that time.

All material samples were analyzed via Polarized Light Microscopy (PLM) as per EPA/600R- 93-116, July 1993.

The analytical results and locations for all samples collected can be found in Appendix A.

The samples were analyzed by International Asbestos Testing Laboratories of Mt. Laurel, New Jersey. IATL is accredited by the National Institute of Standards and Technology’s “National Voluntary Laboratory Accreditation Program” NVLAP (#1011500-0). IATL has developed and implemented an intra laboratory quality assurance/quality control program to ensure accuracy and consistency of results.

Asbestos is present if the material analyzed is greater than one percent (>1%) by weight.

This stipulation is outlined in the EPA Publication EPA 500/5-85-024, Section 2.2.2.2.

2.

V. INSPECTION FINDINGS AND RECOMMENDATIONS

Asbestos containing materials have been identified within the structure and are listed in the following summary along with the material condition. The quantities are approximate and should be confirmed by an abatement contractor prior to providing cost estimates for removal.

Asbestos containing 9 x 9 floor tile is located under luan within the rear entrance way on the right side of the structure of 630 Clay Avenue. The 9 x 9 floor tile is a non - friable material.

Asbestos containing pipe / fitting / duct insulation is located throughout the basement of 630 Clay Avenue. The pipe / fitting insulation is a friable material.

Asbestos containing materials are categorized as containing asbestos concentrations greater than one percent (>1.0%) by weight. Asbestos fiber concentrations less than one percent (<1.0%) by weight are still regulated under OSHA standard 1926.1101.

Below are the results of the building inspection. The results indicate the sample location, sample numbers, material and condition. Some of the materials were homogenized for sampling purposes. For example, once a homogeneous material was sampled, the sample result could be considered representative for that material throughout the residence. If one sample of a homogeneous material tested positive for asbestos, then the entire homogeneous material was classified as asbestos containing in accordance with Environmental Protection Agency Guidelines.

The conditions of the materials are designated as good, damaged or significantly damaged.

The following materials were found to contain more than one percent (>1.0%) asbestos by weight:

630 CLAY AVENUE SCRANTON PA

Analytical results for the materials sampled are located in Appendix A.

Friable materials are materials that can be crushed by applying hand pressure. Non-friable materials are materials that typically cannot be crushed by hand pressure (floor tiles/mastics). If grinding or pulverization were to occur during demolition, non-friable materials can be rendered friable.

Asbestos containing materials (friable and non-friable) located on the interior / exterior of a building, which will be disturbed during renovations / demolition, must be removed and disposed of by a licensed asbestos abatement contractor

3.

Location/Sample # Material Condition Quantity Notes

630 Clay Avenue Right Side

Rear Entrance Way Sample # 025 - 026

9 x 9 Floor Tile Good / Non-Friable ~ 150 Ft2 Located under luan

630 Clay Avenue Basement

Sample # 031 - 036 Pipe / Fitting / Duct Insulation Damaged / Friable ~ 180 Ln Ft Exposed

VI. ASBESTOS CONTAINING MATERIAL ABATEMENT COSTS

As part of this report, cost estimates have been provided to help assist the Scranton Office of Economic and Community Development to evaluate the costs associated with a renovation or demolition project. The cost estimates have been arrived at independently and have been inserted in this report solely for the use of the Scranton Office of Economic and Community Development. The following estimate has been prepared for budgetary purposes. All measurements are approximate. Contractors should independently verify the quantities of materials when preparing a cost estimate for removal.

The following applies:

Location/Sample # Material Condition Estimated Cost

630 Clay Avenue Right Side

Rear Entrance Way Sample # 025 - 026

9 x 9 Floor Tile Good / Non-Friable ~ 150 Ft2 @ $ 12.00 / Ft2 = $ 1,800.00

630 Clay Avenue Basement

Sample # 031 - 036 Pipe / Fitting / Duct Insulation Damaged / Friable ~ 180 Ln Ft @ $ 25.00 / Ln Ft = $ 2,700.00

TOTAL ESTIMATED COST FOR ACM REMOVAL $ 6,300.00

MOBILIZATION AND DEMOBILIZATION

$ 1,500.00

GRAND TOTAL ESTIMATED COST FOR 630 CLAY AVENUE

$ 7,800.00

VII. ADDITIONAL HAZARDOUS MATERIALS RECCOMENDATIONS

At the time of the asbestos containing materials survey Quad 3 Group observed two additional potentially hazardous materials associated with the property. Miscellaneous paint cans and fluorescent lighting units were located within the structure. These materials should be properly handled and disposed of prior to demolition to ensure the safety of the environment and those nearby.

4.

VIII. INSPECTION DISCLAIMER

Data and other information in this report are only valid for the prevailing conditions identified during this investigation and will be kept confidential. Any information contained in this report will not be released to third parties without the expressed written consent of the client except where required by law.

The conclusions expressed within this report are intended to advise the client of the potential regulated environmental hazards within the subject property. It is the responsibility of the client to comply with current regulations relating to the hazards identified in this report. The burden for financial or health consequences for action or lack of action taken by the client or the client's agent is the responsibility of the client.

5.

APPENDIX A

Lab No.: 7346900 Client No.: 001

Analyst Observation: Grey Plaster Client Description: Ceiling Plaster

Location: Wall Facility:

Percent Asbestos:

None Detected

Percent Non-Asbestos Fibrous Material:

5 Cellulose

Percent Non-Fibrous Material:

Lab No.: 7346900(L2) Client No.: 001

Analyst Observation: Off-White Plaster

Lab No.: 7346901 Client No.: 002

Lab No.: 7346901(L2) Client No.: 002

Analyst Observation: Off-White Plaster

Lab No.: 7346902 Client No.: 003

6 Hair

Lab No.: 7346902(L2) Client No.: 003

Analyst Observation: White Plaster

Laboratory Director

Approved By:

Date Analyzed:

1/20/2022Date Received:

Analyst:

Please refer to the Appendix of this report for further information regarding your analysis.

Signature:

Aidan Becker

01/24/2022 Frank E. Ehrenfeld, III

9000 Commerce Parkway Suite B Mt. Laurel, New Jersey 08054

Telephone: 856-231-9449 Email: customerservice@iatl.com

CERTIFICATE OF ANALYSIS

Client: Quad 3 Group -

37 N Washington Street Wilkes-Barre PA 18701

1/24/2022Report Date:

Report No.: 651013 - PLM Project: 630 Clay Ave Project No.: 13030.03.58

PLM BULK SAMPLE ANALYSIS SUMMARY

Client: QUA440

Dated : 1/26/2022 5:36:38 Page 1 of 13

Lab No.: 7346903 Client No.: 004

6 Hair

Lab No.: 7346903(L2) Client No.: 004

Lab No.: 7346904 Client No.: 005

Lab No.: 7346904(L2) Client No.: 005

Lab No.: 7346905 Client No.: 006

Lab No.: 7346905(L2) Client No.: 006

Laboratory Director

Approved By:

Date Analyzed:

1/20/2022Date Received:

Analyst:

Please refer to the Appendix of this report for further information regarding your analysis.

Signature:

Aidan Becker

01/24/2022 Frank E. Ehrenfeld, III

9000 Commerce Parkway Suite B Mt. Laurel, New Jersey 08054

Telephone: 856-231-9449 Email: customerservice@iatl.com

CERTIFICATE OF ANALYSIS

Client: Quad 3 Group -

37 N Washington Street Wilkes-Barre PA 18701

1/24/2022Report Date:

Report No.: 651013 - PLM Project: 630 Clay Ave Project No.: 13030.03.58

PLM BULK SAMPLE ANALYSIS SUMMARY

Dated : 1/26/2022 5:36:38 Page 2 of 13

Lab No.: 7346906 Client No.: 007

Lab No.: 7346906(L2) Client No.: 007

Lab No.: 7346907 Client No.: 008

Analyst Observation: White Texture Client Description: Ceiling Texture

Lab No.: 7346908 Client No.: 009

Lab No.: 7346909 Client No.: 010

Analyst Observation: Tan Texture

Lab No.: 7346910 Client No.: 011

Analyst Observation: Tan Texture

Laboratory Director

Approved By:

Date Analyzed:

1/20/2022Date Received:

Analyst:

Please refer to the Appendix of this report for further information regarding your analysis.

Signature:

Aidan Becker

01/24/2022 Frank E. Ehrenfeld, III

9000 Commerce Parkway Suite B Mt. Laurel, New Jersey 08054

Telephone: 856-231-9449 Email: customerservice@iatl.com

CERTIFICATE OF ANALYSIS

Client: Quad 3 Group -

37 N Washington Street Wilkes-Barre PA 18701

1/24/2022Report Date:

Report No.: 651013 - PLM Project: 630 Clay Ave Project No.: 13030.03.58

PLM BULK SAMPLE ANALYSIS SUMMARY

Dated : 1/26/2022 5:36:38 Page 3 of 13

Lab No.: 7346911 Client No.: 012

Lab No.: 7346912 Client No.: 013

Lab No.: 7346913 Client No.: 014

Lab No.: 7346914 Client No.: 015

Analyst Observation: White Drywall Client Description: Drywall Ceiling

Location:

4 Cellulose

Lab No.: 7346914(L2)

Analyst Observation: White Joint Compound

Lab No.: 7346914(L3)

Analyst Observation: Composite

2 Cellulose

Laboratory Director

Approved By:

Date Analyzed:

1/20/2022Date Received:

Analyst:

Please refer to the Appendix of this report for further information regarding your analysis.

Signature:

Aidan Becker

01/24/2022 Frank E. Ehrenfeld, III

9000 Commerce Parkway Suite B Mt. Laurel, New Jersey 08054

Telephone: 856-231-9449 Email: customerservice@iatl.com

CERTIFICATE OF ANALYSIS

Client: Quad 3 Group -

37 N Washington Street Wilkes-Barre PA 18701

1/24/2022Report Date:

Report No.: 651013 - PLM Project: 630 Clay Ave Project No.: 13030.03.58

PLM BULK SAMPLE ANALYSIS SUMMARY

Dated : 1/26/2022 5:36:38 Page 4 of 13

Lab No.: 7346915 Client No.: 016

Analyst Observation: White Drywall

4 Cellulose

Lab No.: 7346915(L2)

Analyst Observation: White Joint Compound

Lab No.: 7346915(L3)

Analyst Observation: Composite

2 Cellulose

Lab No.: 7346916 Client No.: 017

Analyst Observation: Beige Vinyl Sheet Flooring Client Description: 12x12 Beige Lino Floor

Lab No.: 7346916(L2)

Analyst Observation: White/Tan Fibrous

Lab No.: 7346916(L3)

Analyst Observation: Black Underlayment

15 Cellulose

Laboratory Director

Approved By:

Date Analyzed:

1/20/2022Date Received:

Analyst:

Please refer to the Appendix of this report for further information regarding your analysis.

Signature:

Aidan Becker

01/24/2022 Frank E. Ehrenfeld, III

9000 Commerce Parkway Suite B Mt. Laurel, New Jersey 08054

Telephone: 856-231-9449 Email: customerservice@iatl.com

CERTIFICATE OF ANALYSIS

Client: Quad 3 Group -

37 N Washington Street Wilkes-Barre PA 18701

1/24/2022Report Date:

Report No.: 651013 - PLM Project: 630 Clay Ave Project No.: 13030.03.58

PLM BULK SAMPLE ANALYSIS SUMMARY

Dated : 1/26/2022 5:36:38 Page 5 of 13

Lab No.: 7346917 Client No.: 018

Lab No.: 7346917(L2) Client No.: 018

Analyst Observation: Black Underlayment

Insufficient material provided to verify results.

Lab No.: 7346918 Client No.: 019

Analyst Observation: White Ceiling Tile Client Description: 12x12 White CT

90 Cellulose

Lab No.: 7346919 Client No.: 020

Client Description: 12x12 White CT

Lab No.: 7346920 Client No.: 021

Analyst Observation: Brown Floor Material Client Description: Wood Grain Sheet Floor

30 Cellulose

Lab No.: 7346921 Client No.: 022

Client Description: Wood Grain Sheet Floor

30 Cellulose

Laboratory Director

Approved By:

Date Analyzed:

1/20/2022Date Received:

Analyst:

Please refer to the Appendix of this report for further information regarding your analysis.

Signature:

Aidan Becker

01/24/2022 Frank E. Ehrenfeld, III

9000 Commerce Parkway Suite B Mt. Laurel, New Jersey 08054

Telephone: 856-231-9449 Email: customerservice@iatl.com

CERTIFICATE OF ANALYSIS

Client: Quad 3 Group -

37 N Washington Street Wilkes-Barre PA 18701

1/24/2022Report Date:

Report No.: 651013 - PLM Project: 630 Clay Ave Project No.: 13030.03.58

PLM BULK SAMPLE ANALYSIS SUMMARY

Dated : 1/26/2022 5:36:38 Page 6 of 13

Lab No.: 7346922 Client No.: 023

Client Description: 12x12 Wood Grain Lino Tiles

Lab No.: 7346922(L2) Client No.: 023

Analyst Observation: Lt Brown Mastic

Lab No.: 7346923 Client No.: 024

Lab No.: 7346923(L2) Client No.: 024

Lab No.: 7346924 Client No.: 025

Analyst Observation: Tan Floor Tile Client Description: 9x9 Floor Tile/Tar Paper

PC 1.1 Chrysotile

98.9

Lab No.: 7346924(L2)

Analyst Observation: Dk Brown Tar Paper

Laboratory Director

Approved By:

Date Analyzed:

1/20/2022Date Received:

Analyst:

Please refer to the Appendix of this report for further information regarding your analysis.

Signature:

Aidan Becker

01/24/2022 Frank E. Ehrenfeld, III

9000 Commerce Parkway Suite B Mt. Laurel, New Jersey 08054

Telephone: 856-231-9449 Email: customerservice@iatl.com

CERTIFICATE OF ANALYSIS

Client: Quad 3 Group -

37 N Washington Street Wilkes-Barre PA 18701

1/24/2022Report Date:

Report No.: 651013 - PLM Project: 630 Clay Ave Project No.: 13030.03.58

PLM BULK SAMPLE ANALYSIS SUMMARY

Dated : 1/26/2022 5:36:38 Page 7 of 13

Lab No.: 7346924(L3)

Lab No.: 7346925 Client No.: 026

Analyst Observation: Sample Not Analyzed

Sample Not Analyzed

Note: Positive stop analysis instructions per client for each homogeneous sample group.

Lab No.: 7346925(L2)

Analyst Observation: Dk Brown Tar Paper

Lab No.: 7346925(L3)

Lab No.: 7346926 Client No.: 027

Client Description: 12x12 White Text CT

Location: 2nd Floor

20 Fibrous Glass

Lab No.: 7346927 Client No.: 028

Client Description: 12x12 White Text CT

20 Fibrous Glass

Laboratory Director

Approved By:

Date Analyzed:

1/20/2022Date Received:

Analyst:

Please refer to the Appendix of this report for further information regarding your analysis.

Signature:

Aidan Becker

01/24/2022 Frank E. Ehrenfeld, III

9000 Commerce Parkway Suite B Mt. Laurel, New Jersey 08054

Telephone: 856-231-9449 Email: customerservice@iatl.com

CERTIFICATE OF ANALYSIS

Client: Quad 3 Group -

37 N Washington Street Wilkes-Barre PA 18701

1/24/2022Report Date:

Report No.: 651013 - PLM Project: 630 Clay Ave Project No.: 13030.03.58

PLM BULK SAMPLE ANALYSIS SUMMARY

Dated : 1/26/2022 5:36:38 Page 8 of 13

Lab No.: 7346928 Client No.: 029

Client Description: Lino Tan

20 Cellulose

Lab No.: 7346928(L2) Client No.: 029

Analyst Observation: Tan Mastic

Lab No.: 7346929 Client No.: 030

20 Cellulose

Lab No.: 7346929(L2) Client No.: 030

Analyst Observation: Tan Mastic

Lab No.: 7346930 Client No.: 031

Analyst Observation: Off-White Insulation Client Description: Pipe Insulation

Location: Basement

25 Chrysotile

Lab No.: 7346931 Client No.: 032

Laboratory Director

Approved By:

Date Analyzed:

1/20/2022Date Received:

Analyst:

Please refer to the Appendix of this report for further information regarding your analysis.

Signature:

Aidan Becker

01/24/2022 Frank E. Ehrenfeld, III

9000 Commerce Parkway Suite B Mt. Laurel, New Jersey 08054

Telephone: 856-231-9449 Email: customerservice@iatl.com

CERTIFICATE OF ANALYSIS

Client: Quad 3 Group -

37 N Washington Street Wilkes-Barre PA 18701

1/24/2022Report Date:

Report No.: 651013 - PLM Project: 630 Clay Ave Project No.: 13030.03.58

PLM BULK SAMPLE ANALYSIS SUMMARY

Dated : 1/26/2022 5:36:38 Page 9 of 13

Lab No.: 7346932 Client No.: 033

Lab No.: 7346933 Client No.: 034

Analyst Observation: Off-White Insulation Client Description: Fitting Insulation

15 Chrysotile

Lab No.: 7346934 Client No.: 035

Lab No.: 7346935 Client No.: 036

Laboratory Director

Approved By:

Date Analyzed:

1/20/2022Date Received:

Analyst:

Please refer to the Appendix of this report for further information regarding your analysis.

Signature:

Aidan Becker

01/24/2022 Frank E. Ehrenfeld, III

9000 Commerce Parkway Suite B Mt. Laurel, New Jersey 08054

Telephone: 856-231-9449 Email: customerservice@iatl.com

CERTIFICATE OF ANALYSIS

Client: Quad 3 Group -

37 N Washington Street Wilkes-Barre PA 18701

1/24/2022Report Date:

Report No.: 651013 - PLM Project: 630 Clay Ave Project No.: 13030.03.58

PLM BULK SAMPLE ANALYSIS SUMMARY

Dated : 1/26/2022 5:36:38 Page 10 of 13

Appendix to Analytical Report Customer Contact: William Sterling Method:40 CFR Appendix E to Subpart E of Part 763, interim method for the Determination of Asbestos in Bulk Insulation Samples, USEPA 600, R93-116 and NYSDOH ELAP 198.1 as needed.

This appendix seeks to promote greater understanding of any observations, exceptions, special instructions, or circumstances that the laboratory needs to communicate to the client concerning the above samples. The information below is used to help promote your ability to make the most informed decisions for you and your customers.

Please note the following points of contact for any questions you may have.

iATL Customer Service: customerservice@iatl.com iATL Office Manager:wchampion@iatl.com iATL Account Representative: Shirley Clark Sample Login Notes: See Batch Sheet Attached Sample Matrix: Bulk Building Materials Exceptions Noted: See Following Pages

General Terms, Warrants, Limits, Qualifiers:

General information about iATL capabilities and client/laboratory relationships and responsibilities are spelled out in iATL policies that are listed at www.iATL.com and in our Quality Assurance Manual per ISO 17025 standard requirements. The information therein is a representation of iATL definitions and policies for turnaround times, sample submittal, collection media, blank definitions, quantification issues and limit of detection, analytical methods and procedures, sub-contracting policies, results reporting options, fees, terms, and discounts, confidentiality, sample archival and disposal, and data interpretation.

iATL warrants the test results to be of a precision normal for the type and methodology employed for each sample submitted. iATL disclaims any other warrants, expressed or implied, including warranty of fitness for a particular purpose and warranty of merchantability. iATL accepts no legal responsibility for the purpose for which the client uses test results. Any analytical work performed must be governed by our Standard Terms and Conditions. Prices, methods and detection limits may be changed without notification. Please contact your Customer Service Representative for the most current information.

This confidential report relates only to those item(s) tested and does not represent an endorsement by NIST-NVLAP, AIHA LAP LLC, or any agency of local, state or province governments nor of any agency of the U.S. government.

This report shall not be reproduced except in full, without written approval of the laboratory.

Information Pertinent to this Report:

Analysis by US EPA 600 93-116: Determination of Asbestos in Bulk Building Materials by Polarized Light Microscopy (PLM).

Certifications:

NIST-NVLAP No. 101165-0• NYSDOH-ELAP No. 11021• AIHA-LAP, LLC No. 100188•

Quantification at <0.25% by volume is possible with this method. (PC) Indicates Stratified Point Count Method performed. (PC-Trace) means that asbestos was detected but is not quantifiable under the Point Counting regimen. PC Trace represents a <0.25% amount. Analysis includes all distinct separable layers in accordance with EPA 600 Method. If not reported or otherwise noted, layer is either not present or the client has specifically requested that it not be analyzed (ex. analyze until positive instructions). Small asbestos fibers may be missed by PLM due to resolution limitations of the optical microscope. Therefore, PLM is not consistently reliable in detecting asbestos in non-friable organically bound (NOB) materials. Quantitative transmission electron microscopy (TEM) is currently the only method that can pronounce materials as non-asbestos containing.

Analytical Methodology Alternatives: Your initial request for analysis may not have accounted for recent advances in regulatory requirements or advances in technology that are routinely used in similar situations for other qualified projects. You may have the option to explore additional analysis for further information. Below are a few options, listed as the matrix followed by the appropriate methodology. Also included are links to more information on our website.

Bulk Building Materials that are Non-Friable Organically Bound (NOB) by Gravimetric Reduction techniques employing PLM and TEM: ELAP 198.6 (PLM-NOB), ELAP 198.4 (TEM-NOB) See additional information at the end of this appendix.

9000 Commerce Parkway Suite B Mt. Laurel, New Jersey 08054

Telephone: 856-231-9449 Email: customerservice@iatl.com

CERTIFICATE OF ANALYSIS

Client: Quad 3 Group - 37 N Washington Street Wilkes-Barre PA 18701

1/24/2022Report Date:

Report No.: 651013 - PLM Project: 630 Clay Ave Project No.: 13030.03.58

Page 11 of 13Dated : 1/26/2022 5:36:38

Loose Fill Vermiculite Insulation, Attic Insulation, Zonolite (copyright), etc.: US EPA 600 R-4/004 (multi-tiered analytical process) Sprayed On Insulation/Fireproofing with Vermiculite (SOF-V): ELAP 198.8 (PLM-SOF-V)

Soil, sludge, sediment, aggregate, and like materials analyzed for asbestos or other elongated mineral particles (ex. erionite, etc.): ASTM D7521, CARB 435, and other options available

Asbestos in Surface Dust according to one of ASTM's Methods (very dependent on sampling collection technique – by TEM): ASTM D 5755, D5756, or D6480

Various other asbestos matrices (air, water, etc.) and analytical methods are available.

Disclaimers / Qualifiers:

There may be some samples in this project that have a "NOTE:" associated with a sample result. We use added disclaimers or qualifiers to inform the client about something that requires further explanation. Here is a list with highlighted disclaimers that may be pertinent to this project. For a full explanation of these and other disclaimers, please inquire at customerservice@iatl.com.

1) Note: No mastic provided for analysis.

2) Note: Insufficient mastic provided for analysis.

3) Note: Insufficient material provided for analysis.

4) Note: Insufficient sample provided for QC reanalysis.

5) Note: Different material than indicated on Sample Log / Description.

6) Note: Sample not submitted.

7) Note: Attached to asbestos containing material.

8) Note: Received wet.

9) Note: Possible surface contamination.

10) Note: Not building material. 1% threshold may not apply.

11) Note: Recommend TEM-NOB analysis as per EPA recommendations.

12) Note: Asbestos detected but not quantifiable.

13) Note: Multiple identical samples submitted, only one analyzed.

14) Note: Analyzed by EPA 600/R-93/116. Point Counting detection limit at 0.080%.

15) Note: Analyzed by EPA 600/R-93/116. Point Counting detection limit at 0.125%.

16) Note: This sample contains >10% vermiculite mineral. See Appendix for Recommendations for Vermiculite Analysis.

Recommendations for Vermiculite Analysis:

Several analytical protocols exist for the analysis of asbestos in vermiculite. These analytical approaches vary depending upon the nature of the vermiculite mineral being tested (e.g. un-processed gange, homogeneous exfoliated books of mica, or mixed mineral composites).Please contact your client representative for pricing and turnaround time options available.

iATL recommends initial testing using the EPA 600/R-93/116 method. This method is specifically designed for the analysis of asbestos in bulk building materials. It provides an acceptable starting point for primary screening of vermiculite for possible asbestos.

Results from this testing may be inconclusive. EPA suggests proceeding to a multi-tiered analysis involving wet separation techniques in conjunction with PLM and TEM gravimetric analysis (EPA 600/R-04/004).

For New York State customers, NYSDOH requires disclaimers and qualifiers for various vermiculite containing samples that direct analysis via ELAP198.6 and ELAP198.8 for samples that contain >10% vermiculite mineral where ELAP198.6 may be used to evaluate the asbestos content of the material. However, any test result using ELAP198.6 will be reported with the following disclaimer: “ELAP198.6 method does not remove vermiculite and may underestimate the level of asbestos present in a sample containing >10% vermiculite.”

Further information on this method and other vermiculite and asbestos issues can be found at the following: Agency for Toxic Substances and Disease Registry (ATSDR) www.atsdr.cdc.gov, United States Geological Survey (USGS) www.minerals.usgs.gov/minerals/, US EPA www.epa.gov/asbestos. The USEPA also has an informative brochure "Current Best Practices for Vermiculite Attic Insulation" EPA 747F03001 May 2003, that may assist the health and remediation professional. NYS customers please follow current NYSDOH ELAP requirements per policy on subject of surfacing and vermiculite, May 6, 2016, Testing Requirements for Surfacing Material Containing Vermiculite (https://www.wadsworth.org/sites/default/files/WebDoc/I198_8_02_2.pdf)

The following is a summary of the analytical process outlines in the EPA 600/R-04/004 Method:

1)Analytical Step/Method: Initial Screening by PLM, EPA 600R-93/116 Requirements/Comments: Minimum of 0.1 g of sample. ~0.25% for most samples.

9000 Commerce Parkway Suite B Mt. Laurel, New Jersey 08054

Telephone: 856-231-9449 Email: customerservice@iatl.com

CERTIFICATE OF ANALYSIS

Client: Quad 3 Group - 37 N Washington Street Wilkes-Barre PA 18701

1/24/2022Report Date:

Report No.: 651013 - PLM Project: 630 Clay Ave Project No.: 13030.03.58

Page 12 of 13Dated : 1/26/2022 5:36:38

2)Analytical Step/Method:Wet Separation by PLM Gravimetric Technique, EPA R-04/004 Requirements/Comments: Minimum 50g** of dry sample. Analysis of "Sinks" only.

3)Analytical Step/Method:Wet Separation by PLM Gravimetric Technique, EPA R-04/004 Requirements/Comments: Minimum 50g** of dry sample. Analysis of "Floats" only.

4)Analytical Step/Method:Wet Separation by TEM Gravimetric Technique, EPA R-04/004 Requirements/Comments: Minimum 50g** of dry sample. Analysis of "Sinks" only.

5)Analytical Step/Method:Wet Separation by TEM Gravimetric Technique, EPA R-04/004 Requirements/Comments: Minimum 50g** of dry sample. Analysis of "Suspension" only.

*With advance notice and confirmation by the laboratory.

**Approximately 1 Liter of sample in double-bagged container (~9x6 inch bag of sample).

New York State Department of Health requires that samples originating from NYS that they categorize as Non-friable Organically Bound materials can only be confirmed as None Detected for asbestos by method 198.4. See the table below for a list of those materials. (ENVIRONMENTAL LABORATORY APPROVAL PROGRAM CERTIFICATION MANUAL - ITEM No. 198.1, Revision Date 5/6/16)

*Asphalt Shingles, Caulking, Ceiling Tiles with Cellulose, Duct Wrap, Glazing, Mastic, Paint Chips, Resilient Floor Tiles, Rubberized Asbestos Gaskets, Siding Shingles, Vinyl Asbestos Tile, NOB materials (other that SM-V) with <10% vermiculite, Any material (Friable or NOB other than SM-V) with >10% vermiculite.

Statistically derived uncertainty with any measure should be taken into consideration when reviewing and interpreting all reported data and results. A more comprehensive listing of accuracy, precision, and uncertainty as it impacts this method is available upon request.

9000 Commerce Parkway Suite B Mt. Laurel, New Jersey 08054

Telephone: 856-231-9449 Email: customerservice@iatl.com

CERTIFICATE OF ANALYSIS

Client: Quad 3 Group - 37 N Washington Street Wilkes-Barre PA 18701

1/24/2022Report Date:

Report No.: 651013 - PLM Project: 630 Clay Ave Project No.: 13030.03.58

Page 13 of 13Dated : 1/26/2022 5:36:38

APPENDIX B

APPENDIX C

PHOTOS

APPENDIX D

mcalvert Pen

SECTION 008600 – PA TAX EXEMPT ENTITIES DISCLOSURE

A. Section 204 of the Tax Reform Code of 1971, see 72 P.S. § 7204(57)(i) and (ii), as amended July 1, 1998, provides a tax exemption for the sale at retail to or use by the United States, the

Commonwealth of Pennsylvania or its instrumentalities or political subdivisions, of tangible personal property or services; and the use by a construction contractor of building machinery and equipment and services thereto that are transferred pursuant to a construction contract for any charitable organization, volunteer fireman's organization, nonprofit educational institution or religious organization for religious purposes, provided that the building machinery and equipment and services thereto are not used in any unrelated trade or business.

In order to permit the contractor to benefit from the foregoing exemption, the tax- exempt entity may be required to cooperate with the construction contractor and provide certain evidence as may be required from time to time by the Pennsylvania Department of Revenue.

B. The contractor is entitled to the aforementioned tax exemption, and the contractor should reflect the tax exemption in all bids, where appropriate.

C. The Contractor is encouraged to use a Pennsylvania Tax Exemption Certificate (Form RE\/-1220) when buying property that qualifies for the tax exemption referenced in Section A above.

D. Access to Accounting Records:

The Contractor shall check all materials, equipment and labor entering into the Work and shall keep such full and detailed accounts as may be necessary for proper financial management under this

Agreement, and the system shall be satisfactory to the Owner. The Owner or its representative shall be afforded access to all the Contractor's records, books, correspondence, instructions, drawings, receipts vouchers, memoranda, and similar data relating to this Contract, and the Contractor shall preserve all such records for a period of three years, or for such longer period as may be required by law, after the final payment (AIA Document A111-1978, Article 12).

E. Contracts with Subcontractors:

The Contractor agrees to include the "Access to Accounting Records" paragraph, in full, in any contracts with subcontractors.

PA TAX EXEMPT ENTITIES DISCLOSURE 008600 - 1

COMMONWEALTH OF PENNSYLVANIA

PUBLIC WORKS EMPLOYMENT VERIFICATION FORM

Date _______________________

Business or Organization Name (Employer)_________________________________________________

Address _____________________________________________________________________________

City _____________________________________ State_____________ Zip Code ________________

Contractor {dzōŎƻƴǘNJŀŎǘƻNJ όŎƘŜŎƪ ƻƴŜύ

Contracting Public Body _______________________________________________________________

Contract/Project No ___________________________________________________________________

Project Description ____________________________________________________________________

Project Location ______________________________________________________________________

As a contractor/subcontractor for the above referenced public works contract, I hereby affirm that as of the above date, our company is in compliance with the Public Works Employment Verification Act

(‘the Act’) through utilization of the federal E‐Verify Program (EVP) operated by the United States

Department of Homeland Security. To the best of my/our knowledge, all employees hired post

January 1, 2013 are authorized to work in the United States.

It is also agreed to that all public works contractors/subcontractors will utilize the federal EVP to verify the employment eligibility of each new hire within five (5) business days of the employee start date throughout the duration of the public works contract. Documentation confirming the use of the federal EVP upon each new hire shall be maintained in the event of an investigation or audit.

I, _________________________, authorized representative of the company above, attest that the information contained in this verification form is true and correct and understand that the submission of false or misleading information in connection with the above verification shall be subject to sanctions provided by law.

Authorized Representative Signature

06 62 00 E-verify Act and Form

On July 5, 2012, Gov. Corbett signed into law the Public Works Employment Verification Act (S.B. 637) which takes effect January 1, 2013.

The Act requires all public works contractors and subcontractors in Pennsylvania to use E-Verify to verify the employment eligibility of new employees and applies to projects with an estimated cost in excess of $25,000 that are funded by the Commonwealth, or its political subdivisions, authorities, or agencies. E-Verify is an internet-based system that compares information from an employee’s Form I-9, Employment Eligibility Verification, to data from the U.S. Department of Homeland Security and Social Security Administration records to confirm employment eligibility.

(5) "Public work" means construction, reconstruction, demolition, alteration and/or repair work other than maintenance work, done under contract and paid for in whole or in part out of the funds of a public body where the estimated cost of the total project is in excess of twenty-five thousand dollars ($25,000), but shall not include work performed under a rehabilitation or manpower training program.

Under the Act, a contractor must submit a verification form signed under penalty of perjury and acknowledging its compliance with the Act as a precondition of being awarded a public works contract. Subcontractors must submit the form prior to commencing work on the public works project. In addition, contractors must include in their subcontracts information about the requirements of the Act. The Department of General Services (DGS) will create the verification form and is also charged with enforcement of the Act through complaint-based as well as random audits.

A contractor or subcontractor violates the Act by failing either to use E-Verify or to provide the verification form. Sanctions for failure to use E-Verify range from a warning letter (to be posted on the DGS website) for a first violation to a one year debarment for a third and subsequent violation. A willful violation of the Act will result in a 3-year debarment. Civil penalties for failure to use the form or for false statements on the form range from $250 to $1,000 for each violation.

The Act provides significant protection for whistleblowers. If an employee of a contractor or subcontractor is retaliated against for instigating or cooperating in an investigation, the employee can bring suit (which must be brought within 180 days from the date the employee knew of the retaliation) to obtain reinstatement of employment and to collect three times lost wages, along with an award of attorney’s fees and costs.

A contractor or subcontractor who relies in good faith on E-Verify has immunity from sanctions and shall have no liability to any individual who is not hired or is discharged from employment.

Good faith is shown by a federal agency’s written acknowledgment of the use of E-Verify.

Contractors are not liable for violations by subcontractors.

Information on E-Verify can be found:

http://www.uscis.gov/portal/site/uscis and searching for e-verify.

PA DGS regulations can be found:

http://www.pabulletin.com/secure/data/vol42/42-52/2525.html An electronic version of the verification form can be found at:

http://www.dgs.state.pa.us/portal/server.pt/community/construction_and_public_works/1235/pub lic_works_employment_verification/1357211 http://www.legis.state.pa.us/cfdocs/legis/PN/Public/btCheck.cfm?txtType=HTM&sessYr=2011&sessInd=0&billBody=S&billTyp=B&billNbr=0637&pn=2347 http://www.uscis.gov/portal/site/uscis/menuitem.eb1d4c2a3e5b9ac89243c6a7543f6d1a/?vgnextoid=75bce2e261405110VgnVCM1000004718190aRCRD&vgnextchannel=75bce2e261405110VgnVCM1000004718190aRCRD&gclid=CLKy7PD5lrECFcXe4Aodnm_Yew http://www.uscis.gov/portal/site/uscis http://www.pabulletin.com/secure/data/vol42/42-52/2525.html http://www.dgs.state.pa.us/portal/server.pt/community/construction_and_public_works/1235/public_works_employment_verification/1357211 http://www.dgs.state.pa.us/portal/server.pt/community/construction_and_public_works/1235/public_works_employment_verification/1357211 tsisock Rectangle cnewton Text Box PA E-Verify Form 009200-1

Division 32 Exterior Improvements

TURF AND GRASSES 329200 - 1

SECTION 329200 - TURF AND GRASSES

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes:

1. Seeding for restoring lawn from disturbance of construction activity.

1.2 INFORMATIONAL SUBMITTALS

A. Certification of grass seed.

B. Product certificates.

1.3 DELIVERY, STORAGE, AND HANDLING

A. Seed and other packaged materials: Deliver packaged materials in original, unopened containers showing weight, certified analysis, name and address of manufacturer, and indication of compliance with state and federal laws, as applicable.

PART 2 - PRODUCTS

2.1 SEED

A. Grass seed: Fresh, clean, dry, new-crop seed complying with AOSA's "Rules for Testing Seeds" for purity and germination tolerances.

B. Seed species:

1. Quality: State-certified seed of grass species for solar exposure.

2. Quality: Seed of grass species for solar exposure with not less than 85 percent germination, not less than 95 percent pure seed, and not more than 0.5 percent weed seed.

3. Species as indicated according to seeding schedule on drawings.

2.2 FERTILIZERS

A. Commercial fertilizer: Commercial grade complete fertilizer of neutral character, consisting of fast- and slow-release nitrogen, 50 percent derived from natural organic sources of urea formaldehyde, phosphorous, and potassium in the following composition:

TURF AND GRASSES 329200 - 2

1. Composition: 1 lb./1,000 sq. ft. of actual nitrogen, 4 percent phosphorous, and 2 percent potassium, by weight.

B. Slow-release fertilizer: Granular or pelleted fertilizer consisting of 50 percent water-insoluble nitrogen, phosphorus, and potassium in the following composition:

1. Composition: 20 percent nitrogen, 10 percent phosphorous, and 10 percent potassium, by weight.

PART 3 - EXECUTION

3.1 GRASS AREA PREPARATION

A. Reduce elevation of planting soil to allow for soil thickness of sod.

B. Moisten prepared area before planting, if soil is dry. Water thoroughly and allow surface to dry before planting. Do not create muddy soil.

C. Before planting, obtain Engineer's acceptance of finish grading; restore planting areas if eroded or otherwise disturbed after finish grading.

3.2 SEEDING

A. Sow seed with spreader or seeding machine.

1. Evenly distribute seed by sowing equal quantities in two directions at right angles to each other.

2. Do not use wet seed or seed that is moldy or otherwise damaged.

3. Do not seed against existing trees. Limit extent of seed to outside edge of planting saucer.

B. Rake seed lightly into top 1/8 inch of soil, roll lightly, and water with fine spray.

C. Protect seeded areas with slopes not exceeding 1:6 by spreading straw mulch.

1. Anchor straw mulch by crimping into soil with suitable mechanical equipment.

3.3 GRASS MAINTENANCE

A. General: Maintain and establish turf by watering, fertilizing, weeding, mowing, trimming, replanting, and performing other operations as required to establish healthy, viable turf. Roll, regrade, and replant bare or eroded areas and remulch to produce a uniformly smooth grass surface. Provide materials and installation the same as those used in the original installation.

TURF AND GRASSES 329200 - 3

B. Mow grass as soon as top growth is tall enough to cut. Repeat mowing to maintain specified height without cutting more than one-third of grass height. Remove no more than one-third of grass-leaf growth in initial or subsequent mowing.

3.4 SATISFACTORY GRASS

A. Grass installations shall meet the following criteria as determined by engineer:

1. Satisfactory seeded turf: At end of maintenance period, a healthy, uniform, close stand of grass has been established, free of weeds and surface irregularities, with coverage exceeding 90 percent over any ten sq. ft. and bare spots not exceeding five by five inches.

B. Use specified materials to reestablish turf that does not comply with requirements and continue maintenance until grass is satisfactory. It shall be the complete responsibility of the contractor to ensure that all areas disturbed by construction and demolition activities are reseeded until grass has been established throughout the areas that were disturbed.

END OF SECTION 329200

000000_Title-Page
000110_TABLE_OF_CONTENTS2
001160_INVITATION_TO_BIDDERS_
003121_PHOTOGRAPHIC_INFO
003126.00_EXISTING_HAZARDOUS_MATERIAL_INFO
1.1 EXISTING HAZARDOUS MATERIAL INFORMATION
A. This Document with its referenced attachments is part of the Procurement and Contracting Requirements for Project. They provide Owner's information for Bidders' convenience and are intended to supplement rather than serve in lieu of Bidders' own investigations. They are made available for Bidders' convenience and information but are not a warranty of existing conditions. This Document and its attachments are not part of the Contract Documents.
B. Existing asbestos reports for individual houses have been prepared by Quad Three Group, Inc. The reports of properties containing asbestos are herein attached for review and information.
003126.13_Asbestos_Reports
APPENDIX A
COA_651013
APPENDIX B
Floor Plans
APPENDIX C
PHOTOS
APPENDIX D
2025 ACM CERT
Q3G Back Page
004113_BID_FORM(STIPULATED_SUM)
004313_BID_BOND_AIA310_Rescan
004597_BID_SUBMISSION
005213_AGREEMENT_BY_OWNER
ARTICLE 4: CONDITION PRECEDENT
ARTICLE 5: NON-DISCRIMINATION CLAUSE
ARTICLE 6: INSURANCE & LIABILITY
ARTICLE 7: PREVAILING WAGES: REGISTRATION WITH THE
DEPARTMENT OF LABOR AND INDUSTRY
CONTRACTOR will be required to register their project with the Department of Labor and Industry to obtain a Prevailing Wage Rate schedule for each awarded project as this project is using grant funds towards construction, demolition, reconstruction, alteration, repair work, renovations, build-out, and/or installation of machinery and equipment in excess of $25,000.00. Registration can be completed by filling out the Prevailing Wage Rates Determination Request Form. Specific questions regarding the applicability of Prevailing Wage Rates should be directed to ra-li-slmr-llc@pa.gov.
CONTRACTOR will also need to provide copies of certified payroll worksheets collected from all contractors and subcontractors conducting work on the approved project and submit to the CITY as part of the reimbursement process.
ARTICLE 8: RECORD KEEPING PROCEDURES
ARTICLE 9: TERMINATION OF CONTRACT
ARTICLE 10: JURISDICITION
ARTICLE 11: INDEPENDENT CONTRACTOR
3. Compliance With Anti-Pollution Regulations
ARTICLE 13: MODIFICATION
ARTICLE 14: SEVERABILITY
ARTICLE 15: NO WAIVER
ARTICLE 16: BINDING EFFECT
ARTICLE 17: NOTICES
(i) In the case of a notice or communication to the CONTRACTOR, is addressed as follows:
Office of Economic and Community Development
of the City of Scranton
Scranton Municipal Building
340 N. Washington Avenue
Scranton, PA 18503
Attn: Executive Director
ARTICLE 18: COUNTERPARTS
ARTICLE 19: HEADINGS
ARTICLE 20: ENTIRE AGREEMENT
006113.13_PERFORMANCE_BOND_AIA312
006113.16_PAYMENT_BOND_AIA312
008600_PA_TAX_EXEMPT_DISCLOSURE
009200_PA_E-VERIFY
011000_SUMMARY
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes:
1.2 PROJECT INFORMATION
A. Project Identification: Demolition of Hazardous Structures – Summer 2025
B. Owner: City of Scranton
Office of Community Development
340 N. Washington Avenue
Scranton, PA 18503
C. Engineer: Barry Isett & Associates, Inc.
1170 Highway 315, Suite 3
Wilkes-Barre, PA 18702
1.3 WORK COVERED BY CONTRACT DOCUMENTS
A. The Work of the Project is defined by the Contract Documents and consists of the following:
B. Type of Contract
1.4 PHASED CONSTRUCTION
A. The Work shall be conducted in separate phases.
B. Before commencing Work submit an updated copy of the Contractor's schedule showing the sequence, commencement and completion dates for all of the Work.
1.5 CONSTRUCTION SCHEDULE
A. Schedule
1.6 ACCESS TO SITE
A. Use of Site: Limit use of Project site to work in areas indicated. Do not disturb portions of Project site beyond areas in which the Work is indicated.
B. The contractor shall take all necessary precautions to protect the buildings and surrounding lawns, planting and other property including but not limited to the Owner and privately owned vehicles, equipment and other structures from damage resulting from construction activities under this contract.
1.7 COORDINATION WITH OCCUPANTS
A. Full Owner Occupancy: Existing adjacent building(s) will be occupied during entire construction period. Cooperate with Engineer during construction operations to minimize conflicts. Perform the Work so as not to interfere with adjacent properties day-to-day operations. Maintain existing exits unless otherwise indicated.
1.8 WORK RESTRICTIONS
A. Work Restrictions, General: Comply with restrictions on construction operations.
B. On-Site Work Hours: Limit work in the existing building to normal business working hours of 7 a.m. to 5:30 p.m., Monday through Saturday, except as otherwise indicated or permitted by the authority having jurisdiction.
C. Existing Utility Interruptions: Do not interrupt utilities serving adjacent facilities unless permitted under the following conditions and then only after providing temporary utility services according to requirements indicated: