NETWORK CABLING INSTALLATION Federal contract opportunity
Solicitation number
61320626Q0026
Issued by
Consumer Product Safety Commission

About this file

This is a Request for Quotation (RFQ) and Statement of Work for GAO Cabling infrastructure installation services issued by the U.S. Consumer Product Safety Commission (CPSC).

The CPSC seeks contractor services to install structured cabling and wiring infrastructure at its facility located at 441 G Street NW, Washington, D.C. The project consists of two phases to support network, voice, video, and peripheral services. Phase 1 requires installation of CAT6 cabling to 37 designated Wireless Access Point (WAP) locations, including all terminations, testing, labeling, mounting of customer-provided WAP units, and coordination with Network Engineering. Phase 2 encompasses multiple tasks: installation of single CAT6 cables to 160 locations with termination of new CAT6 and re-termination of existing CAT5 cables plus installation of 2 new port faceplates; installation of two CAT6 cables to 60 locations where existing cable routes to GAO closets, including 2 new port faceplates and management of existing cabling; and installation of 6 CAT6 48-port patch panels, 2 CAT6 24-port patch panels, and 8 horizontal wire management systems. The contract is firm fixed-price, with performance period from award through September 30, 2026. A mandatory site visit is scheduled for August 25, 2026, at 10:00 AM, with attendance confirmation required by 12:00 PM on August 21, 2026. Questions must be submitted by August 28, 2026, at 12:00 PM EST, and quotes with supporting documentation must be received by September 2, 2026, at 12:00 PM EST. Award will be made to the lowest-priced, technically acceptable offeror, contingent on available funding and offeror responsibility. All work must be performed between 8:00 AM and 6:00 PM, Monday through Friday, excluding Federal holidays. The contractor must provide all labor, materials, tools, equipment, and supervision; assume all travel costs; and comply with Section 508 accessibility requirements, federal IT standards, CPSC policies, and industry codes including NIST standards and security requirements.

View the file

Other files for this federal contract opportunity

Other files attached to NETWORK CABLING INSTALLATION, newest first.
File Type Posted
61320626Q0026 (3).pdf PDF
61320626Q0026 - Ver2.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUMIS CHECKED

CODE 18a. PAYMENT WILL BE MADE BY

CODE

FACILITYCODE

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER

OFFEROR

CPS

ROOM 523

4330 EAST WEST HWY

DIVISION OF PROCUREMENT

CONSUMER PRODUCT SAFETY COMMISSION

CPS-EXIT CODE 16. ADMINISTERED BYCODE

X

X

SIZE STANDARD:

% FOR:SET ASIDE:UNRESTRICTED ORCPS

RFPIFB

10. THIS ACQUISITION ISCODE

RFQ

14. METHOD OF SOLICITATION

13b. RATING

NAICS:

SMALL BUSINESS

09/02/2026 1200 ET

08/18/2026

ANKUR PATEL

(No collect calls)

INFORMATION CALL:

FOR SOLICITATION 8. OFFER DUE DATE/LOCAL TIMEb. TELEPHONE NUMBER a. NAME

4. ORDER NUMBER3. AWARD/ 6. SOLICITATION

61320626Q0026

5. SOLICITATION NUMBER

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS 1. REQUISITION NUMBER PAGE OF

1 3 CPS-2240-26-0133OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

BETHESDA MD 20814

TELEPHONE NO.

17a. CONTRACTOR/

BETHESDA MD 20814

4330 EAST WEST HWY ROOM 839-23

OFFICE OF INFO AND TECH SERVICES

CONSUMER PRODUCT SAFETY COMMISSION

CPS-EXIT

15. DELIVER TO

BETHESDA MD 20814

ROOM 523

4330 EAST WEST HWY

DIV OF PROCUREMENT SERVICES

9. ISSUED BY

7.

2. CONTRACT NO.

EFFECTIVE DATE

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW

ISSUE DATE

DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

11.

SEE SCHEDULEX

12. DISCOUNT TERMS

THIS CONTRACT IS A

RATED ORDER UNDER

DPAS (15 CFR 700)

13a.

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

HUBZONE SMALL

BUSINESS

8(A)

CONSUMER PRODUCT SAFETY COMMISSION

WOMEN-OWNED SMALL BUSINESS

(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

24.

AMOUNT

23.

UNIT PRICE

22.

UNIT

21.

QUANTITY

20.

SCHEDULE OF SUPPLIES/SERVICES

19.

ITEM NO.

**THIS IS A REQUEST FOR QUOTATION**

Please provide the following applicable information as stated below:

UEI# _____________________________

Cage Code # ____________________________ Tax Identification # ____________________________

The contractor must provide GAO Cabling support and services to the Consumer Product to the

(Use Reverse and/or Attach Additional Sheets as Necessary)

HEREIN, IS ACCEPTED AS TO ITEMS:

DATED

ADAM D. GRAHAM

. YOUR OFFER ON SOLICITATION (BLOCK 5),

INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER

ARE

ARE

31c. DATE SIGNED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or print)

ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL

SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA

26. TOTAL AWARD AMOUNT (For Govt. Use Only)

OFFER

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA - FAR (48 CFR) 53.212

ARE NOT ATTACHED.

ARE NOT ATTACHED.

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

30b. NAME AND TITLE OF SIGNER (Type or print)

30a. SIGNATURE OF OFFEROR/CONTRACTOR

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

25. ACCOUNTING AND APPROPRIATION DATA

29. AWARD OF CONTRACT:

REF.

ADG

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32c. DATE 32b. SIGNATURE OF AUTHORIZED GOVERNMENT REPRESENTATIVE

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

40. PAID BY39. S/R VOUCHER NUMBER38. S/R ACCOUNT NUMBER

37. CHECK NUMBER

FINALPARTIAL

36. PAYMENT

FINALPARTIAL

35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER33. SHIP NUMBER

COMPLETE

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

42d. TOTAL CONTAINERS42c. DATE REC'D (YY/MM/DD)

42b. RECEIVED AT (Location)

42a. RECEIVED BY (Print)

41c. DATE41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

STANDARD FORM 1449 (REV. 2/2012) BACK

24.

AMOUNT

23.

UNIT PRICE

22.

UNIT

21.

QUANTITY

20.

SCHEDULE OF SUPPLIES/SERVICES

19.

ITEM NO.

Consumer Product Safety Commission in accordance with attached statement of work and terms and conditions.

Inv Approver/COR: LAYTON, BRETT Inv Approver/COR

Backup1: JEFFAS, JAMES

Period of Performance: 08/18/2026 to 09/30/2026

0001 Bethesda Tower Relocation: GAO Cabling Phase 1 and 2

GAO Cabling Phase 1 and 2 to be performed at GOA

Building in Washington, DC

Phase 1 Install Cat6 cabling to thirty seven (37) designated Wireless Access Point (WAP) locations.

Perform all terminations, testing, and labeling in accordance with agency standards. Mount customer provided WAP units at each location.

Coordinate with Network Engineering to validate configuration and ensure full WAP connectivity.

Phase 2 Install (1) Cat6 cable to 160 locations.

Phase 2 Terminate Cat6 and re terminate the existing Cat5 cable. Install 2 new port faceplates.

Phase 2 Coil up existing telephone cable. Label and test.

Phase 2 Install (2) Cat6 cables to 60 locations where the existing cable is going to a GAO closet.

Phase 2 Install 2 new port faceplates. Coil up

Continued ...

32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT REPRESENTATIVE

3 2 of

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

3 3

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

61320626Q0026 existing cabling. Terminate, test and label.

Phase 2 Install (6) Cat6 48 port patch panels.

Install (2) Cat6 24 port patch panels. Install

(8) horizontal wire managements.

Period of Performance: 09/01/2026 to 09/18/2026

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

U.S. CONSUMER PRODUCT SAFETY

COMMISSION

Statement of Work GAO Cabling Project

Statement of Work GAO Cabling Project P a g e | 2

1 Overview

1.1 Introduction

The U.S. Consumer Product Safety Commission (CPSC) is charged with protecting the public from unreasonable risks of serious injury or death from thousands of types of consumer products under the Commission’s jurisdiction. The CPSC is committed to protecting consumers and families from products that pose a fire, electrical, chemical, or mechanical hazard or can injure children.

The CPSC's work to ensure the safety of consumer products - such as toys, cribs, power tools, cigarette lighters, and household chemicals - contributed significantly to the 30 percent decline in the rate of deaths and injuries associated with consumer products over the past 30 years.

The Agency has jurisdiction over 15,000 types of consumer products, from automatic-drip coffee makers to toys to lawn mowers. Some types of products, however, are covered by other federal agencies. For example: cars, trucks and motorcycles are covered by the Department of Transportation; foods, drugs, and cosmetics are covered by the Food and Drug Administration;

and alcohol, tobacco and firearms are within the jurisdiction of the Department of the Treasury.

CPSC works to reduce the risk of injuries and deaths from consumer products by:

1. Developing voluntary standards with industry.

2. Issuing and enforcing mandatory standards; banning consumer products if no feasible standard would adequately protect the public.

3. Obtaining the recall of products via refund or arranging for their repair or replacement.

4. Conducting research on potential product hazards; and

5. Informing and educating consumers through the media, international, federal, state, and local governments, private organizations, and by responding to consumer inquiries.

1.2 Scope

This Scope of Work (SOW) defines the tasks, deliverables, and performance requirements for the installation, testing, and documentation of structured cabling and wiring infrastructure to support network, voice, video, and peripheral services at the designated facility. The objective is to provide a reliable, standards-compliant cabling system that meets current and forecasted operational needs.

The contractor shall furnish all labor, materials, tools, equipment, transportation, and supervision necessary to install and certify new structured cabling (e.g., CAT6/CAT6A, fiber optic cabling) in support of IT operations, workspace build-outs, conference rooms, and specialized systems.

Work shall comply with federal IT standards, agency policies, and industry codes.

Statement of Work GAO Cabling Project P a g e | 3

2 Description of Work

The contractor shall provide professional services to support the U.S. Consumer Products Safety Commission, (CPSC) Office of Information and Technology Services, located at 441 G. St. NW Washington, D.C. The mandatory site visit is scheduled for August 25, 2026, at 10 AM.

Please confirm your attendance by 12 PM on August 21, 2026

The contractor shall provide services in accordance with the Schedule of Supplies/Services for the following CLINs:

Services requested:

Deliverable

Description

Phase 1 Install Cat6 cabling to thirty-seven (37) designated Wireless Access Point (WAP) locations. Perform all terminations, testing, and labeling in accordance with agency standards. Mount customer-provided WAP units at each location.

Coordinate with Network Engineering to validate configuration and ensure full WAP connectivity.

Phase 2 Install (1) Cat6 cable to 160 locations.

Terminate Cat6 and re terminate the existing Cat5 cable. Install 2 new port faceplates.

Coil up existing telephone cable. Label and test.

Phase 2 Install (2) Cat6 cables to 60 locations where the existing cable is going to a GAO closet.

Install 2 new port faceplates. Coil up existing cabling. Terminate, test and label.

Phase 2 Install (6) Cat6 48 port patch panels. Install (2) Cat6 24 port patch panels.

Install (8) horizontal wire managements.

3 Section 508 Requirements All Electronic and Information Technology (E/T), as defined at FAR 2.101, supplied under this contract, must conform to the Architectural and Transportation Barriers Compliance Board Electronic and Information Technology Accessibility Standards (36 CFR Part 1194). The applicable standards are available at http://www.access-board.gov/sec508/guide/index.htm

The following standards are applicable to EXIT contracts:

1194.21 Software applications and operating systems.

1194.22 Web-based intranet and internet information and applications

1194.23 Telecommunications products.

1194.24 Video and multimedia products.

1194.25 Self-contained, closed products.

http://www.access-board.gov/sec508/guide/index.htm

Statement of Work GAO Cabling Project P a g e | 4

1194.26 Desktop and portable computers.

4. Contract Management Characteristics

4.1 Contract Type

Firm fixed price contract. This procurement is a firm fixed-priced type, performance base contract for the services described herein. This delivery is a non-personal contract.

4.2 Period of Performance

Date of award to September 30, 2026

4.3 Place of Performance

All on site work shall be performance between the hours 8:00 am and 6:00 pm, Monday through Friday, excluding Federal holidays and any other day when the CPSC is closed.

Authorities of Government Personnel

Notwithstanding the Contractor’s responsibility for total management during the performance of this order, the administration of the order will require coordination between the Government and the Contractor. The following individuals will be the Government’s points of contact during performance of the order.

4.4 Contracting Officer Representative

The following individual has been designated as the Government’s COR for this contract:

Name: Brett Layton Division: Office of Information & Technology Services Telephone: 301 504-7488 Email: blayton@cpsc.gov

4.4 Conflict of Interest

The Contractor shall not employ any person who is an employee of the U.S. Government if employing that person would create a conflict of interest. Additionally, the Contractor shall not employ any person who is an employee of the CPSC, unless such person seeks and receives approval according to CPSC regulations.

4.5 Government Furnished Property/Material

Except for the items listed here, the Contractor shall independently and not as an agent of the Government provide all necessary materials, services, and facilities to perform the work set forth within the statement of work. The Contractor shall be responsible and accountable for all government property; either furnished or acquired and ensure that this property is within their possession and control until formal return to the CPSC, upon completion of the contract performance period.

mailto:blayton@cpsc.gov

Statement of Work GAO Cabling Project P a g e | 5

4.6 Travel

Contractor shall assume responsibility for all cost for travel related to this project. The CPSC will not reimburse the contractor for any project related travel cost incurred during the period of performance of this contract.

LC1A CONTRACTOR’S NOTE

Deliveries and/or shipments shall not be left at the Loading Dock. All deliveries shall be considered “inside deliveries” to the appropriate room at the Consumer Product Safety Commission (CPSC) and in accordance with the instructions below. When scheduling deliveries the purchase order number shall always be referenced and all packages shall clearly display the Purchase Order Number on the outside of the cartons and/or packages, to include the packing slip.

ATTENTION GOVERNMENT VENDOR

A. DELIVERY INSTRUCTIONS:

1. DELIVERY INSTRUCTIONS FOR LARGE OR HEAVY ITEMS:

If the shipment or item being delivered requires use of a loading dock, advance notification is required. The contractor shall contact Cary Windsor (301) 504-7203 forty-eight (48) hours in advance of the date the items are to arrive to schedule use of the loading dock. The loading dock on 4th street is available between 5 a.m. and 6 p.m. Mon – Fri (excluding holidays).

The COR – TBD

2. DELIVERY INSTRUCTION FOR SMALL ITEMS

When delivering or shipping small items, the contractor and/or carrier service shall report to 441 G St NW, Washington, DC 20226 After delivery, delivery personnel shall promptly depart the building.

B. BILLING INSTRUCTIONS

Pursuant to the Prompt Payment Act (P.L. 97-177) and the Prompt Payment Act Amendments of 1988 (P.L. 100-496) all Federal agencies are required to pay their bills on time, pay interest penalties when payments are made late, and to take discounts only when payments are made within the discount period. To assure compliance with the Act, vouchers and/or invoices shall be submitted through the Invoice Processing Platform (IPP). At a minimum, each invoice document submitted through IPP shall include the documentation required in the contract.

ELECTRONIC INVOICING AND PAYMENT REQUIREMENTS

Statement of Work GAO Cabling Project P a g e | 6

Invoice Processing Platform (IPP) is a secure web-based electronic invoicing and payment information service available to all Federal agencies and their supplier by the U.S. Treasury's Bureau of Fiscal Service. IPP allows Federal agencies and their suppliers to exchange electronic purchase orders, blanket POs, invoices, and payment information in one easy to access web portal. This service is free of charge to government agencies and their suppliers, including services and support.

(a) Definitions. As used in this clause- (1)”Payment request” means a bill, voucher, invoice, or request for contract financing payment with associated supporting documentation. The payment request must comply with the requirements identified in FAR 32.905(b), “Payment documentation and process” and the applicable Payment clause included in this contract.

(b) The Contractor shall submit payment requests electronically using the Invoice Processing Platform (IPP). Information regarding IPP is available on the Internet at www.ipp.gov. Assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email ippgroup@stls.frb.org or phone (866)973-3131.

PAYMENT AND INVOICE QUESTIONS

For payment and invoice questions, contact the Accounts Payable Branch at (304) 480-8000 option 7 or via email at AccountsPayable@fiscal.treasury.gov.

Customer Service inquiries may be directed to Nancy Kneisler at NKneisler@cpsc.gov.

OVERPAYMENTS

Accounts Receivable Conversion of Check Payments to EFT: If the Contractor sends the Government a check to remedy duplicate contract financing or an overpayment by the government, it will be converted into an electronic funds transfer (EFT). This means the Government will copy the check and use the account information on it to electronically debit the Contractor’s account for the amount of the check. The debit from the Contractor’s account will usually occur within 24 hours and will be shown on the regular account statement.

The Contractor will not receive the original check back. The Government will destroy the Contractor’s original check, but will keep a copy of it. If the EFT cannot be processed for technical reasons, the Contractor authorizes the Government to process the copy in place of the original check.

C. INSPECTION & ACCEPTANCE PERIOD

http://www.ipp.gov/ mailto:ippgroup@stls.frb.org mailto:AccountsPayable@fiscal.treasury.gov

Statement of Work GAO Cabling Project P a g e | 7

Unless otherwise stated in the Statement of Work or Description, the Commission will ordinarily inspect all materials/services within seven (7) business days after the date of receipt. The CPSC representative responsible for inspecting the materials/services will transmit disapproval, if appropriate, to the contractor and the Contracting Officer. If other inspection information is provided in the Statement of Work or Description, it is controlling.

D. NO AUTOMATIC RENEWALS

If any license or service tied to periodic payment is provided under this agreement (e.g., annual software maintenance or annual lease term), such license or service shall not renew automatically upon expiration of its current term without prior express consent by an authorized Government representative.

LC 32 Standards of Conduct

Government contractors must conduct themselves with the highest degree of integrity and honesty. Contractors shall have standards of conduct and internal control systems that:

a. Are suitable to the size of the company and the extent of their involvement in

Government contracting,

b. Promote such standards,

c. Facilitate timely discovery and disclosure of improper conduct in connection with Government contracts, and

d. Ensure corrective measures are promptly instituted and carried out.

e. The contractor must comply with CPSC, Federal, State, and local guidelines with regards to working on-site. This may include providing its employees with face masks, gloves, disinfectant, etc. as required by CPSC.

2. By submitting a proposal in response to this solicitation and under award of any resultant contract, the Contractor agrees to employ standards of conduct and internal control systems, which shall include, but are not necessarily limited to the following.

The Contractor shall provide, for all employees:

a. A written code of business ethics and conduct and an ethics training program

b. Periodic reviews of company business practices, procedures, policies, and internal controls for compliance with standards of conduct and the special requirements of Government contracting;

Statement of Work GAO Cabling Project P a g e | 8

c. A mechanism, such as a hotline, by which employees may report suspected instances of improper conduct, and instructions that encourage employees to make such reports;

d. Internal and/or external audits, as appropriate;

e. Disciplinary action for improper conduct;

f. Timely reporting to appropriate Government officials of any suspected or possible violation of law in connection with Government contracts or any other irregularities in connection with such contracts; and

g. Full cooperation with any Government agencies responsible for either investigation or corrective actions.

h. A copy of the written code of ethics and information regarding the above shall be made available to the Government upon request.

(End of Clause)

LC 33 Contractor Personnel

A clear distinction is made between Government and Contractor personnel. No employer-employee relationship will occur between government employees and contractor employees.

Contractor employees must report directly to their company (employer) and will not report to Government personnel.

(End of Clause)

LC 37 Security and Privacy

(a) Agency rules of conduct that the Contractor and the Contractor’s employees shall be required to follow:

In performing its duties related to management, operation, and/or access of systems containing personally identifiable information (PII) under this contract, the Contractor, its employees and subcontractors shall comply with all applicable privacy and security requirements and rules of conduct as specified by the following:

1. Contractor employees must comply with agency personal identity verification (PIV) requirements in order to logically access Government systems.

2. System access granted under this contract is only for work required to perform official duties specified in the contract. The performance of any unrelated and/or unauthorized activity is prohibited.

3. Access to Government information systems (where applicable) will only be for the period stated in the contract. Thereafter, all accounts, passwords, and access associated with the contract will be terminated.

Statement of Work GAO Cabling Project P a g e | 9

4. Disclosure of any system account information or system passwords to any unauthorized party is prohibited.

5. Exhibiting or divulging the content of any record or report to any person except in the performance of official duties specified in the contract is prohibited.

6. Using any data accessed with a Government system account for unauthorized purposes is prohibited.

7. No official record, report, database, or copy thereof, may be removed from Government premises or Government systems without prior written permission.

8. Contractor employees are prohibited from modifying, altering, or otherwise changing any Government system component or configuration except in the performance of official duties specified in the contract. Contractor employees are prohibited from issuing any system command or running any software, scripts, or programs on Government systems without prior authorization.

9. Contractor employees must not disclose sensitive or personal privacy-related information to any unauthorized party.

10. Contractor must notify the Government Contracting Officer and Contracting Officer Representative (COR) immediately upon the termination of any Contractor or subcontractor employee so that system accounts, remote access, or other forms of system access can be terminated.

11. The use of Contractor-owned laptops or other portable media storage devices to process, transmit, or store PII is prohibited under this contract [unless the Contractor is authorized to access Government systems through the agency’s virtual desktop infrastructure environment].

12. The Contractor must notify the Government Contracting Officer, Contracting Officer Representative (COR), the agency’s Information Systems Security Officer (ISSO), and the Chief Privacy Officer (CPO) immediately upon the discovery—or suspected discovery—of any type of security incident, malicious activity, or privacy breach affecting or that might potentially affect the Government’s network, specific systems, or Government-owned information in any form or format.

13. Contractor employees with access to Government systems must agree to agency Rules of Behavior and shall complete annual security and privacy awareness trainings and any role-based security and privacy trainings necessary, as determined by CPSC’s Office of Information Technology (EXIT).

14. Contractors must comply with EXIT’s Change Control Process (CCP), Solution Development Life Cycle (SDCL) and Security & Privacy processes.

15. Contractor shall make changes to CPSC infrastructure only if approved through EXIT’s

CCP.

16. Contractor shall not utilize any software or application that the US government has deemed unsafe or a threat to national security. If use of such software is required to fulfill the obligations of the contract, an exemption from CPSC’s Information Security Office must be obtained prior to use of said software.

Statement of Work GAO Cabling Project P a g e | 10

17. Contractor shall provide a self-attestation that they are following NIST’s Secure Software Development Framework and provide a Software Bill of Materials (SBOM) in accordance with OMB M-22-18.

(b) A list of the anticipated threats and hazards that the Contractor must guard against.

The Contractor must use reasonable measures to guard against the following threats and hazards:

1. Unauthorized disclosure or use of sensitive system information—including system architecture, system configuration, system accounts, and system passwords.

2. Unauthorized disclosure or use of the contents of any information obtained from Government systems—including system records, system reports, or databases.

3. Unauthorized modification or alteration of any Government system component or configuration.

4. Unauthorized circumvention, avoidance, or deception of any Government security system, measure, or control.

5. Unauthorized installation and/or use of hardware, software, firmware, portable media storage, or mobile devices on Government systems.

6. Unauthorized use of Government systems—including hardware, software, system accounts, Internet access, and email accounts—for activity which is not required to perform official duties under this contract.

(c) A description of the safeguards that the Contractor must specifically provide.

1. The Contractor shall limit access to any information related to this contract to those employees and subcontractors who require the information in order to perform their official duties under this contract.

2. The Contractor, Contractor employees, and subcontractors must physically secure PII when not in use and/or under the control of an authorized individual, and when in transit to prevent unauthorized access or loss.

3. When PII is no longer needed or required to be retained under applicable Government records retention policies, it must be destroyed through means that will make the PII irretrievable. The Contractor must provide a certificate of destruction when PII is destroyed.

4. The Contractor shall only use PII obtained under the contract for purposes of the contract and shall not collect or use such information for any other purpose without the prior written approval of the Contracting Officer.

5. At expiration or termination of this contract, the Contractor shall turn over to the Government, all PII obtained under the contract that is in its possession.

6. In the event of any actual or suspected breach of PII, the Contractor shall immediately report the breach to the Contracting Officer, the Contracting Officer’s Representative

Statement of Work GAO Cabling Project P a g e | 11

(COR), the agency’s Information Systems Security Officer (ISSO), and the Chief Privacy Officer (CPO).

7. In the event that a PII breach occurs as a result of the violation of a term of this contract by the Contractor or its employees, the Contractor shall, as directed by the Contracting Officer and at no cost to the Government, take timely action to correct or mitigate the violation, which may include providing notification and/or other identity protection services to affected persons for a period of at least 24 months from discovery of the breach. The Contractor should follow the Commission’s Privacy Breach Response Policy and Plan during the investigation and remediation of any potential privacy breaches. All notifications and offers of services to potentially affected persons must be reviewed and approved by the Commission’s Breach Response Team before sending. If the Government elects to provide and/or procure notification or identity protection services in response to a breach, the Contractor shall be responsible for reimbursing the Government for those expenses. The Contractor shall incorporate the substance of this clause, its terms and requirements in all subcontracts under this contract, and require written subcontractor acknowledgement of same. Violation by a subcontractor of any provision set forth in this clause will be attributed to the Contractor.

(d) Requirements for a program of Government inspection during performance of the contract that will ensure the continued efficacy and efficiency of safeguards and the discovery and countering of new threats and hazards.

Work to be performed under this contract requires the design, development, operation, or disposal of a Federally-controlled information system containing personally identifiable information or handling personally identifiable information. To the extent required to carry out a program of inspection to safeguard against threats and hazards to the security, integrity, and confidentiality of personally identifiable information, the Contractor shall permit the Government access to, and information regarding, the Contractor’s facilities, installations, technical capabilities, operations, documentation, records, and databases, when requested by the Government, as part of its responsibility to ensure compliance with privacy and security requirements. The Contractor shall otherwise cooperate with the Government in assuring compliance with such requirements. Government access shall include independent validation testing of controls, system penetration testing by the Government, Federal Information Security Management Act data reviews, and access by agency Inspectors General for its reviews.

Definitions.

“Personally Identifiable Information” (PII) means information that can be used to distinguish or trace an individual’s identity, such as his or her name, social security number, or biometric records, that alone, or when combined with other personal or identifying information that is linked or linkable to a specific individual, such as date and place of birth or mother’s maiden

Statement of Work GAO Cabling Project P a g e | 12 name. Please see the CPSC Privacy Breach Response Policy and Plan for additional examples of PII.

“Privacy Breach” means the loss of control, compromise, unauthorized disclosure, unauthorized acquisition, or any similar occurrence where (1) a person other than an authorized user accesses or potentially accesses PII or (2) an authorized user accesses or potentially accesses PII for an other than authorized purpose.

“Security Incident” means an occurrence that (1) actually or imminently jeopardizes, without lawful authority, the integrity, confidentiality, or availability of information or an information system; or (2) constitutes a violation or imminent threat of violation of law, security policies, security procedures, or acceptable use policies.

(End of clause) LC 38 Ending Illegal Discrimination and Restoring Merit-Based Opportunity

Contractor/Grantee agrees that compliance in all respects with all applicable Federal anti-discrimination laws is material to the government’s payment decisions for purposes of section 3729(b)(4) of title 31, United States Code.

Contractor/Grantee certifies that it does not operate any programs promoting DEI that violate any applicable Federal anti-discrimination laws.

(End of Clause)

FAR CLAUSES:

52.252-2 Clauses Incorporated by Reference. (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

52.203-17 Contractor Employee Whistleblower Rights https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-

52#FAR_52_203_17

52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements

52#FAR_52_203_19

52.204-13 System for Award Management—Maintenance https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52#FAR_52_203_17 https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52#FAR_52_203_17 https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52#FAR_52_203_19 https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52#FAR_52_203_19

Statement of Work GAO Cabling Project P a g e | 13

52#FAR_52_204_13

52.212-4 Terms and Conditions—Commercial Products and Commercial Services https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-

52#FAR_52_212_4

52.222-3 Convict Labor https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-

52#FAR_52_222_3

52.222-36 Equal Opportunity for Workers with Disabilities https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-

52#FAR_52_222_36

52.222-50 Combating Trafficking in Persons https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-

52#FAR_52_222_50

52.222-51 Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services-Requirements https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-

52#FAR_52_222_51

52.222-90 Addressing DEI Discrimination by Federal Contractors https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-

52#FAR_52_222_90

52.223-23 Sustainable Products and Services https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-

52#FAR_52_223_23

52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving

52#FAR_52_226_8

52.232-33 Payment by Electronic Funds Transfer—System for Award Management

52#FAR_52_232_33

52.232-40 Providing Accelerated Payments to Small Business Subcontractors https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-

52#FAR_52_232_40

52.233-3 Protest After Award https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52#FAR_52_204_13 https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52#FAR_52_204_13 https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52#FAR_52_212_4 https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52#FAR_52_212_4 https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52#FAR_52_222_3 https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52#FAR_52_222_3 https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52#FAR_52_222_36 https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52#FAR_52_222_36 https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52#FAR_52_222_50 https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52#FAR_52_222_50 https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52#FAR_52_222_51 https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52#FAR_52_222_51 https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52#FAR_52_222_90 https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52#FAR_52_222_90 https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52#FAR_52_223_23 https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52#FAR_52_223_23 https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52#FAR_52_226_8 https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52#FAR_52_226_8 https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52#FAR_52_232_33 https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52#FAR_52_232_33 https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52#FAR_52_232_40 https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52#FAR_52_232_40

Statement of Work GAO Cabling Project P a g e | 14

52#FAR_52_233_3

52.233-4 Applicable Law for Breach of Contract Claim https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-

52#FAR_52_233_4

52.240-91 Security Prohibitions and Exclusions https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-

52#FAR_52_240_91

52.244-6 Subcontracts for Commercial Products and Commercial Services

52#FAR_52_244_6

FAR PROVISIONS

52.252-1 Solicitation Provisions Incorporated by Reference. (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

52.203-18 Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements or Statements-Representation https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-

52#FAR_52_204_7

52.204-7 System for Award Management—Registration https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-

52#FAR_52_204_7

52.212-1 Instructions to Offerors—Commercial Products and Commercial Services https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-

52#FAR_52_212_1

52.222-48 Exemption from Application of the Service Contract Labor Standards for Maintenance, Calibration, or Repair of Certain Equipment–Certification https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52#FAR_52_233_3 https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52#FAR_52_233_3 https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52#FAR_52_233_4 https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52#FAR_52_233_4 https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52#FAR_52_240_91 https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52#FAR_52_240_91 https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52#FAR_52_244_6 https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52#FAR_52_244_6 https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52#FAR_52_204_7 https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52#FAR_52_204_7 https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52#FAR_52_204_7 https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52#FAR_52_204_7 https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52#FAR_52_212_1 https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52#FAR_52_212_1

Statement of Work GAO Cabling Project P a g e | 15

52#FAR_52_222_48

52.222-56 Certification Regarding Trafficking in Persons Compliance Plan https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-

52#FAR_52_222_56

52.240-90 Security Prohibitions and Exclusions Representations and Certifications https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-

52#FAR_52_240_90

(End of provision)

ADDITIONAL INFORMATION TO OFFERORS

BASIS FOR AWARD: Award is contingent on available funding and offeror responsibility, and will go to the lowest-priced, technically acceptable offeror. Registration at www.SAM.gov is required. Compliance with all Government Clauses, terms, and conditions is mandatory.

Contractors bear the cost of submitting quotes in response to this RFQ.

The site visit is scheduled for August 25th at 10 AM. Please confirm your attendance by 12 PM on August 21st.

All questions in response to the Request for Quotation must be emailed to apatel@cpsc.gov no later than August 28, 2026, at 12 pm EST. The date and time for submission of quotes and any supporting documentation must be received no later than September 2, 2026, at 12 pm EST. No telephone calls please.

https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52#FAR_52_222_48 https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52#FAR_52_222_48 https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52#FAR_52_222_56 https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52#FAR_52_222_56 https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52#FAR_52_240_90 https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52#FAR_52_240_90

RFQ SOW.pdf
1 Overview
1.1 Introduction
1.2 Scope
2 Description of Work
3 Section 508 Requirements
4. Contract Management Characteristics
4.1 Contract Type
4.2 Period of Performance
4.3 Place of Performance
4.4 Conflict of Interest
4.5 Government Furnished Property/Material
4.6 Travel
52.252-2 Clauses Incorporated by Reference. (Feb 1998)
52.212-4 Terms and Conditions—Commercial Products and Commercial Services https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52#FAR_52_212_4
52.252-1 Solicitation Provisions Incorporated by Reference. (Feb 1998)
52.212-1 Instructions to Offerors—Commercial Products and Commercial Services https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52#FAR_52_212_1
52.222-48 Exemption from Application of the Service Contract Labor Standards for Maintenance, Calibration, or Repair of Certain Equipment–Certification
https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52#FAR_52_222_48
RFQ SOW 2.pdf
1 Overview
1.1 Introduction
1.2 Scope
2 Description of Work
3 Section 508 Requirements
4. Contract Management Characteristics
4.1 Contract Type
4.2 Period of Performance
4.3 Place of Performance
4.4 Conflict of Interest
4.5 Government Furnished Property/Material
4.6 Travel
52.252-2 Clauses Incorporated by Reference. (Feb 1998)
52.212-4 Terms and Conditions—Commercial Products and Commercial Services https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52#FAR_52_212_4
52.252-1 Solicitation Provisions Incorporated by Reference. (Feb 1998)
52.212-1 Instructions to Offerors—Commercial Products and Commercial Services https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52#FAR_52_212_1
52.222-48 Exemption from Application of the Service Contract Labor Standards for Maintenance, Calibration, or Repair of Certain Equipment–Certification
https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52#FAR_52_222_48

File details come from the government source that posted it. Updated .