613-21-105 Replace Steam Piping PH 2_Drawings.pdf
PDF 14 MB Posted
- Solicitation number
- 36C24520B0005
About this file
This document provides details for a federal construction solicitation. The Department of Veterans Affairs is seeking a construction contractor to replace steam piping, insulation, and other steam related work and equipment between Building 310 and 217 at the VA Medical Center in Martinsburg, West Virginia. The project number is 613-21-105. Competition is restricted to Service Disabled Veteran Owned Small Businesses. The estimated construction cost range is $1,000,000 to $2,000,000. Interested firms must be a general construction company approved under NAICS code 236220 with a size standard of $36.5 million. A pre-bid site visit will be held on a date specified in the solicitation. Questions from the site visit must be submitted in writing to the contracting officer. Solicitation documents will be available on or around October 15, 2020, with an approximate bid opening date of November 17, 2020. Award will be made to the responsive and responsible bidder with the lowest price.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Q_A.docx | DOCX document | |
| 0719-375 VAMC Steams Tunnels_Revision 1_20201105.pdf | ||
| 36C24520B0005 0002.docx | DOCX document | |
| Bldg. 310 Pump Room Photos.zip | ZIP file | |
| Pre-Bid Site Visit Sign-in Sheet.pdf | ||
| 36C24520B0005 0001.docx | DOCX document | |
| Bldg. 302 Corridor Photos.zip | ZIP file | |
| Phase 2 Q_A.docx | DOCX document | |
| Inspection Report_Data- Sheets Final.zip | ZIP file | |
| Bldg. 217 Corridor Photos.zip | ZIP file | |
| Bldg. 217 Pump Room Photos.zip | ZIP file | |
| Bldg. 306 Pump Area Photos.zip | ZIP file | |
| Bldg. 306 Corridor Photos.zip | ZIP file | |
| 613-21-105 Replace Steam Piping PH 2_Specs.pdf | ||
| 36C24520B0005_1.docx | DOCX document | |
| 613-21-105 Replace Steam Piping PH 2_ICRA ILSM.pdf | ||
| 613-21-105 Replace Steam Piping PH 2_Contr Resp Postures.docx | DOCX document | |
| Security_CompletePacket.pdf |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STRUCTURAL PHASE-2
GENERAL
TUNNEL AREA
WORK AREAS
CONTRACTOR
STORAGE AND
STAGING AREA
MECHANICAL PHASE-2
CIVIL PHASE-2
STATE OFP
R O
FESSIONAL ENG
IN
E E R
L.
PH
ILL
IP GENTRY
14226
W
EST V I RG I N
IA
R
REGISTE ED
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Numbers
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS:
VAMC - Martinsburg, WV
ARCHITECT/ENGINEERS:
Scale:
AS NOTEDSEAL: 613-19-102REPAIR-PIPING BLDGS
500, 217, 318, & 328 to BOILER PLANT - PHASE-2 500, 217, 318, & 328
Office of
Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
F
E
D
C
B
A
97 8654321
VA FORM 08-6231
MEP ENGINEERS
Valley Engineering 4901 Crowe Drive Mount Crawford, VA 22841
STRUCTURAL ENGINEERS
Engineering Solutions 100 10th Street NE, Suite 200 Charlottesville, VA 22902 of 25
BID DOCUMENTS
SUBMISSION
97 8654321
BID DOCUMENTS SUBMISSION
STRUCTURAL ENGINEERS
Engineering Solutions 100 10th Street NE, Suite 200 Charlottesville, VA 22902
2G0.01
COVER SHEET
07/29/2020 07/29/2020
DL JCH
REPAIR STEAM PIPING
BUILDINGS 500, 217, 318, & 328
TO BOILER PLANT - PHASE-2
FOR
VETERANS ADMINISTRATION
VAMC
MARTINSBURG, WV
STATE MAP VICINITY MAP CAMPUS MAP
SHEET
NUMBER SHEET TITLE S
D
T E
A M
S E
T
/0
/2
S C
H E
M A
T
IC
D E
S
IG
N
/0
/2
C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
/1
/2
C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
R
E V
IE
W
S E
T
/1
/2
B
ID
D O
C U
M E
N T
S S
U B
M
IS
S
IO
N
/2
/2
2G0.01 COVER SHEET X X X X X
2G0.02 MECHANICAL TUNNEL OVERALL PLAN X X X X X
2S0.00 GENERAL NOTES X
2S1.02 STRUCTURAL PIPE SUPPORT PLAN - SUB PHASE-1 X
2S3.01 STRUCTURAL DETAILS - SUB PHASE-1 X
2S3.02 STRUCTURAL DETAILS - SUB PHASE-1 X
2S3.03 STRUCTURAL DETAILS - SUB PHASE-1 X
2S3.04 STRUCTURAL DETAILS - SUB PHASE-1 X
2M0.01 MECHANICAL LEGENDS, ABBREVIATIONS, AND NOTES X X X X X
2M1.01 MECHANICAL TUNNEL OVERALL PLAN X X X X X
2M1.02 MECHANICAL STEAM & CONDENSATE PLAN - SUB PHASE-2.1 X X X X X
2M1.03 MECHANICAL TUNNEL DEMOLITION PLAN - SUB PHASE-2.2 X X X
2M1.04 MECHANICAL STEAM & CONDENSATE PLAN - SUB PHASE-2.1 - A, B, & C X
2M1.05 MECHANICAL STEAM & CONDENSATE PLAN - SUB PHASE-2.1 - D, E, & F X
2M1.06 MECHANICAL STEAM & CONDENSATE PLAN - SUB PHASE-2.1 - G X
2M2.01 ENLARGED MECHANICAL TUNNEL PLANS - SUB PHASE-2.1 X X X
2M2.02 ENLARGED MECHANICAL TUNNEL DEMOLITION PLANS - SUB PHASE-2.2 X X X
2M3.01 MECHANICAL TUNNEL SECTIONS - SUB PHASE-2.1 X X X
2M3.02 MECHANICAL TUNNEL SECTIONS - SUB PHASE-2.1 X X X
2M3.03 MECHANICAL TUNNEL SECTIONS - SUB PHASE-2.1 X
2M3.04 MECHANICAL TUNNEL SECTIONS - SUB PHASE-2.2 DEMOLITION X X
2M3.05 MECHANICAL TUNNEL SECTIONS - SUB PHASE-2.2 DEMOLITION X
2M5.01 MECHANICAL DETAILS X X X X X
2M5.02 MECHANICAL DETAILS X X X
2C3.01 CIVIL TUNNEL PLAN UTILITIES X X X
PHASE 1
PHASE 2
PHASE 3
PHASE 4
304302
THIS AREA IS FOR STAGING AND MATERIAL
STORAGE FOR THE CONTRACTOR;
TEMPORARY CHAIN LINK FENCE WILL BE
PROVIDED & REMOVED BY THE
CONTRACTOR. GRASS WILL BE LEVELED &
RESEEDED WHEN PROJECT IS COMPLETE.
EXISTING
CONDENSATE
PUMP TO REMAIN
EXISTING
CONDENSATE
PUMP TO REMAIN
EXISTING
CONDENSATE
PUMP TO REMAIN
MATERIAL STORAGE ACCESS
PHASE CONSTRUCTION SCOPE
PHASE-3 IN CONSTRUCTION
PHASE-4 IN CONSTRUCTION
PHASE-1 FUTURE PROJECT
PHASE-2 SCOPE IN THIS DWG SET
STATE OFP
R O
FESSIONAL ENG
IN
E E R
L.
PH
ILL
IP GENTRY
14226
W
EST V I RG I N
IA
R
REGISTE ED
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Numbers
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS:
VAMC - Martinsburg, WV
ARCHITECT/ENGINEERS:
Scale:
AS NOTEDSEAL: 613-19-102REPAIR-PIPING BLDGS
500, 217, 318, & 328 to BOILER PLANT - PHASE-2 500, 217, 318, & 328
Office of
Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
F
E
D
C
B
A
97 8654321
VA FORM 08-6231
MEP ENGINEERS
Valley Engineering 4901 Crowe Drive Mount Crawford, VA 22841
STRUCTURAL ENGINEERS
Engineering Solutions 100 10th Street NE, Suite 200 Charlottesville, VA 22902 of
NORTH
BID DOCUMENTS
SUBMISSION
97 8654321
BID DOCUMENTS SUBMISSION
STRUCTURAL ENGINEERS
Engineering Solutions 100 10th Street NE, Suite 200 Charlottesville, VA 22902
2G0.02
MECHANICAL TUNNEL OVERALL PLAN
07/29/2020 07/29/2020
DL JCH
SCALE: 1" = 50'-0"
MECHANICAL TUNNEL OVERALL PLAN
FH
FH
FH
FH
S-MH
S-7
S-6
S-5
S-8
S-9
24'-10"
'-8
15'-8"
158'-8"
78'-0"
139'-2"
C.O.
S-8D
8"
'-2
Signal T-3
T-4
T-3A
SM-2
(TENANT)
EMERG. GEN.
PIV
PIV
PIV
P
IV
A
MAS RECORDS
F
IT
N
E S
S C
E N
T E
R
MOTOR POOL
FMS
PIV
LAUNDRY
OI&T
FMS STORAGE
MAIL ROOM
ED
B SIDE
A SIDE
SHOPS STORAGE
GEMS
PAT. REC.
MECH
RM
VISN 5 CONTRACTING
MUSIC ROOM
VEST.
FMS STORAGE
O N
LY
4" PVC
12" 12"
12"
12"
12"12"
12"
ADT
STOP
PED
6"
1' 1'1'
3'2'
3'
5'
USMH-2
S T
E A
M
12" MPS 5" HPS 2" CPD
8" HPS-3" CPD STEAM
M P
S
P
C D
M P
S
H
P S
C P
D
S-8 S-8A
SECURITY
CAMERA
SECURITY
CAMERA
SECURITY
CAMERA
TRENCH AS NATURAL GAS
EP
EP
EP
F
XX
CW-3
4" CHR
4" CHS
DECON
TANK (ED)
STORM GRATE
TOP=494.90
INV. IN=493.43 (12" DIP)
INV. OUT=492.54 (12" RCP)
Power E-16
Tunnel
Tunnel
STEAM
Type D Inlet
6" G.V. AND HYDRANT
INSTALLED 1992
6" GATE VALVE
AND HYDRANT
INSTALLED 1992
PUMP ROOM #2
BELOW CORRIDOR
PROPOSED TUNNEL
PROPOSED TUNNEL
UTILITY LEGEND
CONSTRUCTION NOTES
1. THE CURRENT VA UTILITY MASTER PLAN IS PROVIDED AS AN OVERLAY TO THE
AREA OF WORK TO BE PERFORMED UNDER THIS CONTRACT. DEPTHS OF THE
SHOWN SERVICES ARE NOT KNOWN, AND SHOULD BE HAND-DUG UNTIL
LOCATIONS CAN BE DETERMINED. LOCATIONS SHOULD NOT BE SCALED, DUE TO
POSSIBLE INACCURACY.
2. EXISTING PHASE TWO STEAM TUNNEL FOR REFERENCE.
001 '2 '
302 304
217 Parking Lot "T"
Parking
Lot "Z"
Patient / Visitor
Parking
B u tl e r
A v e
N th S t.
"B" Ave.
SPILL CONTAINMENT
WALLS 54" AG
SOLAR CHARGING
STATION
2-STORYOUTPATIENTADDITION
LAUNDRY WATER
SOFTENING
EQUIP.
C
C O
R R
ID
O
R C
N
,4
S .F
C
C
C3
C13
CORRIDOR C4N
4,942 S.F.
STEAM TUNNEL
/ 2
M P
S
C
P D
/2
M P
S
C P
D
STEAM
STEAM
S T
E A
M
S T
E A
M
STEAM PIT
2" UP
4" UP
VENT
M P
S
H P
S
C P
D
M P
S
H P
S
C P
D
8" H P S4" C
P D
IN
22" C
8" HPS
4" CPD
IN 22" CONDUIT
M P
S
P
C D
M
P S
P C
D
4" MPS
2" CPD
STEAM TUNNEL 4" MPS 2" CPD
8" HPS-3" CPD STEAM
12" MPS 5" HPS 2" CPD
STEAM VENT
O N
LY
N O
P A
R K
IN
G
N O
P A
R K
IN
G
N O
P A
R K
IN
G
N O
P A
R K
IN
G
ONLY
ONLY
STEAM
H
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Numbers
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS:
VAMC - Martinsburg, WV
ARCHITECT/ENGINEERS:
Scale:
AS NOTEDSEAL: 613-19-102REPAIR-PIPING BLDGS
500, 217, 318, & 328 to BOILER PLANT - PHASE-2 500, 217, 318, & 328
Office of
Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
F
E
D
C
B
A
97 8654321
VA FORM 08-6231
MEP ENGINEERS
Valley Engineering 4901 Crowe Drive Mount Crawford, VA 22841
STRUCTURAL ENGINEERS
Engineering Solutions 100 10th Street NE, Suite 200 Charlottesville, VA 22902 of
NORTH
KEY PLAN
BID DOCUMENTS
SUBMISSION
97 8654321
CONTRACTOR
STORAGE AND
STAGGING AREA
BID DOCUMENTS SUBMISSION
STRUCTURAL ENGINEERS
Engineering Solutions 100 10th Street NE, Suite 200 Charlottesville, VA 22902
2C3.01
CIVIL TUNNEL PLAN UTILITIES
07/29/2020 DL JCH
SCALE: 1" = 20'-0"
CIVIL TUNNEL PLAN UTILITIES
NOTE: THIS PLAN IS FOR REFERENCE ONLY.
CONTRACTOR IS REQUIRED TO HAVE ALL BELOW
GRADE UTILITIES MARKED PRIOR TO ANY EXCAVATION.
Mix Design Table
Location f'c Max Drying and Shrinkage
Density
Durability Exposure Categories and Classes
Freeze Thaw
Sulfate Resistance
Permeability Corrosion Protection
Thrust Block 4000 psi 0.02% 150 pcf F0 S0 W0 C1
Retaining Walls 4000 psi 0.02% 150 pcf F2 S0 W1 C1
Footings 4000 psi 0.02% 150 pcf F0 S0 W1 C1
03250 Post Installed Anchors
03250.1 General
1.1 Submittals in Accordance with the Contract
a. Product specifications with recommended design values and physical characteristics for epoxy dowels, expansion and undercut anchors.
b. Samples: Representative length and diameters of each type anchor shown on the Drawings.
c. ICC ES Evaluation Reports
d. Installer qualifications - training referenced herein shall be documented via submittal and shall be current within 5-years.
03250.2 Products
2.1 Unless otherwise indicated, post installed anchorage shall be adhesive type Hilti HIT-HY200 into concrete or stone base material or Hilti HIT-HY70 into brick masonry material.
2.2 Undercut anchors type anchors are not allowed.
03250.3 Execution
3.1 Post installed anchorage shall be installed per manufacturer technical data to intact base material. Notify Engineer of Record prior to installation if base material conditions deviates from structural drawings or manufacturer technical data.
3.2 Identify position of reinforcing steel and other embedded items prior to drilling holes for anchors.
a. Relocate in accordance with engineers' instructions
b. Notify the Engineer if reinforcing steel or other embedded items are encountered during drilling
c. Take precautions as necessary to avoid damaging prestressing tendons, electrical and telecommunications conduit, and gas lines.
3.3 Remove and replace misplaced or malfunctioning anchors. Fill empty anchor holes and patch failed anchor locations with high-strength non-shrink, nonmetallic grout. Anchors that fail to meet proof load or installation torque requirements shall be regarded as malfunctioning.
3.4 Adhesive anchors under sustained tension loads installed in any direction: shall be installed by certified installers in accordance with ACI 318, latest edition per governing building code.
3.5 Other adhesive anchors: shall be installed by individuals whom have been trained by a manufacture's representative for the type of anchor being installed.
3.6 Expansion and tread-cutting type anchors: shall be installed by individuals whom have been trained by a manufactures representative for the type of anchor being installed.
3.7 Unless otherwise notes on the plans embedment into base material shall be as follows:
Epoxy Anchors Expansion and Thread-cutting Type Anchors
Diameter Min. Ebedment Diameter Min. Ebedment
1/2" 3-3/4" 1/4" 2"
5/8" 5" 3/8" 2-3/4"
3/4" 6-3/4" 1/2" 3"
1" 8" 5/8" 4"
3/4" 5"
1" 6-3/4"
BID DOCUMENTS
SUBMISSION
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Numbers
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS:
VAMC - Martinsburg, WV
ARCHITECT/ENGINEERS:
Scale:
AS NOTEDSEAL: 613-19-102REPAIR-PIPING BLDGS
500, 217, 318, & 328 to BOILER PLANT - PHASE-2 500, 217, 318, & 328
Office of
Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
F
E
D
C
B
A
97 8654321
VA FORM 08-6231
MEP ENGINEERS
Valley Engineering 4901 Crowe Drive Mount Crawford, VA 22841 of 6
BID DOCUMENTS SUBMISSION
97 8654321
STRUCTURAL ENGINEERS
Engineering Solutions 100 10th Street NE, Suite 200 Charlottesville, VA 22902
2S0.00
GENERAL NOTES - SUB PHASE-1
07/29/2020 TM VK
General Notes
1. All structural work shall be coordinated with architectural and mechanical drawings and shall conform to the project specifications, including the 2015 IBC and 2015 IEBC, as modified by the Virginia Uniform Statewide Building Code (USBC).
2. Dimensions and elevations of existing construction given in structural drawings are based on information contained in various original design and construction documents provided by the owner, and limited field observations and measurements. The contractor shall verify all information pertaining to existing conditions by actual measurement and observation at the site. All discrepancies between actual conditions and those shown in the contract documents shall be reported to the Engineer of Record for evaluation before the affected construction is put in place.
3. The contract drawings and specifications are complimentary. These notes highlight rather than replace the specifications contained in the project manual. Where discrepancies exist the more stringent as determined by the Structural Engineer of Record (SER) shall govern.
4. The term "provide", where used in these drawings, is to be interpeted as a combination of both "furnish" and "install".
5. Use structural and mechanical drawings in close coordination. Direct any dimensional discrepancy or omission to the project prime for resolution prior to commencement of construction.
6. Coordinate configuration and location of equipment supports and openings with approved mechanical or other approved shop drawings.
7. Where structural members pass through or above non-load-bearing partitions, provide clearances to permit the structure to deflect without loading the partitions. Where specific clearances are not indicated, provide not less than 1" around the members. Pack the clearance spaces with safing, mineral wool, fiberglass, or specific UL rated or listed assemblies indicated.
8. Where standards are referenced herein, it shall be assumed the edition is the current referenced standard by the governing jurisdiction.
Design Loads and Parameter Table
Governing Code: IBC 2015
Risk Category: II
Loads:
50 plf 6" schedule 80 pipe, insulation and interior water
65 plf 12" schedule 40 pipe, insulation and steam
16,000 lbs 6" pipe maximum thrust force
28,800 lbs 12" pipe maximum thrust force
04 01 00 Maintenance of Masonry - See Specifications
03300 Cast in Place Concrete - See Specifications
05120 Structural Steel - See Specifications
Special Inspections:
07/27/2020
C
C O
R R
ID
O
R C
N
,4
S .F
C
C
C3
C13
CORRIDOR C4N
4,942 S.F.
001 '2 '
302 304
217 Parking Lot "T"
Parking
Lot "Z"
Patient / Visitor
Parking
B u tl e r
A ve
N th
S t.
"B" Ave.
SPILL CONTAINMENT
WALLS 54" AG
SOLAR CHARGING
STATION
2-STORYOUTPATIENTADDITION
LAUNDRY WATER
SOFTENING
EQUIP.
STEAM TUNNEL
/ 2
M P
S
C
P D
/2
M P
S
C P
D
STEAM
STEAM
S T
E A
M
S T
E A
M
STEAM PIT
2" UP
4" UP
VENT
M P
S
H P
S
C P
D
M P
S
H P
S
C P
D
8" H P S4" C
P D
IN
22" C
8" HPS
4" CPD
IN 22" CONDUIT
M P
S
P
C D
M
P S
P C
D
4" MPS
2" CPD
STEAM TUNNEL 4" MPS 2" CPD
8" HPS-3" CPD STEAM
12" MPS 5" HPS 2" CPD
STEAM VENT
O N
LY
N O
P A
R K
IN
G
N O
P A
R K
IN
G
N O
P A
R K
IN
G
N O
P A
R K
IN
G
ONLY
ONLY
STEAM
H
2S3.01
INDICATES COLUMN
LOCATION
2S3.01
2S3.01
SUBGRADE WALL
PENETRATION
2S3.02
302 304
30' - 0" TYP
@ 10'-0" O.C., TYP
LATERAL BRACING
W12x35
W12x35
30' - 0" TYP
@ 10'-0" O.C., TYP
LATERAL BRACING
W x
W x
W x
W x
HSS5x5x3/8
HSS5x5x3/8, TYP
HSS5x5x3/8, TYP
2S3.02
W x
W x
TYP
3' - 2 3/8"
W x
W x
W x
W x
W x
W x
4" SLAB ON GRADE BENEATH PIPES
/8
F3612, TYP
2S3.02
F3612, TYP
TYPICAL THRUST
KICKER (SHORT)
TYPICAL THRUST
KICKER (SHORT)
2S3.02
HSS5x5x3/8
10' - 0"
HSS8x8x3/8
HSS8x8x3/8
KICKER
F4812
F4812
4'-0"x6'-0" FOOTING
T Y
P S
U P
P O
R T
S
HSS5x5x3/8
W x
W x
HSS5x5x3/8W12x35
W12x35
W12x35
W12x35
W12x35
W12x35
W12x35
W12x35
8' - 0"
W12x35
W12x35
W12x35
W12x35
W12x35
W12x35
W12x35
W12x35
W12x35
W12x35
W12x35
W12x35
W12x35
W12x35
W12x35
W12x35
W12x35
W12x35 8' - 0"
2S3.03
2S3.02
SIM
2S3.04
DOWEL REBAR FROM
FOOTING INTO EXISTING
BUILDING FOOTING
DOWEL REBAR FROM
FOOTING INTO EXISTING
TUNNEL WALL
BEAM SPLICE LOCATION
BEAM SPLICE LOCATION
BEAM SPLICE LOCATION
BEAM SPLICE LOCATION
BEAM SPLICE LOCATION
HSS5x5x3/8
HSS5x5x3/8
1' - 0"
BEAM SPLICE
LOCATION
1' - 0"
BEAM SPLICE
LOCATION
1' - 0"1' - 0"
BEAM SPLICE
LOCATION
1' - 0"
BEAM SPLICE
LOCATION TYPICAL
1' - 0"1' - 0" 1' - 0"1' - 0"1' - 0"1' - 0"1' - 0"1' - 0"
F4812
10' - 0"
F4812
LOCATE POST BETWEEN
EXISTING DOOR AND
TUNNEL BILCO DOOR
2S3.04
2S3.04
2S3.04
2S3.04
SIM
6'-0"x3'-0" FOOTING
6'-0"x3'-0" FOOTING
10' - 0"
2S3.04
SIM
2S3.04
SIM
6'-0"x3'-0" FOOTING 10' - 0"
6'-0"x3'-0" FOOTING
HSS5x5x3/8
11'-0"x3'-0" FOOTING
LATERAL BRACING AT 7'-6" O.C.
PER SECTION , TYPICAL/4 2S3.02
TYPICAL INTERIOR
PIPE SUPPORTS
BID DOCUMENTS
SUBMISSION
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Numbers
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS:
VAMC - Martinsburg, WV
ARCHITECT/ENGINEERS:
Scale:
AS NOTEDSEAL: 613-19-102REPAIR-PIPING BLDGS
500, 217, 318, & 328 to BOILER PLANT - PHASE-2 500, 217, 318, & 328
Office of
Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
F
E
D
C
B
A
97 8654321
VA FORM 08-6231
MEP ENGINEERS
Valley Engineering 4901 Crowe Drive Mount Crawford, VA 22841 of
NORTH
BID DOCUMENTS SUBMISSION
97 8654321
STRUCTURAL ENGINEERS
Engineering Solutions 100 10th Street NE, Suite 200 Charlottesville, VA 22902
2S1.02
STRUCTURAL PIPE SUPPORT PLAN -
SUB PHASE-1
07/29/2020 TM VK
1" = 20'-0"2S1.02
1 STRUCTURAL PIPE SUPPORT PLAN
FOUNDATION SCHEDULE
MARK WIDTH (W) DEPTH (D) REINFORCING
F3612 3'-0"x3'-0" 12" (3) #5 BOTTOM EA. WAY
F4812 4'-0"x4'-0" 12" (4) #5 BOTTOM EA. WAY
KEY PLAN
CONTRACTOR
STORAGE AND
STAGGING AREA
INSULATED METAL PANEL WALL
AND ENCLOSURE, CONTRACTOR
TO SUBMIT PROPOSED SYSTEM
AND ERECTION DETAILS
3" CLR
C L R
(4) #5 EPOXY DOWELS 3'-0"
LONG, WITH 6" EMBED
#5 @12 EACH WAY
#5 @12 EACH WAY
BITUMINOUS
WATER PROOFING
PER SPECIFICATION
SAW CUT 2" WIDE x 2" DEEP SLOT IN
WALL TO EXTEND 1'-6" ON EACH
SIDE OF OPENING
INSERT #5 BAT INTO SLOT AND
REPAIR FISH WITH WALL USING
VERTICAL REPAIR MORTAR
REPAIR OPENING IN EXISTING
WALL IN ACCORDANCE WITH
SPECIFICATIONS
1' - 0"
1 1/2" 1 1/2"
1/2"
3/8x6" PLATE
3/16
"W12x35
(3) 3/4"⌀ EPOXY ANCHOR
BOLTS 6" EMBED
/2
"9
3/8 GUSSET
PLATE
9"
3/16
3/8 PLATE
(3) 3/4"⌀ BOLTS
3/16
TYP
1 1/2"
1' - 1"
(4) 3/4"⌀ EPOXY
BOLTS, EMBED 6"
3/4 PLATE
HSS5x5x3/8
W12x35
ATTACH TYPICAL PIPE SUPPORT
TO FLANGE WITH ALL THREAD
EXISTING TUNNEL
NEW PIPES, SEE MECH
1" +/-2"
1"
9 1/8"
EXISTING 2x6 @12
5 5
VIF
8 1/2"
2S3.02
M
A X
1' - 2 5/8"
/8
INSULATED METAL PANEL WALL
AND ENCLOSURE, CONTRACTOR
TO SUBMIT PROPOSED SYSTEM
AND ERECTION DETAILS
REPAIR OPENING IN EXISTING
WALL IN ACCORDANCE WITH
SPECIFICATIONS
NO ADDITIONAL REINFORCING
REQUIRED FOR OPENINGS AT
THIS TUNNEL WALL
C L R
(4) #5 EPOXY DOWELS 3'-0"
LONG, WITH 6" EMBED
#5 @12 EACH WAY
#5 @8 VERTICAL
BITUMINOUS
WATER PROOFING
PER SPECIFICATION
1' - 0"
CLR
3"
#5 @12 HORIZONTAL
Sheet Notes:
1. Sections are based on original drawings and limited field observation. General contractor must verify all dimensions and coordinate with final mechanical layout.
2. Existing pipes shown shall either remain or be removed in accordance with mechanical.
3. All existing structural framing shall remain.
EXISTING TUNNEL WALL
HSS10x4x1/2
10x16x1/2 PLATE
(4) 3/4" ANCHOR BOLT EMBED 9",
TYPICAL
U N
D E
R S
ID
E
O F
E X
P A
N S
IO
N
J O
IN
T
A N
C H
O R
S
V .I
.F F
R O
M T
U N
N E
L F
L O
O R
T O
INFILL CONCRETE TO BOTTOM OF
PIPE ANCHOR
EXISTING 2x6 @12
EXISTING (3) 2x6
DROP BEAM
ANCHOR BASE, BY OTHERS
#4x24" LONG @12 BOTH WAYS. DOWEL
INTO EXISTING CONCRETE 4". DRILL 1" ⌀
HOLE FOR BAR AND GROUT SOLID BEFORE
POURING CONCRETE BLOCK
PROVIDE (3) #4 @3" O.C. HOOPS
WITHIN DEPTH ANCHOR BOLT
1 1/2"
/2 " 3
6"
1/4
BID DOCUMENTS
SUBMISSION
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Numbers
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS:
VAMC - Martinsburg, WV
ARCHITECT/ENGINEERS:
Scale:
AS NOTEDSEAL: 613-19-102REPAIR-PIPING BLDGS
500, 217, 318, & 328 to BOILER PLANT - PHASE-2 500, 217, 318, & 328
Office of
Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
F
E
D
C
B
A
97 8654321
VA FORM 08-6231
MEP ENGINEERS
Valley Engineering 4901 Crowe Drive Mount Crawford, VA 22841 of 6
BID DOCUMENTS SUBMISSION
97 8654321
STRUCTURAL ENGINEERS
Engineering Solutions 100 10th Street NE, Suite 200 Charlottesville, VA 22902
2S3.01
STRUCTURAL DETAILS - SUB PHASE-1
07/29/2020 TM VK
1" = 1'-0"2S1.02 2S3.01
1 TUNNEL SECTION A @ BLDG 302
1" = 1'-0"2S1.02 2S3.01
TUNNEL SECTION B @ BLDG 217 - TYPICAL INTERIOR
PIPE SUPPORTS
1" = 1'-0"2S1.02 2S3.01
4 TUNNEL SECTION C @ BLDG 217
Keynotes
1 Dimension varies as tunnel slopes.
General contractor must coordinate this dimension with final mechanical layout in field.
2 Dimension varies based on location of thrust block. Pipe elevation varies and tunnel floor slopes. General contractor must coordinate this dimension with final mechanical layout.
5 Dimension can vary depending on relative distance between pipes vertically and horizontally.
XX
1" = 1'-0"2S3.01
2 TYPICAL ANCHOR BLOCK
PIPE GUIDE BY OTHERS
P
IP
E D
IR
E
C T
IO
N
P
IP
E D
IR
E
C T
IO
N
24x13x3/4 PLATE
(6) 1/2" ⌀ EXPANSION
ANCHORS, (3) EA. SIDE.
EMBED 3.5" INTO EXISTING
TUNNEL FLOOR
3/16
1/41 1/2"
/2
11 3/4"
CAP PLATE
P
IP
E D
IR
E
C T
IO
N
9 7/8"
1' - 0"
12x8x3/8 CAP PLATE
C12X20.7 LEGS DOWN
(4) 1/2 THROUGH BOLTS
(4) 1/2 THROUGH
BOLTS
GROUT PAD
/2
M
IN
M
A X
EX. TUNNEL FLOOR
HSS3X3X1/4
HSS5X5X3/8
9-1/2" V.I.F. W/ FINAL
MECH LAYOUT
1" CHAMFER
3/4" STIFFENER EACH
SIDE OF HSS
9"
/2
CHANNEL
GRADE
3' - 2 3/8"
HSS5x5x3/8
18" PIER WITH (4) #5
VERTICAL
M
IN
M
IN
4'-0x4'-0"x1'-0"
FOOTING
(4) 3/4 BOLTS,
EMBED 8"
11x11x3/8 PLATE
9" 1/2 GUSSET PLATE
GROUT
W12x58
1' - 6"
C L R
/2
(4) #3 STIRRUP
(4) #5 DOWEL
C L R
(4) #5 EACH WAY
TOS 18'-0" ABOVE GRADE,
VIF BOTTOM OF W24
MUST CLEAR EXISTING
ROOF BY 12"
3/16
3/16
C L
E A
R E
X
IS
T
IN
G F
O O
R B
Y
V
IF
B
O T
T O
M O
F W
M U
S T
3' - 2 3/8"
1'-0"x1/2" PLATE @ 7'-6" O.C.
1' - 0"
2' - 3"
PIPE SUPPORTS
BY OTHERS
1 1/2" TYP
DOUBLE NUT , TYPICAL
3/16
3/16
1/2"
1/2"
1/2" STIFFENER
Sheet Notes:
1. Sections are based on original drawings and limited field observation. General contractor must verify all dimensions and coordinate with final mechanical layout.
2. Existing pipes shown shall either remain or be removed in accordance with mechanical.
3. All existing structural framing shall remain.
GRADE
3' - 2 3/8"
HSS5x5x3/8
(4) 3/4"⌀ BOLTS, CAST
IN PLACE EMBED 6"
10x10x3/8 PLATE
9"
3/8 GUSSET PLATE
1-1/2" GROUT PAD
/2
WIDE FLANGE
BEAM PER PLAN
(3) 3/4"⌀ BOLTS
W12x35
WEEP AT 10'-0" O.C.
4"
6" HIGH CURB.PROVIDE 8" WIDE
GAP IN CURB AT 6'-0" ON
CENTER TO ALLOW DRAINAGE
3/16
3/16
1'-0" PIER WITH (4) #5
VERTICAL
3'-0x3'-0"x1'-0"
FOOTING WITH (3) #5
EACH WAY
(3) #3 STIRRUP
C L R
/2
3' - 0"
EXISTING BUILDING
3'-6" MINIMUM
#4 CONTINUOUS
#3 @18 1" ISOLATION
JOINT
3/16
HSS5x5x3/8 W12x58
PIPE SUPPORT
BY OTHERS
GRADE
18" PIER WITH
(4) #5 VERTICAL
4'-0x4'-0"x1'-0"
FOOTING
(3) #3 STIRRUP
(4) #5 EACH WAY
C L R
(4) #5 EACH WAY DOWEL (4) #5 INTO EXISTING
BUILDING FOOTING OR EXISTING
TUNNEL WALL
4'-0x4'-0"x1'-0"
FOOTING
DOWEL (4) #5 INTO EXISTING
BUILDING FOOTING OR EXISTING
TUNNEL WALL
STRAP WITH (2) #5
TOP AND BOTTOM
(4) #3 STIRRUPS,
DOUBLE AT TOP OF PIER
(4) #3 STIRRUPS,
DOUBLE AT TOP OF PIER
EXISTING BUILDING
6"
DOWEL (8) #6 EPOXIED INTO
EXISTING BUILDING FOOTING
OR TUNNEL WALL
1' - 6"
1" INSOLATION
JOINT
/2
1" INSOLATION
JOINT
BID DOCUMENTS
SUBMISSION
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Numbers
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS:
VAMC - Martinsburg, WV
ARCHITECT/ENGINEERS:
Scale:
AS NOTEDSEAL: 613-19-102REPAIR-PIPING BLDGS
500, 217, 318, & 328 to BOILER PLANT - PHASE-2 500, 217, 318, & 328
Office of
Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
F
E
D
C
B
A
97 8654321
VA FORM 08-6231
MEP ENGINEERS
Valley Engineering 4901 Crowe Drive Mount Crawford, VA 22841 of 6
BID DOCUMENTS SUBMISSION
97 8654321
STRUCTURAL ENGINEERS
Engineering Solutions 100 10th Street NE, Suite 200 Charlottesville, VA 22902
2S3.02
STRUCTURAL DETAILS - SUBPHASE-1
07/29/2020 TM VK
1 1/2" = 1'-0"2S3.01 2S3.02
1 DETAIL 1
1" = 1'-0"2S1.02 2S3.02
3 TYPICAL PIPE SUPPORT - TALL
1 1/2" = 1'-0"2S1.02 2S3.02
4 TYPICAL PIPE SUPPORT ATTACHMENT
Keynotes
3 Dimension shall be coordinated with pipe guide manufacturer details. Dimensions shown are based on information contained in details by Metraflex pre-insulated pipe guide.
XX
1" = 1'-0"2S1.02 2S3.02
5 TYPICAL PIPE SUPPORT - SHORT
1" = 1'-0"2S1.02 2S3.02
2 TYPICAL THRUST KICKER - SHORT
W12x58
W BEAM PER PLAN1
3/16
EA.
PLATE
3/16
9"
3"3"
1 1/2"
1/2 KNIFE PLATE
1/2 GUSSET PLATE
(2) 1/2 PLATE
3/16
3/16
GRADE
18" PIER WITH
(4) #5 VERTICAL
V .I
.F
HSS8x8x3/8
(4) 3/4 BOLTS,
EMBED 8"
14x14x3/8 PLATE
1-1/2" GROUT (5) #3 STIRRUPS, DOUBLE AT
TOP AND BOTTOM OF PIER
6"
DOWEL (8) #6 EPOXIED INTO
EXISTING TUNNEL WALL
EXISTING TUNNEL
EXISTING TUNNEL LID
GRADE
2' - 0"
(8) #6 BARS SHORT WAY
(4) #6 BARS LONG WAY
(6) #6 LONG WAYDOWEL (8) #6 INTO EXISTING
TUNNEL WALL, 5'-0" MINIMUM
6' - 0"
(8) 3/4"⌀ BOLTS,
EMBED 8"
1/2 PLATE x 14"
HSS8x8x3/8
(5) #3 STIRRUPS,
DOUBLE AT TOP AND
BOTTOM OF PIER
(6) #6 VERTICAL
1' - 10"
2' - 6"
GRADE
C L R
M
IN
25'-0", SEE PLAN
(9) 3/4"⌀ BOLTS
6' - 0"
BID DOCUMENTS
SUBMISSION
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Numbers
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS:
VAMC - Martinsburg, WV
ARCHITECT/ENGINEERS:
Scale:
AS NOTEDSEAL: 613-19-102REPAIR-PIPING BLDGS
500, 217, 318, & 328 to BOILER PLANT - PHASE-2 500, 217, 318, & 328
Office of
Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
F
E
D
C
B
A
97 8654321
VA FORM 08-6231
MEP ENGINEERS
Valley Engineering 4901 Crowe Drive Mount Crawford, VA 22841 of 6
BID DOCUMENTS SUBMISSION
97 8654321
STRUCTURAL ENGINEERS
Engineering Solutions 100 10th Street NE, Suite 200 Charlottesville, VA 22902
2S3.03
STRUCTURAL DETAILS - SUBPHASE-1
07/29/2020 TM VK
1" = 1'-0"2S1.02 2S3.03
1 TYPICAL END SUPPORT - TALL
3"
3/8
HSS5x5x3/8
6"
1/
2"
3/8 KNIFE
PLATE
3/8 PLATE
(4) 3/4"⌀ BOLTS, CAST
IN PLACE EMBED 6"
12x12x3/8 PLATE
1-1/2" GROUT PAD
3/16
1'-6" PIER WITH (4) #5
VERTICAL
6'-0x3'-0"x1'-0" FOOTING WITH (5) #5
LONG WAY, #4 @18 SHORT WAY
(3) #3 STIRRUP
C L R
/2 "3
6' - 0"
GRADE
18" PIER WITH (4) #5
VERTICAL
M
IN
M
IN
4'-0x4'-0"x1'-0"
FOOTING
(4) 3/4 BOLTS, EMBED 8"
11x11x3/8 PLATE
GROUT
1' - 6"
C L R
/2
(4) #3 STIRRUP
(4) #5 DOWEL
C L R
(4) #5 EACH WAY
3/16
4" 4" 2" 4"
W12
9x3/4 PLATE
/2
/2
3/4"⌀ FINGER TIGHT BOLTS IN
LONG SLOTTED HOLES. DEFORM
THREADS AFTER FIT-UP.
3/16
4" 6" 4" 2" 6"
W12
W24
9x3/4 PLATE
/2
/2
3/4"⌀ FINGER TIGHT BOLTS IN
LONG SLOTTED HOLES. DEFORM
THREADS AFTER FIT-UP.
3/16
GRADE
4) #5 VERTICAL
M
IN
1' - 6"
(4) #3 STIRRUPS, DOUBLE
AT TOP OF PIER
F3612 WITH TYPICAL
REINFORCING
5' - 0"
DIRECTLY BURIED PIPE
F3612 WITH TYPICAL
REINFORCING
(8) #4 BARS
(5) #5 BARS
(3) #4 DOWELS
1'-4"x3'-0"
CONCRETE BEAM
HSS PER PLAN
(3) #4 DOWELS
3/16
BID DOCUMENTS
SUBMISSION
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Numbers
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS:
VAMC - Martinsburg, WV
ARCHITECT/ENGINEERS:
Scale:
AS NOTEDSEAL: 613-19-102REPAIR-PIPING BLDGS
500, 217, 318, & 328 to BOILER PLANT - PHASE-2 500, 217, 318, & 328
Office of
Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
F
E
D
C
B
A
97 8654321
VA FORM 08-6231
MEP ENGINEERS
Valley Engineering 4901 Crowe Drive Mount Crawford, VA 22841 of 6
BID DOCUMENTS SUBMISSION
97 8654321
STRUCTURAL ENGINEERS
Engineering Solutions 100 10th Street NE, Suite 200 Charlottesville, VA 22902
2S3.04
STRUCTURAL DETAILS - SUBPHASE-1
07/29/2020 TM VK
1" = 1'-0"2S1.02 2S3.04
1 TYPICAL KICKER - LATERAL
1" = 1'-0"2S1.02 2S3.04
2 TYPICAL BEAM SPLICE - 12-12
1" = 1'-0"2S1.02 2S3.04
3 TYPICAL BEAM SPLICE - 12-24
1" = 1'-0"2S1.02 2S3.04
4 SUPPORT OVER BURIED PIPES
MECHANICAL GENERAL DEMOLITION NOTES
1. COORDINATE ALL MECHANICAL UTILITY AND HVAC UNIT SHUT DOWNS WITH OWNER. ANY SHUT DOWNS NECESSARY TO ACHIEVE THE OBJECTIVE OF THIS DESIGN SHALL BE COMPLETED DURING "OFF HOURS" AND SHALL COMPLY WITH OWNER'S UTILITY SHUT
DOWN POLICIES.
2. CONTRACTOR IS RESPONSIBLE FOR ALL CUTTING, PATCHING AND DEMOLITION OF ALL BUILDING SYSTEMS PER THEIR MEANS-AND-
METHODS AS NECESSARY TO PROVIDE THE DESIGN INDICATED.
MECHANICAL ABBREVIATIONS
AMP AMPERE
A/C AIR CONDITIONING
A/E ARCHITECT / ENGINEER
AAHX AIR TO AIR HEAT EXCHANGER
AAV AUTOMATIC AIR VENT
AB AIR BLENDER
ABV ABOVE
ACC AIR COOLED CONDENSER
ACCH AIR COOLED CHILLER
ACCU AIR COOLED CONDENSING UNIT
ACD AUTOMATIC CONTROL DAMPER, MODULATING
ACD-TP AUTOMATIC CONTROL DAMPER, TWO POSITION
ACU AIR CONDITIONING UNIT
AD ACCESS DOOR
AF AIR FILTER
AFC ABOVE FINISHED CEILING
AFCV AIR FLOW CONTROL VALVE
AFF ABOVE FINISHED FLOOR (18" UON)
AFG ABOVE FINISHED GRADE (18" UON)
AFMS AIR FLOW MEASURING STATION
AFW AIR FOIL WHEEL (FAN)
AHU AIR-HANDLING UNIT
ALT ALTERNATE
AMB AMBIENT
AMP AMPERE
ANSI AMERICAN NATIONAL STANDARDS INSTITUTE
AP ACCESS PANEL
APD AIR PRESSURE DROP
APPROX APPROXIMATE
AQST AQUASTAT
ARI AIR CONDITIONING AND REFRIGERATION INSTITUTE
AS AIR SEPARATOR
ASHRAE AMERICAN SOCIETY OF HEATING REFRIGERATION AIR
CONDITIONING ENGINEERS
ASME AMERICAN SOCIETY OF MECHANICAL ENGINEERS
AVG AVERAGE
AW AIR WASHER
AXF AXIAL FLOW
B BOILER
BD BUTTERFLY DAMPER
BDD BACKDRAFT DAMPER
BDR BASE BOARD RADIATOR
BEL BELOW
BFT BOILER PLANT FIRE TUBE
BG BOTTOM GRILL
BHP BRAKE HORSEPOWER
BHW HOT WATER HEATING BOILER
BHX BOILER BLOWDOWN HEAT EXCHANGER
BIW BACKWARD INCLINED WHEEL (FAN)
BLDG BUILDING
BMT BONE MARROW TRANSPLANT
BR BOTTOM REGISTER
BSC BIOLOGICAL SAFETY CABINETS
BT BLOWOFF TANK
BTC BLOWOFF TANK CONTROL VALVE
BTUH BRITISH THERMAL UNIT PER HOUR
BWT BOILER PLANT WATER TUBE
C CENTIGRADE (CELSIUS)
CAV CONSTANT AIR VOLUME
CC COOLING COIL
CCD COOLING COIL CONDENSATE DRAIN
CD CEILING DIFFUSER
CD-1 CONSTRUCTION DOCUMENTS (SUBMISSION1)
CD-2 CONSTRUCTION DOCUMENTS (SUBMISSION2)
CENT CENTRIFICAL
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CFT CUBIC FEET
CFP CHEMICAL FEED PUMP
CG CEILING GRILL
CH CHILLER
CHP CHILLER WATER PUMP
CHW CHILLER WATER
CHR CHILLER WATER RETURN
CHS CHILLER WATER SUPPLY
CI CAST IRON
CLG CEILING
CM CARBON MONOXIDE
CM CUBIC METER
CM/S CUBIC METER PER SECOND
CO CLEAN OUT
CO2 CARBON DIOXIDE
COMP COMPRESSOR UNIT
COP COEFFICIENT OF PERFORMANCE
CP CONDENSATE PUMP
CR CEILING REGISTER
CS CONDENSATE STORAGE TANK
CSG CLEAN STEAM GENERATOR
CT COOLING TOWER
CU CONDENSING UNIT
CUH CABINET UNIT HEATER
CV CONSTANT VOLUME
CW COLD WATER (POTABLE)
CWCC CHILLED WATER COOLING COIL
CWP CONDENSER WATER RETURN
CWR CONDENSER WATER RETURN (TO COOLING TOWER)
CWS CONDENSER WATER SUPPLY (FROM COOLING TOWER)
D DAMPER - AUTOMATIC
Db DRY-BULB TEMPERATURE dB DECIBELS
DCW DOMESTIC COLD WATER
DD-1 DEIGN DEVELOPMENT (SUBMISSION 1)
DD-2 DEIGN DEVELOPMENT (SUBMISSION 2)
DDC DIRECT DIGITAL CONTROLS
DEG DEGREE
DF DIFFUSER
DEMO DEMOLITION
DHW DOMESTIC HOT WATER
DHWR DOMESTIC HOT WATER RETURN
DIA DIAMETER
DIW DEIONIZED WATER
DN DOWN
DP DEW POINT TEMPERATURE
DP DIFFUSER PLATE
DPA DIFFERENTIAL PRESSURE ASSEMBLY
DPS DIFFERENTIAL PRESSURE SENSOR
DWG DRAWING
DX DIRECT EXPANSION
DXCC DIRECT EXPANSION COOLING COIL
ALL ABBREVIATIONS INDICATED MAY NOT APPEAR ON THESE CONTRACT DRAWINGS
R/E RETURN OR EXHAUST
RA RETURN AIR
RAD RETURN AIR DAMPER
RAF RADIO FREQUENCY
RAHX ROTARY AIR HEAT EXCHANGER
RAT RETURN AIR TEMPERATURE
RCCH REMOTE CONDENSER CHILLER
RCU RECIPROCATING CHILLER UNIT
RD ROOF DRAIN
RDS ROOM DATA SHEETS
REA RELIEF AIR
RELAD RELIEF AIR DAMPER
RF RETURN FAN
RG RETURN GRILLE
RH RELATIVE HUMIDITY
RHC REHEAT COIL
RHG REHEAT GRILLE
RL REFRIGERANT HOT GAS
RLA RUN LOAD AMPERE
RO REVERSE OSMSIS
RPM REVOLUTIONS PER MINUTE
RR RETURN REGISTER
RS REFRIGERANT SUCTION
RTU ROOF TOP UNIT
RV RELIEF VALVE
SA SUPPLY AIR
SAD SUPPLY AIR DAMPER
SAT SUPPLY AIR TEMPERATURE
SC SHADING COEFFICIENT
SCFM STANDARD CUBIC FEET PER MINUTE
SCI SPINAL CODE INJURY
SD SMOKE DETECTOR
SD SUPPLY AIR DIFFUSER
SD-1 SCHEMATIC DESIGN (SUBMISSION1)
SD-2 SCHEMATIC DESIGN (SUBMISSION2)
SDPR SMOKE DAMPER
SDR SMOKE DAMPER (RETURN)
SDS SMOKE DAMPER (SUPPLY)
SEN SENSIBLE HEAT
SF SUPPLY FAN
SF SQUARE FEET
SG SUPPLY AIR GRILLE
SH STEAM HUMIDIFIER
SHC STEAM HEATING COIL
SI SQUARE INCHES
SP STATIC PRESSURE
SP GR SPECIFIC GRAVITY
SPD SUPPLY PROCESS AND DISTRIBUTION
SPRV STEAM PRESSURE REDUCING VALVE
SPS STATIC PRESSURE SENSOR
SPEC SPECIFICATION
SQ FT SQUARE FOOT (FEET)
SR SUPPLY AIR REGISTER
SS STAINLESS STEEL
SSHX STEAM TO STEAM HEAT EXCHANGER
SSR SOLID SEPARATOR
ST STEAM TRAP
STD STANDARD
SUH STEAM UNIT HEATER
SV STEAM PRESSURE REDUCING VALVE
SVS STEAM VENT SILENCER
SW SOFTENED WATER
SWHX STEAM TO WATER HEAT EXCHANGER
T&PCV TEMPERATURE AND PRESSURE CONTROL VALVE
TAB TESTING, ADJUSTING, BALANCE,
TBR TO BE REMOVED
TD TEMPERATURE DIFFERENCE
TDH TOTAL DYNAMIC HEAD
TDS TOTAL DISSOLVED SOLIDS
TEMP TEMPERATURE
TG TRANSFER GRILLE
TOF TOP OF FOOTER
TP TRAP
TR TOP REGISTER
TSP TOTAL STATIC PRESSURE
TSTAT THERMOSTAT
TU TERMINAL UNIT
TWU THRU-WALL UNIT
TYP TYPICAL
UC UNDERCOUNTER
UC UNDER CUT
UC UNIT COOLER
UH UNIT HEATER
UL UNDERWRITERS LABORATORY
U.O.N UNLESS OTHERWISE NOTED
URV UPBLAST UNIT VENTILATOR
V VALVE
VAF VANE-AXIAL FAN
VAV VARIABLE AIR VOLUME
VD VOLUME DAMPER (MANUAL OPPOSED BLADE)
VERT VERTICAL
VFD VARIABLE FREQUENCY DRIVE
VHA VETERANS HEALTH ADMINISTRATION
VI VIBRATION ISOLATOR
VP VACUUM PUMP
VPS VARIABLE PRIMARY SYSTEM
VR VACUUM (STEAM CONDENSATE) RETURN
VSD VARIABLE SPEED DRIVE
VUH VERTICAL HEAT UNIT
W WATTS
W/ WITH
W/O WITH OUT
WAG WASTE AMNESIA GAS
Wb WET BULB (TEMPERATURE)
WC WATER COOLED
WCCH WATER COOLED CHILLER
WCCU WATER COOLER CONDENSING UNIT
WCHP WATER COOLED HEAT PUMP
WCPU WATER COOLED PACKAGE UNIT
WEF WALL EXHAUST FAN
WF WATER FILTER
WFCV WATER FLOW CONTROL VALVE
WMF WATER FLOWMETER
WFMD WATER FLOW MEASURING DEVICE
WG WATER GAGE
WPD WATER SIDE PRESSURE DROP
WTR WATER
WWM WELDED WIRE MESH
YR YEAR
I/O INPUT/OUTPUT
IAQ INDOOR AIR QUALITY
IBT INVERTED BUCKET TRAP
ICF IN-LINE CENTRIFUGAL FAN
ICU INTENSIVE CARE UNIT
ID INSIDE DIAMETER
I.E. INVERT ELEVATION
IFB INTEGRAL FACE AND BYPASS
IN INCHES
IN HG INCHES OF MERCURY
IN WC INCH WATER COLUMN
IN WG INCH WATER GAUGE
IN-LB INCH POUND
IPLV INTEGRATED PART LOAD VALUE
IRH INFRARED HEATER
IS INSECT SCREEN
IU INDUCTION UNIT
I.V. INLET VANES
J INTENTIONALLY LEFT BANK
KG KILOGRAM
KG/HR KILOGRAM PER HOUR
kPa KILOPASCAL
KW KILOWATTS
KWH KILOWATT HOUR
L LITER
L/h LITER PER HOUR (OR LITER/HOUR) L/m LITER PER MINUTE (OR LITER/MINUTE)
L/S LITER PER SECOND (OR LITER/SECOND)
LAT LEAVING AIR TEMPERATURE
LBS POUNDS
LBS/HR POUNDS PER HOUR
LF LINEAR FOOT (FEET)
LGT LEAVING GLYCOL TEMPERATURE
LH LATENT HEAT
LLHX LIQUID TO LIQUID HEAT EXCHANGER
LPC LOW PRESSURE STEAM CONDENSATE RETURN
LPG LIQUEFIED PETROLEUM GAS
LPR LOW PRESSURE RETURN (STEAM CONDENSATE)
LPRC LOW PRESSURE STEAM RETURN (CLEAN)
LPS LOW PRESSURE STEAM
LPSC LOW PRESSURE STEAM (CLEAN)
LSD LINEAR SLOT DIFFUSER
LTCP LOCAL TEMPERATURE CONTROL PANEL
LVG LEAVING
LVR LOUVER
LWT LEAVING WATER TEMPERATURE
M METER, SI UNIT
M/S METER PER SECOND (OR METER/SECOND)
MA MIXED AIR
MAT MIXED AIR TEMPERATURE
MAU MAKE-UP AIR UNIT
MAV MANUAL AIR VENT
MAX. MAXIMUM
MB MIXING BOX
MBH 1,000 BTUH
MC MECHANICAL CONTRACTOR
MCA MINIMUM BRANCH CIRCUIT AMPACITY
MER MECHANICAL EQUIPMENT ROOM
MFR MANUFACTURER
MH MANHOLE
MHP MOTOR HORSEPOWER
MIN. MINIMUM
MM MILLIMETER
MOD MOTOR OPERATED DAMPER
MOV MOTOR OPERATED VALVE
MPC MEDIUM PRESSURE STEAM CONDENSATE RETURN
MPR MEDIUM PRESSURE RETURN (STEAM CONDENSATE)
MPS MEDIUM PRESSURE STEAM
MRI MAGNETIC RESONANCE IMAGING
MTD MEAN TEMPERATURE DIFFERENCE
MVD MANUAL VOLUME DAMPER
MZ MULTI-ZONE
NA NOT APPLICABLE
NC NOISE CRITERIA
NC NORMALLY CLOSED
NIC NOT IN CONTRACT
NG NATURAL GAS
NGFM NATURAL GAS FLOWMWTER
Nm NEWTON METER
NO NORMALLY OPEN
NOAA NATIONAL OCEANIC & ATMOSPHERIC ADMINISTRATION
NOM. NOMINAL
NPLV NON-STANDARD PART LOAD VALUE
NPSH NET POSITIVE SUCTION HEAD
NPSHA NET POSITIVE SUCTION HEAD AVAILABLE
NPSHR NET POSITIVE SUCTION HEAD REQUIRED
NTS NOT TO SCALE
OA OUTSIDE AIR
OAD OUTDOOR AIR DAMPER
OAG OUTSIDE AIR GRILLE
OAI OUTSIDE AIR INTAKE
OD OUTSIDE DIAMETER
OFM OIL FLOWMETER
OR OPERATING ROOM
OA OUTSIDE AIR
OAD OUTDOOR AIR DAMPER
OAG OUTSIDE AIR GRILLE
OAI OUTSIDE AIR INTAKE
OD OUTSIDE DIAMETER
OFM OIL FLOWMETER
OR OPERATING ROOM
P PUMP
Pa PASCAL
PC PUMPED CONDENSATE
PCF POUNDS PER CUBIC FOOT (FEET)
PD PRESSURE DROP
PEF PROPELLER (TYPE) EXHAUST FAN
PF PRE-FILTER
PG PRESSURE GAGE
PGW PROPYENE GLYCOL-WATER (SOLUTION)
PHC PREHEAT COIL
PPM PARTS PER MILLION
PRS PRESSURE REGULATING (VALVE) STATION
PRV PRESSURE REGULATING VALVE
PSI POUND PER SQUARE INCH
PSIA POUND PER SQUARE INCH - ABSOLUTE
PSIG POUND PER SQUARE INCH - GAGE
PSE POUNDS PER SQUARE INCH
PSS PRIMARY SECONDARY SYSTEM
PSV PRESSURE SAFETY VALVE
P/T PRESSURE/TEMPERATURE TAP
PTAC PACKAGED TERMINAL AIR CONDITIONER
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
EC ELECTRICAL CONTRACTOR
EC EVAPORATIVE COOLER
ECC ENGINEER CONTROL CENTER
ECU EVAPORATIVE CONDENSER UNIT
EDH ELECTRIC DUCT HEATER
EER ENERGY EFFICIENCY RATIO
EF EXHAUST FAN
EG EXHAUST GRILLE
EGS EMERGENCY GAS SHUTOFF
EGT ENTERING GLYCOL TEMPERATURE
EH EXHAUST HOOD
EJ EXPANSION JOINT
EMD END OF MAIN DRIP (STEAM)
ENT ENTERING
EQUIP EQUIPMENT
ER EXHAUST REGISTER
ER EXISTING RELOCATED
ERC ELECTRIC REHEAT COIL
ERP ELECTRIC RADIANT PANEL
ESP EXTERNAL STATIC PRESSURE
ET EXPANSION TANK
ETO ETHYLENE OXIDE
ETR EXISTING TO REMAIN
EUH ELECTRIC UNIT HEATER
EWC EVAPORATIVE WATER COOLER
EWH ELECTRIC WATER HEATER
EWT ENTERING WATER TEMPERATURE
EX EXISTING
F FAHRENHEIT
F&T FLOAT AND THERMOSTATIC
F/SDPR COMBINATION FIRE SMOKE DAMPER
FA FREE AREA
FBO FURNISHED BY OTHERS
FC FLEXIBLE CONNECTION
FCU FAN COIL UNIT (4 PIPE)
FCUC FAN COIL UNIT COOLING ONLY
FCUH FAN COIL UNIT HEATING ONLY
FCW FORWARD CURVED WHEEL (FAN)
FD FLOOR DRAIN
FD FIRE DAMPER
FF FINAL FILTER
FHX FLUE GAS/FEEDWATER HEAT EXCHANGER
FLEX FLEXIBLE
FLR FLOOR
FM FLOW METER
FOB FLAT ON BOTTOM
FOP FUEL OIL PUMP
FOT FUEL OIL TANK
FOT FLAT ON TOP
FOHX FUEL OIL HEAT EXCHANGER
FPM FEET PER MINUTE
FPTU FAN POWERED TERMINAL UNIT
FR FLOOR REGISTER
FRP FIBER REINFORCED POLYESTER
FS FLOW SWITCH
FSTST FREEZESTAT
FT FEET
FT WC FEET OF WATER COLUMN
FT-LB FOOT-POUND
FTR FIN TUBE RADIATION
FV FACE VELOCITY
GA GAUGE
GAL GALLON
GC GENERAL CONTRACTOR
GH GRAVITY HOOD
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GPR GAS PRESSURE REGULATOR
GS GALVANIZED STEEL
H HUMIDIFIER
HAC HOUSEKEEPING AID CLOSET
HB HOSE BIBB
HC HEATING COIL
HD HOOD
HGT HEIGHT
HGT HEIGHT
HOA HAND/OFF/AUTOMATIC
HORZ HORIZONTAL
HP HEAT PUMP
HP HORSEPOWER
HPC HIGH PRESSURE STEAM CONDENSATE RETURN
HPDT HIGH PRESSURE DRIP TRAP
HPR HIGH PRESSURE RETURN (STEAM CONDENSATE)
HPS HIGH PRESSURE SUPPLY (STEAM)
HRC HEAT RECOVERY COIL
HRD HEAT RECOVERY DEVICE
HRP HYDRONIC RADIANT (CEILING) PANEL
HRW HEAT RECOVERY WHEEL
HSTAT HUMIDISTAT
HTM HUMIDIFIER TERMINAL
HUM HUMIDIFIER UNIT MOUNTED
HVU HEATING AND VENTILATING UNIT
HW HOT WATER
HWC HOT WATER COIL
HWHC HOT WATER HEATING COIL
HWP HEATING HOT WATER PUMP
HWR HEATING HOT WATER RETURN
HWS HEATING HOT WATER SUPPLY
HWUH HOT WATER UNIT HEATER
HVAC HEATING, VENTILATION, AND AIR CONDITIONING
HVD HOISTWAY VENT DAMPER
HX HEAT EXCHANGER
HZ HERTZ
M
GENERAL
DUCTWORK AND ACCESSORIES
PIPING
PIPE FITTINGS
VALVE SYMBOLS
CONTROLS
MECHANICAL LEGEND
VAV BOX WITH HOT WATER COIL
AIR FLOW STATIONAFS
VOLUME DAMPER W/ REMOTE
DAMPER OPERATORR
REGISTER/GRILLE/DIFFUSER (MARK/CFM)
PRESSURE SWITCH
FLOW SWITCH
UNION
ECCENTRIC PIPE REDUCER/INCREASER
CONCENTRIC PIPE REDUCER/INCREASER
TEE DOWN
"NEW CONSTRUCTION AT
THIS POINT" SYMBOL
"DEMOLITION TO THIS POINT" SYMBOL
ACCESS DOOR, VERTICAL OR HORIZONTAL
SMOKE DETECTOR
STEAM
MEDIUM PRESSURE CONDENSATE
MEDIUM PRESSURE STEAM
HIGH PRESSURE STEAM
HIGH PRESSURE CONDENSATE
SOFT WATER
REFRIGERANT SUCTION
PIPE CAP
TEE UP
TEE AND ELBOW DOWN
TEE AND ELBOW UP
PIPE TURNING DOWN
PIPE TURNING UP
REFRIGERANT LIQUID
FUEL OIL TANK VENT
FUEL OIL RETURN
FUEL OIL SUCTION
NATURAL GAS
SUPPLY DUCT SECTION
(POSITIVE PRESSURE)
EXHAUST DUCT SECTION
(NEGATIVE PRESSURE)
RETURN DUCT SECTION
(NEGATIVE PRESSURE)
SUPPLY DIFFUSER 3-WAY
SUPPLY DIFFUSER 1-WAY
SUPPLY DIFFUSER 2-WAY CORNER
SUPPLY DIFFUSER 2-WAY
FLEXIBLE DUCT
RADIANT CEILING PANEL
EXHAUST GRILLE
RETURN GRILLE
MOTOR OPERATED DAMPER
ROUND DUCT SIZE (INCHES)
3/4" DOOR UNDERCUT
DOOR GRILLE
VOLUME DAMPER
ITEM TO BE PROVIDED
EXISTING
EXISTING TO BE REMOVED
CONDENSER WATER SUPPLY
CHILLED WATER RETURN
CHILLED WATER SUPPLY
PUMPED CONDENSATE
LIQUEFIED PETROLEUM GAS (PROPANE)
LOW PRESSURE CONDENSATE
HEATING WATER SUPPLY
HEATING WATER RETURN
LOW PRESSURE STEAM
SUPPLY GRILLE OR REGISTER
HORIZONTAL FIRE DAMPER
HORIZONTAL FIRE AND SMOKE DAMPER
HORIZONTAL SMOKE DAMPER
VERTICAL FIRE AND SMOKE DAMPER
VERTICAL FIRE DAMPER
VERTICAL SMOKE DAMPER
OUTSIDE AIR DUCT
(NEGATIVE PRESSURE)
NITROGEN DIOXIDE SENSOR
CARBON MONOXIDE SENSOR
PS
FS
75E
SD
AD
HPS
HPC
G
STM
SW
MPC
MPS
RS
RL
FOV
FOR
FOS
R
T
T
DN
UC
DG
HWR
HWS
CWS
CWR
CS
PC
LPG
LPC
LPS
F
F
F/SD
F/SD
SD
SD
CO
NO2
ALL SYMBOLS INDICATED MAY NOT APPEAR ON THESE CONTRACT DRAWINGS
EXISTING REGISTER/GRILLE/DIFFUSER
(CFM SHOWN)
75-
SUPPLY DIFFUSER 4-WAY
22x14
12ø
DUCT SIZE (INCHES), FIRST FIGURE IS
SIDE SHOWN
24x12ø OVAL DUCT SIZE (INCHES), FIRST
FIGURE IS SIDE SHOWN
CHANGE OF ELEVATION-RISE
(UP)-DROP (DN)
ELECTRIC THERMOSTAT
(MOUNT 48" AFF U.O.N)
CONDENSATE DRAIN
CONDENSER WATER RETURN
COMPRESSED AIR
BOILER BLOW DOWN
CR
CD
A
BBD
DOMESTIC COLD WATER
PNEUMATIC THERMOSTAT
(MOUNT 48" AFF U.O.N)
STATIC PRESSURE SENSORSP
GATE VALVE WITH GLOBE-VALVED BYPASS
PLUG VALVE
CONTROL VALVE (CV) - FLOAT-OPERATED
PRESSURE REDUCING VALVE (PRV)
WATER LEVEL CONTROLLER
FLOW METER
LC
M
BALL VALVE
GATE VALVE WITH 3/4" HOSE ADAPTER
CHECK VALVE
ANGLE GLOBE VALVE
BUTTERFLY VALVE
MODULATING CONTROL VALVE
TWO POSITION CONTROL VALVE
THREE-WAY MODULATING CONTROL VALVE
AUTOMATIC BALANCING CONTROL VALVE
PRESSURE SAFETY VALVE
GATE VALVE - THREADED/FLANGED
GLOBE VALVE - THREADED/FLANGED
PRESSURE REGULATING VALVE
THREE-WAY TWO POSITION CONTROL VALVE
WYE STRAINER (WITH BALL VALVE & HOSE
CONNECTION)
FLEXIBLE CONNECTION
WATER BALANCE DEVICE
MODULATING CONTROL BUTTERFLY VALVE
CIRCUIT SETTER VALVE
WYE STRAINER WITH VALVED DRAIN AND
QUICK-COUPLE HOSE CONNECTOR
HIGH PRESSURE STEAM TRAPDISCHARGE
INTO PUMPED CONDENSATE RETURN LINE
STEAM TRAP
GENERAL BID NOTE
1. EXISTING PIPING IS BASED ON ORIGINAL CONSTRUCTION DRAWINGS AND MAY NOT REFLECT CURRENT PIPING LAYOUT. CONTRACTOR SHALL FIELD VERIFY ACTUAL CONDITIONS PRIOR TO PRICING AND BEFORE PROCEEDING WITH WORK. NOTIFY ENGINEER IN THE EVENT THAT EXISTING MAIN PIPING SHOWN TO REMAIN IS SIGNIFICANTLY DIFFERENT FROM EXISTING CONDITIONS.
2. CONTRACTORS SHALL BE RESPONSIBLE FOR MATCHING EXISTING BUILDING SYSTEMS WHERE REQUIRED BY DEMOLITION AND NEW WORK.
ITEMS INCLUDING BUT NOT LIMITED TO: WALL TYPES, INSULATION, GLASS, CONCRETE, REBAR, ETC. SHALL MATCH EXISTING DESIGN
CONDITIONS WHEN REPLACED OR REPAIRED.
3. CONTRACTOR SHALL IDENTIFY AND COORDINATE WITH THE OWNER ALL WORK AREAS REQUIRING CONSTRUCTION EFFORTS DURING FACILITY "OFF" HOURS. "OFF" HOUR WORK SHALL BE INCLUDED IN THE CONTRACTOR'S BID/SCOPE OF WORK.
4. CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL ISOLATION VALVES NECESSARY TO COMPLETE THE DESIGN INDICATED.
GENERAL NOTES
1. THE DRAWINGS ILLUSTRATE GENERAL SCOPE AND ARRANGEMENT OF MECHANICAL SYSTEMS. THEY SHALL BE FOLLOWED AS CLOSELY AS ACTUAL CONDITIONS ALLOW. MECHANICAL CONTRACTOR SHALL PROVIDE FITTINGS AND OFFSETS IN PIPING TO AVOID FIELD
INTERFERENCES.
2. ALL WORK SHALL CONFORM TO THE REGULATIONS OF APPLICABLE FEDERAL, STATE, LOCAL LAWS, ORDINANCES AND CODES. MECHANICAL WORK SHALL BE IN ACCORDANCE WITH THE LATEST ADOPTED EDITION OF THE INTERNATIONAL MECHANICAL CODE AND ANY APPROVED
SUPPLEMENTS TO THAT CODE.
3. DRAWINGS, SPECIFICATIONS, AND SCHEDULES TOGETHER FORM THE BASIS OF DESIGN.
4. PROVIDE FIRESTOPPING WHERE NECESSARY.
5. DIMENSIONS AND PIPING/EQUIPMENT SIZES INDICATED ON THE DRAWINGS MAY NOT REFLECT ACTUAL FIELD CONDITIONS IN ALL LOCATIONS.
FIELD VERIFY PIPING AND EQUIPMENT SIZES AND LOCATIONS PRIOR TO FABRICATION OF PIPING SUCH THAT PIPING AND EQUIPMENT WILL FIT
IN APPROXIMATELY THE LOCATION SHOWN ON THE DRAWING.
PHASE - 2: SUB-PHASE REFERENCE
SUB-PHASE -2.1: INSTALLATION OF ALL NEW STEAM AND CONDENSATE PIPES:
1. CREATE TEMPORARY ACCESS THROUGH TUNNEL WALLS.
2. INSTALL ALL NEW STEAM AND CONDENSATE PIPES.
3. COMPLETE ALL REQUIRED TESTING OF NEW SYSTEM.
4. BRING NEW SYSTEM TO FULLY OPERATIONAL STATUS.
5. PREP TO TIE-IN TO ALL EXISTING TO REMAIN BRANCHES.
SUB-PHASE -2.2: DEMO EXISTING PIPES AND CREATE CLEAR ACCESS THROUGH TUNNEL:
1. DEMO OLD EXISTING ABANDONED STEAM AND CONDESATE PIPE STARTING AT
THE TEMPORARY ACCESS.
2. DEMO ALL CONCRETE SUPPORTS UNDER ABANDONED PIPE.
3. REPAIR OPENINGS THROUGH TUNNEL WALLS. BACKFILL, GRADE, AND RE-SEED
TO MATCH EXISTING CONDITIONS PRIOR TO CONSTRUCTION.
STATE OFP
R O
FESSIONAL ENG
IN
E E R
L.
PH
ILL
IP GENTRY
14226
W
EST V I RG I N
IA
R
REGISTE ED
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Numbers
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS:
VAMC - Martinsburg, WV
ARCHITECT/ENGINEERS:
Scale:
AS NOTEDSEAL: 613-19-102REPAIR-PIPING BLDGS
500, 217, 318, & 328 to BOILER PLANT - PHASE-2 500, 217, 318, & 328
Office of
Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
F
E
D
C
B
A
97 8654321
VA FORM 08-6231
MEP ENGINEERS
Valley Engineering 4901 Crowe Drive Mount Crawford, VA 22841
STRUCTURAL ENGINEERS
Engineering Solutions 100 10th Street NE, Suite 200 Charlottesville, VA 22902 of 25
BID DOCUMENTS
SUBMISSION
97 8654321
BID DOCUMENTS SUBMISSION
STRUCTURAL ENGINEERS
Engineering Solutions 100 10th Street NE, Suite 200 Charlottesville, VA 22902
2M0.01
MECHANICAL LEGENDS,
ABBREVIATIONS, AND NOTES
07/29/2020 07/29/2020
DL JCH
PHASE 2
304302
THIS AREA IS FOR STAGING AND MATERIAL
STORAGE FOR THE CONTRACTOR;
TEMPORARY CHAIN LINK FENCE WILL BE
PROVIDED & REMOVED BY THE
CONTRACTOR. GRASS WILL BE LEVELED &
RESEEDED WHEN PROJECT IS COMPLETE.
EXISTING
CONDENSATE
PUMP TO REMAIN
EXISTING
CONDENSATE
PUMP TO REMAIN
EXISTING
CONDENSATE
PUMP TO REMAIN
MATERIAL STORAGE ACCESS
STATE OFP
R O
FESSIONAL ENG
IN
E E R
L.
PH
ILL
IP GENTRY
14226
W
EST V I RG I N
IA
R
REGISTE ED
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Numbers
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS:
VAMC - Martinsburg, WV
ARCHITECT/ENGINEERS:
Scale:
AS NOTEDSEAL: 613-19-102REPAIR-PIPING BLDGS
500, 217, 318, & 328 to BOILER PLANT - PHASE-2 500, 217, 318, & 328
Office of
Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
F
E
D
C
B
A
97 8654321
VA FORM 08-6231
MEP ENGINEERS
Valley Engineering 4901 Crowe Drive Mount Crawford, VA 22841
STRUCTURAL ENGINEERS
Engineering Solutions 100 10th Street NE, Suite 200 Charlottesville, VA 22902 of
NORTH
BID DOCUMENTS
SUBMISSION
97 8654321
BID DOCUMENTS SUBMISSION
STRUCTURAL ENGINEERS
Engineering Solutions 100 10th Street NE, Suite 200 Charlottesville, VA 22902
2M1.01
MECHANICAL TUNNEL OVERALL PLAN
07/29/2020 07/29/2020
DL JCH
GENERAL NOTES
1. REMOVE PIPE SUPPORTS ASSOCIATED WITH PIPING SHOWN TO BE REMOVED.
SUPPORTS SHALL NOT BE ABANDONED IN PLACE.
2. COORDINATE ALL MECHANICAL UTILITY SHUT DOWNS WITH OWNER. ANY SHUT
DOWNS NECESSARY TO ACHIEVE THE OBJECTIVE OF THIS DESIGN SHALL BE
COMPLETED DURING "OFF HOURS" AND SHALL COMPLY WITH OWNER'S UTILITY
SHUT DOWN POLICIES.
3. CONTRACTOR IS RESPONSIBLE FOR ALL CUTTING, PATCHING AND DEMOLITION
OF ALL BUILDING SYSTEMS PER THEIR MEANS-AND-METHODS AS NECESSARY
TO PROVIDE THE DESIGN INDICATED.
4. ACCORDING TO THE VA, THERE IS NO ASBESTOS IN THE EXISTING TUNNELS ON
THIS PROJECT. THERE IS CONTAMINATED EARTH UNDER THE TUNNEL SLABS,
AND ANY CUTTING THROUGH THE SLAB SHOULD BE COORDINATED WITH THE
COR.
SCALE: 1" = 50'-0"
MECHANICAL TUNNEL OVERALL PLAN
508 308
X
X
X
XX
X
X
COURTYARD
ACCESS
P A
R T
IA
L
P L
A N
A
M
.0
P A
R T
IA
L
P L
A
B
.0
P A
R T
IA
L
P L
A
C
.0
PARTIAL
PLAN D
2M1.05
PARTIAL
PLAN E
2M1.05
PARTIAL
PLAN F
2M1.05
P A
R T
IA
L
P
L A
G
.0
ANCHOR POINT - A
SEE STRUC. DWGS
ANCHOR POINT - B
SEE STRUC. DWGS
ANCHOR POINT - C
SEE STRUC. DWGS
ANCHOR POINT - D
SEE STRUC. DWGS
ANCHOR POINT - E
SEE STRUC. DWGS
ANCHOR POINT - F
SEE STRUC. DWGS
ANCHOR POINT - G
WITH EXPANSION JOINTS
SEE STRUC. DWGS
POINT A-B
28,800 lbs
16,000 lbs
POINT B-C
14,800 lbs
8,000 lbs
POINT C-D
STEAM PIPE LOAD SCHEDULE
POINT PIPE SIZE PIPE TYPE LOAD NOTES
POINT D-E
26,400 lbs
16,000 lbs
POINT F-G
12" MPS
8,000 lbs
6" PC
NOTES: ALL EXPANSION JOINTS SHALL BE EQUAL TO METRAFLEX MODEL METRAGATOR
AND INSTALLED NEXT TO ANCHOR POINT.
8" EXPANSION JOINT
4" EXPANSION JOINT
4" EXPANSION JOINT
2" EXPANSION JOINT
8" EXPANSION JOINT
4" EXPANSION JOINT
2" EXPANSION JOINT
12"
6"
12"
6"
12"
6"
12"
6"
MPS
PC
MPS
PC
MPS
PC
MPS
PC
POINT E-F
12"
6"
MPS
PC
TUNNEL
- A
12" MPS
6" PC
2" EXPANSION JOINT2,800 lbs
6"
12"
MAX.CONCENTRIC PIPE GUIDE SPACING
SIZE TO 1ST
GUIDE
1ST TO 2ND
GUIDE
BETWEEN ADD'L
GUIDE
2 FT
4 FT
7 FT
14 FT
70 FT
120 FT
NOTE: ADDITIONAL STANCHIONS SHALL BE ADDED AT THESE DISTANCES
FOR SUPPORT.
001 '2 '
302 304
217 Parking Lot "T"
Parking
Lot "Z"
Patient / Visitor
Parking
B u tl e r
A v e
N th S t.
"B" Ave.
SPILL CONTAINMENT
WALLS 54" AG
SOLAR CHARGING
STATION
2-STORYOUTPATIENTADDITION
LAUNDRY WATER
SOFTENING
EQUIP.
C
C O
R R
ID
O
R C
N
,4
S .F
C
C
C3
C13
CORRIDOR C4N
4,942 S.F.
STEAM TUNNEL
/ 2
M P
S
C
P D
/2
M P
S
C P
D
STEAM
STEAM
S T
E A
M
S T
E A
M
STEAM PIT
2" UP
4" UP
VENT
M P
S
H P
S
C P
D
M P
S
H P
S
C P
D
8" H P S4" C
P D
IN
22" C
8" HPS
4" CPD
IN 22" CONDUIT
M P
S
P
C D
M
P S
P C
D
4" MPS
2" CPD
STEAM TUNNEL 4" MPS 2" CPD
8" HPS-3" CPD STEAM
12" MPS 5" HPS 2" CPD
STEAM VENT
O N
LY
N O
P A
R K
IN
G
N O
P A
R K
IN
G
N O
P A
R K
IN
G
N O
P A
R K
IN
G
ONLY
ONLY
STEAM
H
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Numbers
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS:
VAMC - Martinsburg, WV
ARCHITECT/ENGINEERS:
Scale:
AS NOTEDSEAL: 613-19-102REPAIR-PIPING BLDGS
500, 217, 318, & 328 to BOILER PLANT - PHASE-2 500, 217, 318, & 328
Office of
Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
F
E
D
C
B
A
97 8654321
VA FORM 08-6231
MEP ENGINEERS
Valley Engineering 4901 Crowe Drive Mount Crawford, VA 22841
STRUCTURAL ENGINEERS
Engineering…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .